O Chum 2 Hydropower Dam

Last updated
O Chum 2 Hydropower Dam
Cambodia relief map.svg
Red pog.svg
Location of O Chum 2 Hydropower Dam in Cambodia
Official nameO Chum 2 Hydropower Dam
Country Cambodia
LocationBanlung, Ratanakiri province, Cambodia
Coordinates 13°46′20.4″N106°59′14.3″E / 13.772333°N 106.987306°E / 13.772333; 106.987306
Opening date1992 [1]
Owner(s) Cambodia Government
Dam and spillways
Type of dam Seasonal Storage
ImpoundsLam Dom Noi River
Height10 m (33 ft)
Length107 m (351 ft)
Reservoir
CreatesO Chum 2 Hydropower Dam Reservoir
Catchment area 45 km2 (17 sq mi)
Power Station
Installed capacity 1 MW (1,300 hp)
Annual generation 51 GWh (180 TJ)

O Chum 2 Hydropower Dam is located on O Chum River, in Banlung, Ratanakiri Province, Cambodia. O Chum 2, commissioned in 1993, is a 1 MW mini-hydropower plant located in the north-east of Ratanakiri province. It is owned and operated by the Cambodian government and has an estimated annual generation output of between 2.2 and 2.5 GWh. [2]

Contents

The dam has the following characteristics:

See also

Related Research Articles

<span class="mw-page-title-main">Mekong</span> Major river in Southeast Asia

The Mekong or Mekong River is a trans-boundary river in East Asia and Southeast Asia. It is the world's twelfth-longest river and the third-longest in Asia with an estimated length of 4,909 km (3,050 mi) and a drainage area of 795,000 km2 (307,000 sq mi), discharging 475 km3 (114 cu mi) of water annually. From its headwaters in the Tibetan Plateau, the river runs through Southwest China, Myanmar, Laos, Thailand, Cambodia, and southern Vietnam. The extreme seasonal variations in flow and the presence of rapids and waterfalls in the Mekong make navigation difficult. Even so, the river is a major trade route between Tibet and Southeast Asia. The construction of hydroelectric dams along the Mekong in the 2000s through the 2020s has caused serious problems for the river's ecosystem, including the exacerbation of drought.

<span class="mw-page-title-main">Hydropower in the Mekong River Basin</span>

The estimated hydropower potential of Mekong River Basin about 58,930 Megawatts (MW). As of February 2024, there are an estimated 167 Hydropower Plants (HPPs) in the Mekong, with a combined installed capacity of some 36,376.3 MW. An additional 20 HPPs are currently under construction and at various stages of completion. These have a combined installed capacity of an additional 4,535.5 MW.

<span class="mw-page-title-main">Sirindhorn Dam</span> Dam in Sirindhorn, Ubon Ratchathani

The Sirindhorn Dam is in Sirindhorn District, Ubon Ratchatani, Thailand. It impounds the Lam Dom Noi River, and its reservoir is the province's largest water resource. The dam was commissioned in 1971 to serve as a hydropower facility as well as to supply irrigation water. The dam was named after Princess Royal Sirindhorn. All of the electricity generated by the dam is destined for domestic markets. The dam was constructed and is owned and operated by the Electricity Generating Authority of Thailand and is located in the Mekong River Basin, just upstream from the controversial Pak Mun Dam.

The Sambor Dam is a proposed dam and hydroelectric power station on the Mekong River south of Sambor village in Prek Kampi District, Kratie Province, Cambodia. If built, it would be the lowest dam of the Mekong's mainstream dams, and largest in Cambodia.

The Stung Battambang 1 is a dam planned for construction on the Battambang River in Cambodia. The river is a major tributary of the Tonlé Sap. Of the two dams planned for this river, the larger is the Stung Battambang 1. A letter of commitment has been issued by the Cambodian authorities for a pre-feasibility study of the dam by an unknown Korean company

The Kirirom 1 Dam is an embankment dam located in the Kirirom National Park of Koh Kong Province, Cambodia

The Lower Se San 2 Dam is a hydroelectric dam under development on the Se San River in Stung Treng Province, northeastern Cambodia. The Se San River is a major tributary of the Mekong River. The dam site is located 25 kilometres (16 mi) east of the provincial capital, also named Stung Treng. The first turbine began producing electricity in November 2017. The dam was officially opened on December 18, 2018.

Stung Sen Dam is a proposed multipurpose dam to be located on the Stung Sen River. The river originates in Preah Vihear and flows to the Tonlé Sap Lake in Kompong Thom, southeast of Phnom Rovieng, Cambodia. Under MoU study project and Feasibility Study by Korean company. The large reservoir would submerge Kompong Putrea. Exact data for reservoir size and number of displaced people is not available, nor is any information on the importance of the Stung Sen's flow to the Tonle Sap Lake or fisheries.

The Stung Treng Dam is a proposed hydroelectric dam on the Mekong River in Stung Treng Province, Cambodia. It would be located on the mainstream of the Lower Mekong River. The project is controversial for several reasons, including its possible impact on the fisheries, as well as other ecological and environmental factors.

The Lam Takhong Dam is an embankment dam on the Lam Takhong River between Pak Chong District and Sikhio District in Nakhon Ratchasima Province, Thailand. The dam was originally constructed in 1974 for the purposes of irrigation and water supply but after 2002, its water storage also serves as the lower reservoir for the Lam Takhong pumped storage power plant, Thailand's first power plant of that type.

<span class="mw-page-title-main">Ubol Ratana Dam</span> Dam in Ubolratana, Khon Kaen

The Ubol Ratana Dam, formerly known as the "Phong Neeb Dam", is a multi-purpose dam in tambon Khok Sung, Ubolratana district, approximately 50 km (31 mi) north of Khon Kaen, Khon Kaen province, Thailand. It was the first hydroelectric power project developed in Thailand's northeastern area of Isan. The dam impounds the Nam Phong, which flows into the Chi River and thence to the Mun River, a tributary of the Mekong River. The dam was given its current name by royal permission in 1966, in honour of princess Ubol Ratana, the eldest child of King Bhumibol Adulyadej.

<span class="mw-page-title-main">Xayaburi Dam</span> Dam in Xayaburi

The Xayaburi Dam is a run-of-river hydroelectric dam on the Lower Mekong River, approximately 30 kilometres (19 mi) east of Sainyabuli (Xayaburi) town in northern Laos. Commercial operation of the dam started in October 2019. The main purpose of the dam is to produce hydroelectric power, 95% of which is to be purchased by the Electricity Generating Authority of Thailand (EGAT). The project is surrounded in controversy due to complaints from downstream riparians and environmentalists. Preliminary construction began in early-2012, but work on the dam itself was suspended shortly thereafter due to complaints from Cambodia and Vietnam downstream. After making modifications to the dam's design, Laos started construction with a ceremony on 7 November 2012. The Xayaburi Dam is the first of the 11 dams planned on the lower Mekong.

Qorlortorsuaq Dam is a hydroelectric dam near Qorlortorsuaq in the Nanortalik district of the Kujalleq municipality in southern Greenland. It has a capacity of 7.6 MW and it generates power for the neighbouring towns of Qaqortoq and Narsaq.

The Houay Ho is a dam located in Samakkhixay District of Attapeu Province, Laos, 160 km (99 mi) east of Pakse and 30 km (19 mi) northwest of Attapeu. The project is considered the first privately financed joint venture 'build-operate-transfer' (BOT) hydropower project in Laos. It has installed capacity of 152.1 megawatts (204,000 hp), almost all of which is exported to Thailand.

The Nadarivatu Dam, also known as the Korolevu Dam, is a concrete gravity dam on the upper reaches of the Sigatoka River in Nadarivatu District of Nadroga-Navosa Province, Fiji. The primary purpose of the dam is to generate hydroelectric power in a 41.7 megawatts (55,900 hp) run-of-the-river scheme. The Nadarivatu Hydropower Scheme was first identified in 1977 during a hydropower study. Detailed plans for the project were developed in 2002 and major construction began in 2009. The power station was commissioned on 7 September 2012 but an inauguration ceremony led by Prime Minister Frank Bainimarama was held a week later on 14 September. Funding and loans for the project was provided by several organizations to include the China Development Bank, Fiji Electricity Authority bonds, ADZ Bank. The 40 m (130 ft) tall dam diverts water from the Sigatoka River through a 3,225 metres (10,581 ft) long headrace/penstock tunnel to a power station along the Ba River to the southwest. The power station contains two 20.85 megawatts (27,960 hp) Pelton turbine-generators. The drop in elevation between the reservoir and the power station affords a gross hydraulic head of 335.7 metres (1,101 ft).

The Afulilo Dam is a gravity dam on the Afulilo River about 3 km (1.9 mi) south of Ta'elefaga in the district of Va'a-o-Fonoti on Upolu island of Samoa. The primary purpose of the dam is hydroelectric power generation and it supports a 4 megawatts (5,400 hp) power station. It is the largest hydroelectric power station by installed capacity in Samoa. First studied in 1980, construction on the project began in 1990 and the power station was commissioned in 1993. Funding for the US$26.6 million project was provided by the World Bank, Asian Development Bank, International Development Association, European Investment Bank, and European Economic Community loans and grants.

<span class="mw-page-title-main">Reventazón Dam</span> Dam in Siquirres, Limón Province

The Reventazón Dam is a concrete-face rock-fill dam on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. It was inaugurated on 16 September 2016, and its primary purpose is the production of hydroelectric power. The US$1.4 billion project and largest power station in the country has an installed capacity of 305.5 MW and is expected to provide power for 525,000 homes. Construction on the dam began in 2009. At a height of 130 metres (430 ft) and with a structural volume of 9,000,000 m3 (12,000,000 cu yd), it is the largest dam in Central America. To produce electricity, water from the reservoir is diverted about 3 km (1.9 mi) to the northeast where it reaches the power station along the Reventazón River. Due to its environmental features, like offset habitats and migration corridors for jaguars and many other species, the project could be a model for other future hydroelectric power plants.

<span class="mw-page-title-main">Kulekhani Reservoir</span> Dam in Kulekhani, Makwanpur District, Narayani Zone

The Kulekhani Dam is a rock-fill dam on the Kulekhani River near Kulekhani in the Indrasarowar Rural Municipality of Makwanpur District in Bagmati Province, Nepal. The primary purpose of the dam is hydroelectric power generation and it supports the 60 MW Kulekhani I, 32 MW Kulekhani II and 14 MW Kulekhani III Hydropower Stations. Construction began in 1977 and Kulekhani I was commissioned in 1982. Kulekhani II was commissioned in 1986 and a third power station, the 14 MW Kulekhani III was expected to be commissioned in May 2015 but was delayed due to issues with the builder. The US$117.84 million project received funding from the World Bank, Kuwait Fund, UNDP, Overseas Economic Cooperation Fund and OPEC Fund. It is owned by Nepal Electricity Authority.

<span class="mw-page-title-main">Vorotan Cascade</span> Dam in Syunik Province

The Vorotan Cascade, or the ContourGlobal Hydro Cascade, is a cascade on the Vorotan River in Syunik Province, Armenia. It was built to produce hydroelectric power and provide irrigation water. The Vorotan Cascade consists of three hydroelectric power plants and five reservoirs with a combined installed capacity of 404.2 MW. It is one of the main power generation complexes in Armenia.

Daraundi A Hydropower Station is a 6 MW run-of-river hydro-electric plant located on the Daraundi River in the Gorkha District of Nepal.

References

  1. "Hydropower Development on the 3S Rivers" (PDF). cambodiahydropower.weebly.com. Retrieved 2024-05-17.
  2. Cambodia’s Hydropower Development and China’s Involvement