Otter Tail Corporation

Last updated
Otter Tail Corporation
Company type Public
Nasdaq:  OTTR
S&P 600 component
Founded1909;115 years ago (1909)
Headquarters Fergus Falls, Minnesota
Number of employees
Approximately 2,500
Subsidiaries Otter Tail Power Company, BTD Manufacturing Inc. T.O. Plastics Inc., Northern Pipe Products, Inc., and Vinyltech Corporation
Website ottertail.com

Otter Tail Corporation is an electric power and manufacturing company based in Fergus Falls, Minnesota. Its subsidiaries include Otter Tail Power Company,BTD Manufacturing Inc.,T.O. Plastics Inc.,Northern Pipe Products Inc., and Vinyltech Corporation.

Contents

As of 2007, Otter Tail Power Company serves at least 423 towns at retail and delivers power to about 14 municipal utilities. The company currently has a workforce of over 750 employees, a generating capacity of 660 megawatts, and owns over 5,000 miles (8,000 km) of electrical power transmission lines (the majority of which are operated at 41.6 kV). The company serves 128,500 customers in North Dakota, Minnesota, and South Dakota.

History

General Offices in Fergus Falls, Minnesota Otter Tail Power Company.jpg
General Offices in Fergus Falls, Minnesota

The company was incorporated in 1907 when funds were secured to begin construction of the Dayton Hollow Dam southwest of Fergus Falls. Once the dam came online in April 1909, the company transmitted power at 22 kV over a 25-mile (40 km) line to serve the customers of the Northern Light Electric Company at Wahpeton, North Dakota.

Shortly thereafter, contracts were secured to provide power at wholesale to the cities of Breckenridge and Fergus Falls, MN (the latter after their own municipal utility's dam failed). After connecting Foxhome, MN, to the system in 1912, the company connected or purchased electric distribution systems in 10 Minnesota towns (the most prominent being Elbow Lake and Morris, MN) and a second town in North Dakota (Fairmount) the following year. Northern Light Electric also merged with Otter Tail at this time and its owner came on board as the company's first general manager. The first South Dakota community served by the company was White Rock in 1915. By 1920, the company was serving approximately 44 towns, all but a handful of which were in or near Otter Tail County. However, the company quickly found its Minnesota service area hemmed in by neighboring utility companies that were also rushing to add territory. This led to the company expanding westward into and across much of eastern North Dakota, reaching Jamestown, ND by 1924 (the company was serving over 100 towns by this time). The company grew at an incredible rate over the next 5 years—reaching the Missouri River at Washburn in 1926 and approaching the Canada–US border by 1928. By the end of the 1920s, the company's service area had tripled to serve more than 310 towns. During the Great Depression, the company was apparently not as badly affected as some of its neighbors but was still forced to focus more on survival than growth. By 1939, the worst was past, and they were ready to move forward once more.

Between 1940 and 1944, Otter Tail added territory by merger or acquisition of 6 smaller power companies within or adjacent to its territory (almost all of who had corporate parents that were required to divest these properties due to passage of the Public Utility Holding Company Act of 1935). These purchases increased its territory to its present size of 50,000 square miles (130,000 km2), about the same size as the state of Wisconsin. The one exception in this territory is the Red River Valley between Grand Forks and Fargo, ND, which was then and still is served by Northern States Power Company (now Xcel Energy).

After the final major acquisition in 1944, the company had reached its 'maximum system' of 496 towns served at both retail and wholesale. As the company matured over the next several decades, the number of towns served within the region would shrink (mainly due to towns served at wholesale changing suppliers and some smaller retail towns dying out). A few towns were added between 1944 and 1968—the largest being the purchase of Fergus Falls' municipal utility in 1953 and the last addition being the transfer of several towns in Polk County, Minnesota, from Northern States Power Company when the 34.5 kV transmission line serving these towns approached its load limit.

A merger with Montana-Dakota Utilities was briefly explored in the late 1960s but was soon dropped due to all the regulatory hurdles involved. By the 1990s, flat revenues from the utility operations led the company to establish a subsidiary (Varistar) to acquire and oversee non-utility businesses. In 2001, the company changed its name to Otter Tail Corporation with the utility becoming a division within the company. In late 2008, the company completed a reorganization to realign the utility operations into a subsidiary within Otter Tail Corporation.

Hydropower

Central-Wright Dam Otter Tail River dam - Fergus Falls 01.jpg
Central-Wright Dam

In the beginning, Otter Tail Power built a series of hydroelectric plants to provide power for its system and these served the company well until its expansion in the 1920s outstripped the dams' capacity (steam provided the bulk of the company's power needs from then on). The company has grown to such a point that today only about 1% of the company's needs still comes from hydropower. The dams are: Dayton Hollow (1909 - southwest of Fergus Falls), Hoot Lake (1914 / 1918 - east Fergus Falls), Pisgah (1918 - west Fergus Falls), Wright (rebuilt 1922 - downtown Fergus Falls), Taplin Gorge (1925 - northeast of Fergus Falls), and Bemidji (built early 1900s / purchased in 1944). Hoot Lake is unique in that the dam also formed the water intake for the coal-fired power plant that once stood nearby. Taplin Gorge's powerhouse is unique in that it was modeled after the Mausoleum of Theodoric at Ravenna, Italy. [1] The company has since removed the Bemidji dam from its generation fleet (due to an equipment failure) but continues to operate the dam to regulate water levels on the lake behind the dam and the river downstream.

Coal-fired plants

After the company's load exceeded the capacity of its dams, the company then switched to coal to meet its energy requirements. A number of plants were added to its system in the 1920s, starting with Hoot Lake in 1921. The most important one was built near Washburn, ND in 1926, as it was one of the earliest large-scale plants to burn lignite exclusively. The company then added several more plants across the system in the late 1940s to meet the huge surge in demand after WWII, but when the company's Big Stone plant was completed in 1974, all of these smaller plants were retired and removed (the Washburn plant had been removed in 1969). The company completed its Coyote plant in 1981, after which another of the company's earlier plants (at Ortonville, MN) was removed. The Hoot Lake plant was the last of the company's early plants and the last that was 100% owned by the company. The plant began as an extension of the Hoot Lake hydro plant, with six additions built between 1921 and 1964. At the time of its retirement and demolition in 2021 (as part of Minnesota's commitment to carbon-free sources of energy), only the two most recent units (built in 1959 and 1964) were still in operation. The company is also seeking to withdraw from its investment in the Coyote plant in western North Dakota.

Wind power

Otter Tail Power Company currently owns 138 MW of wind generation, and purchases an additional 45 MW for a total of 183 MW of wind power. By 2010 wind generation on the system was expected to be equivalent to 18 percent of retail sales. [2] Owned wind resources and power purchase agreements for Otter Tail Power Company include: Luverne Wind Farm, Ashtabula Wind Energy Center, Langdon Wind Energy Center, and North Dakota Wind II.

See also

Sources

Related Research Articles

<span class="mw-page-title-main">Otter Tail County, Minnesota</span> County in Minnesota, United States

Otter Tail County is a county in the U.S. state of Minnesota. As of the 2020 census, its population was 60,081. Its county seat is Fergus Falls. Otter Tail County comprises the Fergus Falls micropolitan statistical area. With 1,048 lakes in its borders, Otter Tail County has more lakes than any other county in the United States.

<span class="mw-page-title-main">Fergus Falls, Minnesota</span> City in Minnesota, United States

Fergus Falls is a city in and the county seat of Otter Tail County, Minnesota, United States. The population was 14,119 at the 2020 census.

<span class="mw-page-title-main">Wahpeton, North Dakota</span> City in North Dakota, United States

Wahpeton is a city in Richland County, in southeast North Dakota along the Bois de Sioux River at its confluence with the Otter Tail River, which forms the Red River of the North. Wahpeton is the county seat of Richland County. The population was 8,007 at the 2020 census.

<span class="mw-page-title-main">Portland General Electric</span> Public utility based in Portland, Oregon

Portland General Electric (PGE) is a Fortune 1000, investor-owned energy company based in Portland, Oregon, that generates, transmits and distributes electricity, serving almost two-thirds of Oregon’s commercial and industrial activity. PGE is regulated by the Oregon Public Utility Commission. Founded in 1888 as the Willamette Falls Electric Company, the company has been an independent company for most of its existence, though was briefly owned by the Houston-based Enron Corporation from 1997 until 2006, almost 20 years ago, when Enron divested itself of PGE during its bankruptcy.

<span class="mw-page-title-main">Manitoba Hydro</span> Electric power and natural gas utility company in Manitoba, Canada

The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 16 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000 natural gas customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a HVDC system, the Nelson River Bipole, to customers in the south. The internal staff are members of the Canadian Union of Public Employees Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034.

Northern States Power Company (NYSE: NSP) was a publicly traded S&P 500 electric and natural gas utility holding company based in Minneapolis, Minnesota, that is now a subsidiary of Xcel Energy.

<span class="mw-page-title-main">Otter Tail River</span> River in Minnesota, United States

The Otter Tail River is a 192-mile-long (309 km) river in the west-central portion of the U.S. state of Minnesota. It begins in Becker County, 40 miles (64 km) southwest of Bemidji. It then flows through a number of lakes and cities in Minnesota, including Many Point Lake, Chippewa Lake, Height of Land Lake, Frazee, the Pine lakes, Rush Lake, Otter Tail Lake and Ottertail, West Lost Lake, Fergus Falls, and Orwell Lake.

<span class="mw-page-title-main">Great River Energy</span>

Great River Energy is an electric transmission and generation cooperative in the U.S. state of Minnesota; it is the state's second largest electric utility, based on generating capacity, and the fifth largest generation and transmission cooperative in the U.S. in terms of assets. Great River Energy was formed in 1999 when Cooperative Power Association and United Power Association merged.

<span class="mw-page-title-main">Alliant Energy</span> Public utility holding company based in Madison, Wisconsin, US

Alliant Energy Corporation is a public utility holding company headquartered in Madison, Wisconsin, providing power in Iowa and Wisconsin.

<span class="mw-page-title-main">Phelps Mill</span> United States historic place

Phelps Mill is a flour mill in Otter Tail County, Minnesota, United States, on the Otter Tail River. The mill was built in 1888–1889 by William E. Thomas, a local entrepreneur who owned a flour and feed business in Fergus Falls. During that time, wheat was a high-demand crop, and nearly one thousand flour mills were in operation throughout Minnesota. Thomas began constructing a wooden dam on the river in the spring of 1888, although the dam was prone to leakage and had to be shored up with sandbags, dirt, gravel, and other materials. The mill itself was built by Royal Powers, who built and framed the mill without using blueprints. He was able to keep the entire plan within his head and did not even have to mark out the lumber he was cutting.

MDU Resources Group, Inc. is a U.S.-based corporation supplying products and services to regulated energy delivery and utilities related construction materials and services businesses. It is headquartered in Bismarck, North Dakota, and operates in 48 states.

<span class="mw-page-title-main">Otter Tail Valley Railroad</span>

The Otter Tail Valley Railroad is a Class III railroad operating 81 miles (130 km) of track between Moorhead, Minnesota, and Fergus Falls, Minnesota, and short branch lines from Fergus Falls to French and from Fergus Falls to Hoot Lake.

<span class="mw-page-title-main">Idaho Power</span>

Idaho Power Company (IPC) is a regulated electrical power utility. Its business involves the purchase, sale, generation, transmission and distribution of electricity in eastern Oregon and southern Idaho. It is a subsidiary of IDACORP, Inc. The company's 24,000-square-mile (62,000 km2) service area generally follows the area around the Snake River and its tributaries.

Otter Tail Power Co. v. United States, 410 U.S. 366 (1973), is a United States Supreme Court decision often cited as the first case in which the Court held violative of the antitrust laws a single firm's refusal to deal with other firms that denied them access to a facility essential to engaging in business.

<span class="mw-page-title-main">Broken Down Dam</span> Dam in Minnesota, United States

Broken Down Dam was a concrete hydroelectric gravity dam on the Otter Tail River in Otter Tail County, Minnesota in the United States. Constructed in 1908 to supply power to the nearby town of Fergus Falls, the dam suddenly failed on September 24, 1909. Collapse of the dam caused the failure of four others downstream as well as significant property damage. There were no deaths. City officials left the damaged structure in place and today its ruins lie along the recreational Otter Tail River State Water Trail at Broken Down Dam Park. The only flood recorded in the history of Fergus Falls was due to this disaster.

Dayton Hollow Dam is a hydroelectric gravity dam on the Otter Tail River in Otter Tail County, Minnesota in the United States. It is located 5 miles southwest of the city of Fergus Falls. Completed in 1909, it is the first power plant built by the Otter Tail Power Company and is one of five dams on the river. Together, they produce about 3.5 megawatts of power.

References

  1. "Hydropower". www.otpco.com. Archived from the original on 2004-08-08.
  2. "Wind power". www.otpco.com. Archived from the original on 2004-08-08.