Olkaria VII Geothermal Power Station | |
---|---|
Country | Kenya |
Location | Hell's Gate National Park |
Coordinates | 00°55′49″S36°20′02″E / 0.93028°S 36.33389°E |
Status | Proposed |
Construction began | 2024 Expected |
Commission date | 2027 Expected |
Owner(s) | Kengen |
Power generation | |
Nameplate capacity | 80.3 megawatts (107,700 hp) |
The Olkaria VII Geothermal Power Station, also known as the Olkaria VII Geothermal Power Plant, is a proposed geothermal power station in Kenya. The feasibility studies which will inform the design and generation capacity of this renewable energy infrastructure is ongoing, as of March 2022. The proposed generation capacity ranges from 83 megawatts, [1] to 140 megawatts. [2] The plant is owned and under development by Kenya Electricity Generating Company (KenGen), the electricity generation parastatal company in Kenya. [3]
The power station would be located in the Olkaria area, in Hell's Gate National Park, in Nakuru County, approximately 126 kilometres (78 mi), by road, northwest of the city of Nairobi, the capital of Kenya. [4] After exploring seven possible locations, KenGen settled on a location 220 metres (720 ft) from the southern boundary of Hell's Gate National Park. [5]
In 2020 Kenya had total installed generation capacity of 2,840 megawatts. [6] Of that, 863.1 megawatts (30.4 percent), were derived from geothermal sources. [7] Olkaria VII helps the country increase its generation capacity to 5,000MW by 2030 and also increases the geothermal content towards the 50 percent goal by ethe same date. [8]
In August 2024, in regulatory filings to the National Environment Management Authority (NEMA), following environmental and social impact studies carried out by West Japan Engineering Consultants Inc, KenGen decited to build a power plant with generation capacity of 80.3 megawatts. [5] [9]
Olkaria VII is under development by the Kenyan parastatal, KenGen, who owns the project. [3]
The construction of this renewable energy infrastructure project is reported as KSh32 billion (approx. US$247,511,000). [5]
Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.
Kenya Electricity Generating Company PLC abbreviated to KenGen, is a government enterprise in the Republic of Kenya charged with the production of electricity for the country. KenGen is the largest electric power producer in Kenya, generating over 60% of the electricity consumed in the country.
The Olkaria I Geothermal Power Station, also known as Olkaria I Geothermal Power Plant is a geothermal power station in Kenya, with an installed capacity of 268.3 megawatts (359,800 hp).
The Olkaria II Geothermal Power Station also known as Olkaria II Geothermal Power Plant is a geothermal power plant in Kenya, with installed electric generating capacity of 105 megawatts (141,000 hp)
Geothermal power is very cost-effective in the Great Rift Valley of Kenya, East Africa. As of 2023, Kenya has 891.8 MW of installed geothermal capacity. Kenya was the first African country to build geothermal energy sources. The Kenya Electricity Generating Company, which is 74% state-owned, has built several plants to exploit the Olkaria geothermal resource; Olkaria I, Olkaria II, Olkaria IV, Olkaria V, and Wellhead generation plants, with a third private plant Olkaria III. Additionally, a pilot wellhead plant of 2.5 MW has been commissioned at Eburru; and, two small scale plants with a total of 4 MW have been built by Oserian Development Company powering businesses on and around Oserian land.
The Olkaria III Geothermal Power Station, is a large geothermal power plant in Kenya, having an installed electricity generating capacity of 150 megawatts (200,000 hp).
The Olkaria Area is a region located immediately to the south of Lake Naivasha in the Great Rift Valley of Kenya, Africa. It is geothermally active and is being used to generate clean electric power. The region has an estimated potential of 2,000 MW. This is almost double the maximum daily electricity peak demand recorded in 2008/2009 for the entire country.
This article describes energy and electricity production, consumption, import and export in Kenya. Kenya's current effective installed electricity capacity is 2,651 megawatts (MW), with peak demand of 1,912 MW, as of November 2019. At that time, demand was rising at a calculated rate of 3.6 percent annually, given that peak demand was 1,770 MW, at the beginning of 2018. Electricity supply is mostly generated by renewable sources with the majority coming from geothermal power and hydroelectricity.
Ngong Hills Wind Power Station, also Ngong Hills Wind Farm, is a wind-powered power station in Kenya.
Despite its high potential for wind energy generation, wind power in Kenya currently contributes only about 16 percent of the country's total electrical power. However, its share in energy production is increasing. Kenya Vision 2030 aims to generate 2,036 MW of wind power by 2030. To accomplish this goal, Kenya is developing numerous wind power generation centers and continues to rely on the nation's three major wind farms: the Lake Turkana Wind Power Station, the Kipeto Wind Power Station, and the Ngong Hills Wind Farm. While these wind power stations are beneficial to help offset fossil fuel usage and increase overall energy supply reliability in Kenya, project developments have also negatively impacted some indigenous communities and the parts of the environment surrounding the wind farms.
Most of Kenya's electricity is generated by renewable energy sources. Access to reliable, affordable, and sustainable energy is one of the 17 main goals of the United Nations’ Sustainable Development Goals. Development of the energy sector is also critical to help Kenya achieve the goals in Kenya Vision 2030 to become a newly industrializing, middle-income country. With an installed power capacity of 2,819 MW, Kenya currently generates 826 MW hydroelectric power, 828 geothermal power, 749 MW thermal power, 331 MW wind power, and the rest from solar and biomass sources. Kenya is the largest geothermal energy producer in Africa and also has the largest wind farm on the continent. In March 2011, Kenya opened Africa's first carbon exchange to promote investments in renewable energy projects. Kenya has also been selected as a pilot country under the Scaling-Up Renewable Energy Programmes in Low Income Countries Programme to increase deployment of renewable energy solutions in low-income countries. Despite significant strides in renewable energy development, about a quarter of the Kenyan population still lacks access to electricity, necessitating policy changes to diversify the energy generation mix and promote public-private partnerships for financing renewable energy projects.
The Akiira One Geothermal Power Station, is a proposed 70 MW (94,000 hp) geothermal power plant in Kenya, the largest economy in the East African Community.
The Olkaria V Geothermal Power Station, also known as the Olkaria V Geothermal Power Plant is a power station in Kenya, with an electric capacity of 158 megawatts (212,000 hp).
The Olkaria IV Geothermal Power Station is an operational geothermal power plant in Kenya, with installed capacity of 140 megawatts (190,000 hp).
Karura Hydroelectric Power Station, commonly referred to as Karura Power Station, also Karura Dam, is a planned 90 MW hydropower station in Kenya.
The Olkaria–Lessos–Kisumu High Voltage Power Line is a high voltage electricity power line connecting the high voltage substation at Olkaria, Kenya to another high voltage substation at Kisumu, Kenya.
The Olkaria VI Geothermal Power Station, also known as the Olkaria VI Geothermal Power Plant, is a power station under construction in Kenya, with an electric capacity of 140 megawatts. The plant will be developed under a public private partnership (PPP) model, where the state-owned Kenya Electricity Generating Company (KenGen) will co-own the power station with a strategic partner.
Nyamwamba II Hydroelectric Power Station, is a 7.8 megawatts mini-hydroelectric power station, that was commercially commissioned in March 2022 in Uganda. The run of river mini-hydroelectric installation is owned and was developed, between October 2019 and March 2022, by Serengeti Energy Limited, a Kenyan independent power producer (IPP), which was formerly called responsAbility Renewable Energy Holding (rAREH). The energy generated here is sold directly to the Ugandan electricity transmission parastatal company, Uganda Electricity Transmission Company Limited (UETCL), under a 20-year power purchase agreement (PPA). The power is integrated into the Ugandan national electric grid.
The KenGen Floating Solar Power Station (KFSPS), is a planned 42.5 MW (57,000 hp) solar power plant in Kenya.