Native name | ОАО «ОГК-6» |
---|---|
Company type | Public (OAO) |
Industry | Power generation |
Predecessor | RAO UES |
Founded | 16 March 2005 |
Defunct | 1 November 2011 |
Fate | Merged with OGK-2 |
Successor | OGK-2 |
Headquarters | , |
Key people | Alexey Mityushov (CEO) |
Products | Power and heat |
Revenue | US$1.5 billion (2007) |
Number of employees | 6,100 (2007) |
Parent | Gazprom |
The Sixth Wholesale Power Market Generating Company JSC (OGK-6) was a Russian power generation company formed by merger of six generation companies. In 2006, the following power plants were merged into single company:
The installed capacity of all six thermal power plants was about 9,052 MW which made OGK-6 the fourth largest power company by installed capacity in Russia. The total installed heat of OGK-6 plants amounted to 2,704 Gcal/h. The power output of the OGK-6 power plants in 2007 was around 32.065 TWh.
OGK-6 shares were traded on MICEX and RTS.
In April 2010, it was announced that Gazprom, the major shareholder of OGK-2 and OGK-6, will merger OGK-6 into OGK-2 to create a single company with 10 power stations and a capacity of 17,750 MW. [1] The merger was completed by 1 November 2011. [2]
Ørsted A/S is a Danish multinational energy company. Headquartered in Fredericia, Denmark, Ørsted is the largest energy company in Denmark. The company adopted its current name on 6 November 2017. It was previously known as DONG.
OGK-3 was a Russian power company. The stock was traded on the MICEX-RTS stock exchange.
The Cuciurgan power station, the largest power station of Moldova, is located in Dnestrovsc, Transnistria, on the shores of the Cuciurgan Reservoir bordering Ukraine. Commissioned on 26 September 1964, the facility produced as of 2021 about 79% of Moldova's electricity.
North-West Thermal Power Plant is a cogeneration power station (TETs) in Saint-Petersburg, owned by Inter RAO UES. This is a first power station in Russia to use combined cycle.
The Energy in Russia is an area of the national economy, science, and technology of the Russian Federation, encompassing energy resources, production, transmission, transformation, accumulation, distribution, and consumption of various types of energy.
The First Generation Company of the Wholesale Electricity Market (OGK-1) was a large Russian company formed by the merger of six electricity generation companies.
OGK-2 is a Russian power generation company. Majority of the company's stock is owned by Gazprom.
Unipro is a Russian power generation company formed by merger of five generation companies. 83.73% of the company is owned by the German energy company Uniper, the rest of the shares are owned by minority shareholders. General Director — Maxim Shirokov
Enel Russia is a Russian power generation company created by the reorganization of RAO UES, a former united power company of Russia. The company is registered in Yekaterinburg and its headquarters are in Moscow. The Italian Enel Group owns a majority stake of the company (56%).
Beryozovskaya GRES is a coal-fired power plant near the town of Sharypovo in Krasnoyarsk Krai, Russia. The power plant is owned by Unipro. The installed capacity of the plant is 2,420 megawatts (3,250,000 hp).
Energy in Armenia is mostly from natural gas. Armenia has no proven reserves of oil or natural gas and currently imports most of its gas from Russia. The Iran-Armenia Natural Gas Pipeline has the capacity to equal imports from Russia.
Mosenergo is a Russian power generating company operating on fossil fuel and a large thermal generation. In addition to electric power it also generates and sells heat for consumers in Moscow and the Moscow Oblast. The company was founded in 1887 in Moscow.
Alterra Power Corp. a subsidiary of Innergex Renewable Energy Inc., is a diversified renewable power generation company based in Vancouver, British Columbia, Canada. It was formed in 2011 through the merger of Magma Energy Corp. and Plutonic Power Corp. It develops, owns, acquires and operates hydroelectric, wind, solar energy and geothermal projects. On February 6, 2018, Innergex Renewable Energy Inc. completed the acquisition of Alterra including all its assets.
The Ryazan Power Station is the fifth largest power station in Russia, with an installed capacity of 3,130 MW. The power station is located in Novomichurinsk of the Ryazan Oblast, Russia. It mainly fires lignite from the Moscow coal basin and the Kansk-Achinsk coal basins.
Russia is the fourth largest generator and consumer of electricity in the world. Its 440 power stations have a combined installed generation capacity of 220 GW.
Lithuania is a net energy importer. In 2019 Lithuania used around 11.4 TWh of electricity after producing just 3.6 TWh.
Reftinskaya GRES is the largest solid fuel thermal power plant in Russia. It is situated in Sverdlovsk Oblast, 100 km north-east of Yekaterinburg and 18 km from Asbest. Reftinskiy town, which is home to 18,000 people, is situated 2.5 km from the GRES, which produces 20,000 million KWh annually. It has a total installed capacity of 3,800 and heat power 350 GKh. Coal from Ekibastuz's coal field is used as the main fuel and the black oil is used as the starting fuel. GRES produces power with the bar «Outdoor switchgear -500 kV» on five power lines -500 kV and with the bar «Outdoor switchgear -220 kV» on five power lines -220 kV. The station supplies power to the industrial areas in Sverdlovsk, Tyumen, Perm and Chelyabinsk regions. The construction of the electric power station was started in 1963, the launching of the first power unit took place in 1970 and the last one in 1980.
Pskov power station (Pskov GRES) is a large-scale Russian regional power station located 5.3 kilometres (3.3 mi) from Dedovichi urban settlement in Pskov Oblast near the western border of the Russian Federation. The station operates as a branch of OGK-2 since 2006.
Nevinnomysskaya GRES is a power plant of federal importance located in Nevinnomyssk, Stavropol krai, Northern Caucasus federal area. It is a subsidiary of Enel Russia.