The Shrewsbury and Birmingham Railway was authorised in 1846. It agreed to joint construction with others of the costly Wolverhampton to Birmingham section, the so-called Stour Valley Line. This work was dominated by the hostile London and North Western Railway, which used underhand and coercive tactics. The section between Shrewsbury and Wellington was also built jointly, in this case with the Shropshire Union Railway.

Contents

System map of the Shrewsbury and Birmingham Railway S&br 01.png
System map of the Shrewsbury and Birmingham Railway

The S&BR opened from Shrewsbury to its own Wolverhampton terminus in 1849. The Stour Valley Line was still delayed by the LNWR, but the S&BR eventually got access to it in 1852. By this time it was obvious that the LNWR was an impossible partner, and the S&BR allied itself to the Great Western Railway, which reached Wolverhampton in 1854. The S&BR merged with the GWR in 1854. With the S&BR and other absorbed railways, the GWR obtained a through route between London and the River Mersey at Birkenhead, and to Manchester and Liverpool by the use of running powers.

The S&BR route was an important part of this main line until the 1960s, when electrification of former LNWR routes compelled concentration of long-distance traffic elsewhere, and the line became a secondary route, still in important passenger operation.

The S&BR line had the distinction of having at one time the northernmost section of GWR broad gauge usage, and much later the first section of the former GWR to have overhead electrification.

Origins

Local people proposed a railway from Birmingham to Shrewsbury by way of Dudley and Wolverhampton in 1844. The London and Birmingham Railway was engaged at the time in competitive rivalry with the Grand Junction Railway and hoped that the Shrewsbury line might enable them to by-pass the GJR; accordingly they supported it, and provisionally agreed a lease. [1] [2]

In their own defence, the Grand Junction Railway devised a scheme for a railway from Wolverhampton to Shrewsbury as well as a line from Stafford, on their own main line, to join it. It was these lines that went to the 1845 session of Parliament as the Shrewsbury and Birmingham Railway, but the scheme failed Standing Orders and was rejected.

Shortly afterwards the London and Birmingham Railway and the Grand Junction Railway amalgamated, forming (with the Manchester and Birmingham Railway)the London and North Western Railway. This changed the competitive situation completely, and both factions within the LNWR abandoned their support for any Shrewsbury line. [1] [3]

The independent promoters of the Shrewsbury line called their line the Shrewsbury and Birmingham Railway. They decided to continue their attempt, but to leave the section of route between Birmingham and Wolverhampton to be built jointly with others: this was going to be the most expensive section to build, and the bigger railways already had plans for the district. That became the Birmingham, Wolverhampton and Stour Valley Railway; it would be paid for jointly, with the S&BR, the LNWR and the Birmingham Canal each subscribing a quarter of the capital; the remaining quarter would come from ordinary public subscriptions. [2]

Authorisation

Shrewsbury and Birmingham Railway Act 1846
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Long title An Act for making a Railway from Shrewsbury to Wolverhampton, with a Branch, to be called "The Shrewsbury and Birmingham Railway."
Citation 9 & 10 Vict. c. cccvii
Dates
Royal assent 3 August 1846

The Shrewsbury and Birmingham Railway Bill (now for a railway between Shrewsbury and Wolverhampton only, under 20 miles) and the Stour Valley Railway (the short form name of the BW&SVR) both went to the 1846 session; so did the Birmingham, Wolverhampton and Dudley Railway, destined to be the saviour of the S&BR later on. Sixteen railways in the district were under consideration, and the S&BR capital was £1.3 million. The Stour Valley capital was £1.11 million. The bills were passed on 3 August 1846 as the Shrewsbury and Birmingham Railway Act 1846 (9 & 10 Vict. c. cccvii) and the Birmingham, Wolverhampton and Dudley Railway Act 1846 (9 & 10 Vict. c. cccxv). [4] [2] [5] [6]

The Shrewsbury, Oswestry and Chester Junction Railway was authorised in 1845 to build to a terminus in Shrewsbury, but the obvious affinity of that line – it became the Shrewsbury and Chester Railway – with the Birmingham company led to the decision to have a joint station at Shrewsbury, at a modified location. It would also be jointly used by the Shrewsbury and Hereford Railway and the Shropshire Union company. It was ready in time for the opening throughout of the S&BR. [7]

So far as the Shrewsbury and Birmingham Railway was concerned, the ten miles from Shrewsbury to Wellington, about a third of the extent of the line, was to be built and operated jointly with the Shropshire Union Railways and Canal Company; that railway was planning a line from Stafford to Wellington, in order to get access to Shrewsbury.

The final laying out of the line was entrusted to William Baker. The directors instructed that the major structures on the line be made suitable for broad gauge track, in case that were to be laid later. [1] [8]

The Shrewsbury, Wolverhampton and South Staffordshire Junction Railway amalgamated with the S&BR in 1847.

In 1847 the Shrewsbury and Birmingham Railway got approval to build a branch from Shifnal to Madeley, and extend the Coalbrookdale branch to Ironbridge, as well as increasing capital. [9]

The LNWR gathers strength

In the autumn of 1846 the LNWR took a lease of both the Shropshire Union Railway and Canal system, and of the Stour Valley Railway. The S&BR acquiesced in this, having been given assurances about traffic pooling. [8] The LNWR had acquired share of the Birmingham Canal Company, so that the LNWR now had a 50% share of the Stour Valley Railway as well as the lease. Suddenly the LNWR was dominant in the area, and the Shrewsbury and Birmingham saw that its position was precarious. However an agreement was reached with the LNWR that traffic would not improperly be diverted away from the S&BR line, and the LNWR's Bill to authorise the lease was allowed to pass. The Shrewsbury and Birmingham Railway was also given running powers over the Stour Valley line; and in addition that the short section of line from Wolverhampton station to the divergence of the Shrewsbury and Stafford lines would be joint. The running powers would lapse if the S&BR were taken over by the GWR or certain companies considered to be its allies. [10] [8]

Opening of the line

Oakengates tunnel, 471 yards, took some time to complete; although it was short, it was to be bored through solid rock. [9]

Wolverhampton railways in 1849 S&br 02.png
Wolverhampton railways in 1849

The S&BR opened its line as far as from Shrewsbury to Oakengates station, as well as the joint line on 1 June 1849. The LNWR opened its line from Stafford, joining the joint line at Wellington, on the same day. The rest of the S&BR through to a temporary station at Wolverhampton was opened on 12 November 1849. The Wolverhampton station was a small affair immediately south of the Wednesfield Road. It was at this stage not connected to any other railway, so one platform was enough for the passenger business. [11] [12] [9]

War with the LNWR

Oakengates Tunnel Train Tunnel - geograph.org.uk - 117493.jpg
Oakengates Tunnel

At this period the LNWR decided to do all it could to harm the Shrewsbury and Birmingham Railway, and its natural allies the Shrewsbury and Chester Railway, and the Chester and Birkenhead Railway. This extended to illegal acts; the worst of these took place around Chester, involving the two railways that opposed the LNWR there. [13] Further south the LNWR engaged in a price war, in which fares dropped to unreasonably low levels, in an attempt to coerce the S&BR.

In addition the LNWR as the major shareholder in the Stour Valley line ensured that the completion of the line, on which the S&BR relied, was delayed. The agreement about traffic pooling was ignored. The LNWR had the old Grand Junction Railway station at Wednesfield Heath, a mile or so from Wolverhampton, while the S&BR connected into no other line at Wolverhampton. [14] [15]

Obviously the S&BR was unable to convey goods traffic for points south of Wolverhampton because of LNWR intransigence, and they tried to construct a goods transhipment location alongside the canal at Victoria basin, just north of Wolverhampton, in April 1850. This was alongside their passenger terminus. As they attempted to lay boards to make a pathway for the physical transfer of goods from their wagons to canal barges, they suffered from LNWR physical violence and intimidation there too. [9]

The S&BR was alienated from the LNWR, and turned to the Great Western Railway, which was building its own line towards Wolverhampton. [note 1] On 10 January 1851 a traffic agreement was concluded between the S&BR and the S&CR with the GWR. [16] [17] [18]

LNWR actions included packing shareholders’ meetings with nominees, the forging of a S&BR company seal, and numerous other improper procedures. As the S&BR and S&CR became increasingly aligned to the GWR, LNWR aggression turned to the Birkenhead, Lancashire and Cheshire Junction Railway. Nevertheless, in 1851 the Associated Companies (the GWR, the S&BR and the S&CR) obtained running powers over the BL&CJR, giving them ultimately access to Birkenhead, Liverpool and Manchester. [19]

Stour Valley line

Wolverhampton railways in 1852 Wolverhampton railways in 1852.png
Wolverhampton railways in 1852

The Shrewsbury and Birmingham Railway needed the Stour Valley line to be opened, to give them access to Birmingham. It was evidently physically completed, but the LNWR now adopted underhand tactics to delay opening that would permit the S&BR trains to run on the line. The escalation of this culminated in the S&BR deciding to run a train on 1 December 1851, despite the LNWR prevarication. The LNWR put physical obstructions on the lie to prevent the train running; a large number of men on both the S&BR and LNWR sides were present, but the planned run was frustrated.

The matter dragged on, with alleged unsafe factors on the line being used to delay opening, in some cases assisted by the Board of Trade inspector. At length the line opened on 1 July 1852. The LNWR was still able to prevent the S&BR trains running, by failing to agree operating rules at Wolverhampton and Birmingham stations, and numerous other artificial difficulties. Eventually on 4 February 1854 S&BR Trains started to run on the Stour Valley Line to Birmingham. [20] [21] [22] [9]

A GWR route at last

Wellington station WellingtonRailwayStation3.JPG
Wellington station

The opening of the Birmingham, Wolverhampton and Dudley Railway in 1854 finally gave the S&BR access southwards to the GWR, and the LNWR was at last powerless to frustrate the S&BR in the Birmingham area. [17] The Wolverhampton Junction Railway was an essential part of the connection. It was three-quarters of a mile long and connected the southward course of the S&BR at Stafford Road Junction into the Birmingham, Wolverhampton and Dudley Railway, at Cannock Road Junction. It was wholly owned by the Great Western Railway.

Wolverhampton railways in 1854 Wolverhampton railways 1854.png
Wolverhampton railways in 1854

Its course passed through the S&B locomotive and carriage works at Stafford Road; this was quite new, and many modern buildings were demolished to make way for the new connecting line. It opened in on 14 November 1854, at the same time as the BW&DR. It was mixed gauge; OW&WR broad gauge trains required access to Victoria Basin, and the headshunt into the Basin sidings was the northernmost point of the GWR broad gauge. [23]

Amalgamation with the GWR

The determined hostility of the LNWR naturally led to a strong feeling of allied interests between the Great Western Railway, the Shrewsbury and Birmingham Railway and the Shrewsbury and Chester Railway, and they became known as the Allied Companies. It was clear that formal amalgamation was inevitable, and this was enacted on 7 August 1854, taking effect on 1 September 1854. [24] The two Shrewsbury lines were narrow (standard) gauge and were referred to as the “northern division” within the enlarged GWR. There was no physical connection at first until the Wolverhampton line was opened in November 1854. [25] [26]

The Shrewsbury lines which the GWR now absorbed were not greatly profitable; and they had huge indebtedness in debentures and guaranteed preference shares. The two lines together had £3 million of capital, of which only £1.8 million was in ordinary shares. There was half a million in 8% preference shares. [27]

Madeley and Lightmoor

Buildwas railway station and power station Buildwas railway station 1935708 42d2f55f.jpg
Buildwas railway station and power station

The Lightmoor branch was authorised in S&BR days, to serve a mineral district. It opened in 1854 and was extended to Coalbrookdale in 1864, and the area was connected from the southern end also. The passenger service was never successful and closed in 1915. There was pressure locally to revive it, and remarkably a trial was arranged in 1925; it was unsuccessful and the service closed again two months later.

From 1969 the branch handled merry-go-round services to a coal-fired power station at Ironbridge. This work has ceased and the branch has closed. [28]

In GWR days

Codsall station Codsall Railway Station - geograph.org.uk - 515579.jpg
Codsall station

In 1858 the GWR built a large goods depot at Herbert Street, Wolverhampton, near the Victoria Basin. In broad gauge days it was used as the transshipment shed at the break of gauge.

GWR passenger trains now used their own station at Wolverhampton, and in March 1859 the GWR sold its half share of the other (High Level) station, inherited from the S&BR, to the LNWR. The connection from the S&BR lines to the High Level station was then severed. Herbert Street depot was alongside that connection, and now traffic for Herbert Street accessed the depot by a one-mile connection from Stafford Road Junction. [29]

From 1854 the Great Western Railway had a through route from Paddington to the Mersey at Birkenhead., albeit with a break of gauge at Wolverhampton. By this time it was obvious that extension of the broad gauge north of Wolverhampton was impossible, and the GWR progressively converted the broad gauge southward to mixed gauge. From 1 October 1861 narrow gauge trains ran between Paddington and Birkenhead.

The S&BR route proved to be an important part of the GWR connection with Birkenhead, and through expresses from London were booked on the route. Local traffic was never significant, and the development of reliable bus services in the 1920s and later took much traffic away from the line.

Oxley marshalling yard was developed just north of the divergence from the Stafford line, and a large carriage servicing depot was later established there.

After 1930

Between Wellington and Market Drayton Junction Wellington (Shropshire) Market Drayton Junction geograph-2575835-by-Ben-Brooksbank.jpg
Between Wellington and Market Drayton Junction

The GWR operated the line as an important main line; Birkenhead was a key access point for Liverpool passenger traffic, and trunk express trains, including a night sleeping car train ran. The Birkenhead, Lancashire and Cheshire Junction Railway network gave direct access for goods trains to Liverpool and Manchester. The BL&CJR was now owned jointly by the GWR and the London, Midland and Scottish Railway as successor to the LNWR. Birkenhead was itself a key destination for coal and an originating point for imported iron ore. As holiday and leisure traffic developed the seasonal train service included through trains to the coastal destinations of Aberystwyth, Barmouth and Pwllheli.

The main line railways of Great Britain were nationalised in 1948, but the train service pattern remained largely unchanged for some time. However, a changed pattern of leisure and holiday travel led to a gradual decline of those services, while the local passenger trains suffered a steep decline in patronage. The loss of heavy industry resulted in diminished mineral traffic; and the common ownership of alternative routes led to diversion of much trunk freight to other lines.

From 1966

The Stafford – Wolverhampton – Birmingham line was electrified in 1966. The Paddington to Birkenhead trunk passenger route was ended in 1967, with all through traffic from London to Crewe and beyond being handled over the former LNWR route. Wolverhampton Low Level, the GWR station, was closed to passengers on 6 March 1972 [30] and all Wolverhampton passenger traffic was dealt with at the High Level (former LNWR) station. This required reinstatement of the short connecting line to the S&BR line near Stafford Road. Wolverhampton Low Level station was later used as a parcels concentration depot, from 6 April 1970. [31]

Oxley Sidings had become an important carriage servicing depot, and the line from there to Wolverhampton High Level was electrified in 1972. This was the first section of the former GWR to be electrified with overhead equipment. [29] [32]

Telford Station Telford Station - geograph.org.uk - 738390.jpg
Telford Station

From 1967 development of a new town named Telford took place. The town has a station on the S&BR line, opened in 1986.

In 1983 a new spur line was built at Wolverhampton, enabling direct running from the Stafford direction to Oxley Carriage Sidings: from Stafford Road Junction to Bushbury Junction. The short line was largely built on the course of the Wolverhampton Railway connection from Stafford Road Junction, and a former gas works branch near Bushbury Junction. The connection was installed to enable empty coaching stock trains to access Oxley sidings, but there have been occasional instances of diverted passenger trains using the line.

In 2009 a rail freight depot known as Telford International Railfreight Park was opened, partly funded by generous Government grants. However it does not appear to have attracted much traffic.

The present-day (2019) passenger train service consists of typically three trains an hour on weekdays, with some through trains to Aberystwyth and Holyhead.

Location list

Main line

Wolverhampton Junction Railway and Low Level Station

Lightmoor branch

Opened 1854.

See also

Wolverhampton–Shrewsbury line

Notes

  1. At this stage the GWR was no closer than Banbury.

Related Research Articles

<span class="mw-page-title-main">Wolverhampton–Shrewsbury line</span> Railway line serving between Wolverhampton and Shrewsbury

The Wolverhampton–Shrewsbury line is the railway line from Wolverhampton to Shrewsbury via Wellington; it was originally built by the Shrewsbury and Birmingham Railway. The line is double track throughout, with rarely used relief sidings at Cosford and four tracks through Wellington station.

<span class="mw-page-title-main">Wellington railway station (Shropshire)</span> Railway station in Shropshire, England

Wellington railway station serves the town of Wellington, Shropshire, England. It is situated on the former Great Western Railway's London Paddington to Birkenhead via Birmingham Snow Hill line. Trains are operated by West Midlands Railway, and Transport for Wales.

The Stour Valley Line is the present-day name given to the railway line between Birmingham and Wolverhampton, in England. It was authorised as the Birmingham, Wolverhampton and Stour Valley Railway in 1836; the title was often shortened to the Stour Valley Railway.

The Wellington to Craven Arms Railway was formed by a group of railway companies that eventually joined the Great Western Railway family, and connected Wellington, Shropshire and Shifnal, with Coalbrookdale, Buildwas, Much Wenlock and a junction near Craven Arms. Its objectives were dominated by the iron, colliery and limestone industries around Coalbrookdale.

The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.

<span class="mw-page-title-main">Rugby–Birmingham–Stafford line</span> UK railway line

The Rugby–Birmingham–Stafford line is a railway line in the West Midlands of England. It is a loop off the West Coast Main Line (WCML) between Rugby and Stafford, via the West Midlands cities of Coventry, Birmingham and Wolverhampton. The direct route between Rugby and Stafford is the Trent Valley line.

The South Staffordshire Railway (SSR) was authorised in 1847 to build a line from Dudley in the West Midlands of England through Walsall and Lichfield to a junction with the Midland Railway on the way to Burton upon Trent, with authorised share capital of £945,000. It was supported by the newly-formed London and North Western Railway (LNWR) and the Midland Railway, giving each company access to important areas. It completed its main line in 1849. As collieries in the Cannock region rose in importance, it built a second main line from Walsall to Rugeley, as well as numerous short spurs and connections to lines it intersected. Colliery working in the Cannock area expanded enormously, and mineral traffic carryings increased in step.

The Pontypool, Caerleon and Newport Railway was promoted independently to relieve congestion on the heavily worked Eastern Valley Line of the Monmouthshire Railway and Canal Company. The Great Western Railway put up half the capital, making it in effect a GWR subsidiary. It opened in 1874, and most long-distance passenger and goods traffic, especially the heavy mineral traffic, transferred to it. It amalgamated with the GWR in 1876.

The Midland Railway branches around Walsall were built to give the Midland Railway independent access to Wolverhampton, and to a colliery district at Brownhills. The Midland Railway had a stake in the South Staffordshire Railway giving it access to Walsall, and the Walsall and Wolverhampton Railway (W&WR) was opened in 1872. At first the W&WR was independent and neutral, but it was acquired by the London and North Western Railway (LNWR), and then sold by that company to the Midland Railway.

<span class="mw-page-title-main">Shrewsbury and Wellington Joint Railway</span>

The Shrewsbury and Wellington Joint Railway (S&WJR) was operated by the London North Western Railway and the Great Western Railway. Its line ran from Shrewsbury to Wellington. Abbey Foregate also acted as a junction, with chords to Shrewsbury station and to the direct line to Wales.

The Shrewsbury and Hereford Railway was an English railway company that built a standard gauge line between those places. It opened its main line in 1853.

The Newport, Abergavenny and Hereford Railway was a railway company formed to connect the places in its name. When it sought parliamentary authorisation, it was denied the southern section, and obliged to use the Monmouthshire Railway between Pontypool and Newport.

<span class="mw-page-title-main">Birkenhead Railway</span> Former railway company in the UK

The Birkenhead Railway was a railway company in North West England. It was incorporated as the Birkenhead, Lancashire and Cheshire Junction Railway (BL&CJR) in 1846 to build a line connecting the port of Birkenhead and the city of Chester with the manufacturing districts of Lancashire by making a junction near Warrington with the Grand Junction Railway. The BL&CJR took over the Chester and Birkenhead Railway in 1847, keeping its own name for the combined company until it shortened its name to the Birkenhead Railway in 1859. It was taken over jointly, on 1 January 1860, by the London and North Western Railway (LNWR) and the Great Western Railway (GWR). It remained a joint railway until nationalisation of the railways in 1948.

The West London Railway was conceived to link the London and Birmingham Railway and the Great Western Railway with the Kensington Basin of the Kensington Canal, enabling access to and from London docks for the carriage of goods. It opened in 1844 but was not commercially successful.

Admaston railway station was a railway station serving the village of Admaston in Shropshire, England. It was located on what is now known as the Shrewsbury to Wolverhampton Line.

The Worcester and Hereford Railway started the construction of a standard gauge railway between the two cities in 1858. It had needed the financial assistance of larger concerns, chiefly the Oxford, Worcester and Wolverhampton Railway, and the Newport, Abergavenny and Hereford Railway. It opened its line progressively from 1859 to 1861, delayed by exceptionally difficult tunnelling at Colwall and Ledbury. The company was purchased by the West Midland Railway in 1860, and that company amalgamated with the Great Western Railway in 1863.

<span class="mw-page-title-main">Shrewsbury and Chester Railway</span> Former railway company

The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title the Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.

The Oxford and Rugby Railway was promoted by the Great Western Railway as a means of connecting to the West Midlands and the north of England, by joining existing railways at Rugby. It was authorised in 1845, but the GWR soon decided to make its own line to Birmingham, and in 1846 it acquired the O&RR; work had not started on its construction. In the same year the GWR obtained an act of Parliament, the Birmingham and Oxford Junction Railway Act 1846, giving authorisation for its Birmingham line. The two railways were treated as a single project, to connect Birmingham and Oxford. In 1850 a single line was opened between Oxford and Banbury, and in 1852 the whole line to Birmingham was opened.

The Birmingham and Oxford Junction Railway was an English railway line promoted by the Great Western Railway to gain a route from its southern base towards the industrial centres of the West Midlands, and in due course the north-west. It overtook another GWR subsidiary, the unbuilt Oxford and Rugby Railway, and the Birmingham Extension Railway which was to build a new independent station in the city. It was authorised in 1846 and formed a single project to connect Birmingham and Oxford.

The Birmingham, Wolverhampton and Dudley Railway was an English railway company promoted to connect those places by rail. It was authorised by Parliament in 1846. It became apparent that it would be advantageous to merge with the Great Western Railway. The rival London and North Western Railway went to great lengths to frustrate the amalgamation, but ultimately failed, and the merger took place in 1847.

References

  1. 1 2 3 E T MacDermot, History of the Great Western Railway: volume I, published by the Great Western Railway, London, 1927, pages 348 to 351
  2. 1 2 3 Keith M Beck, The Great Western North of Wolverhampton, Ian Allan Limited, Shepperton, 1986, ISBN   0 7110 1615 1, page 10
  3. Rex Christiansen, A Regional History of the Railways of Great Britain: volume 7: the West Midlands, David & Charles Publishers, Newton Abbot, 1973, 0 7110 6093 0, pages 81 to 83
  4. Christiansen, page 85
  5. Herbert Rake, The Progress of the Great Western Railway from London to the Mersey, part1, in the Railway Magazine, June 1915
  6. Ernest F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, pages 117 to 119
  7. MacDermot, page 346
  8. 1 2 3 Beck, page 11
  9. 1 2 3 4 5 Rake, part 2, in Railway Magazine, August 1915
  10. MacDermot, pages 351 to 353
  11. MacDermot, page 353
  12. Christiansen, page 86
  13. Peter E Baughan, A Regional History of the Railways Of Great Britain: volume 11: North and Mid Wales, David St John Thomas, Nairn, 1980, ISBN   0 946537 59 3, pages 40 and 41
  14. Geoffrey Holt and Gordon Biddle, A Regional History of the Railways of Great Britain: volume 10: the North West, David St John Thomas, Nairn, 1986, ISBN   0 946537 34 8, page 45
  15. George P Neele, Railway Reminiscences, McCorquodale & Co, London, 1904, pages 28 and 29
  16. MacDermot, pages 357 to 363
  17. 1 2 Christiansen, page 88
  18. Beck, page 14
  19. MacDermot, pages 371 to 373
  20. MacDermot, pages 373 to 380
  21. Christiansen, pages 88 and 89
  22. Beck, pages 15 to 18
  23. Christiansen, pages 91 and 92
  24. MacDermot, page 390
  25. MacDermot, page 397
  26. Donald J Grant, Directory of the Railway Companies of Great Britain, Matador Publishers, Kibworth Beauchamp, 2017, ISBN   978 1785893 537, page 502
  27. MacDermot pages 402 and 403
  28. Christiansen, page 156
  29. 1 2 Christiansen, page 90 and 91
  30. 1 2 Michael Quick, Railway Passenger Stations in England, Scotland and Wales: A Chronology, the Railway and Canal Historical Society, Richmond, Surrey, 2002
  31. Christiansen, pages 95 and 96
  32. J C Gillham, The Age of the Electric Train, Ian Allan Limited, Shepperton, 1988, ISBN   0 7110 1392 6
  33. R A Cooke, Atlas of the Great Western Railway as at 1947, Wild Swan Publications, Didcot, 1997, ISBN   1 874103 38 0
  34. Col M H Cobb, The Railways of Great Britain: A Historical Atlas, Ian Allan Limited, Shepperton, 2002