Riverdale station (Toronto)

Last updated
Riverdale
Riverdale Railway Station pictures-r-1345.jpg
General information
Location De Grassi Street, Riverdale,
Toronto, Ontario
Canada
Coordinates 43°39′39″N79°20′46″W / 43.66083°N 79.34611°W / 43.66083; -79.34611
Owned by Grand Trunk Railway
CNR
Operated by Grand Trunk Railway
CNR
Line(s) CN Kingston Subdivision
Distance1.7 miles (2.7 km) to Toronto Union Station [1]
Other information
StatusDemolished in 1974 [2] and re-purpose as "Bruce Mackey Park" a city parkette
History
Opened1896
Closed1932

Riverdale Railway Station was located on De Grassi Street just north of Queen Street East [3] in Toronto, Ontario, Canada. Constructed by the Grand Trunk Railway (GTR) in 1896 as "Queen East Station", on what is now the Lakeshore East line, the station was renamed "Riverdale Station" in 1907. [2] The Canadian National Railway (CNR) took over the station in 1923, when they absorbed the Grand Trunk Railway. [4] CNR discontinued passenger train service at the station in 1932, later for commercial use and demolished the building in 1974. [5]

Contents

History

The station was originally built at grade, with a level crossing at Queen Street. [6] This level crossing was considered very dangerous and on November 17, 1904, a collision here between a Toronto Railway Company streetcar and a GTR freight train killed three people and injured seventeen. [7]

Construction began in 1925 on the Toronto Grade Separation project which was completed in 1930. The rebuilding of this eastern approach, beyond the Toronto Terminals Railway limit, eliminated the level crossing. [8] The station had to be moved northwest to accommodate construction of the Queen Street overpass. [2]

The last site of the station building is now part of City of Toronto's Bruce Mackey Park, [6] (formerly Wardell Parkette [9] ) which runs along the westerly side of the railway tracks, between Queen and Dundas Streets. [10]

Plans to build a GO Station at this location were discussed as part of Metrolinx's 2014 Yonge Relief Network Study. [11] The proposed SmartTrack plan, raised during the 2014 Toronto Mayoral Election, would also have built a station here, where GO Transit's Stouffville commuter service crosses Queen Street. [12] A subway station on the under-construction Ontario line is located just southwest of the final (1920s) Riverdale station location. [13]

Related Research Articles

<span class="mw-page-title-main">Union Station (Toronto)</span> Railway station in Toronto, Ontario, Canada

Union Station is a major railway station and intermodal transportation hub in Toronto, Ontario, Canada. The station is located in downtown Toronto, on Front Street West, on the south side of the block bounded by Bay Street and York Street. The municipal government of Toronto owns the station building while the provincial transit agency Metrolinx owns the train shed and trackage. It is operated by the Toronto Terminals Railway, a joint venture of the Canadian National Railway and Canadian Pacific Railway, which directs and controls train movement along the Union Station Rail Corridor, the largest and busiest rail corridor in Canada. Constructed in 1927, Union Station has been a National Historic Site of Canada since 1975, and a Heritage Railway Station since 1989.

<span class="mw-page-title-main">Barrie line</span> Commuter rail line in Ontario, Canada

Barrie is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto in a generally northward direction to Barrie, and includes ten stations along its 101.4 kilometres (63.0 mi) route. From 1982 to 1990 and again from 1993 to 2007, it was known as the Bradford line, named after its former terminus at Bradford GO Station until the opening of Barrie South GO Station.

<span class="mw-page-title-main">Weston GO Station</span> Railway station in Toronto, Ontario, Canada

Weston GO Station is a train station in Toronto, Ontario, serving the GO Transit Kitchener line and the Union Pearson Express. It is located on the south side of Lawrence Avenue West, just east of Weston Road, in the neighbourhood of Weston.

<span class="mw-page-title-main">Brampton GO Station</span> Railway station in Ontario, Canada

Brampton Innovation District GO Station is a railway station served by GO Transit and Via Rail, located at 27 Church Street West in downtown Brampton, Ontario, Canada. It is directly connected to the Downtown Brampton Terminal which serves GO Transit and Brampton Transit buses.

<span class="mw-page-title-main">Georgetown GO Station</span> Railway station in Ontario, Canada

Georgetown GO Station is a railway station in Georgetown, Ontario, Canada. It is served by GO Transit's Kitchener line and Via Rail's Toronto-Sarnia trains. It is located west of Mountainview Road North at 55 Queen Street.

<span class="mw-page-title-main">Danforth GO Station</span> Railway station in Toronto, Ontario, Canada

Danforth GO Station is a railway station on GO Transit's Lakeshore East line in Toronto, Ontario, Canada. The station is situated in the east end of Old Toronto, south west of the intersection of Main Street and Danforth Avenue. The station is a short walk from Main Street station on Line 2 Bloor–Danforth of the Toronto subway.

<span class="mw-page-title-main">Northern Railway of Canada</span> Defunct railway in Ontario

The Northern Railway of Canada was a railway in the province of Ontario, Canada. It was the first steam railway to enter service in what was then known as Upper Canada. It was eventually acquired by the Grand Trunk Railway, and is therefore a predecessor to the modern Canadian National Railway (CNR). Several sections of the line are still used by CNR and GO Transit.

<span class="mw-page-title-main">Aurora GO Station</span> Train station in Aurora, Ontario

Aurora GO Station is a railway station and bus station in the GO Transit network located on Wellington Street East between Yonge Street and Bayview Avenue in Aurora, Ontario, Canada. It is a stop on the Barrie line train service, and connects with York Region Transit local bus routes, and the GO Express Bus between Newmarket Bus Terminal and Union Station Bus Terminal.

<span class="mw-page-title-main">Oshawa GO Station</span> Railway station in Oshawa, Ontario, Canada

Durham College Oshawa GO station is a station for commuter rail, passenger rail and regional bus services in Oshawa, Ontario, Canada. It is the terminal station for the Lakeshore East line of GO Transit and serves Via Rail's Corridor service, which travels from Toronto to both Ottawa and Montreal. The bus terminal is served by bus routes of GO Transit and Durham Region Transit.

<span class="mw-page-title-main">Belleville station (Ontario)</span> Railway station in Ontario, Canada

The Belleville railway station in Belleville, Ontario, Canada is served by Via Rail trains running from Toronto to Ottawa and Montreal. The station is staffed, with ticket sales, vending machines, telephones, washrooms, and wheelchair access to the station and trains.

<span class="mw-page-title-main">Stratford station (Ontario)</span> Railway station in Ontario, Canada

Stratford is a Via Rail train station in Stratford, Ontario, Canada. It is served by one daily round trip between Sarnia and Toronto via London.

<span class="mw-page-title-main">Toronto Belt Line Railway</span>

The Toronto Belt Line Railway was built during the 1890s in Toronto, Ontario, Canada. It consisted of two commuter railway lines to promote and service new suburban neighbourhoods outside of the then city limits. Both lines were laid as loops. The longer Don Loop ran north of the city limits, and the shorter Humber Loop ran west of the city limits. The railway was never profitable and ran for only two years. Today, as part of a rails-to-trails project, the Beltline Trail lies on the right-of-way of the Don Loop.

The Relief Line was a proposed rapid transit line for the Toronto subway system, intended to provide capacity relief to the Yonge segment of Line 1 and Bloor–Yonge station and extend subway service coverage in the city's east end. Several plans for an east–west downtown subway line date back to the early 20th century, most of which ran along Queen Street.

<span class="mw-page-title-main">CN Halton Subdivision</span>

The CN Halton Subdivision is a major railway line in Southern Ontario, Canada. It is owned and operated by the Canadian National Railway (CN).

<span class="mw-page-title-main">Sunnyside station (Toronto)</span> Railway station in Toronto, Ontario, Canada

Sunnyside railway station was formerly located at the intersection of King Street, Queen Street West and Roncesvalles Avenue in Toronto, Ontario, Canada. It operated passenger service from 1910 until 1971.

<span class="mw-page-title-main">Railway Lands</span> Redevelopment district in Toronto, Ontario, Canada

Railway Lands is an area in Downtown Toronto, Ontario, Canada. Originally a large railway switching yard near the Toronto waterfront, including the CNR Spadina Roundhouse and the CPR John Roundhouse, it has since been redeveloped and today is home to mostly mixed-used development, including the CN Tower and the Rogers Centre. The lands were owned and maintained by the Canadian National Railway and later transferred to the federal crown corporation Canada Lands Company. The area is bounded by Front Street, Yonge Street, Gardiner Expressway and Bathurst Street. The western portion of the Railway Lands is now part of the CityPlace neighbourhood and the eastern portion is now called South Core.

<span class="mw-page-title-main">Toronto Union Station (1858)</span> Railway station in Toronto, Ontario, Canada

Toronto’s first Union Station was a passenger rail station located west of York Street at Station Street, south of Front Street in downtown Toronto. It was built by the Grand Trunk Railway (GTR) and opened in 1858.

<span class="mw-page-title-main">Ontario Line</span> Rapid transit line under construction in Toronto

The Ontario Line is a rapid transit line under construction in Toronto, Ontario, Canada. Its northern terminus will be at Eglinton Avenue and Don Mills Road, at Science Centre station, where it will connect with Line 5 Eglinton. Its southern terminus will be at the existing Exhibition GO Station on the Lakeshore West line. The Ontario Line was announced by the Government of Ontario on April 10, 2019. As of August 2024, the estimated cost for the 15.6-kilometre (9.7 mi) line is CA$27 billion with an estimated completion in 2031. Originally, the cost was estimated at $10.9 billion with completion by 2027. A groundbreaking ceremony for the project took place on March 27, 2022. Upon opening, the plan is for the line to be numbered as "Line 3". This number was used by Line 3 Scarborough until its closure in July 2023.

Breslau GO Station is a planned GO Transit train station to be built by Metrolinx near the community of Breslau in Woolwich, Ontario, as part of GO Transit's Regional Express Rail (RER) expansion program. The preliminary plan is to provide approximately 1000 parking spaces. A kiss and ride area and a bus loop are also planned to be provided. Metrolinx expects the station's daily ridership to be 2,480 in 2031.

References

  1. "Grand Trunk Railway - Main Line". Mileages. NiagaraRails. Retrieved February 2, 2015. 332.3 Toronto, Riverdale station; 334.0 Toronto, Union station
  2. 1 2 3 "Riverdale Railway Station". Toronto's Historical Plaques. Retrieved February 2, 2015.
  3. Chris Bateman (June 6, 2014). "5 Toronto railway stations we wish we still had: Riverdale". blogTO. Retrieved February 2, 2015.
  4. "The Start of Riverdale". riverdaler. 2014-03-21. Retrieved February 2, 2015. These railway tracks are now part of CN Rail after the Grand Trunk Railway ran into financial problems and was nationalized.
  5. https://www.trha.ca/trha/history/stations/riverdale-station/
  6. 1 2 Jeff Low (February 7, 2012). "Then and Now: Riverdale Station". urbantoronto.ca. Retrieved February 2, 2015. At one time, there was a level rail crossing at Queen and Degrassi streets
  7. Mike Filey (2013-03-27). "Shares Historic Toronto Railway Images". Toronto Railway Historical Association . Retrieved February 2, 2015.
  8. R.L.Kennedy (2009). "Toronto Terminals Railway: Waterfront Viaduct". Old Time Trains. Retrieved February 2, 2015.
  9. Joe Halstead (2002-12-17). "Wardell Park Renaming Proposal" (PDF). Staff Report. City of Toronto. Retrieved February 2, 2015. That the name Wardell Parkette, located on Wardell Avenue be renamed the Bruce Mackey Park.
  10. "Bruce Mackey". Toronto's Historical Plaques. Retrieved February 2, 2015.
  11. "Yonge Relief Network Study" (PDF). Metrolinx. Archived from the original (PDF) on July 18, 2014. Retrieved February 2, 2015. Build a new GO station south of Pape and Gerrard at the former Riverdale Station (in present-day Bruce Mackey Park)
  12. Natalie Alcoba (November 14, 2014). "The dust from the election is settled. Now John Tory moves to make SmartTrack actually happen". National Post. Retrieved February 2, 2015. add stations along the way, at places like Gerrard, Queen, Liberty Village and St. Clair West.
  13. "Updated Ontario Line plans from the Don River to Gerrard: Maximizing space within the existing GO rail corridor". Metrolinx. September 29, 2020. Archived from the original on September 29, 2020. Retrieved September 29, 2020.

Commons-logo.svg Media related to Riverdale, Toronto railway station at Wikimedia Commons