Trenton Channel Power Plant

Last updated
Trenton Channel Power Plant
Trenton Channel Power Plant 2022.jpg
View of the power plant from the Detroit River
Trenton Channel Power Plant
Location within the state Michigan
CountryUnited States
Location4695 West Jefferson Avenue
Trenton, Michigan 48183
Coordinates 42°07′20″N83°10′53″W / 42.12222°N 83.18139°W / 42.12222; -83.18139
StatusRetired and demolished
Commission date 1924 [1]
Decommission dateDecember 2022 [2]
Owner(s) Detroit Edison
Power generation
Nameplate capacity
  • 535.5 MW
  • 775.5 MW

The Trenton Channel Power Plant, also known as the Trenton Stacks, was a coal-burning power station located in Trenton, Michigan. Completed in 1924, it is owned by Detroit Edison, a subsidiary of DTE Energy.

Contents

Location

Part of the facility's property is on the mainland surrounding West Jefferson Avenue in southern Wayne County. The main building – the two-smokestack power station – and the coal yard are located on what is now technically the southern portion of Slocum's Island in the Detroit River. The facility shares this island with Elizabeth Park, which is separated from the facility by Grosse Ile Parkway. The Trenton Channel Power Station and the affiliated Sibley Quarry occupy 458 acres (185 ha) of land along the Detroit River, in which 225 acres (91 ha) of that property is open fields, woods, ponds, and sound berms. [3]

Environment

The characteristic striped smokestacks were constructed with an innovative “smokestack within a smokestack” design to reduce the level of pollutants released. However, to better achieve this, the inner smokestacks were lined with asbestos that had to be later removed at great cost. [4]

The Trenton Channel Power Plant became ISO 14001 certified in 2001. [5] The plant also donated money for a wildlife observation deck in the Humbug Marsh. [6]

History

Trenton Channel power plant in 2007 Trenton Channel Power Plant 2007.jpg
Trenton Channel power plant in 2007

The Trenton Channel Power Plant was first fired up in 1924. It had 6 turbine generators with 13 coal-fired boilers. There was space for 2 additional boilers, but they were never needed. Operating conditions were 750 °F (399 °C) and 420 psi (29,000 hPa). The sixth and last turbine generator arrived by 1929. Each unit produced a rated 50 megawatts of electricity. Five short smoke stacks exhausted gases from the boilers. These were the first Detroit Edison units to use pulverized coal rather than the older style stoker-fired beds of coal. They were also the first power plants in the US to use electrostatic precipitators to capture fly ash from the stacks. Electrostatic precipitators were, however, in use in other industries at the time. [1]

In 1950, a second plant started up at the same site and adjoined the first plant. It had two turbine generators, #7 and #8, with a rating of 120 megawatts each. They were fed by a total of 4 boilers. The boilers ran at higher steam conditions than the first plant, at 950 °F (510 °C) and about 1,250 psi (86,000 hPa). Therefore, the first plant became known as the "low side", while the newer plant was known as the "high side". The high side was located to the south of the low side. Two short smoke stacks released gases from the four boilers. [1]

Finally in 1968, Unit #9 was placed in service. It is a 550-megawatt turbine generator fed by a single boiler. It adjoins the high side plant and is located on the south side. Operating conditions are 1,000 °F (538 °C) and 2,520 psi (174,000 hPa). One 563-foot (172 m) smoke stack is used for this unit. Soon afterwards, another stack, identical to the #9 stack, was erected to replace the two short stacks on the high side plant. Both tall stacks remained in service as of 2012.[ citation needed ]

Decommissioning and repurposing

By the mid-1970s, the low side plant was decommissioned and the boiler house was eventually demolished. In the 2010s, all generators except #9 were closed. In 2016, DTE announced its intention to close the plant as well as the St. Clair Power Plant by 2022 as it began to change to natural gas and renewable energy plants. [7] [8] The retirement of the Trenton and St. Clair plants began in the summer of 2022 and ended that December. [2] Just before dawn on March 15, 2024, at approximately 7:00am EDT, DTE Energy demolished both smokestacks in a controlled demolition. [9] The northernmost stack was demolished first, shortly before the southernmost stack. The demolition lasted less than a minute. [10] DTE began constructing a 4-hour 220 MW / 880 MWh battery storage power station at the site in June 2024. [11]

See also

Related Research Articles

<span class="mw-page-title-main">Trenton, Michigan</span> City in Michigan, United States

Trenton is a city in Wayne County, Michigan, United States. At the 2010 census, the city population was 18,853.

<span class="mw-page-title-main">Ludington Pumped Storage Power Plant</span> Dam in Ludington, Michigan

The Ludington Pumped Storage Plant is a hydroelectric plant and reservoir in Ludington, Michigan. It was built between 1969 and 1973 at a cost of $315 million and is owned jointly by Consumers Energy and DTE Energy and operated by Consumers Energy. At the time of its construction, it was the largest pumped storage hydroelectric facility in the world.

<span class="mw-page-title-main">Enrico Fermi Nuclear Generating Station</span> Nuclear power plant in Frenchtown Charter Township, Michigan

The Enrico Fermi Nuclear Generating Station is a nuclear power plant on the shore of Lake Erie near Monroe, in Frenchtown Charter Township, Michigan on approximately 1,000 acres (400 ha). All units of the plant are operated by the DTE Energy Electric Company and owned by parent company DTE Energy. It is approximately halfway between Detroit, Michigan, and Toledo, Ohio. It is also visible from parts of Amherstburg and Colchester, Ontario as well as on the shore of Lake Erie in Ottawa County, Ohio. Two units have been constructed on this site. The first unit's construction started on August 4, 1956 and reached initial criticality on August 23, 1963, and the second unit received its construction permit on September 26, 1972. It reached criticality on June 21, 1985 and was declared commercial on November 18, 1988. The plant is connected to two single-circuit 345 kV Transmission Lines and three 120 kV lines. They are operated and maintained by ITC Transmission.

<span class="mw-page-title-main">Thermal power station</span> Power plant that generates electricity from heat energy

A thermal power station is a type of power station in which heat energy is converted to electrical energy. In a steam-generating cycle heat is used to boil water in a large pressure vessel to produce high-pressure steam, which drives a steam turbine connected to an electrical generator. The low-pressure exhaust from the turbine enters a steam condenser where it is cooled to produce hot condensate which is recycled to the heating process to generate more high pressure steam. This is known as a Rankine cycle.

<span class="mw-page-title-main">DTE Energy</span> Energy company based in Detroit

DTE Energy is a Detroit-based diversified energy company involved in the development and management of energy-related businesses and services in the United States and Canada. Its operating units include an electric utility serving 2.2 million customers and a natural gas utility serving 1.3 million customers in Michigan.

DTE Electric Company was founded in 1886.

<span class="mw-page-title-main">Lansing Board of Water & Light</span>

The Lansing Board of Water & Light is a publicly owned, municipal utility that provides electricity and water to the residents of the cities of Lansing and East Lansing, Michigan, and the surrounding townships of Delta, Delhi, Meridian and DeWitt. The Lansing Board of Water & Light also provides steam and chilled water services within the City of Lansing. It is the largest public utility in Michigan.

<span class="mw-page-title-main">Swanbank Power Station</span> Power station complex in Queensland, Australia

The Swanbank Power Stations are located in Swanbank within South East Queensland, Australia. The original power station was coal fired, but the site has since moved to gas. By 2007 the site had consisted of the highly efficient 385 megawatts (516,000 hp) gas-fired Swanbank E Power Station and the smaller 28 megawatts (38,000 hp) gas-fired Swanbank C Power Station. Swanbank E was written off by the Queensland Audit Office as having no value, as it is uneconomical to run in 2021.

<span class="mw-page-title-main">Wayne Stamping & Assembly</span> Ford manufacturing plant in Wayne, Michigan, United States

The Wayne Stamping and Assembly Plant is a Ford manufacturing plant in Wayne, Michigan, United States. Many of its more than 3,000 employees are represented by UAW Local 900.

<span class="mw-page-title-main">Tufts Cove Generating Station</span>

Tufts Cove Generating Station is a Canadian electrical generating station located in the Dartmouth neighbourhood of Tufts Cove in Nova Scotia's Halifax Regional Municipality.

<span class="mw-page-title-main">Tallawarra Power Station</span>

Tallawarra Power Station is a 435-megawatt (583,000 hp) combined cycle natural gas power station in the city of Wollongong, New South Wales, Australia. Owned and operated by EnergyAustralia, the station is the first of its type in New South Wales and produces electricity for the state during periods of high demand. It is located on the western shore of Lake Illawarra in the suburb of Yallah.

<span class="mw-page-title-main">St. Clair Power Plant</span> Power generation facility

The Saint Clair Power Plant was a major coal- and oil-fired power plant owned by DTE Electric, a subsidiary of DTE Energy. It was located in St. Clair County, Michigan, on the west bank of St. Clair River. The plant was across M-29 from the newer Belle River Power Plant in East China, Michigan. The first four units of St. Clair were built in 1953–1954. Since then, three more generating units were added to the plant. The St. Clair Power Plant generated 1982 megawatts in total. It was Detroit Edison's second largest power producer. The power plant has a large impact on the local economy, employing about 300 workers. The plant shut down in May 2022.

<span class="mw-page-title-main">Peterborough Power Station</span>

Peterborough Power Station is a 360MW gas-fired power station at Eastern Industry, Fengate in the city of Peterborough, Cambridgeshire in the United Kingdom. It employs around forty people.

Belle River Power Plant is a major coal-and-natural gas-fired power plant owned by Detroit Edison, a subsidiary of DTE Energy. It is located in St. Clair County, Michigan, on the peninsula formed by the St. Clair and Belle rivers. The plant was built across M-29 from the St. Clair Power Plant in East China, Michigan, and shares the coal delivery terminal with it. The Belle River plant also shares cooling water from the St. Clair River with its sister plant. Five oil-fueled internal combustion generators were built in 1981, with a total output 13.75 megawatts. Coal-fired unit 1 of the Belle River plant was completed in 1984, followed by a similar unit 2 in 1985. Each unit has a nameplate capacity of 697.5 MWe, however the coal-fired plant as a whole generates 1260 MWe all year around. In 1999, three peaker natural-gas fired turbines were added, with a total name-plate capacity of 256 MWe.

<span class="mw-page-title-main">Mohave Power Station</span>

Mohave Power Station was a 1580 megawatt electric (MWe) coal-fired power plant that was located in Laughlin, Nevada. Southern California Edison is the majority owner of the plant and was its operator. The plant entered commercial operation in 1971. A steam line that ran near the plant's control room and cafeteria ruptured on June 9, 1985, fatally scalding six and injuring ten more. In 2005, the plant was shut down and was later dismantled.

<span class="mw-page-title-main">Elizabeth Park (Michigan)</span>

Elizabeth Park is a county-owned public park in southeast Wayne County in the U.S. state of Michigan. The park is located in the city of Trenton along West Jefferson Avenue and the Detroit River just north of the Wayne County Bridge leading to Grosse Ile. Under private ownership until it was given to the county in 1919, Elizabeth Park is recognized as the first county park established in the state of Michigan.

<span class="mw-page-title-main">West Springfield Generating Station</span> Power plant in Massachusetts, U.S.

The West Springfield Generating Station, also known by its corporate name EP Energy Massachusetts, LLC, was a fossil-fuel-fired power plant located in West Springfield, Massachusetts. The station was a "peaking" facility, meaning that it primarily operates during peak electrical demand. The facility consisted of two 49-megawatt (MW) combustion turbine generators fueled by natural gas or ultra low-sulphur diesel fuel, one 18 MW jet turbine that was fueled by kerosene, and one 107 MW simple-cycle steam boiler unit burning no. 6 fuel oil, ULSD or natural gas. The station also had a small auxiliary boiler for process and building heat and an emergency back-up generator.

<span class="mw-page-title-main">T. B. Simon Power Plant</span> Power plant in East Lansing, Michigan, United States

The T.B. Simon Power Plant is a multi-fuel cogeneration facility located on the campus of Michigan State University in East Lansing, Michigan. The Simon Power Plant is the principal provider of electricity and district heating to the 50,000-student main campus.

<span class="mw-page-title-main">Marysville Power Plant</span> Power plant

The Marysville Power Plant, nicknamed the Mighty Marysville, was a coal-fired power plant in Marysville, Michigan on the shore of the St. Clair River. The plant was demolished on November 7, 2015, after the land was sold to a developer.

References

  1. 1 2 3 Miller, Raymond (1957). Kilowatts at Work, A History of The Detroit Edison Company . Detroit, Michigan: Wayne State University Press. pp.  467.
  2. 1 2 Clark, Kevin (December 14, 2022). "DTE Energy officially retires two coal plants". Power Engineering . Archived from the original on January 4, 2023. Retrieved January 4, 2023.
  3. Wildlife Habitat Council (July 2005). "A Portfolio of DTE Energy's Activities with the Wildlife Habitat Council" (PDF). Archived from the original (PDF) on July 9, 2010. Retrieved March 15, 2010.
  4. GLOBAL Encasement, Inc (2009). "112 - Detroit Edison, Trenton Channel Power Plant" . Retrieved March 15, 2010.
  5. DTE Energy (2010). "Environmental Policies for Detroit Edison Facilities" . Retrieved March 15, 2010.
  6. "Dedication of Wildlife Observation Deck at Humbug Marsh" (Press release). United States Fish and Wildlife Service. May 12, 2007. Archived from the original on October 25, 2008. Retrieved March 15, 2010.
  7. Witsil, Frank (June 8, 2016). "DTE to shut down three coal plants within 7 years". Detroit Free Press .
  8. Martin, Jackie (June 18, 2022). "Trenton Channel Power Plant 1924 – 2022: end is near for its retirement". The News-Herald .
  9. Mattioli, Santino (March 15, 2024). "Watch as DTE demolishes Trenton Stacks just before dawn". MLive . Archived from the original on March 15, 2024.
  10. Witsil, Frank; Selasky, Susan (March 15, 2024). "Trenton Channel power plant stacks demolished, toppling one at a time". Detroit Free Press . Archived from the original on March 18, 2024.
  11. Thompson, Carol (10 June 2024). "'A bright new beginning': DTE replacing coal-burning plant with large-scale battery storage". The Detroit News .