The Transmission Company of Nigeria (TCN) is a federal government owned electric utility company in Nigeria established in 2005. It is headquartered in the Federal Capital Territory in Abuja. It is a member of the West African Power Pool, an agency committed to improving energy flow across ECOWAS member states through joint financing between member countries for better sustainability of power projects within the region. It is in furtherance of this collective objective that the TCN provides bulk power supplies to Republic of Niger, Republic of Benin and Togo. [1] [2] [3] [4]

Contents

History

TCN was among the eighteen companies unbundled from PHCN during the tenure president of Olusegun Obasanjo in 2005 backed by the Electric Power Sector Reform Act (EPSR Act) including six generation companies (GenCos) and eleven distribution companies (DisCos). It was incorporated in 2005 and given a license by the Nigerian Electricity Regulatory Commission in 2006. The company was formed by the government in an effort to ensure better coordination of electricity transmission in the country; as electricity is generated, transmitted and then distributed to the consumer. [5]

The transmission company is one of the key entities in delivering electricity to the end user, the electricity consumer in Nigeria and its neighbors. And Nigeria over the years has sought to unbundle the complications in the chain of electricity delivery thereby leading to various levels of the chain allotted to private companies namely; generation, transmission and distribution. Transmission company of Nigeria became duly incorporated in 2005 and was granted operating license by the main electricity regulating body, (NERC). TCN’s licensed activities include electricity transmission, system operation and electricity trading. It is responsible for evacuating electric power generated by the electricity generating companies (GenCos) and wheeling it to distribution companies (DisCos). It provides the vital transmission infrastructure between the GenCos and the DisCos’ Feeder Sub-stations. [6] The approved license was granted for two tiers which were transmission service provision and independent system operation. [7]

Operation

Under the issued license for transmission, the company oversees the development and maintenance of Nigeria's transmission infrastructure such as high voltage cables, towers and transformers. [8] [9] In the effort to ensure Nigeria's power sector becomes viable and boost foreign direct investment and local industrialization, the mandate and policy document of TCN was designed to focus on implementation of the use of new technology, faster project execution and improving operational efficiencies. Nigeria over the years has attributed its slow growth to poor electricity supply since its inception in 1896 when electricity was first produced in Lagos. [10] The mandate which was to drive the level of growth in capacity utilization, replacement of state of the art equipment and prompt maintenance practice for optimum functionality was based on the government's master plan to ensure continuous improvement in its capacity to deliver in its responsibilities to generating companies and distribution companies also. [11]

In 2021, the independent system operator was introduced. [12] ISO is one of the components that forms the transmission company of Nigeria. It is responsible for ensuring that the transmission grid lines are reliable and maintaining the technical stability of the grid through its operations of planning, dispatch, and control of the electricity on the grid. [12] The Electric Power Sector Reform (EPSR) Act under section 26(7) outlined the functions of the ISO within the terms and conditions stipulated by NERC with powers and roles as system operator. [12]


TCN leadership

Transmission company of Nigeria is led by a board of directors composed of the chairman, the managing director and other members. [13] The managing director and chief executive oversees the management staff running the day to day activities of the company. Engr. Sule Abdulaziz is the managing director and chief executive officer appointed since 2022 and leads the company till date. [14]

Transmission corridors

NETAP is the Nigerian component of the north core transmission project which will connect Nigeria, Niger, Benin and Burkina Faso on 330kV DC line. It is to support the supply and installation of Supervisory Control and Data Acquisition/Energy Management Systems (SCADA/EMS) and consultancies that will support PPP projects in TCN in the future. [15] [16]

Lagos/Ogun transmission infrastructure project

Lagos state is Nigeria’s commercial city and one of the most populous cities in Africa making its demand for power to be on the increase due to growing industrial activities and migration. TCN took the initiative to design this project for the provision of increased power supply to Lagos and neighboring areas in Ogun state. It was targeted at raising national transmission wheeling power by 1,487 megawatts thereby boosting transmission by 7,000MW. [17]

Abuja transmission ring scheme

Abuja, Nigeria's federal capital territory is one of the fastest growing cities in Africa and the country’s epicenter where the federal government is situated. In ensuring increased transmission of power in the FCT and its neighboring states, the TCN flagged off this scheme in the city with the inclusion of five other sites. [18] [19] [20]

Northern corridor transmission project

Nigeria’s northern corridor, comprising North East, North West and North Central, has not been left out of the drive to improve available transmission capacity in order to boost the national grid. TCN as the sole transmission company initiated this project for the purpose of re-constructing one out of the two Shiroro-Kaduna old and limited 330kV SC line into quad line and built initially four 330kV substations in Sokoto, Daura, Jogana-Kano and Kaura Namoda. [21] [22]

Sub-stations

In a continuous effort at further improving bulk power transmission to distribution load centres nationwide, the Transmission Company of Nigeria (TCN) was building new power transmission facilities and rehabilitating old ones around the country. These substations which serve as transmission branches of the company across the country are situated in various states and regions including some of the following listed below:

[23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34]

Funding

The company is mainly funded through various channels including revenue from payment for services to generating companies, distribution companies, international distribution companies and directly connected customers. Also from budgetary appropriation for capital projects by the federal government and such grants and loans from reputable international donour agencies such as the World Bank, African Development Bank, Japan International Cooperation Agency, Agence Francais de Development and the European Union. [35] [36] [37] [38] In 2018, a joint agreement between president Muhammadu Buhari and German Chancellor, Angela Merkel birthed the presidential power initiative. The project was expected to contribute immensely in savaging the country’s perennial power challenges. The TCN constitutes as one of the key stakeholders in the Nigerian Presidential Power Initiative embarked by Siemens, and as a government-to-government agreement between Nigeria and Germany in resolving existing challenges in the country's power sector thereby expanding the capacity of the transmission and distribution network. [39] [40]

Challenges

Since the privatisation of Nigeria's generating and distributing segments of electricity, the transmission of electricity remains the cardinal point and key aspect. [41] Among the many challenges the transmission company of Nigeria has continually been confronted are:

These have contributed to reoccurring power failure and collapse of the national grid. [41] [42] [43]

Related Research Articles

The Power Holding Company of Nigeria (PHCN), formerly the National Electric Power Authority (NEPA), was a power company owned by the government of Nigeria. It represented Nigeria in the West African Power Pool. During the era when it operated as NEPA, the company managed a football team, NEPA Lagos.

<span class="mw-page-title-main">Transnational Corporation of Nigeria</span>

Transnational Corporation plc, is a diversified conglomerate with strategic investments and core interests in the hospitality, agribusiness and energy sectors. A publicly quoted conglomerate with a diversified shareholders base of about 300,000 investors, its notable assets include Transcorp Hotels plc owner of Transcorp Hilton Hotel, Abuja and Aura by Transcorp Hotels; Transcorp Power Plc and Transcorp Energy Limited .. As at 2023, Transcorp Group’s market capitalization is in excess of N540bn.

Benin is a coastal country located in the Gulf of Guinea in Western Africa, which is a resource rich region. Energy in Benin has a diverse energy mix and takes several forms including: solar, wind, hydropower, biomass, fossil resources, and mineral resources. Out of this energy mix, about 60% of energy comes from biomass. Benin is also dependent on energy imports from Ghana and Côte d'Ivoire. While power plants and other energy facilities were built in the 1950s and 1960s, the lack of investment has led to deterioration over time. Similarly, its location in the Gulf of Guinea has led to an attempt of oil production starting in the late 1980s. However, due to unprofitable operations, oil production halted in 1998.

AltaLink, L.P. is one of Canada's largest electricity transmission companies. Based in Alberta, AltaLink is responsible for the maintenance and operation of approximately 12,000 kilometres of transmission lines and 280 substations in Alberta. AltaLink is owned by Berkshire Hathaway Energy.

The West African Power Pool (WAPP) is a cooperation of the national electricity companies in Western Africa under the auspices of the Economic Community of West African States (ECOWAS). The members of WAPP are working to establish a reliable power grid for the region and a common market for electricity. It was founded in 2010.

Rilwan Lanre Babalola was appointed Nigerian Minister of Power on 17 December 2008 after a cabinet shuffle by President Umaru Yar'Adua. He left office in March 2010 when Acting President Goodluck Jonathan dissolved his cabinet.

Nigerian Electricity Regulatory Commission(NERC) is an independent regulatory body with authority for the regulation of the electric power industry in Nigeria. NERC was formed in 2005 under the Obasanjo administration’s economic reform agenda through the Electric Power Sector Reform Act, 2005 for formation and review of electricity tariffs, transparent policies regarding subsidies, promotion of policies that are efficient and environmentally friendly, and also including forming and enforcing of standards in the creation and use of electricity in Nigeria. NERC was instituted primarily to regulate the tariff of Power Generating companies owned or controlled by the government, and any other generating company which has a licence for power generation and transmission of energy, and distribution of electricity.

<span class="mw-page-title-main">Roxtec</span> Swedish manufacturing company

Roxtec is a company specialising in the development and manufacture of cable and pipe seals. Roxtec's products are designed to seal cable and pipe penetrations in order to protect from multiple hazards including fire, water, gas, dust, vibrations, electro-magnetic disturbances, vermin, and the risk of explosion. Markets include power, marine, oil and gas, telecoms, infrastructure, industrial equipment, and the process industries.

Wellington Electricity, registered as Wellington Electricity Lines Limited, is an electricity distribution company, based in Wellington, New Zealand.

<span class="mw-page-title-main">Electricity sector in Hong Kong</span> Electricity sector in Hong Kong, China

Electricity sector in Hong Kong ranges from generation, transmission, distribution and sales of electricity covering Hong Kong. The combustion of coal, natural gas and oil are the main sources of electricity in Hong Kong. The electricity sector contributes 60.4% of Hong Kong's total greenhouse gas emissions.

<span class="mw-page-title-main">Dhaka Electric Supply Company Limited</span> Electric utility in Dhaka, Bangladesh

Dhaka Electric Supply Company Limited (DESCO) is a public limited company which distributes electricity at the northern parts of Dhaka City and Tongi Town of Gazipur District. The company was created in November 1996 under the Companies Act 1994 as a Public Limited Company. The company is now under the Power Division of the Bangladesh Ministry of Power, Energy and Mineral Resources and serving a total number of 604,304 consumers as of 31 December 2013. Md. Selim Uddin, rank of additional secretary, is the chairperson of DESCO and Engr. Md. Kausar Ameer Ali is the managing director.

<span class="mw-page-title-main">Nigerian energy supply crisis</span> Ongoing failure of the Nigerian power sector

The Nigerian energy supply crisis refers to the ongoing failure of the Nigerian power sector to provide adequate electricity supply to domestic households and industrial producers despite a rapidly growing economy, some of the world's largest deposits of coal, oil, and gas and the country's status as Africa's largest oil producer. Currently, only 45% of Nigeria's population is connected to the energy grid whilst power supply difficulties are experienced around 85% of the time and almost nonexistent in certain regions. At best, average daily power supply is estimated at four hours, although several days can go by without any power at all. Neither power cuts nor restorations are announced, leading to calls for a load shedding schedule during the COVID-19 lockdowns to aid fair distribution and predictability.

<span class="mw-page-title-main">Reynolds Dagogo-Jack</span>

Reynolds Bekinbo Dagogo-Jack, popularly known as "Beks", is a Nigerian civil engineer, technocrat, entrepreneur, and public servant. For over thirty years, he has been active in both the public and private sector, especially in areas of government/public administration and project management including engineering, construction and manufacturing.

The electricity sector in Nigeria generates, transmits and distributes megawatts(MW) of electric power that is significantly less than what is needed to meet basic household and industrial needs. Nigeria has twenty-three (23) power-generating plants connected to the national grid with the capacity to generate 11,165.4 MW of electricity. These plants are managed by generation companies (GenCos), independent power providers, and Niger Delta Holding Company. In 2012, the industry labored to distribute 5,000 MW, very much less than the 40,000 MW needed to sustain the basic needs of the population. This deficit is also exacerbated by unannounced load shedding, partial and total system collapse and power failure. To meet demand, many households and businesses resort to purchasing generating sets to power their properties; this source of energy provided 6,000 MW in 2008. Nigeria has a chronic electricity shortage that has affected the country for many years. In 2022, its power grid collapsed twice in one week.

<span class="mw-page-title-main">Electricity in Turkey</span> Electricity generation, transmission and consumption in Turkey

Turkey uses more electricity per person than the global average, but less than the European average, with demand peaking in summer due to air conditioning. Most electricity is generated from coal, gas and hydropower, with hydroelectricity from the east transmitted to big cities in the west. Electricity prices are state-controlled, but wholesale prices are heavily influenced by the cost of imported gas.

<span class="mw-page-title-main">Copperbelt Energy Corporation</span>

Copperbelt Energy Corporation Plc (CEC) is a Zambian electricity generation, transmission, distribution and supply company with operations in Zambia and Nigeria. The company is listed on the Lusaka Stock Exchange

On December 23, 2015, the power grid in two western oblasts of Ukraine was hacked, which resulted in power outages for roughly 230,000 consumers in Ukraine for 1-6 hours. The attack took place during the ongoing Russo-Ukrainian War (2014-present) and is attributed to a Russian advanced persistent threat group known as "Sandworm". It is the first publicly acknowledged successful cyberattack on a power grid.

Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.

<span class="mw-page-title-main">Federal Ministry of Power (Nigeria)</span> Arm of the Nigerian government

Federal Ministry of Power is an arm of the Federal government of Nigeria with the responsibilities of providing social amenities such as Electricity across the country. The Ministry in discharging this mandate is guided by the provisions of the laws provided under National Electric Power Policy (NEPP) of 2001, the Electric Power Sector Reform (EPSR) Act of 2005, Rural Electrification Implementation Strategy Plan 2016 and the Roadmap for Power Sector Reform of August 2010.

Kola Adesina is a Nigerian entrepreneur, managing director of Sahara Group, former chairman of Egbin Power Plc, and board chairman of Ikeja Electric.

References

  1. "TCN Canvasses Timely Contributions wapp". The Punch Nigeria. 2022-03-03. Retrieved 2022-08-02.
  2. "Power WAPP Set to Complete North Core Transmission Line". Vanguard Media Limited. 2021-11-05. Retrieved 2022-08-02.
  3. "WAPP Vows to Link Nigeria with Transmission Lines". Sun News Online. 2021-11-07. Retrieved 2022-08-02.
  4. "WAPP Commits to Linking Nigeria to Three Countries". Independent Nigeria News. 2021-11-05. Retrieved 2022-08-02.
  5. "Transmission Company of Nigeria". Devex. Retrieved 2022-07-22.
  6. Izuaka, Mary (2021-05-21). "BPE Proposes Privatization of Transmission Company of Nigeria". Premium Times. Retrieved 2022-07-22.
  7. Akpan, Udeme (2020-07-10). "NERC Unbundles TCN into Transmission, Operations". Vanguard Media Limited. Retrieved 2022-07-22.
  8. "Facilitating Energy Transition Greenfield Terminal Project". Global Energy Storage. Retrieved 2022-07-22.
  9. Jeremiah, Kingsley (2019-09-24). "Again Discos at Loggerheads with TCN Over Transmission Infrastructure". The Guardian Newspaper Limited. Retrieved 2022-07-22.
  10. Ayanruoh, Felix (26 February 2013). "The Challenges of the Nigeria Electric Power Sector Reform". Vanguard . Vanguard Media Limited. Retrieved 26 July 2022.
  11. Tena, Nomvuyo (6 June 2022). "Nigeria TCN to Use Transmission Expansion Masterplan". ESI Africa. Retrieved 26 July 2022.
  12. 1 2 3 Ogaji, Joy (2021-03-01). "Exploring the Dynamics in the Current Ailing Power Sector". Business Day Nigeria. Retrieved 2022-07-22.
  13. Sunday, Simon (2022-06-03). "Buni and 13 others make TCN board after 7 years". Media Trust Limited. Retrieved 2024-06-02.
  14. Tajudeen, Jamiu (2022-04-14). "Buhari Confirms Sule Abdulaziz as TCN MD". Media Trust Limited. Retrieved 2024-06-02.
  15. "Nigeria To Invest 27 Billion Loan in Power Infrastructure". Guardian Newspaper. 2022-03-09. Retrieved 2022-07-26.
  16. "TCN Votes On 756 Billion on Bilateral Multilateral Projects". The Nation Online. 2021-10-11. Retrieved 2022-07-26.
  17. "Federal Government to Ram Up Power Infrastructure". Vanguard Media Limited. 2022-03-08. Retrieved 2022-07-26.
  18. Uko, Anthony. "TCN Plans to Raise Abuja Transmission Network by 624MW". Leadership Nigeria Newspaper. Retrieved 2022-08-01.
  19. "TCN Builds 5 Substations in Abuja to Boost Power Supply". NIPC. Retrieved 2022-08-01.
  20. "Power Wobbles Despite Over One Billion Dollar Investment". Guardian Nigeria Newspaper. 2020-11-02. Retrieved 2022-08-01.
  21. "French Agency Approves 245 Million Dollars for Transmission Projects in Northern Nigeria". Guardian Nigeria Newspaper. 2018-12-31. Retrieved 2022-08-01.
  22. "French Agency Approves $245m For Transmission Projects in Northern Nigeria". News Express Agency. 2018-12-31. Retrieved 2022-08-01.
  23. "TCN Offices in Nigeria". Nigerian Finder. Retrieved 2022-08-01.
  24. "Existing Transmission Company of Nigeria Line System Source". Research Gate. Retrieved 2022-08-01.
  25. "TCN Commences Digitisation of Old Transmission Substation". 2022-02-11. Retrieved 2022-08-01.
  26. "Nigeria TCN Delivers Two Units of 330kva Power Transmission Substations". ESI Africa.
  27. "Ondo TCN Partner to Improve Power Supply". PM News Nigeria. 2022-01-11. Retrieved 2022-08-01.
  28. "TCN Begins Digitization of Old Power Transmission Substations". Daily Trust Nigeria. 2022-02-12. Retrieved 2022-08-01.
  29. "Recent Project Activities of Transmission Company of Nigeria". Financial Nigeria. 2022-12-22. Retrieved 2022-08-01.
  30. "TCN Completes Ajah Transmission Tower". Vanguard Media Limited. 2022-03-18.
  31. "TCN Completes Akure Substation". Blueprint Media. 2022-03-18. Retrieved 2022-08-01.
  32. "New Lafia Substation to Become Nigeria's Transmission Hub". Tribune Online. 2022-03-05. Retrieved 2022-08-01.
  33. "TCN Energizes Damaturu Substation". 2018-10-08. Retrieved 2022-08-01.
  34. "List of Power Transmission Stations in Nigeria". Daily Tips Finder. Retrieved 2022-08-01.
  35. "FG Hopes to Ramp Up Power Infrastructure". Vanguard Media Limited. 2022-03-28. Retrieved 2022-08-02.
  36. "TCN 15 Transformers To Improve". ICIR Nigeria. Retrieved 2022-08-02.
  37. "FG Partners Japan on Transmission Expansion Programme". The Punch Nigeria. 2022-05-23. Retrieved 2022-08-02.
  38. "FG to partner Japan agency on power transmission". Blueprint Media Limited. 2022-02-09. Retrieved 2022-08-02.
  39. "Understanding Nigeria's Presidential Power Initiative". Businessday Newspaper. 2021-04-07. Retrieved 2022-08-01.
  40. "Understanding Nigeria's Presidential Power Initiative". Punch Nigeria Newspaper. 2021-03-31. Retrieved 2022-08-01.
  41. 1 2 "Challenges and Interventions Needs in the Nigerian Electricity Supply Industry". Choice Social Change Africa. Retrieved 22 August 2022.
  42. Opaoluwani, Akintayo. "Why Nigeria Gas to Power Challenges May Worsen". The Punch Nigeria. Retrieved 2022-08-22.
  43. "As Power Sector Falters TCN Trudges". Thisday Newspaper. Retrieved 2022-08-22.