Project 21900 icebreaker

Last updated
Sankt-peterburg 2015-03-25.jpg
Sankt-Peterburg, the second Project 21900 icebreaker, underway in Kara Sea in 2015
Class overview
Builders
Operators Rosmorport
Built
  • 2008–2009 (21900)
  • 2015–2016 (21900M)
  • 2023–2025 (21900M2; planned)
Planned7
Building1
Completed5
General characteristics (21900, 21900M)
Type Icebreaker
Displacement14,300 t (14,100 long tons)
Length114–119.8 m (374–393 ft) (overall)
Beam27.5 m (90 ft)
Draft8.5 m (28 ft) (design)
Ice class RMRS Icebreaker6
Installed powerFour diesel generating sets
Propulsion Diesel-electric; two Steerprop azimuth thrusters (2 × 8.2–9 MW)
Speed
  • 16–17 knots (30–31 km/h; 18–20 mph)
  • 3–3.5 knots (5.6–6.5 km/h; 3.5–4.0 mph) in 1.0 m (3.3 ft) ice
Crew25
Aviation facilitiesHelideck for Ka-32/Ka-226 (21900) or Mi-8 (21900M)

Project 21900 icebreakers and their derivative designs are a series of Russian diesel-electric icebreakers built in the 2000s. They are also sometimes referred to using the type size series designation LK-16. [note 1]

Contents

The two Project 21900 icebreakers built by Baltic Shipyard, Moskva and Sankt-Peterburg, were the first non-nuclear icebreakers built by a Russian shipyard in over three decades and the first new icebreakers ordered following the dissolution of the Soviet Union. Few years later, three additional icebreakers of a slightly improved design referred to as Project 21900M were ordered from Vyborg Shipyard: two vessels (Vladivostok and Novorossiysk) were built in Russia and the third (Murmansk) was subcontracted to the Finnish shipbuilder Arctech Helsinki Shipyard. One icebreaker of revised Project 21900M2 design was ordered from Pella Sietas in 2019 and another from Vyborg Shipyard in 2021.

Development and construction

Project 21900

In the early 2000s, Russia's state-owned icebreaker fleet consisted mainly of Soviet-era vessels dating back to the 1970s and 1980s. [1] Whereas the Soviet Union had been steadily building up the world's largest icebreaker fleet, Russia had managed to commission only one nuclear-powered icebreaker during the decade following its dissolution. In addition, the construction of another nuclear-powered icebreaker had been suspended in the mid-1990s due to lack of funds [2] and a number of older diesel-powered icebreakers were written off in the 1990s. [3]

Despite efforts to extend the service life of the deteriorating Soviet-era icebreaker fleet and a number of private Russian companies acquiring their own icebreaking vessels to serve their needs, a fleet renewal plan was direly needed to avoid a situation where older icebreakers would be decommissioned before their replacements were ready. [1] As a result, the federal program Modernization of the transport system of Russia (2002–2010) included recapitalizing the icebreaker fleet with a number of new vessels. Among these were two medium-sized diesel-electric icebreakers for service in the Gulf of Finland and Saint Petersburg area. [4]

In July 2004, the Saint Petersburg-based Baltic Shipyard won an international tender for the construction of two 16-megawatt diesel-electric icebreakers for Rosmorport, a state-owned company established in 2003 to manage Russia's port infrastructure and operate its fleet of diesel-powered icebreakers. The other bidders for the $150 million contract included the Finnish shipbuilders Kvaerner Masa-Yards and Aker Finnyards that had previously built a large number of icebreakers for the Soviet Union. [5] Although Baltic Shipyard had built five Arktika-class nuclear-powered icebreakers in 1975–1992 and had the sixth under construction at the time, these would be the first non-nuclear icebreakers built on a Russian shipyard in over three decades and the first new icebreakers ordered following the dissolution of the Soviet Union. [6] While the state budget did not initially allocate funding for the new icebreakers, the construction was nonetheless set to begin already in 2004 and the lead ship was to be delivered by November 2006. [5]

The lead ship of Project 21900 icebreakers, Moskva, was delivered on 11 December 2008 and the sister ship, Sankt-Peterburg, on 12 July 2009. [7] [8]

Project 21900M

Following the challenging winter navigating season of 2010–2011, during which ice conditions in the Baltic Sea became so severe that Russia was forced to call in the nuclear-powered icebreaker Vaygach from Murmansk to escort ships in the eastern Gulf of Finland, [9] the Russian government decided to continue the fleet renewal within the framework of the federal program Development of the Transport System of Russia (2010–2020) with three additional 16-megawatt diesel-electric icebreakers. [1] [10] While the initial agreement was signed between Rosmorport and the state-owned United Shipbuilding Corporation (USC) at the Baltic Shipyard, the construction of the first icebreaker awarded to the non-USC-affiliated Vyborg Shipyard on 2 December 2011. [11] [12] On 23 February 2012, the remaining two vessels were also contracted to Vyborg Shipyard which was simultaneously acquired by USC to solve the shipyard's financial problems. [13] [14] Hull assembly, outfitting and commissioning of one icebreaker was subcontracted to the Finnish shipbuilding company Arctech Helsinki Shipyard which, at the time, was a joint venture between USC and a subsidiary of the South Korean STX Offshore & Shipbuilding. [15]

The new icebreakers, referred to as Project 21900M, represented a further development of the preceding design. [1] The lead ship, Vladivostok, was delivered by Vyborg Shipyard on 23 September 2015. [16] She was followed by the Arctech-built Murmansk on 25 December 2015 [17] and the final vessel of the series, Novorossiysk, on 26 December 2016. [18]

Project 21900M2

In April 2019, Rosmorport contracted Vympel Design Bureau to develop a new 18-megawatt icebreaker concept based on the previous Project 21900M design. The new icebreaker, named Project 21900M2, would feature selective catalytic reduction (SCR) units and scrubbers to reduce nitrogen oxide (NOx) and sulfur oxide (SOx) emissions, respectively, as well as meet the requirements of the International Code for Ships Operating in Polar Waters (Polar Code). [19] [20]

In August 2019, Rosmorport opened a RUB 7,549,241,400 (about 100 million euro) tender for the construction of a 18-megawatt icebreaker to ensure year-round operation of the Russian Far East. According to the tender, the new icebreaker would be delivered by 30 September 2024. [21] On 5 September 2019, it was announced that the contract was awarded to the Otradnoye-based Pella Shipyard which was the only bidder. [22] However, construction of the vessel has been subcontracted to Pella Sietas in Hamburg, Germany, for which the 100 million euro order is the biggest single contract in the company history. [23] The keel of the vessel was laid on 29 October 2020. [24] However, due to the financial difficulties of the shipyard, construction had reportedly not progressed since early 2021, [25] and in July 2021 the shipyard filed for insolvency. [26]

On 2 April 2020, Rosmorport opened a second tender for a similar icebreaker to be constructed for the Baltic Sea with delivery by 10 December 2024. [27] However, the Russian newspaper Kommersant speculated that the contract price of RUB 7,309,329,900 [note 2] might be too low to attract bidders for a vessel with foreign-sourced components due to the volatility of the Russian ruble. [28] The tender was extended by two weeks in late April and finally declared invalid on 12 May after no bids had been submitted for the construction of the new icebreaker. [29] [30] It was then proposed to increase the value of the contract by 10 %. [31] On 12 November 2020, Rosmorport opened a revised tender with a higher contract price of RUB 8,033,958,400. [note 3] [32] However, it too failed to attract any bids and was declared invalid on 7 December 2020. [33] In May 2021, Rosmorport re-opened the tender again with an even higher contract price of about RUB 10.5 billion. [note 4] [34] Having received no bids by the original deadline of 14 July, Rosmorport extended the tender until 26 July, [35] but again no bids were submitted for the construction of the icebreaker. [36] The tender was re-opened again on 5 August with the previous contract price and closed on 18 August. [37] On 20 August, it was announced that the shipbuilding contract had been awarded to the Samara-based Nefteflot CJSC. As the shipyard is located inland along the Volga river, the actual construction of the 14,300-tonne icebreaker was expected to be subcontracted to either Chinese or Turkish shipyard. [38] However, Nefteflot was later disqualified and the tender was re-opened in October 2021. [39] On 26 October, the shipbuilding contract was awarded to the only bidder, Vyborg Shipyard, which had previously built two icebreakers based on the preceding Project 21900M design. [40] Steel cutting began on 31 August 2022 [41] and the keel was laid on 16 November 2022. [42] In October 2022, the General Director of Vyborg Shipyard, Aleksandr Solovyov, stated that the delivery has been postponed from 2025 to late 2028 and 8 to 10 billion rubles of additional financing is likely required to complete the construction of the icebreaker. [43]

Design

Project 21900 and 21900M

Project 21900 icebreakers are 114 metres (374 ft) long overall and have a moulded beam of 27.5 metres (90 ft). Fully laden, the 14,300-tonne (14,100-long-ton) icebreakers draw 8.5 metres (28 ft) of water. [44] While Project 21900M icebreakers are slightly longer at 119.8 metres (393 ft), they have the same beam, design draught and displacement. [45] The general layout of both designs is somewhat similar with the largest external difference being the helideck: Project 21900 icebreakers have a slightly smaller landing area located behind the superstructure while in Project 21900M and 21900M2 icebreakers the helideck has been moved to the forecastle and increased in size. [46]

Both Project 21900 and 21900M icebreakers have a fully integrated diesel-electric propulsion system with four main diesel generators supplying power for both main propulsion as well as the ship's service loads while underway. In the first two vessels, the main power plant consists of two 4,500-kilowatt (6,000 hp) 9-cylinder Wärtsilä 9L32 and two 6,000-kilowatt (8,000 hp) 12-cylinder Wärtsilä 12V32 medium-speed diesel engines. [44] In the three following vessels, all four main engines are identical 12-cylinder Wärtsilä 12V32E units rated at 6,960 kilowatts (9,330 hp) each. [45] In addition, all icebreakers have two Wärtsilä 4L20 auxiliary diesel generators for use when the vessel is at port. [46] [47]

For main propulsion, both Project 21900 and 21900M icebreakers are fitted with two electrically driven Steerprop Z-drive azimuth thrusters with four-bladed stainless steel propellers. In the first two vessels, the propellers were in pusher configuration whereas the later icebreakers had more efficient forward-facing propellers. Each propeller is driven by two electric propulsion motors in tandem: in Project 21900, they are rated at 4,100 kW (5,500 hp) each while in Project 21900M the motors have been uprated to 4,500-kilowatt (6,000 hp). The resulting combined propulsion power output is about 16,000 kilowatts (21,000 hp) (21900) to 18,000 kilowatts (24,000 hp) (21900M). In addition, the icebreakers have a single transverse bow thruster for maneuvering. [44] [45] [46]

Project 21900 icebreakers are strengthened to Russian Maritime Register of Shipping ice class Icebreaker6 which is intended for icebreaking operations in non-Arctic freezing seas where the ice is up to 1.5 metres (5 ft) thick. [44] While officially the Project 21900M icebreakers have the same ice class, [45] their hulls and propulsion systems are strengthened to meet the requirements of Icebreaker7 which is a higher ice class intended for icebreaking operations in the Arctic. [48] [49]

Project 21900M2

Due to the international sanctions during the 2022 Russian invasion of Ukraine, almost all imported equipment will be replaced with domestic alternatives. Although the layout of the icebreaker remains largely unchanged, the design needs to be reworked for Russian equipment such as main diesel engines manufactured by Kolomna Locomotive Works and azimuthing propulsion units supplied by Zvezdochka. [50] [51]

Ships in class

NameProjectBuilderIMO numberDeliveredStatusImageRef
Moskva 21900 Baltic Shipyard (Saint Petersburg, Russia) 9326574 2008In service Stroitel'stvo ledokola 'Moskva'.jpg [44]
Sankt-Peterburg 21900Baltic Shipyard (Saint Petersburg, Russia) 9326586 2009In service Sankt-Peterburg icebreaker (2229979).jpg [52]
Vladivostok 21900M Vyborg Shipyard (Vyborg, Russia) 9658654 2015In service Vladivostok icebreaker.JPG [53]
Murmansk 21900M Arctech Helsinki Shipyard (Helsinki, Finland) 9658666 2015In service Helsinki, Finland (18962968838).jpg [54]
Novorossiysk 21900MVyborg Shipyard (Vyborg, Russia) 9692571 2016In service V Festival' ledokolov v SPb. Ledokol Novorossiisk.jpg [55]
21900M2 Pella Sietas (Hamburg, Germany)99013742023 (planned)Construction stopped as of 2021 [25] [24]
21900M2Vyborg Shipyard (Vyborg, Russia)10224212025 (planned) [56]
2028 (current estimate) [43]
Under construction [40]

Notes

  1. The type size series designation "LK-16" (Russian : ЛК-16) comes from the Russian language word for "icebreaker" (Russian : ледокол, romanized: ledokol) and the propulsion power (16 megawatts).
  2. About 85 million euro in April 2020.
  3. About 88 million euro in November 2020.
  4. About 117 million euro in May 2020.

Related Research Articles

<i>Viktor Chernomyrdin</i> (icebreaker)

Viktor Chernomyrdin, also known through her Russian design number Project 22600 or type size series designation LK-25, is a Russian icebreaker. Launched at Baltic Shipyard and outfitted at Admiralty Shipyard in Saint Petersburg, she is the largest and most powerful diesel-electric icebreaker built in Russia.

<span class="mw-page-title-main">Zvezda Shipbuilding Complex</span> Russian shipbuilding company

Zvezda Shipbuilding Complex is a Russian shipbuilding company that operates the country's largest shipyard in the town of Bolshoy Kamen in Primorsky Krai across the bay from Vladivostok. Established in 2015 by a consortium of investors led by the Russian oil company Rosneft, the company has since attracted a large number of orders for oil tankers, LNG carriers and icebreakers.

Project 22220 icebreaker Series of Russian nuclear-powered icebreakers under construction

Project 22220, also known through the Russian type size series designation LK-60Ya, is a series of Russian nuclear-powered icebreakers. The lead ship of the class, Arktika, was delivered in 2020 and surpassed the preceding Soviet-built series of nuclear-powered icebreakers as the largest and most powerful icebreaker in the world.

<span class="mw-page-title-main">Vyborg Shipyard</span>

Vyborg Shipyard PJSC is a shipbuilding company located in Vyborg, Russia. The company has a focus on icebreakers and other icegoing vessels for arctic conditions, but the company has also built deep sea semi-submersible floating drilling and production platforms for exploration of oil and gas offshore fields. Vyborg Shipyard employs more than 1,500 people.

<i>Moskva</i> (2007 icebreaker) Russian icebreaker

Moskva is a Russian Project 21900 diesel-electric icebreaker. Built at Baltic Shipyard in 2008, she was the first non-nuclear-powered icebreaker built in Russia after the dissolution of the Soviet Union.

<i>Sankt-Peterburg</i> (icebreaker) Russian icebreaker

Sankt-Peterburg is a Russian diesel-electric icebreaker. She was built at Baltic Shipyard in 2009 as the second vessel for Project 21900, the first series of non-nuclear icebreakers built in Russia after the dissolution of the Soviet Union. She has an identical sister ship, the 2008-built Moskva.

<i>Murmansk</i> (2015 icebreaker) Russian icebreaker

Murmansk is a Russian Project 21900M diesel-electric icebreaker. While her construction was contracted to Vyborg Shipyard in Russia, she was built at Arctech Helsinki Shipyard in Finland and delivered to Rosmorport in 2016.

<i>Novorossiysk</i> (icebreaker) Russian icebreaker

Novorossiysk is a Russian Project 21900M diesel-electric icebreaker. She was built by Vyborg Shipyard in Russia and delivered to Rosmorport in 2016.

<i>Arktika</i> (2016 icebreaker) Russian nuclear-powered icebreaker

Arktika is a Russian nuclear-powered icebreaker built by Baltic Shipyard in Saint Petersburg. It is the lead ship of Project 22220 icebreakers and superseded the preceding class of nuclear-powered icebreakers as the largest and most powerful icebreaker ever constructed.

<i>Ilya Muromets</i> (2016 icebreaker) Russian Navy icebreaker

Ilya Muromets, Russian designation Project 21180, is a Russian icebreaker built by Admiralty Shipyard in Saint Petersburg and commissioned on 30 November 2017. She is the first icebreaker built for the Russian Navy in almost 40 years.

Project 23550 patrol ship Russian naval ship class

Project 23550 is a class of armed icebreaking patrol ships under construction for the Russian Navy. Two ships were ordered from Saint Petersburg-based Admiralty Shipyards in 2016. The ships are designed to patrol the Russian territorial waters and exclusive economic zone in the Arctic. The ships are also referred as "Arktika" type.

Sibir is a Russian Project 22220 nuclear-powered icebreaker. Built by Baltic Shipyard in Saint Petersburg, the vessel was laid down in 2015, launched in 2017, and delivered in December 2021.

<i>Ural</i> (icebreaker) Russian nuclear icebreaker

Ural is a Russian Project 22220 nuclear-powered icebreaker. Built by Baltic Shipyard in Saint Petersburg, the vessel was laid down in 2016, launched in 2019 and delivered in 2022.

<i>Vladivostok</i> (2014 icebreaker) Russian icebreaker

Vladivostok is a Russian diesel-electric icebreaker and the lead ship of Project 21900M icebreakers. She was built by Vyborg Shipyard in Russia and delivered to Rosmorport in 2015.

<span class="mw-page-title-main">Project 10510 icebreaker</span> Planned series of Russian nuclear-powered icebreakers

Project 10510, also known through the Russian type size series designations LK-110Ya and LK-120Ya or the project name Leader, is a planned series of Russian nuclear-powered icebreakers. Designed in the 2010s, when built in the 2020s, it would supersede Project 22220 icebreakers as the largest and most powerful icebreakers in the world.

<i>Evpatiy Kolovrat</i> (icebreaker)

Evpatiy Kolovrat is a Russian Navy icebreaker. The vessel was built by the Almaz Shipbuilding Company and entered service in July 2024.

Yakutiya is a Russian Project 22220 nuclear-powered icebreaker currently under construction at Baltic Shipyard in Saint Petersburg.

Chukotka is a Russian Project 22220 nuclear-powered icebreaker currently under construction at Baltic Shipyard in Saint Petersburg.

<i>Yuriy Lisyanskiy</i> (icebreaker) Soviet/Russian Icebreaker (1965-2021)

Yuriy Lisyanskiy was a Soviet and later Russian icebreaker in service from 1965 until 2021. It was one of twelve Project 97A icebreakers built by Admiralty Shipyard in Leningrad in 1961–1971.

References

  1. 1 2 3 4 "Ломая лед" (PDF), ОСК (in Russian), 4 (8): 24, 2011, retrieved 20 May 2019
  2. Savelyev, Igor. "Nuclear giant goes out to the Northern Sea route". Maritime Market. Retrieved 20 May 2019.
  3. Les Défis Pour la Société Européenne À L'aube de L'an 2000: Stratégies Pour Un Développement Durable Des Etats Du Nord de L'Europe, Council of Europe, 1998, p. 94, ISBN   9789287137289 , retrieved 20 May 2019
  4. "Федеральная целевая программа "Модернизация транспортной системы России (2002-2010 годы)"" (in Russian). Russian Government. 5 December 2011. Retrieved 24 December 2023.
  5. 1 2 "Для Приморска построят ледоколы" (in Russian). dp.ru. 21 October 2004. Retrieved 20 May 2019.
  6. "RosMorPort takes delivery of diesel-electric icebreaker Moskva built by Baltiysky Zavod". PortNews. 11 December 2008. Retrieved 19 May 2019.
  7. "The Moskva to serve St. Petersburg". PortNews. 12 December 2008. Retrieved 19 May 2019.
  8. "Владимир Путин на борту ледокола" (in Russian). RIA Novosti. 13 July 2009. Retrieved 9 June 2019.
  9. "Baltic Sea Icebreaking Sport 2010-2011" (PDF). Baltic Icebreaking Management. Retrieved 4 August 2019.
  10. "Подписан акт приема-передачи дизель-электрического ледокола "Владивосток" (фото)" (in Russian). PortNews. 9 October 2015. Retrieved 4 August 2019.
  11. "Vyborg Shipyard JSC will construct icebreaking vessel". Vyborg Shipyard. December 2012. Retrieved 4 August 2019.
  12. "Выборгский СЗ и ОСК подписали соглашение о строительстве дизельного ледокола мощностью 16 мВт" (in Russian). PortNews. 5 December 2011. Retrieved 20 May 2019.
  13. "The contract for construction of two diesel-powered open sea icebreakers has signed". Vyborg Shipyard. February 2012. Retrieved 20 May 2019.
  14. "ОСК спасает Выборгский завод" (in Russian). United Shipbuilding Corporation. 23 February 2012. Retrieved 4 August 2019.
  15. "Next icebreaker project 21900M will be built by Vyborg Shipyard in cooperation with Arctech Helsinki Shipyard". Vyborg Shipyard. December 2012. Retrieved 20 May 2019.
  16. "Official ceremony of lifting the National Flag on the prototype Icebreaker project 21900 M was held in St.-Petersburg". Vyborg Shipyard. September 2015. Retrieved 4 August 2019.
  17. "Icebreaker Murmansk project 21900M delivered to the customer at Vyborg Shipyard". Vyborg Shipyard. December 2015. Retrieved 4 August 2019.
  18. "Icebreaker Novorossiysk project 21900M delivered to the customer". Vyborg Shipyard. 27 December 2016. Retrieved 4 August 2019.
  19. "VDB to develop design of an 18MW icebreaker for Rosmorport". PortNews. 24 April 2019. Retrieved 17 August 2019.
  20. "Нижегородское КБ "Вымпел" спроектирует ледокол для "Росморпорта"" (in Russian). Tema NN. 15 May 2019. Retrieved 17 August 2019.
  21. "Росморпорт проводит конкурс на строительство ледокола мощностью 18 МВт для замерзающих морских портов Дальнего Востока" (in Russian). PortNews. 13 August 2019. Retrieved 17 August 2019.
  22. "Новый ледокол для "Росморпорта" построит СЗ "Пелла"" (in Russian). Sudostroenie.info. 5 September 2019. Retrieved 5 September 2019.
  23. "Pella Sietas GmbH secures construction of icebreaker of ice class "Icebreaker7" and largest single order in company history". Port of Hamburg. 9 December 2019. Retrieved 22 February 2020.
  24. 1 2 "Sietas (Германия) заложила ледокол мощностью 18 МВт для ФГУП «Росморпорт»". PortNews. 29 October 2020. Retrieved 29 October 2020.
  25. 1 2 "Ледокол разворачивают в Россию" (in Russian). Kommersant. 11 October 2021. Retrieved 11 October 2021.
  26. Preuß, Olaf (28 July 2021). "Deutschlands älteste Werft meldet Insolvenz an". Die Welt (in German). Welt. Retrieved 17 November 2022.
  27. "Росморпорт объявил конкурс на строительство ледокола мощностью 18 МВт с начальной ценой 7,3 млрд руб". PortNews. 2 April 2020. Retrieved 2 April 2020.
  28. ""Росморпорт" недооценил ледоколы" (in Russian). Kommersant. 2 April 2020. Retrieved 29 April 2020.
  29. "На постройку ледокола для "Росморпорта" за 7,3 млрд рублей не нашлось желающих" (in Russian). Sudostroenie.info. 29 April 2020. Retrieved 29 April 2020.
  30. "Конкурс на строительство второго ледокола 18 МВт для Росморпорта признан несостоявшимся" (in Russian). Sudostroenie.info. 14 May 2020. Retrieved 14 May 2020.
  31. "Стоимость ледокола мощностью 18 МВт может вырасти на 10%" (in Russian). PortNews. 8 September 2020. Retrieved 8 September 2020.
  32. ""Росморпорт" объявил повторный конкурс на второй ледокол мощностью 18 МВт" (in Russian). Sudostroenie.info. 13 November 2020. Retrieved 13 November 2020.
  33. "Конкурс "Росморпорта" на строительство второго ледокола 18 МВт опять проходит без участников" (in Russian). Sudostroenie.info. 8 December 2020. Retrieved 8 December 2020.
  34. "Цены вверх: "Росморпорт" вновь закупает второй ледокол мощностью 18 МВт" (in Russian). Sudostroenie.info. 18 May 2021. Retrieved 18 May 2021.
  35. ""Росморпорт" продлил срок подачи заявок на строительство второго ледокола мощностью 18 МВт" (in Russian). Sudostroenie.info. 15 July 2021. Retrieved 15 July 2021.
  36. "Конкурс на второй ледокол проекта 21900М2 вновь прошел без участников". Sudostroenie.info. 27 July 2021. Retrieved 27 July 2021.
  37. ""Росморпорт" вновь ищет строителя второго ледокола проекта 21900М2" (in Russian). Sudostroenie.info. 17 August 2021. Retrieved 17 August 2021.
  38. "Росморпорт отдал контракт на строительство второго 18 МВт ледокола самарскому ЗАО «Нефтефлот»" (in Russian). PortNews. 20 August 2021. Retrieved 20 August 2021.
  39. "Объявлен конкурс на строительство ледокола 18 МВт стоимостью 10,5 млрд руб" (in Russian). PortNews. 7 October 2021. Retrieved 7 October 2021.
  40. 1 2 "Контракт на второй ледокол проекта 21900М2 заключат с Выборгским заводом" (in Russian). Sudostroenie.info. 26 October 2021. Retrieved 26 October 2021.
  41. "Vyborg Shipyard held steel-cutting ceremony for 18 MW Icebreaker 7 class vessel". PortNews. 31 August 2022. Retrieved 31 August 2022.
  42. "На Выборгском судостроительном заводе заложен ледокол класса Icebreaker 7" (in Russian). Korabel.ru. 16 November 2022. Retrieved 16 November 2022.
  43. 1 2 "IAA PortNews' interview with Aleksandr Solovyov, General Director of Vyborg Shipyard". PortNews. 7 October 2022. Retrieved 8 October 2022.
  44. 1 2 3 4 5 "Moskva (050211)". Register of ships. Russian Maritime Register of Shipping . Retrieved 19 May 2019.
  45. 1 2 3 4 "Vladivostok (120113)". Register of ships. Russian Maritime Register of Shipping . Retrieved 19 May 2019.
  46. 1 2 3 ""Мурманск" для Петербурга: каков ледокол проекта 21900М?" (in Russian). Korabel.ru. 16 April 2018. Retrieved 19 May 2019.
  47. "Почти 4 млн рублей за запчасти к ледоколу "Москва" отдаст Росморпорт" (in Russian). Sudostroenie.info. 7 November 2014. Retrieved 9 June 2019.
  48. "Icebreaker of 21900M Project Hull Float Out Ceremony". Rosmorport. 29 April 2014. Retrieved 15 June 2019.
  49. "Rules for the Classification and Construction of Sea-Going Ships, Part I: Classification". Russian Maritime Register of Shipping. 2019. Retrieved 9 June 2019.
  50. "Первый полностью отечественный ледокол для "Росморпорта"" (in Russian). Korabel.ru. 16 November 2022. Retrieved 16 November 2022.
  51. "Заключен контракт на изготовление винто-рулевых колонок для ледокола проекта 21900М2" (in Russian). Sudostroenie.info. 15 December 2023. Retrieved 16 December 2023.
  52. "Sankt-Peterburg (060054)". Register of ships. Russian Maritime Register of Shipping . Retrieved 18 August 2019.
  53. "Vladivostok (120113)". Register of ships. Russian Maritime Register of Shipping . Retrieved 18 August 2019.
  54. "Murmansk (120132)". Register of ships. Russian Maritime Register of Shipping . Retrieved 18 August 2019.
  55. "Novorossiysk (120128)". Register of ships. Russian Maritime Register of Shipping . Retrieved 18 August 2019.
  56. "ОСК надеется на сдачу ледокола 18 МВт класса Icebreaker 7 к 2025 году" (in Russian). PortNews. 9 December 2021. Retrieved 9 December 2021.