Modern methods of construction

Last updated

Modern methods of construction (MMC) is a term used in the UK construction industry to refer to "smart construction" processes designed to improve upon traditional design and construction approaches by focussing on (among other things) component and process standardisation, design for manufacture and assembly (DfMA), prefabrication, preassembly, off-site manufacture (including modular building) and onsite innovations such as additive manufacture (3D printing). While such modern approaches may be applied to infrastructure works (bridges, tunnels, etc.) and to commercial or industrial buildings, MMC has become particularly associated with construction of residential housing.

Contents

History

The MMC term started to enter common industry use in the early 2000s following the publication of the Egan Report, Rethinking Construction, in November 1998. An industry task force chaired by Sir John Egan, produced an influential report on the UK construction industry, [1] which did much to drive efficiency improvements in UK construction industry practice during the early years of the 21st century, [2] with its recommendations implemented through initiatives including the Movement for Innovation (M4I) and the Construction Best Practice Programme (CBBP). [3] However, the emergence of some non-traditional methods substantially predated Egan's report; procurement of prefabricated homes, for example, was a UK government response to housing shortages after both World Wars, the CLASP created prefabricated schools in the late 1950s, and the 1964-1970 Labour government engaged in an "Industrialised Building Drive". [3]

MMC has been repeatedly advocated in UK government construction strategy statements including the 2017 Transforming Infrastructure Performance from the Infrastructure and Projects Authority (IPA), [4] the 2019 Construction Sector Deal, [5] the Construction Playbook (2020, 2022), [6] and the IPA's 2021 TIP Roadmap to 2030. [7] The 2022 Playbook and TIP Roadmap also encouraged procurement of construction projects based on product 'platforms' ("Platform Design for Manufacture and Assembly, PDfMA") comprising kits of parts, production processes, knowledge, people and relationships required to deliver all or part of construction projects.

The UK Government has also invested in MMC initiatives and businesses. During the 2010s, as government backing (including via Homes England) for MMC grew, several UK companies (for example, Ilke Homes, L&G Modular Homes, House by Urban Splash, TopHat, Lighthouse) were established to develop modular homes as an alternative to traditionally-built residences. From its Knaresborough, Yorkshire factory (opened in 2018, closed in 2023), Ilke Homes delivered two- and three-bedroom 'modular' homes that could be erected in 36 hours. [8] Homes England invested £30m in Ilke Homes in November 2019, [9] and a further £30m in September 2021. [10] Despite a further fund-raising round, raising £100m in December 2022, [11] [12] Ilke Homes went into administration on 30 June 2023, [13] [14] with most of the company's 1,150 staff made redundant, [15] and creditors owed £320m, [16] including £68m owed to Homes England. [17] In November 2023, Homes England loaned £15m to TopHat, another loss-making MMC housebuilder, to fund construction of a factory in Corby; [18] in March 2024, the factory's opening was postponed. [19]

In January 2024, following the high-profile failures of Ilke Homes, L&G Modular and House by Urban Splash during 2022 and 2023, the House of Lords Built Environment Committee highlighted that the UK Government needed to take a more coherent approach to addressing barriers affecting adoption of MMC: "If the Government wants the sector to be a success, it needs to take a step back, acquire a better understanding of how it works and the help that it needs, set achievable goals and develop a coherent strategy." [20] [21] [22] Lighthouse went into administration in March 2024. [23]

Defining MMC

MMC refers to a variety of off-site construction methods: [24]

During the early 2000s, the Housing Corporation classified a number of offsite manufacturing initiatives. Its classification included volumetric construction (e.g. bathroom and kitchen pods), panellised construction systems, hybrid construction (volumetric units integrated with panellised systems), sub-assemblies and components (e.g. floor and roof cassettes, wiring looms, pre-fabricated plumbing), and site-based MMC approaches. [3]

In 2017, the IPA's Transforming Infrastructure Performance committed the government to "smart construction, using modern methods, including offsite manufacture". It said: "Smart construction (or 'modern methods of construction') offers the opportunity to transition from traditional construction to manufacturing, and unlock the benefits from standard, repeatable processes with components manufactured offsite." [4]

MMC framework

Recognising that terms such as MMC, prefabrication and off-site construction were prone to different interpretations, a Modern Methods of Construction working group was established by the UK's Ministry for Housing, Communities and Local Government (MHCLG) to develop a definition framework. With inputs from Build Offsite, Homes England, National House Building Council (NHBC) and Royal Institute of Chartered Surveyors (RICS), the Modern Methods of Construction (MMC) framework definition was published in 2019. [25] It was intended to regularise and refine the term MMC by defining the broad spectrum of innovative construction techniques being applied, enabling clients, advisors, lenders and investors, warranty providers, building insurers and valuers to all build a common understanding of the different forms of MMC use. [25] It divides factory-produced systems into seven categories:

Modern Methods of Construction (MMC) framework
CategoryTitleExplanation [26]
1Pre-Manufacturing – 3D primary structural systems"The creation of 3D volumes – boxes effectively – away from site which are then combined on site to create a building."
2Pre-Manufacturing – 2D primary structural systems"The creation of 2D panelised and framing systems away from site that are assembled on site to create the structure of a building."
3Pre-Manufacturing – Non-systemised structural components"The use of pre-manufactured components to form part of the structure of a building."
4Pre-Manufacturing – Additive manufacturing"3D printing of components or whole elements of buildings."
5Pre-Manufacturing – Non-structural assemblies and sub-assemblies"The use of pre-assembled components that do not form the structure of the building but which consolidate materials and processes that otherwise would be delivered on site."
6Traditional building product led to site labour reduction/productivity improvements"The evolution of traditional building materials so that they are quicker, easier and safer to install."
7Site process led to labour reduction/productivity improvements"The use of systems and processes on-site to drive productivity by removing unnecessary workstages, enabling better and faster installation and improving health and safety."

Criticisms

As previously mentioned, while MMC suggests a modern approach, some of its processes - notably prefabrication, but also standardisation of components - were extensively deployed during the 20th century. MMC, particularly in the UK, has been challenging to implement due to the volatility of the UK housing market, [27] while the increasingly globalised nature of the supply chain for products such as panelised cladding systems also creates issues - for example, concerns about working conditions in remote off-site factories, and the de-skilling impacts on traditional capabilities in local communities. [27] Moreover, re-classifying activities as manufacturing rather than construction would also materially impact the headline labour productivity of the construction sector. [27] Also "Off-site factories are essentially transient entities. There is hence no guarantee they will be able to supply replacement components in the future. And the more that manufactured components rely on 'high-precision engineering' the less malleable they are in terms of future adaptation." [27]

Related Research Articles

<span class="mw-page-title-main">Modular building</span> Prefabricated building or house that consists of repeated sections

A modular building is a prefabricated building that consists of repeated sections called modules. Modularity involves constructing sections away from the building site, then delivering them to the intended site. Installation of the prefabricated sections is completed on site. Prefabricated sections are sometimes placed using a crane. The modules can be placed side-by-side, end-to-end, or stacked, allowing for a variety of configurations and styles. After placement, the modules are joined together using inter-module connections, also known as inter-connections. The inter-connections tie the individual modules together to form the overall building structure.

<span class="mw-page-title-main">Legal & General</span> British multinational financial services company

Legal & General Group plc, commonly known as Legal & General, is a British multinational financial services and asset management company headquartered in London, England. Its products and services include investment management, lifetime mortgages, pensions, annuities, and life assurance. As of January 2020, it no longer provides general insurance following the sale of Legal & General Insurance to Allianz. It has operations in the United Kingdom and United States, with investment management businesses in the Gulf, Europe and Asia.

Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located. Some researchers refer it to “various materials joined together to form a component of the final installation procedure“.

<span class="mw-page-title-main">Prefabricated home</span> Type of prefabricated building

Prefabricated homes, often referred to as prefab homes or simply prefabs, are specialist dwelling types of prefabricated building, which are manufactured off-site in advance, usually in standard sections that can be easily shipped and assembled. Some current prefab home designs include architectural details inspired by postmodernism or futurist architecture.

<span class="mw-page-title-main">Manufactured housing</span> Type of prefabricated housing

Manufactured housing is a type of prefabricated housing that is largely assembled in factories and then transported to sites of use. The definition of the term in the United States is regulated by federal law : "Manufactured homes are built as dwelling units of at least 320 square feet (30 m2) in size with a permanent chassis to assure the initial and continued transportability of the home." The requirement to have a wheeled chassis permanently attached differentiates "manufactured housing" from other types of prefabricated homes, such as modular homes.

Vistry Group, formerly Bovis Homes Group, is a British house-building company based in Kings Hill, England. Bovis Homes completed a deal to acquire Galliford Try's housing arm in January 2020, renaming the combined business Vistry. It is listed on the London Stock Exchange and is a constituent of the FTSE 250 Index.

<span class="mw-page-title-main">Laing O'Rourke</span> Multinational construction company in the United Kingdom

Laing O'Rourke is a multinational construction company headquartered in Dartford, England. It was founded in 1978 by Ray O'Rourke. It is the largest privately owned construction company in the United Kingdom.

<span class="mw-page-title-main">Prefabricated building</span> Building constructed using prefabrication

A prefabricated building, informally a prefab, is a building that is manufactured and constructed using prefabrication. It consists of factory-made components or units that are transported and assembled on-site to form the complete building. Various materials were combined to create a part of the installation process.

<span class="mw-page-title-main">Flaxby</span> Village and civil parish in North Yorkshire, England

Flaxby is a village and civil parish in the Harrogate district of North Yorkshire, England. It is close to the A1(M) motorway and 2 miles (3.2 km) east of Knaresborough.

<span class="mw-page-title-main">Kier Group</span> British construction, services and property group

Kier Group plc is a British construction, services and property group active in building and civil engineering, support services, and the Private Finance Initiative.

Offsite construction refers to the planning, design, manufacture and assembly of building elements at a location other than their final installed location to support the rapid speed of, and efficient construction of a permanent structure. Such building elements may be prefabricated offsite in a different location and transported to the site or prefabricated on the construction site and then transported to their final location. Offsite construction is characterized by an integrated planning and supply chain optimization strategy. Offsite manufacturing (OSM), offsite production (OSP) and offsite fabrication (OSF) are terms used when referring primarily to the factory work proper.

<span class="mw-page-title-main">Amey plc</span> United Kingdom-based infrastructure support service provider

Amey plc, previously known as Amey Ltd and Amey Roadstone Construction, is a United Kingdom-based infrastructure support service provider.

<span class="mw-page-title-main">Homes England</span> Public body that funds new affordable housing in England

Homes England is the non-departmental public body that funds new affordable housing in England. It was founded on 1 January 2018 to replace the Homes and Communities Agency (HCA). HCA in turn was established by the Housing and Regeneration Act 2008 as one of the successor bodies to the Housing Corporation, and became operational on 1 December 2008.

Galliford Try plc is a British construction company based in Uxbridge, England. It was created through a merger in 2000 of two businesses: Try Group, founded in 1908 in London, and Galliford, founded in 1916.

<span class="mw-page-title-main">Haygrove School</span> Academy in Bridgwater, Somerset, England

Haygrove School is a co-educational secondary school in Bridgwater, Somerset, England, with 1,106 students aged between 11 and 16. It is located on Durleigh Road in Bridgwater.

<span class="mw-page-title-main">Modular construction</span> Construction technique

Modular construction is a construction technique which involves the prefabrication of 2D panels or 3D volumetric structures in off-site factories and transportation to construction sites for assembly. This process has the potential to be superior to traditional building in terms of both time and costs, with claimed time savings of between 20 and 50 percent faster than traditional building techniques.

Commercial Modular Buildings are code-compliant, non-residential structures that are 60% to 90% completed offsite in a factory-controlled environment. They are then transported or shipped to a final destination where the modules are then erected onto a concrete foundation to form a finished building. The word "modular" does not describe a building type or style; it simply describes a means of construction.

Resolution: 4 Architecture (RES4) is a ten-person architecture firm based in New York City, founded by architects Joseph Tanney and Robert Luntz in 1990. The firm is most recognized for their work on prefabricated housing and mass customization of the single-family house.

The industrialization of construction is the process through which construction aims to improve productivity through increased mechanization and automation. The process commonly involves modularization, prefabrication, preassembly, and mass production.

Ilke Homes was a UK housebuilder specialising in modular homes for both social housing and for open market sale and private rental. Established in 2017, it went into administration in June 2023, owing £320 million and making over 1,100 workers redundant.

References

  1. Egan, J. (1998) Rethinking Construction: Report of the Construction Task Force, London: HMSO. (Copy of report available on Constructing Excellence website: report. Accessed: 8 September 2014.)
  2. Ward, Don and Crane, Alan (2003) "The story so far" in Jones, David, Savage, David and Westgate Rona, Partnering and Collaborative Working (Informa Professional, London), pp 1-26.
  3. 1 2 3 Matthews, Stuart (2023). "Modern methods of construction (MMC) - A long and ongoing journey!". Institution of Structural Engineers. Retrieved 15 March 2024.
  4. 1 2 "Transforming Infrastructure Performance" (PDF). Infrastructure and Projects Authority. IPA. Retrieved 18 March 2024.
  5. "HM Government Industrial Strategy: Construction Sector Deal" (PDF). UK Gov. Retrieved 18 March 2024.
  6. "The Construction Playbook: Government Guidance on sourcing and contracting public works projects and programmes" (PDF). UK Gov. Retrieved 18 March 2024.
  7. "Transforming Infrastructure Performance: Roadmap to 2030". Infrastructure and Projects Authority. Retrieved 18 March 2024.
  8. Collinson, Patrick (30 November 2018). "'UK housebuilding revolution': £65,000 prefab homes go into production". the Guardian. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  9. Morby, Aaron (4 November 2019). "Government pumps £30m into modular house builder". Construction Enquirer. Retrieved 14 March 2024.
  10. Morby, Aaron (27 September 2021). "Ilke Homes raises £60m for top 10 house builder plan". Construction Enquirer. Retrieved 14 March 2024.
  11. Morby, Aaron (6 December 2022). "Ilke Homes pulls off £100m record-breaking fund raise". Construction Enquirer. Retrieved 14 March 2024.
  12. O'Connor, Rob (6 December 2022). "ilke Homes announces new £100m investment". Infrastructure Intelligence. Retrieved 14 March 2024.
  13. Gardiner, Joey (30 June 2023). "Ilke Homes sinks into administration with most of firm's 1,100 staff set to lose their jobs". Building. Retrieved 14 March 2024.
  14. Riding, James (30 June 2023). "Modular house builder Ilke Homes enters administration with majority of staff to be made redundant". Inside Housing. Retrieved 14 March 2024.
  15. Morby, Aaron (30 June 2023). "Ilke Homes falls into administration". Construction Enquirer. Retrieved 14 March 2024.
  16. Prior, Grant (25 August 2023). "Ilke Homes went under owing £320m". Construction Enquirer. Retrieved 14 March 2024.
  17. Willmore, James (14 February 2024). "Homes England to lose most of £68.8m it is owed from Ilke Homes following collapse". Inside Housing. Retrieved 14 March 2024.
  18. Prior, Grant (22 November 2023). "TopHat agrees £15m loan with Homes England". Construction Enquirer. Retrieved 15 March 2024.
  19. Prior, Grant (26 March 2024). "TopHat puts plans to open huge Corby factory on hold". Construction Enquirer. Retrieved 26 March 2024.
  20. "MMC sector may continue to struggle without a fresh approach from the Government". UK Parliament - Committees. Retrieved 14 March 2024.
  21. Aaron, Morby (26 January 2024). "Government wasted millions on failed MMC housing push". Construction Enquirer. Retrieved 14 March 2024.
  22. "House of Lords calls for transparency in Government MMC initiatives". PBC Today. 26 January 2024. Retrieved 14 March 2024.
  23. Prior, Grant (22 March 2024). "Lighthouse modular staff start looking for new jobs". Construction Enquirer. Retrieved 22 March 2024.
  24. Building Societies Association (2016) Laying the Foundations for MMC, London: BSA.
  25. 1 2 "Modern Methods of Construction: introducing the MMC definition framework (29 March 2019)". Ministry of Housing, Communities & Local Government. Retrieved 15 March 2024.
  26. "Modern Methods of Construction (MMC)" (PDF). Cast. Cast Consultancy. Retrieved 15 March 2024.
  27. 1 2 3 4 Green, Stuart (27 September 2019), "Modern Methods of Construction: Unintended Consequences", Buildings & Cities. Retrieved 18 March 2024.