Reorder point

Last updated

The reorder point (ROP), also reorder level (ROL) or "optimal re-order level", [1] is the level of inventory which triggers an action to replenish that particular inventory. It is a minimum amount of an item which a firm holds in stock, such that, when stock falls to this amount, the item must be reordered. It is normally calculated as the forecast usage during the replenishment lead time plus safety stock. In the EOQ (Economic Order Quantity) model, it was assumed that there is no time lag between ordering and receipt of materials.

Contents

Continuous review system

The reorder point for replenishment of stock occurs when the level of inventory drops down to zero. In a model with instantaneous replenishment of stock the level of inventory jumps to the original level from zero level. In real life situations there is never a zero lead time: there is always a time lag from the date of placing an order for material to the date on which materials are received. As a result, the reorder point is always higher than zero, and if the firm places the order when the inventory reaches the reorder point, the new goods will arrive before the firm runs out of goods to sell. The decision on how much stock to hold is generally referred to as the order point problem, that is, how low should the inventory be depleted before it is reordered.

The two factors that determine the appropriate order point are the delivery time stock, which is the inventory needed during the lead time (i.e., the difference between the order date and the receipt of the inventory ordered), and the safety stock, which is the minimum level of inventory that is held as a protection against shortages due to fluctuations in demand.

Therefore:

Reorder Point = Normal consumption during lead-time + Safety Stock .

Several factors determine how much delivery time stock and safety stock should be held. In summary, the efficiency of a replenishment system affects how much delivery time is needed. Since the delivery time stock is the expected inventory usage between ordering and receiving inventory, efficient replenishment of inventory would reduce the need for delivery time stock. And the determination of level of safety stock involves a basic trade-off between the risk of stockout, resulting in possible customer dissatisfaction and lost sales, and the increased costs associated with carrying additional inventory.

Another method of calculating reorder level involves the calculation of usage rate per day, lead time which is the amount of time between placing an order and receiving the goods and the safety stock level expressed in terms of several days' sales.

Reorder level = Average daily usage rate × lead-time in days .

From the above formula it can be easily deduced that an order for replenishment of materials be made when the level of inventory is just adequate to meet the needs of production during lead-time.

Example[ dubious ]

If the average daily usage rate of a material is 50 units and the lead-time is seven days, then:

Reorder level = Average daily usage rate × Lead time in days = 50 units per day × 7 days = 350 units.

When the inventory level reaches 350 units an order should be placed for material. By the time the inventory level reaches zero towards the end of the seventh day from placing the order materials will reach and there is no cause for concern.

Reorder point = Average Lead Time*Average Demand + Service Level*Avg. Lead Time*Standard Deviation of Demand2 + Avg. Demand2*Standard Deviation of Lead Time2 [2]

Reorder point = S × L + J (S × R × L) where

The stock-out acceptance factor, 'J', depends on the stock-out percentage rate specified and the probability distribution of usage (which is assumed to follow a Poisson distribution). [3]

See also

Related Research Articles

An economic indicator is a statistic about an economic activity. Economic indicators allow analysis of economic performance and predictions of future performance. One application of economic indicators is the study of business cycles. Economic indicators include various indices, earnings reports, and economic summaries: for example, the unemployment rate, quits rate, housing starts, consumer price index, Inverted yield curve, consumer leverage ratio, industrial production, bankruptcies, gross domestic product, broadband internet penetration, retail sales, price index, and changes in credit conditions.

<span class="mw-page-title-main">Inventory</span> Goods held for resale

Inventory or stock refers to the goods and materials that a business holds for the ultimate goal of resale, production or utilisation.

Vendor-managed inventory (VMI) is an inventory management practice in which a supplier of goods, usually the manufacturer, is responsible for optimizing the inventory held by a distributor.

Economic order quantity (EOQ), also known as financial purchase quantity or economic buying quantity, is the order quantity that minimizes the total holding costs and ordering costs in inventory management. It is one of the oldest classical production scheduling models. The model was developed by Ford W. Harris in 1913, but the consultant R. H. Wilson applied it extensively, and he and K. Andler are given credit for their in-depth analysis.

<span class="mw-page-title-main">Operations management</span> In business operations, controlling the process of production of goods

Operations management is concerned with designing and controlling the production of goods and services, ensuring that businesses are efficient in using resources to meet customer requirements.

A lead time is the latency between the initiation and completion of a process. For example, the lead time between the placement of an order and delivery of new cars by a given manufacturer might be between 2 weeks and 6 months, depending on various particularities. One business dictionary defines "manufacturing lead time" as the total time required to manufacture an item, including order preparation time, queue time, setup time, run time, move time, inspection time, and put-away time. For make-to-order products, it is the time between release of an order and the production and shipment that fulfill that order. For make-to-stock products, it is the time taken from the release of an order to production and receipt into finished goods inventory.

Service level measures the performance of a system. Certain goals are defined and the service level gives the percentage to which those goals should be achieved. Fill rate is different from service level.

Safety stock is a term used by logisticians to describe a level of extra stock that is maintained to mitigate risk of stockouts caused by uncertainties in supply and demand. Adequate safety stock levels permit business operations to proceed according to their plans. Safety stock is held when uncertainty exists in demand, supply, or manufacturing yield, and serves as an insurance against stockouts.

The economic production quantity model determines the quantity a company or retailer should order to minimize the total inventory costs by balancing the inventory holding cost and average fixed ordering cost. The EPQ model was developed and published by E. W. Taft, a statistical engineer working at Winchester Repeating Arms Company in New Haven, Connecticut, in 1918.

Gross Margin Return on Inventory Investment (GMROII) is a ratio in microeconomics that describes a seller's return on every unit of currency spent on inventory. It is one way to determine how profitable the seller's inventory is, and describes the relationship between the profit earned from total sales, and the amount invested in the inventory sold. Generally for a seller, the higher the GMROII the better. Since the inventory is a very widely ranging factor in a seller's investment in working capital, it is important for the seller to know how much he might expect to gain from it. The GMROII answers the question "for each unit of average inventory held at cost, how many units of currency of gross profit I generated in one year?" GMROII is traditionally calculated by using one year's gross profit against the average of 12 or 13 units of inventory at cost. GMROII may vary depending on which segment we are analyzing, but a rule of thumb is that a GMROII of typical retailer is above 3.0.

<span class="mw-page-title-main">Inventory turnover</span> Measure of the number of times inventory is sold or used in a time period

In accounting, the inventory turnover is a measure of the number of times inventory is sold or used in a time period such as a year. It is calculated to see if a business has an excessive inventory in comparison to its sales level. The equation for inventory turnover equals the cost of goods sold divided by the average inventory. Inventory turnover is also known as inventory turns, merchandise turnover, stockturn, stock turns, turns, and stock turnover.

Supply-chain optimization (SCO) aims to ensure the optimal operation of a manufacturing and distribution supply chain. This includes the optimal placement of inventory within the supply chain, minimizing operating costs including manufacturing costs, transportation costs, and distribution costs. Optimization often involves the application of mathematical modelling techniques using computer software. It is often considered to be part of supply chain engineering, although the latter is mainly focused on mathematical modelling approaches, whereas supply chain optimization can also be undertaken using qualitative, management based approaches.

Backflush accounting is a subset of management accounting focused on types of "postproduction issuing;" It is a product costing approach, used in a Just-In-Time (JIT) operating environment, in which costing is delayed until goods are finished. Backflush accounting delays the recording of costs until after the events have taken place, then standard costs are used to work backwards to 'flush' out the manufacturing costs. The result is that detailed tracking of costs is eliminated. Journal entries to inventory accounts may be delayed until the time of product completion or even the time of sale, and standard costs are used to assign costs to units when journal entries are made. Backflushing transaction has two steps: one step of the transaction reports the produced part which serves to increase the quantity on-hand of the produced part and a second step which relieves the inventory of all the component parts. Component part numbers and quantities-per are taken from the standard bill of material (BOM). This represents a huge saving over the traditional method of a) issuing component parts one at a time, usually to a discrete work order, b) receiving the finished parts into inventory, and c) returning any unused components, one at a time, back into inventory.

In materials management, ABC analysis is an inventory categorisation technique. ABC analysis divides an inventory into three categories—"A items" with very tight control and accurate records, "B items" with less tightly controlled and good records, and "C items" with the simplest controls possible and minimal records.

A spare part, spare, service part, repair part, or replacement part, is an interchangeable part that is kept in an inventory and used for the repair or refurbishment of defective equipment/units. Spare parts are an important feature of logistics engineering and supply chain management, often comprising dedicated spare parts management systems.

Inventory management software is a software system for tracking inventory levels, orders, sales and deliveries. It can also be used in the manufacturing industry to create a work order, bill of materials and other production-related documents. Companies use inventory management software to avoid product overstock and outages. It is a tool for organizing inventory data that before was generally stored in hard-copy form or in spreadsheets.

The base stock model is a statistical model in inventory theory. In this model inventory is refilled one unit at a time and demand is random. If there is only one replenishment, then the problem can be solved with the newsvendor model.

In inventory management, Economic Batch Quantity (EBQ), also known as Optimum Batch Quantity (OBQ) is a measure used to determine the quantity of units that can be produced at the minimum average costs in a given batch or product run. EBQ is basically a refinement of the economic order quantity (EOQ) model to take into account circumstances in which the goods are produced in batches. The goal of calculating EBQ is that the product is produced in the required quantity and required quality at the lowest cost.

The (Q,r) model is a class of models in inventory theory. A general (Q,r) model can be extended from both the EOQ model and the base stock model

References

  1. ACCA (the Association of Chartered Certified Accountants), Inventory control, accessed 8 February 2024
  2. NC State University: Supply Chain Resource Cooperative, REORDER POINT FORMULA: Inventory Management Models : A Tutorial, published 30 January 2011, accessed 8 February 2024
  3. Jain, P. K. (1999). Theory and Problems in Financial Management. Tata McGraw-Hill. ISBN   9780074636831.

Resources