Shrewsbury and Chester Railway

Last updated

The Shrewsbury and Chester Railway in 1849 Shrewsbury & Chester Railway.png
The Shrewsbury and Chester Railway in 1849

The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title The Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.

Contents

Much of its main line ran through rural areas, but the important mineral area west of Wrexham, and also near Ruabon, led to considerable development of mineral business. A dense network of branches to access pits and ironworks built up, although the hilly terrain made railway construction difficult. At the end of the nineteenth century passenger services were put on for the mining communities.

The main line business developed too, enabling the GWR to access the Mersey, from London and from South Wales, and a heavy long-distance mineral flow built up. That traffic dwindled steeply in the 1930s; the main line suffered from the handicap of reaching the west bank of the Mersey, and later it was reduced to the status of a secondary route. The original main line remains open.

The North Wales Coalfield

The North Wales Coalfield runs from near Talacre at the mouth of the River Dee through Wrexham to Oswestry. The coal and associated iron industries became particularly active from the early eighteenth century, but poor transport links to markets suppressed the potential of the trade. [1]

The Chester and Holyhead Railway was being promoted from 1836, and more actively from 1840, and the idea of a railway feeder to that line arose. This was promoted locally, titled the North Wales Mineral Railway. At first it was to include branches to coal pits and iron works, but these were dropped due to local opposition. It obtained the Royal Assent to its Act of Incorporation on 6 August 1844. It was to run from Wrexham to a wharf at Saltney, and a connection at the latter place to the Chester and Holyhead Railway, which was authorised in the same session. In the following Parliamentary session, on 21 July 1845 it was authorised to extend south from Wrexham to Ruabon. To get better access to the pits, it was to include a branch from a junction at Wheatsheaf, a little north of Wrexham, to Brymbo and Minera. [2] [3]

Further powers were taken the following year, on 27 July 1846, for short stubs to access collieries at Ffrwd, Brynmally, Brymbo and Vron. The line from Wheatsheaf to Minera was open in July 1847 and the local branches were ready and open in November 1847. [3]

Shrewsbury, Oswestry and Chester Railway

The forecast for the main line disrupted when the Chester and Holyhead Railway proposed its own line south. This arose out of disagreements with the Grand Junction Railway, on which the CHR would depend for access to London. The CHR developed proposals for a line from Chester to Shrewsbury (to be called the Cheshire and Shropshire Junction Railway). Such a railway would hugely reduce the income of the North Wales Mineral Railway, so the NWMR promoted its own route from Ruabon to Shrewsbury, named the Shrewsbury, Oswestry and Chester Junction Railway. In Parliament it was this line that was authorised, on 30 June 1845, unopposed in Parliament, and the CHR scheme was turned down. [2]

Shrewsbury and Chester Railway formed

The NWMR and the SO&CR were allies, and their strength was in the end-to-end route. It made sense to combine formally, and on 27 July 1846 the Shrewsbury and Chester Railway was created by Act of Parliament.

On the same day the Royal Assent was given to SO&CJR proposals for a branch from Leaton to Wem, and from Gobowen via Oswestry to Crickheath (four miles south of Oswestry, to join a proposed Shropshire Union Railway branch there). The plans for the SO&CR had been prepared hastily, and included an independent station at Shrewsbury. Negotiations with the promoters of other lines resulted in agreement for a joint station near the centre. The extension to this station was authorised in the amalgamation act; the joint station there was to be used also by the Shropshire Union Railway, the Shrewsbury and Hereford Railway, the Shrewsbury and Birmingham Railway. [2] [4]

The former NWMR main line from Ruabon (actually Rhosymedre, a little to the south) to Saltney, 15 miles, opened on 2 or 4 November 1846; [5] the section of the Chester and Holyhead Railway from Saltney into Chester opened on the same day, worked temporarily by the S&CR as the C&HR was not yet operational. There were five passenger trains each way daily.

The Minera branch, with two rope-worked inclines and two tunnels, opened in July 1847, and two subsidiary branches off that line, to Ffrwd and Brynmally collieries opened in November 1847. [2] [6]

The SO&CJR main line of 25 miles opened from Ruabon to a temporary terminus at Shrewsbury on 14 or 16 October 1848; [7] the extension to the new joint station was opened on 1 June 1849. [2] This was the first railway to enter Shrewsbury. There were two remarkable viaducts on the section between Ruabon and Shrewsbury, at Cefn over the Dee, and at Chirk over the River Ceiriog. The Dee viaduct is 510 yards in length, and was the largest in the country at the time of construction. [8]

Chester was promised a joint station by Act of 9 July 1847, to be used by S&CR, C&HR and LNWR trains; it opened on 1 August 1848. The Wem branch authorised in 1846 was never built, and the Crickheath branch was cut back to Oswestry from Gobowen; it opened on 23 December 1848. [2]

Dee Bridge failure

The Shrewsbury and Chester Railway used a section of the Chester and Holyhead Railway to reach Chester itself. On 24 May 1847 a bridge on that railway over the River Dee not far from Chester failed, and six persons were killed. The C&HR arranged for the bridge to be strengthened, and invited the S&CR to resume normal operation, but the S&CR waited for a Board of Trade inspection of the work; S&CR trains resumed operation over the strengthened bridge from 26 July. [9]

Shrewsbury and Birmingham Railway

The London and Birmingham Railway had encouraged the formation of the Shrewsbury and Chester Railway, but the L&BR itself merged with the Grand Junction Railway, forming the London and North Western Railway in July 1846. Now the LNWR viewed the S&CR as an abstracter of business: with the Shrewsbury and Birmingham Railway it would compete with the LNWR for traffic between the Mersey and London. However the Great Western Railway was building its line to Birmingham, so that an alignment with the GWR would benefit the S&CR; equally the LNWR would oppose any such linkage. [10] [4]

The Shrewsbury and Birmingham Railway had been authorised in 1846, though the section south of Wolverhampton to Birmingham was omitted, in favour of the Stour Valley Line. A Birkenhead, Lancashire and Cheshire Junction Railway had opened in 1840, between Birkenhead and Chester, and the Shrewsbury railways (S&BR and SCR) allied with it, achieving a through route from Birkenhead to Birmingham. The docks at Birkenhead, with the access to Liverpool, formed a key location at the time. [11] [12]

Conflict with the LNWR

The LNWR chairman, Mark Huish, was accustomed to aggressive business tactics, and prohibited the sale of tickets to Wolverhampton from Chester station, and had S&CR and BL&CJR publicity defaced, and banned omnibuses put on to by-pass the obstruction. The BL&CJR board was intimidated by the LNWR action and at first submitted to the pressure; but in 1850 its shareholders protested at the loss of business, and co-operation with the S&CR was resumed. (The shareholders had discovered that three times as much traffic was being received from the Shrewsbury line as from the LNWR. [13] [12]

In January 1851 the S&BR and the S&CR formed a traffic agreement with the GWR. The LNWR retaliated with a series of extremely improper business practices, including the forging of a traffic agreement using a false company seal. The S&CR obtained running powers over the whole of the Birkenhead line, enshrined in Act of Parliament, and the S&BR and the S&CR decided to merge with the GWR. At first this was refused by Parliament; the collaborative grouping continued nevertheless, and become known as “the Associated Companies”. [12]

Merging with the Great Western Railway

The amalgamation with the GWR was again proposed, and it was approved on 1 September 1854; in the process the new (expanded) GWR acquired its first narrow (standard) gauge locomotives. [14]

The Birkenhead company saw what was inevitable and made a traffic agreement with the GWR, and goods traffic from Birkenhead started on 2 February 1856. A passenger service between Birmingham and Birkenhead started on 1 May 1857. In 1859 the LNWR and the GWR agreed to joint operation of the Birkenhead line, and full joint ownership followed on 20 November 1860, ratified by Act of Parliament in 1861.

In August 1861 the GWR completed the laying of mixed gauge to Paddington, so that narrow gauge trains could run throughout from Birkenhead, and on 1 October 1861 the first narrow gauge through train ran. [12]

For some time the GWR did little to develop long distance passenger traffic; it had the handicap of the long route via Oxford, and of serving Liverpool from the Birkenhead side of the Mersey. Only from 1880 was a fast through train put on, known as the Northern Zulu. From this time the North and West route had trains from Cardiff and the West of England. [15] Goods traffic, more particularly mineral traffic, had long been a much more fruitful business; notwithstanding the existence of the North Wales Coalfield locally, there was a heavy traffic in coal from South Wales to the Wrexham area and Birkenhead for bunkering, and a corresponding southward traffic of iron ore to serve the ironworks of South Wales. [16] [17]

Passenger traffic developed from Birkenhead to GWR destinations, many of them outside London, as the LNWR service from Liverpool was superior. From the late 1890s through trains from Liverpool via the Mersey Railway were begun. In fact the dominant traffic was coal from South Wales to Birkenhead. [17]

Access to Minera improved

The 1847 branch from Wheatsheaf Junction to Minera via Brymbo was difficult to work, having two rope-worked inclines. The Shrewsbury and Chester Railway promoted a new line, the Wrexham and Minera Railway, which obtained the Royal Assent on 17 May 1861. It ran by a more southerly route, from a junction south of Wrexham, at Croes Newydd to Brymbo, [note 1] and it opened on 22 May 1862. The Moss Incline, the rope-worked inclined plane immediately east of Moss on the original Minera branch line was closed. [18] [19]

Wrexham, Mold and Connah's Quay Railway

There was dissatisfaction among industrialists over railway connections out of the area. In time the Wrexham, Mold and Connah’s Quay Railway was authorised on 7 August 1862. It was built from Wrexham to join the Buckley Railway, a former horse tramway that had been upgraded, and together the two short lines gave access to a wharf on the River Dee, and to a connection with the Chester and Holyhead Railway. The line opened on 1 January 1866 for mineral traffic, and for passengers after improvements, on 1 May 1866. [20]

LNWR branches

Since 1805 there had been a horse tramway from the canal at Pontcysyllte to Acrefair village, serving Kynaston colliery and iron works on the way, as well as quarries at Cefn. It was called the Ruabon Brook Tramway, owned by the canal company. It was leased to the London and North Western Railway in 1847, and in 1863 the LNWR converted the line to a locomotive railway, adding numerous short connections to pits and brickworks in the locality. [21]

The LNWR had a branch line to Coed Poeth and Tryddyn. The Wrexham and Minera Extension Railway, from Brymbo to Tryddyn, was authorised in 1865, and the powers were transferred to the LNWR and GWR jointly, and opened in 1872. [22] [23]

Ponkey branch

In 1861 the GWR opened a further branch from a junction just north of Ruabon station to furnaces at Ponciau (Ponkey) and Aberderfyn, opening on 1 August 1861, and on 27 August 1871 it was extended to Legacy Colliery. [23]

Moss Valley branch

The GWR opened a Moss Valley Branch of 3 miles, authorised on 21 July 1873 and opened on 11 May 1881; it ran to Ffrwd Ironworks from a junction with the W&MR main line near its origin. [24]

Passenger operation on the Brymbo lines

On the GWR line from Brymbo to Minera, passenger trains started operating as far as Coed Poeth on 15 November 1897, and the passenger service was extended to Berwig in 1905. From this time the motor-train system favoured by the GWR was used: a single coach incorporated a small steam engine; the arrangement was economical on lightly used passenger services, and a number of motor halts were opened to take advantage of the system. The Moss Valley branch received a similar passenger service from 1 May 1905, running from Wrexham as far up the valley as Moss Platform. [25]

Branch line extensions to Rhos

The GWR later obtained authorisation to construct a branch line (the “Rhos” branch) from near Wrexham to Rhos via the site of the closed Legacy Colliery, now Legacy Station, making new connections there with the Ponkey branch and the Plas Madoc branch. This new group of branches opened on 1 October 1901. Railmotors once again enabled a passenger service on local routes where patronage might not be heavy; from 1 May 1905 the passenger service on the Rhos branch was extended further south to Wynn Hall Halt, and from 5 June 1905 southwards from Legacy Station on the Ponkey branch as far as Ponkey Crossing Halt. [23] [26] [25]

Wrexham station improvements

The open cast working to the west of the coalfield declined as the pits became worked out, and increasingly at the end of the nineteenth century the focus was on underground working further east. Wrexham became the centre of railway activity as main branches led there, and the passenger facilities at Wrexham General station were substantially improved in the period 1909 – 1912. [27]

Passenger train services

In July 1938 there were expresses from London to Birkenhead at 09:10, 11:05, 14:10, 16:05 and 18:10, with some summer Saturday extras. Most of these trains advertised connections for the Isle of Man or Belfast, as well as Liverpool Landing Stage. Travel by the morning train occupied 5 hours and 7 minutes to Liverpool Landing Stage. Most of the expresses stopped at Shrewsbury, Gobowen, Ruabon, Wrexham and Chester, and there were some trains from the south coast conveying through coaches from multiple destinations.

The local service was fairly limited; taking Rednal as an example, there were seven weekday down trains calling, and most of the local trains did not run right through from Shrewsbury to Chester. [28] The general pattern had been similar in 1910, but the journey time was slower (6 hours 40 minutes London to Liverpool) and the last train was earlier, at 16:55. [29]

In 1960 there were express trains from London to Birkenhead at about two-hourly intervals, as well as a night train conveying a sleeping car. Most of the trains made connections to and from Oswestry at Gobowen. The local station service was very limited; for example Stanwardine Halt had three calls a day by down trains. [30]

Service reductions

Retrenchment in World War I resulted in the railmotor halts closing, as well as severance of the Ponkey to Legacy connection. Wrexham to Rhos passenger trains continued running until 30 December 1930.

The line between Pontcysyllte and Pant closed in 1953, and between Pant and Rhos on 14 October 1963. Competition from road services for local transport after World War II resulted in a steep decline in passenger and goods business at intermediate stations, and most of those were closed on 10 September 1962. [31]

When the electrification of the former LNWR London to Birmingham route was complete in March 1967, through trains from Paddington were discontinued, from 4 March 1967. [32]

The Gobowen to Oswestry line passenger service was discontinued on 7 November 1966; it was singled on 2 November 1971 with occasional freight operation, until 28 October 1988. [32] [33]

The original main line from Saltney Junction (Chester) to Shrewsbury remains active, with passenger stations open at Wrexham General, Ruabon, Chirk and Gobowen. Trains are about every hour but at irregular times.

Location list: main line and Oswestry branch only

Main line

Oswestry branch

See also

Notes

  1. It is sometimes asserted that the Wrexham and Minera Railway ran throughout between the points in its name. In fact the western extremity was at Brymbo, where it joined the 1847 Minera branch, which continued in use westward from there.

Related Research Articles

<span class="mw-page-title-main">Shrewsbury–Chester line</span> Railway line in England and Wales

The Shrewsbury–Chester line is a railway line between Chester and Shrewsbury in England, with the line passing through Wrexham County Borough in Wales. Passenger train services are operated by Transport for Wales Rail between the northern terminal of Chester and Shrewsbury in the south as part of the Wales & Borders franchise. Some additional services, starting part way along the line to London Euston via Chester are operated by Avanti West Coast. The line was built in 1846 by the Shrewsbury and Chester Railway, with the engineer for the line being Henry Robertson, a partner in locomotive builders Beyer Peacock, while the contractor was Thomas Brassey in partnership with William Mackenzie and Robert Stephenson. The line is part of Transport for Wales' North Wales Metro improvement programme.

<span class="mw-page-title-main">Shrewsbury and Birmingham Railway</span> Railway in England

The Shrewsbury and Birmingham Railway was authorised in 1846. It agreed to joint construction with others of the costly Wolverhampton to Birmingham section, the so-called Stour Valley Line. This work was dominated by the hostile London and North Western Railway, which used underhand and coercive tactics. The section between Shrewsbury and Wellington was also built jointly, in this case with the Shropshire Union Railway.

<span class="mw-page-title-main">Gobowen railway station</span> Railway station in Shropshire, England

Gobowen railway station is a railway station on the Shrewsbury to Chester Line of the former Great Western Railway's London Paddington to Birkenhead Woodside via Birmingham Snow Hill line, serving the village of Gobowen in Shropshire, England. It is the nearest station to the town of Oswestry.

<span class="mw-page-title-main">Wrexham General railway station</span> Railway station in Wrexham, Wales

Wrexham General is the main railway station serving the city of Wrexham, north-east Wales, and one of the two serving the city, alongside Wrexham Central. It is currently operated by Transport for Wales, but services are also provided by Avanti West Coast who operate a service to London Euston. Until January 2011 Wrexham & Shropshire also operated from here to London Marylebone.

The Chester and Holyhead Railway was an early railway company conceived to improve transmission of Government dispatches between London and Ireland, as well as ordinary railway objectives. Its construction was hugely expensive, chiefly due to the cost of building the Britannia Tubular Bridge over the Menai Strait. The company had relied on Government support in facilitating the ferry service, and this proved to be uncertain. The company opened its main line throughout in 1850. It relied on the co-operation of other railways to reach London, and in 1859 it was absorbed by the London and North Western Railway.

The Wrexham and Minera Railway or Wrexham and Minera Branch was a railway line in North Wales between the city of Wrexham, the village of Brymbo where it served the Brymbo Steelworks, and the lead mines and limeworks at Minera. A further branch ran from Brymbo to Coed Talon, where it connected with lines to Mold. The system was constructed in several stages between 1844 and 1872, while the various lines making up the system closed in 1952, 1972 and 1982.


The Mold and Denbigh Junction Railway was a railway company that built a 16-mile (26 km) railway line in North Wales. It formed a link between the Mold Railway and the Vale of Clwyd Railway towards Rhyl.

The North Wales Mineral Railway was constructed in Wales in 1844, during the early years of the Railway Mania. It was originally intended to link Chester via Wrexham to the industrial areas around Ruabon; there were branches to Brymbo and Minera from Wheatsheaf junction via a tunnel and inclined plane. The initial plan was to tap the mineral reserves of the area.

The Denbigh, Ruthin and Corwen Railway was a standard gauge railway line that connected Corwen with Denbigh via Ruthin in North Wales.

<span class="mw-page-title-main">Vale of Clwyd Railway</span>


The Vale of Clwyd Railway (VoCR) was a standard-gauge line which connected the towns of Rhyl and Denbigh via St Asaph in North Wales.

<span class="mw-page-title-main">Birkenhead Railway</span>

The Birkenhead Railway was a railway company in North West England. It was incorporated as the Birkenhead, Lancashire and Cheshire Junction Railway (BL&CJR) in 1846 to build a line connecting the port of Birkenhead and the city of Chester with the manufacturing districts of Lancashire by making a junction near Warrington with the Grand Junction Railway. The BL&CJR took over the Chester and Birkenhead Railway in 1847, keeping its own name for the combined company until it shortened its name to the Birkenhead Railway in 1859. It was taken over jointly, on 1 January 1860, by the London and North Western Railway (LNWR) and the Great Western Railway (GWR). It remained a joint railway until nationalisation of the railways in 1948.

The Bangor and Carnarvon Railway was a railway company promoted to build a branch railway connecting Caernarfon with the main line at Bangor, in north-west Wales. It opened in 1852 as far as Port Dinorwic and was extended to Caernarfon later in the same year.

<span class="mw-page-title-main">Saltney railway station</span> Former railway station in England

Saltney was a minor railway station located on the Great Western Railway's Paddington to Birkenhead line a few miles west of Chester, England. Although the station is now closed, the route is still open today as part of the Shrewsbury to Chester Line.

The Crewe and Shrewsbury Railway was a railway company which was previously owned by the London and North Western Railway (LNWR), built to connect Crewe with the Shrewsbury and Hereford Railway which was jointly owned with GWR.

The Mold Railway was a railway company that built a line in north-east Wales. The line linked Mold to Chester and it opened on 14 August 1849. The company built a mineral branch line to Ffrith, opened in November 1849. Mold itself was an important regional centre, and contained considerable mineral resources.

<span class="mw-page-title-main">Oswestry railway station</span> Former railway station in England

Oswestry railway station is a Grade II listed heritage railway station in Oswestry, Shropshire, England. It was closed when passenger services were withdrawn in 1966. The station building today is used as commercial premises although the Cambrian Railways Society are restoring it.

The Oswestry, Ellesmere and Whitchurch Railway was a railway company that constructed a line from Whitchurch via Ellesmere to Oswestry. Most of the line was in Shropshire but part entered Flintshire, now Wrexham County Borough. It was seen as a link from the local railways around Newtown to the London and North Western Railway, breaking the local monopoly of the Great Western Railway. It opened as a single line in 1863 and 1864. Throughout the construction period it was short of money, and was paid for by the contractor, who took shares. Sporadically through its life it became a useful part of a through route for mineral trains, but it never developed greatly.

The Wrexham and Ellesmere Railway was a railway line that ran from Wrexham in North Wales, to Ellesmere in Shropshire, England. The line opened in 1895 and closed in 1962, except for a residual goods service which itself closed in 1981.

<span class="mw-page-title-main">Brymbo railway branch lines</span>

The Brymbo railway branch lines served the rich reserves of coal, iron, limestone and other minerals in an area around Brymbo to the west of Wrexham in Wales. Coalowners and others needed transport to get their products to market and lines were built from the main line into the mineral-bearing area. The topography was difficult and gradients were steep. The Great Western Railway became dominant, but a rival company built a competing line and branches.

The Ruabon railway branch lines were a network of railways built to serve the mineral bearing area west of Ruabon, which contained many coal and iron deposits, as well as limestone, and a small but dense network of railways developed to handle the minerals.

References

  1. Peter E Baughan, A Regional History of the Railways of Great Britain: volume 11: North and Mid Wales, David St John Thomas Publisher, Nairn, 1991, ISBN   0 946537 59 3, page 36
  2. 1 2 3 4 5 6 E T MacDermot, History of the Great Western Railway: volume I, 1833 to 1863, published by the Great Western Railway, 1927, part 1, pages 341 to 347
  3. 1 2 Baughan, page 37
  4. 1 2 Baughan, pages 37 to 40
  5. Baughan, page 38
  6. Peter E Baughan, The Chester and Holyhead Railway, volume 1, David & Charles, Newton Abbot, 1972, ISBN   0 7153 5617 8, pages 15 to 22
  7. Baughan, page 39
  8. Keith M Beck, The Great Western North of Wolverhampton, Ian Allan Limited, Shepperton, 1986, ISBN   0 7110 1615 1, page 9
  9. Baughan, Chester and Holyhead Railway, page 109
  10. E T MacDermot, History of the Great Western Railway: volume I, 1833 to 1863, published by the Great Western Railway, 1927, part 1, pages 348 to 354
  11. T B Maund, The Birkenhead Railway (LMS and GW Joint), The Railway Correspondence and Travel Society, Sawtry, 2000, ISBN   090 1115 878, pages 18 to 21
  12. 1 2 3 4 Baughan, pages 40 to 42
  13. Beck, page 19
  14. MacDermot, page 390
  15. Beck, pages 59 to 61
  16. Beck, pages 27 and 73
  17. 1 2 Buaghan, pages 41 to 43
  18. Baughan, page 51
  19. James I C Boyd, The Wrexham, Mold and Connah's Quay Railway, The Oakwood Press, Headington, 1991, ISBN   0 85361 417 2 pages 48 and 49
  20. Boyd, page 95 onwards
  21. James I C Boyd, The Wrexham, Mold and Connah's Quay Railway, The Oakwood Press, 1991, ISBN   0 85361 417 2
  22. Baughan, pages 56 and 60
  23. 1 2 3 Rex Christiansen, Forgotten Railways: North and Mid Wales, David St John Thomas, Newton Abbot, 1984, ISBN   0 946537 05 4, pages 37, 39 and 41
  24. Baughan, pages 55 and 56
  25. 1 2 Baughan, page 61 and 62
  26. Christiansen, page 43
  27. Baughan, pages 44 and 45
  28. Bradshaw's 1938 Railway Guide, David and Charles Reprints, 1969, ISBN   0 7153 4686 5
  29. Bradshaw's April 1910 Railway Guide, David and Charles, Newton Abbot, 1968, ISBN   0 7153 4246 0
  30. British Railway, Passenger Services, that is Public Timetable, Western Region, summer 1960
  31. Baughan, pages 62 and 63
  32. 1 2 Baughan, page 45
  33. Baughan, page 170
  34. Michael Quick; Railway Passenger Stations in England, Scotland and Wales: A Chronology, Railway and Canal Historical Society, Richmond, 2002
  35. R A Cooke, Atlas of the Great Western Railway, Wild Swan Publications Limited, Didcot, 1997, ISBN   1 874103 38 0
  36. Col M H Cobb, The Railways of Great Britain: A Historical Atlas, Ian Allan, Shepperton, 2003, ISBN   978-0711030022