Off-site construction

Last updated

Offsite construction refers to the planning, design, manufacture and assembly of building elements at a location other than their final installed location to support the rapid speed of, and efficient construction of a permanent structure. Such building elements may be prefabricated offsite in a different location and transported to the site or prefabricated on the construction site and then transported to their final location. Offsite construction is characterized by an integrated planning and supply chain optimization strategy. Offsite manufacturing (OSM), offsite production (OSP) and offsite fabrication (OSF) are terms used when referring primarily to the factory work proper. [1]

Contents

Building configurations

Off-site construction (like on-site construction) can be used for a variety of purposes including residential, educational, health care and commercial applications. Buildings can range from a few modular units to several hundred. They can be arranged in architectural configurations and can be many stories in height.

Advantages of off-site construction

Boston Consulting Group writers Romain de Laubier et al. identify six advantages of offsite construction:

Where these factors are measurable, they suggest, for example, that best-in-class offsite construction operates with a defect-free rate for new buildings at over 95%, and that construction waste and emissions can be reduced by 50% in comparison with onsite construction. [2]

Similarities

Off-site construction is very similar to modular construction, but it is focused primarily on permanent construction; modular construction can be either permanent or relocatable. Also known as offsite construction, or OSC, and also incorporates many MMC - or modern methods of construction technologies.

History

Prefabrication of building components has been ongoing since the industrial revolution, especially with the adoption of the balloon frame construction method in the 1830s. Applied to single-family homes, it gave rise to many kit homes, such as the Sears Modern Homes imagined by the eponymous company in 1908.

The rise of steel frames and the first skyscrapers led to the industrial production of steel components, produced off-site. In 1930, the Empire State building, one of the most famous skyscrapers in New-York City, was built essentially off site, in the record time of one year and 45 days. Thanks to the prefabricated elements, a new floor was built every day, seven every week. [3] After the Second World War, Walter Gropius and Konrad Wachsmann drew a new type of prefabricated single-family house, based on a grid of wooden panels and a seamless metal assembly. [4]

Today, the most widely used form of prefabrication in building and civil engineering is the use of prefabricated concrete and prefabricated steel sections in structures where a particular part or form is repeated many time.

From the 1990s, industry experts and scholars started using the term off-site construction has been in use since the 1990s to consider technological, engineering and industrialization evolutions in the building sector. [5] Off-site construction is a subject of research since at least 2004. [6]

Public Policy

In the UK

In 2004, a study of the building and civil engineering department of the Loughborough University showed the interest of off-site construction to enhance building quality. [7] In 2017, the British government ordered the Farmer Review of the UK Construction Labour Model. The review highlighted the weaknesses of traditional methods of construction, especially their lack of productivity, and called for the widespread adoption of off-site construction. As a result, in 2020, the UK Department for Education announced a 3 £billion investment to build one hundred and twenty off-site schools in four years. [8]

In North America

The North America off-site construction market size was valued at $49,460.1 million in 2021, and is projected to reach $80,851.3 million by 2031, registering a CAGR of 4.9% from 2022 to 2031. [9] In May 2022, the Cree Nation communities in Canada received $17.4 million to deploy modular housing. Such factors are anticipated to significantly boost the North America off-site construction market. [9] An Autodesk study mentions 6.000 houses built off-site every year, that is 12% of the new homes built in a year. [10]

In Australia

Led by current research drawing attention to the industry’s potential, Melbourne School of Engineering and the Centre for Advanced Manufacturing of Prefabricated Housing wants to grow the prefab market share within the Australian construction industry from five per cent to 15 per cent by 2025. [11]

Realizations

122, Lendenhall, London

This 225-meter tower, created by Richard Rogers, was finished in 2014. It is built 80% off-site. [12]

Hotel Jakarta, Amsterdam

A 30 meters high hotel, made by SeArch Agency. 176 on 200 rooms were prefabricated. [13]

Off-site construction companies

In Europe

TopHat

TopHat is a British start-up born in 2019, it conceives modular buildings made of recycled and bio sourced materials. It first realization started in 2018 and achieved in 2019. The company received a capital investment from Goldman Sachs. [10]

Vonovia

In Germany, the largest residential property company, Vonovia, with €33 billion under management, delivered its first modular operation of 38 homes on the outskirts of Wiesbaden, a city of 300,000 inhabitants, in 2018. [10]

GA Smart building

GA Smart Building is a pioneer on the off-site construction in France. The off-site approach of this developer and builder dates from the 1970s. It has eight French factories, three for wood in the Loire and Vosges regions, three for concrete in Normandy, the Grand-Est and Occitanic regions, one for thermal and lighting comfort equipment and one for joinery.

In America

Full Stack Modular

Full Stack Modular, an American off-site player with a similar positioning, set up its main factory in Brooklyn in 2016 and has been operating it ever since.

Dvele

Dvele is a designer and producer of high-end prefabricated homes. Their modular homes are marketed to both individual home buyers as well as larger, multi-unit developers. They currently offer 20 different floor plans which range from 705 square foot tiny homes and ADUs to large, two-story homes with nearly 4,000 square feet of living space. [14]

See also

Related Research Articles

<span class="mw-page-title-main">Modular building</span> Prefabricated building or house that consists of repeated sections

A modular building is a prefabricated building that consists of repeated sections called modules. Modularity involves constructing sections away from the building site, then delivering them to the intended site. Installation of the prefabricated sections is completed on site. Prefabricated sections are sometimes placed using a crane. The modules can be placed side-by-side, end-to-end, or stacked, allowing for a variety of configurations and styles. After placement, the modules are joined together using inter-module connections, also known as inter-connections. The inter-connections tie the individual modules together to form the overall building structure.

Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located. Some researchers refer it to “various materials joined together to form a component of the final installation procedure“.

Prefab is prefabrication, the practice of assembling at a manufacturing site, and transporting to the construction site.

<i>Dwell</i> (magazine) Magazine

Dwell is a design and technology brand. It was launched with a magazine in October 2000 by CEO Lara Hedberg Deam with architecture and design critic Karrie Jacobs as its editor-in-chief. In August 2002, Jacobs left the magazine and was replaced by senior editor Allison Arieff. After Arieff, Sam Grawe held the position from 2006 to 2011, followed by Amanda Dameron from 2011 to 2017. William Hanley became the editor-in-chief in 2019.

<span class="mw-page-title-main">Prefabricated home</span> Type of prefabricated building

Prefabricated homes, often referred to as prefab homes or simply prefabs, are specialist dwelling types of prefabricated building, which are manufactured off-site in advance, usually in standard sections that can be easily shipped and assembled. Some current prefab home designs include architectural details inspired by postmodernism or futurist architecture.

<span class="mw-page-title-main">Manufactured housing</span> Type of prefabricated housing

Manufactured housing is a type of prefabricated housing that is largely assembled in factories and then transported to sites of use. The definition of the term in the United States is regulated by federal law : "Manufactured homes are built as dwelling units of at least 320 square feet (30 m2) in size with a permanent chassis to assure the initial and continued transportability of the home." The requirement to have a wheeled chassis permanently attached differentiates "manufactured housing" from other types of prefabricated homes, such as modular homes.

<span class="mw-page-title-main">Prefabricated building</span> Building constructed using prefabrication

A prefabricated building, informally a prefab, is a building that is manufactured and constructed using prefabrication. It consists of factory-made components or units that are transported and assembled on-site to form the complete building. Various materials were combined to create a part of the installation process.

Hawthorne Village is a suburban community in Milton, Ontario which was established by Mattamy Homes in 1999. Hawthorne Village has been the best selling community in the Greater Toronto Area for the last 5 years (2007), and presently houses over 3500 families. In 2002 Hawthorne Village was awarded "Project of the Year" by the Ontario Home Builders Association and "Community of the Year" by the Greater Toronto Homebuilders Association.

<span class="mw-page-title-main">Cemesto</span>

Cemesto is a sturdy, lightweight, waterproof and fire-resistant composite building material made from a core of sugar cane fiber insulating board, called Celotex, surfaced on both sides with asbestos cement. It was originally developed by the Celotex Corporation and first introduced to the market in 1937.

Peter DeMaria is an American architect and artist known for his non-conventional use of materials and construction/fabrication methodologies.

<span class="mw-page-title-main">Modular construction</span> Construction technique

Modular construction is a construction technique which involves the prefabrication of 2D panels or 3D volumetric structures in off-site factories and transportation to construction sites for assembly. This process has the potential to be superior to traditional building in terms of both time and costs, with claimed time savings of between 20 and 50 percent faster than traditional building techniques.

<span class="mw-page-title-main">Carl Koch (architect)</span> American architect

Carl Koch was a noted American architect. He was most associated with the design of prefabricated homes and development of the Techcrete building system.

Joseph Tanney is an American architect based in New York City. He is known for his work in prefabricated housing. He gained international attention with the Dwell Home, the winner of a 2003 international competition, which is considered a modern prefab icon.

<span class="mw-page-title-main">Prefabs in the United Kingdom</span>

Prefabs were a major part of the delivery plan to address the United Kingdom's post–World War II housing shortage. They were envisaged by war-time prime minister Winston Churchill in March 1944, and legally outlined in the Housing Act 1944.

A relocatable building is a partially or completely assembled building that was constructed in a building manufacturing facility using a modular construction process. They are designed to be reused or repurposed multiple times and transported to different locations. Relocatable buildings can offer more flexibility and a much quicker time to occupancy than conventionally built structures. They are essential in cases where speed, temporary swing space, and the ability to relocate are necessary. These buildings are cost effective, code compliant solutions for many markets.

Commercial Modular Buildings are code-compliant, non-residential structures that are 60% to 90% completed offsite in a factory-controlled environment. They are then transported or shipped to a final destination where the modules are then erected onto a concrete foundation to form a finished building. The word "modular" does not describe a building type or style; it simply describes a means of construction.

Rocio Romero is a Chilean-American designer who has designed prefabricated homes in a modern aesthetic, utilizing kit housing to control both cost and offer flexibility for local ordinances. Her rebirth of the kit house was praised by Karrie Jacobs, founding editor in chief of Dwell magazine.

Resolution: 4 Architecture (RES4) is a ten-person architecture firm based in New York City, founded by architects Joseph Tanney and Robert Luntz in 1990. The firm is most recognized for their work on prefabricated housing and mass customization of the single-family house.

The industrialization of construction is the process through which construction aims to improve productivity through increased mechanization and automation. The process commonly involves modularization, prefabrication, preassembly, and mass production.

Modern methods of construction (MMC) is a term used in the UK construction industry to refer to "smart construction" processes designed to improve upon traditional design and construction approaches by focussing on component and process standardisation, design for manufacture and assembly (DfMA), prefabrication, preassembly, off-site manufacture (OSM) and onsite innovations such as additive manufacture. While such modern approaches may be applied to infrastructure works and to commercial or industrial buildings, MMC has become particularly associated with construction of residential housing.

References

  1. Smith, Ryan (2017). Offsite Architecture. Oxon and New York: Routledge. p. 264. ISBN   978-1-138-82137-8.
  2. 1 2 De Laubier, R. et al., The Offsite Revolution in Construction, Boston Consulting Group, published 8 May 2019, accessed 1 January 2024
  3. Willis, Carol (1998). Building the Empire State. WW Norton & Co. ISBN   978-0-393-73231-3.
  4. Gropius, Walter; Wachsmann, Konrad (2021-04-22). "8. The Packaged House: A Wartime Proposal". MIT Press Open Architecture and Urban Studies.
  5. Smith, Ryan E.; Quale, John D., eds. (2017). Offsite architecture: constructing the future. London New York: Routledge, Taylor & Francis Group. ISBN   978-1-138-82139-2.
  6. Hosseini, M. Reza; Martek, Igor; Zavadskas, Edmundas Kazimieras; Aibinu, Ajibade A.; Arashpour, Mehrdad; Chileshe, Nicholas (March 2018). "Critical evaluation of off-site construction research: A Scientometric analysis". Automation in Construction . 87: 235–247. doi:10.1016/j.autcon.2017.12.002.
  7. Pan, Wei; Dainty, Andrew; Gibb, Alistair (2004-01-01). Encouraging appropriate use of Offsite Production (OSP): perspectives of designers. Loughborough University. ISBN   978-962-367-436-2.
  8. "DfE to launch £2bn offsite schools framework". Construction Enquirer. Retrieved 2024-03-05.
  9. 1 2 "North America Off-Site Construction Market Growth Analysis 2031". Allied Market Research. September 2022. Retrieved 2024-03-05.
  10. 1 2 3 Keys REIM (2022). Construction hors site Automne 2022 Avantages, inconvénients & potentiel zéro carbone[Off-site construction : advantages, disadvantages, zero carbon potential] (in French). p. 30.
  11. Campbell, Verity (2018). "Towards off-site construction". Sanctuary: Modern Green Homes (42): 64–65. ISSN   1833-1416.
  12. "The building". The Leadenhall Building. Retrieved 2024-03-05.
  13. "Hotel Jakarta | SeARCH, MOSO Bamboo Products, Cosentino". Archello (in French). Retrieved 2024-03-05.
  14. "Dvele Review". Prefab Review. 2023-11-14. Retrieved 2024-03-05.