Scotia Square | |
---|---|
General information | |
Status | Completed |
Type | Mixed-use |
Architectural style | Modern |
Address | 5201 Duke Street Halifax, Nova Scotia B3J 1N9 |
Coordinates | 44°39′0.00″N63°34′38.13″W / 44.6500000°N 63.5772583°W |
Groundbreaking | 1967 |
Opened | 1969 |
Owner | Crombie REIT |
Landlord | Crombie REIT |
Design and construction | |
Architect(s) | Allward and Gouinlock |
Developer | Halifax Developments Limited |
Main contractor | Robert McAlpine Ltd. |
Website | |
scotiasquare |
Scotia Square is a commercial development in downtown Halifax, Nova Scotia, Canada. It was built from the late 1960s to late 1970s and is managed by Crombie REIT.
The complex comprises several office buildings, a shopping centre, two hotels, a parking garage, and three apartment buildings. A fourth apartment building is under construction. Scotia Square is connected to the Downtown Halifax Link, a network of enclosed walkways, and hosts a major Halifax Transit bus terminal.
Scotia Square was developed in an era when urban renewal was in vogue. Many cities were demolishing neighbourhoods considered blighted and obsolete. In 1956, the National Housing Act was amended, offering federal government assistance to redevelopment projects that put land to its "highest and best use". Halifax city council commissioned town planner Gordon Stephenson to draw up a redevelopment proposal for the city, which was published in 1957. Stephenson called the area now home to Scotia Square the "worst part" of the city centre, writing: "With the exception of the blocks between Barrington and Argyle Streets, it is in a generally deplorable condition. Here are some of the worst tenements, and dirty cinder sidewalks merge with patches of cleared land littered with rubbish. It is suggested that the clearing of this area should have high priority." [1] Stephenson proposed a suite of recommendations across Halifax including the clearance of what was termed the "Central Redevelopment Area".
The City of Halifax applied for (and won) funds under section 23 of the National Housing Act to aid in land acquisition and clearance. The 12.81 acres of cleared land was held jointly by all three levels of government. In 1962, the city put out a request for proposals that attracted only one response, from the Woking Group. The city considered the proposal too ambitious and rejected it. In September 1963, the Woking Group submitted a more modest proposal developed with the assistance of architects Robert Matthew and Percy Johnson-Marshall of the University of Edinburgh. An agreement was signed between the city and the Woking Group in October 1963. This agreement later fell through due to financial issues. [2]
K.C. Appleyard, an engineer who had helped set up Industrial Estates Limited, was critical of the city's failure to develop the Central Redevelopment Area. Halifax mayor Charles Vaughan challenged Appleyard to do something about it, and Appleyard reportedly went to the Halifax Club the same day to assemble a new development company, Halifax Developments Limited (HDL), with the board of directors composed of prominent members of the province's business elite. The company informed Halifax council of their plans, and hired architect Carl Koch and real estate consultant William Hardman. The city issued a second call for proposals, which this time attracted three entrants – HDL, Woking Group, and local developer Ralph Medjuck. Medjuck bought out Woking Group "at the last minute", giving him control over two of the proposals. [2]
On 24 April 1966, the city announced that HDL's "Scotia Square" proposal had been selected. Halifax Developments Limited hired McAlpine Construction to serve as general contractor, and brought Toronto architecture firm Allward and Gouinlock on as an architectural consultant. A formal agreement between HDL and the City of Halifax was signed on 31 August 1966 and construction of the Trade Mart, the first phase of the development, began thereafter. [2] The urban fabric of downtown Halifax was significantly altered by the development. Several streets disappeared from the map, including Buckingham Street, Bells Lane, Jacob Street, and sections of Grafton and Argyle streets.
Scotia Square was developed in concert with the adjacent Cogswell Interchange, a multi-level road interchange that opened in 1970 and was to be the first phase of a waterfront highway called Harbour Drive, which was cancelled due to public protest.
The first phase of Scotia Square, the Trade Mart building, was officially opened in 1968 by Nova Scotia premier George Isaac Smith. That building was described by the developer as "a combined shopping centre for wholesalers, distributors, manufacturers' agents, and a warehouse for light manufacturing and storage." [3] As of 2023, the Trade Mart is called "Brunswick Place".
Premier Smith also opened the Scotia Square shopping centre on 15 October 1969. At that time, there were 29 stores. Another 30 stores opened by the end of 1969. The first office tower in the complex, Duke Tower, was opened on 1 February 1970. [4]
The shopping centre, called Scotia Mall, housed tenants such as Famous Players cinema and a Woolco department store. [5] A food court, known as the "Ports of Call", opened in July 1978 with 350 seats and seven food kiosks. [6]
The second office tower, Barrington Tower, was officially completed on 1 April 1971 and served as the headquarters of the Nova Scotia Power Commission, later Nova Scotia Power Corporation. [7] Following privatization of the electricity utility, it became the headquarters of Emera. Duke Tower and Barrington Tower are located directly on top of the Scotia Square mall.
In addition to offices, retail space, and a hotel, Scotia Square was designed to include several apartment buildings. The first of these was the 190-unit Scotia Towers, which opened in 1972. [8]
In October 1971, it was announced that Halifax Developments Limited would partner with Canadian Pacific Hotels to build a new hotel at Scotia Square. [9] Called the Chateau Halifax, the hotel was completed on 29 January 1974. [10] [11] It later became the Delta Halifax, and as of 2023 is operated as the Hotel Halifax by a different owner.
MacKeen Towers, the second residential building in the Scotia Square complex, opened in October 1974. It is named after Colonel John C. MacKeen. [12]
The original development plan called for an apartment building at the north end of the parking garage. Owing to the successful leasing of the two office towers, it was decided to build a third office tower there instead. [13] Called Cogswell Tower, this building was completed in May 1975. [14]
The third residential building, the 155-unit Plaza 1881, began accepting tenants in May 1980. It was designed as a "deluxe apartment building" with a health club and swimming pool. [15] It was built on the site of Halifax's old city market and police department.
Two additional buildings on the opposite side of Barrington Street are marketed as being part of Scotia Square, though these were not part of the original development proposal. They were developed by Durham Leaseholds Limited, a joint venture between Halifax Developments Limited and Oxford Development Group of Edmonton, and are linked to the Square Square mall via enclosed pedestrian bridges.
1809 Barrington, better known as the CIBC Building, is an office high-rise that was announced by the Canadian Imperial Bank of Commerce in 1975 as the bank's new Atlantic regional headquarters, and opened as the Bank of Commerce Tower in September 1977. [16] [17] It is connected to TD Tower, which is owned by a different landlord and is not considered part of Scotia Square.
Barrington Place, a low-rise retail and hotel building, was opened on 26 March 1980. It housed the 203-room Barrington Inn, which was operated by Delta Hotels and was later known as the Delta Barrington. As of 2023, it operates as the Barrington Hotel. Barrington Place also contained 55 retail spaces on opening, providing together with Scotia Mall more than 150 shops and services, which Halifax Developments described as "the greatest single selection of stores and services in Atlantic Canada". [18] The eastern side of the development incorporates the architecturally valuable facades of demolished 19th-century buildings facing the Granville Mall (a portion of Granville Street closed to motor vehicle traffic). In recent years, much of the Barrington Place retail space was converted to office space as well as a gym that occupies many of the former shopfronts along Granville Street.
In the 1980s, a footbridge was built across the Cogswell Interchange linking Barrington Place to the Purdy's Wharf development on the waterfront. In the late 1990s, the podium façade at the corner of Duke and Barrington streets was altered.
In 2014, retail and dining storefronts were added to the three apartment buildings on Brunswick Street (MacKeen Towers, Scotia Towers, and Plaza 1881), replacing blank walls. [19] This project won an Award of Merit for Civic Design in the Halifax municipal government's Urban Design Awards 2018. [20]
An expansion of the Scotia Square shopping centre, along Barrington Street, was built around 2016-17. It was designed by DSRA Architects of Halifax. [21] The three-storey development adds street-level commercial space, as well as office and retail space above. According to Crombie REIT, the design was intended to bring the site into better agreement with municipal design guidelines mandating more pedestrian-oriented districts. [22] The project also added an indoor waiting room, at street level, for Halifax Transit passengers.
A new building, Westhill on Duke, was proposed in the 2010s for the southwest corner of the complex on the corner of Duke Street and Albemarle Street. It was to be an 18-storey building with retail, residential, and office space with a more pedestrian-friendly street frontage than the current blank wall. [23] Architects involved on the project were DSRA Architects and Zeidler Partnership Architects.
The Westhill on Duke proposal was superseded in 2023 by "The Marlstone", a 291-unit residential building that began construction the same year. [24]
Scotia Square consists of a shopping mall, two hotels, and a number of office and apartment towers connected to each other and to other buildings by pedways and tunnels. In the centre of the complex is Scotia Square Mall and a large food court servicing the adjoining office buildings. The complex is adjacent to the Cogswell Interchange, and it fronts on Duke Street to the south, Barrington Street to the east, and Albemarle Street (formerly Market Street) to the west.
Name | Type | Opening year | Floor count | Notes | References |
---|---|---|---|---|---|
Brunswick Place | Office, warehouse | 1968 | 5 | Formerly the Trade Mart | [25] [26] |
Podium | Retail, office, parking | 1969 | Varies | Includes a shopping centre, 1,700-space parking garage, tower lobbies, and office space. | |
Duke Tower | Office | 1970 | 16 | [25] [27] | |
Barrington Tower | Office | 1971 | 20 | [25] [28] | |
Scotia Towers | Residential | 1972 | 12 | ||
Hotel Halifax | Hotel | 1974 | 13 | Formerly the Chateau Halifax, Delta Halifax | [29] |
MacKeen Towers | Residential | 1974 | 12 | ||
Cogswell Tower | Office | 1975 | 20 | 14 office levels on top of 6 parkade levels | [25] [30] |
CIBC Building | Office | 1977 | 16 | ||
Barrington Place | Hotel, retail, office | 1980 | 5 | Includes the Barrington Hotel | [31] [25] |
Plaza 1881 | Residential | 1980 | 12 | ||
The Marlestone | Residential | 2026 | 20 | Construction began in 2023. |
Scotia Square is connected to surrounding buildings by several pedestrian bridges and tunnels.
The Scotia Square mall is mainly located beneath Duke and Barrington towers. It has grown smaller over time, as the uppermost floor was converted to office space. Today, the mall occupies one level (except for the NSLC outlet next to the Barrington Street entrance at street level).
The food court was renovated in 2014 and named "The Mix" by Crombie REIT. The court features 14 different food vendors ranging from large fast food chains like McDonald's to locally owned vendors like Mama Gratti's Deli & Market. Various upgrades to seating during the renovation allows large foot traffic during lunchtime rushes during the week. Being based toward servicing those working downtown the hours of operation of most food court tenants are 9:30 a.m. to 6:00 p.m. [33]
The municipal government operated a service centre in the mall, but this closed permanently in 2020. [34]
As of 2023, the mall is home to 11 food outlets and 23 shops and services. Major tenants include Lawtons, Scotiabank, Coles, NSLC, Dollarama, and Goodlife Fitness. [35]
Scotia Square is home to one of the busiest Halifax Transit bus terminals in the city; Scotia Square Terminal saw over 11,000 passengers board or alight on an average weekday in 2019/20. [36] As of October 2021, it was served by 33 bus routes. Most of the buses stop on Barrington Street with the exception of the regional express (MetroX) routes, which are located on Albemarle Street, and route 2, which stops on Duke Street in the Clayton Park-bound direction.
As part of a renovation and expansion of the Scotia Square shopping centre on Barrington Street, an indoor waiting room was added for Halifax Transit passengers. Located at street level, on the west side of Barrington Street, the waiting room opened on 27 November 2017. [37]
There are plans to expand and enhance Scotia Square Terminal as part of the Cogswell Interchange redevelopment project, adding dedicated transit lanes, seating, improved lighting, canopies, and electronic signage. [38]
The Spring Garden Road area, along with Barrington Street is a major commercial and cultural district in Halifax, Nova Scotia, Canada. It acquired its name from the fresh water spring that flows directly beneath it. It comprises Spring Garden Road, South Park Street, and a number of smaller side streets. The area is considered to be one of the trendiest areas in Halifax and is the busiest shopping district east of Quebec.
The Plus 15 or +15 is a skyway network in Calgary, Alberta, Canada. It is the world's most extensive pedestrian skywalk system, with a total length of 16 kilometres and 86 bridges connecting 130 buildings, as of 2022. Calgary often has severe winters and the walkways allow people to get around the city's downtown more quickly and comfortably. The busiest parts of the network saw over 20,000 pedestrians per day in a 2018 count.
Purdy's Wharf is an office complex in Halifax, Nova Scotia, Canada. Built over the water at the edge of Halifax Harbour and resting on pilings, it consists of two office towers, and a smaller office structure called Purdy's Landing. The complex is located along the Halifax Waterfront Boardwalk.
The Bank of Commerce Building, also known as the CIBC Building, is a high-rise office building in the downtown core of Halifax, Nova Scotia, Canada. It is located on Barrington Street and is owned and operated by Crombie REIT. The office tower stands at 66 metres and has 16 floors. It was completed in 1977. The building is connected to the Downtown Halifax Link system.
The Downtown Halifax Link system is a network of climate-controlled pedways connecting various office buildings, hotels, parkades, and entertainment venues around downtown Halifax, Nova Scotia, Canada. It is similar to Toronto's PATH or Montreal's RÉSO system, but on a much smaller scale. These walkways are all open to the public, and are convenient during inclement weather and the winter months.
Barrington Tower is a part of the Scotia Square Complex in Downtown Halifax, Nova Scotia, Canada. The tower stands at 84 metres (275 feet) and has 20 floors. It is owned and operated by Crombie REIT.
Cogswell Tower is part of the Scotia Square Complex in downtown Halifax, Nova Scotia. It is used for office and commercial space and stands at 79 metres (259 ft) with 14 floors, plus levels G, P1, P2, P3, P4, P5, P6 underneath, which are part of the parkade on which Cogswell Tower sits. G level is ground level for Barrington Street and connects to the lobby of the Delta Halifax, P1 enters into Scotia Square, and P3 level is ground level for Albemarle Street. The building is connected to the Downtown Halifax Link system.
Duke Tower is part of the Scotia Square complex in Downtown Halifax, Nova Scotia. It is used for office and commercial use and stands at 71 metres with 16 floors. It in part houses the offices of Emera as well as tenants such as the dentistry offices of Scotia Dental and a campus for the Canadian Language Learning Centre. The building is connected to the Downtown Halifax Link system and has a ground level entrance on Duke Street and an entrance in Scotia Square Mall.
Barrington Street is a major street in Halifax, Nova Scotia, Canada, running from the MacKay Bridge in the North End approximately 7 km south, through Downtown Halifax to Inglis Street in the South End. Its civic numbers range from 950 to 4756 on the Halifax Peninsula street grid numbering system.
Halifax City Hall is the home of municipal government in Halifax, Nova Scotia, Canada. Designed by architect Edward Elliot, and constructed for the City of Halifax between 1887 and 1890, it is one of the oldest and largest public buildings in Nova Scotia. The property was designated a National Historic Site of Canada in 1997.
The Edmonton Pedway system is a pedestrian network connecting office buildings, shopping centres, and parkades in downtown Edmonton, Alberta, Canada. It consists of approximately 13 kilometres (8.1 mi) of year-round climate-controlled tunnels, and walkways between the second floors of buildings, approximately 15 feet (4.6 m) above ground. The main network connects more than 40 buildings and parkades, and three of the five Edmonton Light Rail Transit (LRT) stations in the downtown area.
Halifax Shopping Centre, located in Halifax, Nova Scotia, is Atlantic Canada's largest multi-building shopping centre. The centre is owned and operated by Primaris REIT. The property consists of an enclosed shopping centre with 641,585 square feet (59,605.2 m2) of leasable area, which attracts over 110,000 people each week, and an adjacent property with larger format retailers and office tower called Halifax Shopping Centre Annex with an additional 419,776 square feet (38,998.5 m2) of leasable area, including a 53,846 square feet (5,002.5 m2) office tower, Chebucto Place. Mumford Professional Centre is immediately adjacent to the annex property and represents an additional 237,084 square feet (22,025.8 m2) of leaseable space.
Park Lane is a three-storey shopping mall with 40+ shops in Halifax, Nova Scotia, Canada. It is located on Spring Garden Road and is owned by Universal Properties.
Crombie REIT is a Canadian unincorporated open ended publicly traded real estate investment trust which trades on the Toronto Stock Exchange and has an estimated market capitalization of $1.6 billion. The company is based in New Glasgow, Nova Scotia.
Winnipeg Square is an underground shopping mall located at Portage and Main in downtown Winnipeg, Manitoba, Canada. It was built in 1979 by Smith Carter Parkin for the Trizec Corporation, and has 45 stores and restaurants.
360 Main is a 32-storey office tower located at Portage and Main in downtown Winnipeg, Manitoba.
Brunswick Square is a building complex located in Uptown Saint John, New Brunswick, Canada. It consists of a 3-storey shopping mall as well as a 19-storey Class A office tower. The complex contains a 700 capacity parking garage.
... it is expected that the apartment building planned to sit atop the north pad of the project will be changed to a third office building comprising about 85,000 square feet. This change reflects successful leasing of the first two (2) office buildings.
In 1975, the bank announced plans for a sixteen-storey tower in Halifax to serve as the new headquarters for the Atlantic region and house the Halifax main branch.