The Pylons of Messina are two free-standing steel towers, the Sicilian one in Torre Faro and the Calabrian one in Villa San Giovanni. They were used from 1955 to 1994 to carry a 220 kilovolt (150 kilovolt until 1971) power line across the Strait of Messina, between the Scilla substation in Calabria on the Italian mainland at 38°14′42″N15°40′59″E / 38.24500°N 15.68306°E / 38.24500; 15.68306 (Scilla substation) and the Messina-Santo substation in Sicily at 38°15′57″N15°39′04″E / 38.26583°N 15.65111°E / 38.26583; 15.65111 (Messina-Santo substation) .

Contents

Design

Overhead line mast in Torre Faro; lines added on the image indicate the path of the removed power lines leading to Morandi Towers Torri Morandie - Kabelgegengewichtsturme.jpg
Overhead line mast in Torre Faro; lines added on the image indicate the path of the removed power lines leading to Morandi Towers

The two pylons, built in 1955, are both 232-metre-high (761 ft) free-standing steel towers. Each stands on an 8-metre-high (26 ft) cross-shaped base and is equipped with a crossbar that carries four conductors at a height of 212 metres (696 ft), and another V-shaped structure at the top which carries two additional conductors in addition to ground wires. In contrast to more conventional pylon design, the corners of the pylons are arranged diagonally along the direction of the course of the line. The pylons of Messina were the model for the Elbe Crossing 1 in Germany and were, until the completion of Elbe Crossing 2, the tallest pylons in the world. They did however have the longest span of any hydroelectric crossing ever built at 3646 meters, [1] even greater than that of the current record holder the Zhoushan Island Overhead Powerline Tie at 2,700 meters. The span was able to be so large because there wasn't a need for a high clearance, the conductors weren't as heavy and because the east tower was built on elevated ground approximately 163 m (536 ft) asl, giving the tower a total elevation of 396 m (1,300 ft) above sea level.

After their completion, the oscillation of the structures and their maximum deflections were determined in a very unusual manner: engineers mounted three rockets with a thrust of 9800 kilonewtons on top of the pylons and ignited them. [2]

The line had switching stations at each end of the span. At the Calabrian station, Cannitello, ( 38°14′29.16″N15°41′20.27″E / 38.2414333°N 15.6889639°E / 38.2414333; 15.6889639 (Cannitello Switching Station) ), the conductors were fixed tightly to a strainer portal. At the Sicilian station at Torre Faro ( 38°16′8″N15°38′45″E / 38.26889°N 15.64583°E / 38.26889; 15.64583 (Torre Faro Switching Station) ), the conductors were strained by a device providing constant force, which was situated in a building with two inspiring towers, the so-called Morandi Towers (italian Torri Morandi), designed by the Italian builder Riccardo Morandi. [3]

Conductors

Until 1971, the electrical service consisted of a single 150 kV three-phase AC system. Four conductors, of which one was used as backup, were installed on the crossbar of the pylon. In 1971 the voltage was increased to 220 kV and two additional conductors were installed at the bottom site of the V-shaped pinnacles. This gave a total transmission capacity of 300 MW.

Conductors consisting of steel and aluminium with a diameter of 27.8 mm were used. They had an aluminium cross section of 45 mm2 and a steel cross section of 305 mm2. The minimum height of the conductors over the Strait of Messina was 70 metres, to allow large ships to pass safely below. This, together with the span of 3.646 kilometres (2.266 mi), required a tension force of 608 N/mm2 in the conductor cables. Antivibration ropes were used to dampen oscillations.

By the early 1980s, this transmission capacity was no longer sufficient. It could not be increased by using bundle conductors or more conductive cables, as bundle conductors tend to have much greater wind-induced oscillations than single conductors, which can result in short circuits in such a long span. Normal overhead lines use conducting cables with a larger aluminium portion but these do not have the tensile strength needed for this span. In 1985 a 380 kV three-phase AC submarine cable with a maximum transmission capacity of 1000 MW was laid underneath the Strait of Messina.

The electrical crossing was decommissioned in 1993 and the conductors were removed a year later.

Today

The former electricity pylon at Torre Faro has been open to visitors since 2006 Pilone di Torre Faro, Messina, Italy.jpg
The former electricity pylon at Torre Faro has been open to visitors since 2006

After the removal of the power lines, the pylons remain with protected status as historical monuments and are used for meteorological measurements, high distance rescue training and telecommunications. In 2006, the staircase to the top of the Sicilian pylon was briefly opened to the public, [4] but public access to the structure is now prohibited. [5] The stairway to the top has approximately 1,250 steps. [6] [ unreliable source? ][ better source needed ]

The switching stations at both ends of the span still exist. The former anchor portal at Cannitello Switching Station is still in place but the tensioning system at Torre Faro has been dismantled. The unused power line from Scilla substation to Cannitello remains, while the line from Torre Faro Switching Station to Messina-Santo substation may be[ vague ] completely dismantled.

Messina Strait submarine cable

The submarine cable across the Strait of Messina was laid in 1985. It has a total transmission capacity of 1000 MW and is a part of the single-circuit 380 kV powerline between Rizziconi substation on the Calabrian mainland ( 38°26′32″N15°59′8″E / 38.44222°N 15.98556°E / 38.44222; 15.98556 (Rizziconi substation) ) and Sorgente substation on Sicily ( 38°11′17″N15°17′1″E / 38.18806°N 15.28361°E / 38.18806; 15.28361 (Sorgente substation) ). It starts at the end of the overhead line south of Villa San Giovanni ( 38°12′11.8″N15°38′16.47″E / 38.203278°N 15.6379083°E / 38.203278; 15.6379083 (Villa San Giovanni Cable Terminal) ), enters the sea at 38°12′13.4″N15°38′0.91″E / 38.203722°N 15.6335861°E / 38.203722; 15.6335861 (Cable enters Sea) , reaches Sicily in Messina ( 38°12′57.76″N15°34′1.79″E / 38.2160444°N 15.5671639°E / 38.2160444; 15.5671639 (Cable leaves Sea) ) and ends north of Messina ( 38°13′43.11″N15°33′40.2″E / 38.2286417°N 15.561167°E / 38.2286417; 15.561167 (Messina Cable Terminal) ), where the overhead line to Sorgente starts.

The cable consists of 4 conductors, one of which serves as a reserve.

Second 380 kV cable

Plans were announced in July 2010 to build a second 380 kV power line between Sorgente and Rizziconi in 2015. The line will have a transmission capacity of 2000 MW and will be 105 kilometres (65 mi) long, with an undersea portion of 38 kilometres (24 mi). [7]

In May 2016 a double-circuit 380 kV HVAC (high voltage alternating current) land and submarine cable system was handed over to the utility company. It was installed along a total route of approximately 44 km between the power stations of Villafranca Tirrena in Sicily and Scilla in Calabria. [8]

Similar structures

The largest towers of the Zhoushan Island Overhead Powerline Tie are of a very similar design, but are tubular lattice steel towers.

See also

Related Research Articles

<span class="mw-page-title-main">Messina</span> Comune in Sicily, Italy

Messina is a harbour city and the capital of the Italian Metropolitan City of Messina. It is the third largest city on the island of Sicily, and the 13th largest city in Italy, with a population of more than 218,000 inhabitants in the city proper and about 650,000 in the Metropolitan City. It is located near the northeast corner of Sicily, at the Strait of Messina and it is an important access terminal to Calabria region, Villa San Giovanni, Reggio Calabria on the mainland. According to Eurostat the FUA of the metropolitan area of Messina has, in 2014, 277,584 inhabitants.

<span class="mw-page-title-main">Strait of Messina</span> Strait between Calabria and Sicilia, Italy

The Strait of Messina is a narrow strait between the eastern tip of Sicily and the western tip of Calabria in Southern Italy. It connects the Tyrrhenian Sea to the north with the Ionian Sea to the south, within the central Mediterranean. At its narrowest point, between Torre Faro and Villa San Giovanni, it is 3.1 km (1.9 mi) wide. At the city of Messina, it is 5.1 km (3.2 mi) wide. The strait's maximum depth is about 250 m (820 ft).

<span class="mw-page-title-main">Transmission tower</span> Structure used to support an overhead power line

A transmission tower is a tall structure, usually a lattice tower made of steel that is used to support an overhead power line. In electrical grids, transmission towers carry high-voltage transmission lines that transport bulk electric power from generating stations to electrical substations, from which electricity is delivered to end consumers; moreover, utility poles are used to support lower-voltage sub-transmission and distribution lines that transport electricity from substations to electricity customers.

<span class="mw-page-title-main">HVDC Volgograd–Donbass</span> Powerline between Volgograd, Russia and Donbas, Ukraine

The HVDC Volgograd–Donbass is a 475 kilometres (295 mi) long bipolar ±400 kV high voltage direct current powerline used for transmitting electric power from Volga Hydroelectric Station at Volgograd in Russia to Donbas in eastern Ukraine and vice versa.

The Mettlen–Lavorgo powerline, also called the Lukmanier powerline, is the 400 kV three-phase alternating current high voltage electric power transmission line over the Lukmanier Pass in Switzerland, from Mettlen substation, next Inwil, about 7-kilometre (4.3 mi) south of Hochdorf, to Lavorgo substation, next Lavorgo, about 5-kilometre (3.1 mi) south of Faido. Trees falling on the line in 2003 caused a major blackout in Italy.

<span class="mw-page-title-main">Pylons of Cádiz</span>

The Pylons of Cádiz, also known as the Towers of Cádiz, are two 158 m (518 ft)-tall pylons supporting a double-circuit 132 kV three-phase AC powerline over the bay of Cádiz, Spain, running from Puerto Real Substation to the substation of the former Cádiz Thermal Power Station, situated on the peninsula upon which the city of Cádiz stands.

<span class="mw-page-title-main">Overhead line crossing</span> Crossing of an immovable obstacle by an overhead power line

An overhead line crossing is the crossing of an obstacle—such as a traffic route, a river, a valley or a strait—by an overhead power line. The style of crossing depends on the local conditions and regulations at the time the power line is constructed. Overhead line crossings can sometimes require extensive construction and can also have operational issues. In such cases, those in charge of construction should consider whether a crossing of the obstacle would be better accomplished by an underground or submarine cable.

<span class="mw-page-title-main">Dead-end tower</span> Structure used in construction of overhead power lines

A dead-end tower is a fully self-supporting structure used in construction of overhead power lines. A dead-end transmission tower uses horizontal strain insulators at the end of conductors. Dead-end towers may be used at a substation as a transition to a "slack span" entering the equipment, when the circuit changes to a buried cable, when a transmission line changes direction by more than a few degrees, or at intervals along a straight run to limit the extent of a catastrophic collapse.

<span class="mw-page-title-main">Overhead power line</span> Above-ground structure for bulk transfer and distribution of electricity

An overhead power line is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors suspended by towers or poles. Since most of the insulation is provided by air, overhead power lines are generally the lowest-cost method of power transmission for large quantities of electric energy.

<span class="mw-page-title-main">Strait of Messina Bridge</span> Proposed suspension bridge linking Sicily to mainland Italy

The Strait of Messina Bridge is a planned 3.2-kilometer suspension bridge across the Strait of Messina, connecting Torre Faro in Sicily with Villa San Giovanni in the Italian Peninsula.

<span class="mw-page-title-main">Traction power network</span> Electricity grid for the supply of electrified rail networks

A traction network or traction power network is an electricity grid for the supply of electrified rail networks. The installation of a separate traction network generally is done only if the railway in question uses alternating current (AC) with a frequency lower than that of the national grid, such as in Germany, Austria and Switzerland.

Transposition is the periodic swapping of positions of the conductors of a transmission line, in order to reduce crosstalk and otherwise improve transmission. In telecommunications this applies to balanced pairs whilst in power transmission lines three conductors are periodically transposed.

<span class="mw-page-title-main">Villa San Giovanni</span> Comune in Calabria, Italy

Villa San Giovanni is a port city and a municipality in the Metropolitan City of Reggio Calabria of Calabria, Italy. In 2010 its population was 13,747 with a decrease of 2.5% until 2016 and in 2020 an increase of 3.7%. It is an important terminal of access to Sicily and is also known for being the location of several police films.

<span class="mw-page-title-main">Scilla, Calabria</span> Town in Calabria, Italy

Scilla is a town and comune in Calabria, Italy, administratively part of the Metropolitan City of Reggio Calabria. It is the traditional site of the sea monster Scylla of Greek mythology.

The Yangtze River power line crossings are overhead power lines that cross the Yangtze River in China. There are at least three power line crossings on the Yangtze River at Jiangyin, Nanjing, and Wuhu. The towers of the crossing in Jiangyin are among the highest in the world.

<span class="mw-page-title-main">Scilla Lighthouse</span> Lighthouse

Scilla Lighthouse is an active lighthouse in Calabria just opposite of Capo Peloro Lighthouse which is on the Sicilian coast; both lighthouses direct the ships from the north into the Strait of Messina. The lighthouse is settled on the seaward side terrace of the Castello Ruffo di Scilla, in the town of Scilla on the Tyrrhenian Sea.

<span class="mw-page-title-main">Whakamaru to Brownhill Road transmission line</span>

The Whakamaru to Brownhill Road transmission line is a double-circuit 400 kV-capable transmission line constructed by Transpower to increase the capacity of the National Grid between the southern Waikato and the city of Auckland. The line runs from the Whakamaru sub-station near the Whakamaru Power Station, over a distance of 186 kilometres (116 mi) to the new Brownhill Road substation near Whitford in southeastern Auckland. The line will initially be operated at 220 kV. From Brownhill Road, 220 kV underground cables connect the line to the Pakuranga sub-station in eastern Auckland. The project was the subject of considerable controversy and protest during the planning and approval stages. Construction of the line started in February 2010, and the line was commissioned on 30 October 2012. The transmission line forms the major part of a wider North Island Grid Upgrade project with a forecast cost to completion of $894 million.

The Osaki Channel Crossing is a power line crossing over Seto Inland Sea south of Yoshina, Takehara in Japan, which was built in 1997 and runs from Chugoku Electric Power's Ozaki Power Station at 34°15′26.4″N132°52′25.1″E to the Japanese Mainland at 34°18′19.6″N132°52′29.1″E, with two water crossings: the Nagashima Sector, connecting the Power Station to Usujima, with a span width of 1603 metres, and the Yoshina Sector, which spans from Usujima to the mainland at 2145 metres long. At a height of 223 metres, the towers of the Yoshina Sector are just 3 metres shorter than those of the Chūshi Powerline Crossing, making them the second-tallest electricity pylons in Japan. The pylons follow a barrel design with 3 crossbars.

The Zhoushan Island Overhead Powerline Tie is a 220 kV three-phase AC interconnection of the power grid of Zhoushan Island with that of the Chinese mainland. It runs over several islands and consists of several long distance spans, the longest with a length of 2.7 kilometres (1.7 mi) south of Damao Island. This span uses two 370-metre-tall (1,210 ft) pylons, which were the highest electricity pylons in the world, until 500kV line to Zhoushan from mainland was completed. The north tower on Damao Island was completed in 2009, and the south tower on Liangmao Island was completed in 2010. These pylons resemble those of the Messina Strait, but are steel-tube lattice structures.

<span class="mw-page-title-main">Torre Faro</span> Italian seaside village

Torre Faro is a frazione of the comune of Messina in the Province of Messina, Sicily, southern Italy. It is a seaside village near the Ganzirri Lake and on its territory it hosts the Pylons of Messina.

References

  1. "Pylons of Messina". www.atlasobscura.com.
  2. Turmbauwerke, Bauverlag GmbH, Wiesbaden, 1966
  3. "Torri Morandi Messina, Italy". www.atlasobscura.com.
  4. OndaTV Sicilia (2020-05-01). "In cima al pilone di Torre Faro, uno dei simboli di Messina. Spettacolare - YouTube" [On top of the tower of Torre Faro, one of the symbols of Messina. Spectacular] (video) (in Italian). 1:28. Archived from the original on 2021-12-12. Retrieved 2021-06-20.
  5. "Torre Faro - Pylons of Messina - Messina Form - TripAdvisor" . Retrieved 2021-06-20.
  6. Pagano, Francesco (2007-08-20). "Il Pilone de Torre Faro" (in Italian). Retrieved 2010-04-25.
  7. "Green light for new "electricity bridge" across the Strait of Messina". Terna S.p.A. 2010-07-09. Archived from the original on 2012-09-11. Retrieved 2012-07-13.
  8. "Power transmission submarine cable link between Sicily and Calabria". Prysmian group. Retrieved 23 December 2016.