This article needs additional citations for verification .(June 2019) |
Upper Baker Dam | |
---|---|
Country | United States |
Location | Whatcom County, Washington |
Coordinates | 48°38′56″N121°41′27″W / 48.64889°N 121.69083°W Coordinates: 48°38′56″N121°41′27″W / 48.64889°N 121.69083°W |
Status | In use |
Opening date | 1959 |
Owner(s) | Puget Sound Energy |
Dam and spillways | |
Type of dam | Concrete gravity |
Impounds | Baker River |
Height | 312 feet (95 m) |
Length | 1,200 feet (370 m) |
Spillways | 3 |
Spillway type | Gate-controlled, service |
Spillway capacity | 90,000 cubic feet per second (2,500 m3/s) |
Reservoir | |
Creates | Baker Lake |
Total capacity | 285,000 acre-feet (352,000,000 m3) |
Catchment area | 215 square miles (560 km2) |
Surface area | 4,800 acres (19 km2) |
Power Station | |
Installed capacity | 91 MW |
Annual generation | 337,350,000 KWh [1] |
Upper Baker Dam is a dam spanning the Baker River in northern Washington in the United States of America. It is one of two dams on the river, the other one being the Lower Baker Dam a few miles downstream. The dam is used to generate hydroelectricity and provide flood control. [2]
Construction of the dam was finished in 1959 by Puget Sound Energy as part of a power generating scheme, the Baker River Hydroelectric Project. The dam is a concrete gravity structure 312 feet (95 m) high and 1,200 feet (370 m) long, and is capable of producing 91 MW. Its reservoir stretches 9 miles (14 km) upstream and contains 285,000 acre-feet (352,000,000 m3) of water. [3]
Upper Baker Dam has a mediterranean climate (Köppen Csb).
Climate data for Upper Baker Dam (1991–2020 normals, extremes 1965–present) | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Year |
Record high °F (°C) | 57 (14) | 68 (20) | 76 (24) | 92 (33) | 102 (39) | 110 (43) | 101 (38) | 98 (37) | 100 (38) | 84 (29) | 66 (19) | 60 (16) | 110 (43) |
Mean maximum °F (°C) | 46.6 (8.1) | 53.2 (11.8) | 65.1 (18.4) | 75.6 (24.2) | 83.4 (28.6) | 85.4 (29.7) | 90.7 (32.6) | 90.4 (32.4) | 84.9 (29.4) | 71.5 (21.9) | 54.2 (12.3) | 46.5 (8.1) | 93.8 (34.3) |
Average high °F (°C) | 37.9 (3.3) | 42.4 (5.8) | 47.9 (8.8) | 55.8 (13.2) | 63.7 (17.6) | 67.5 (19.7) | 74.4 (23.6) | 75.3 (24.1) | 68.6 (20.3) | 55.7 (13.2) | 43.8 (6.6) | 37.3 (2.9) | 55.9 (13.3) |
Daily mean °F (°C) | 33.4 (0.8) | 35.8 (2.1) | 39.9 (4.4) | 45.8 (7.7) | 52.8 (11.6) | 57.2 (14.0) | 62.6 (17.0) | 63.3 (17.4) | 57.9 (14.4) | 48.2 (9.0) | 39.0 (3.9) | 33.6 (0.9) | 47.5 (8.6) |
Average low °F (°C) | 28.9 (−1.7) | 29.1 (−1.6) | 31.8 (−0.1) | 35.8 (2.1) | 41.9 (5.5) | 46.9 (8.3) | 50.9 (10.5) | 51.3 (10.7) | 47.3 (8.5) | 40.6 (4.8) | 34.2 (1.2) | 29.8 (−1.2) | 39.0 (3.9) |
Mean minimum °F (°C) | 18.1 (−7.7) | 20.7 (−6.3) | 24.7 (−4.1) | 29.5 (−1.4) | 34.2 (1.2) | 40.0 (4.4) | 45.1 (7.3) | 45.0 (7.2) | 39.8 (4.3) | 30.8 (−0.7) | 24.6 (−4.1) | 19.6 (−6.9) | 13.3 (−10.4) |
Record low °F (°C) | 0 (−18) | 4 (−16) | 10 (−12) | 24 (−4) | 28 (−2) | 35 (2) | 39 (4) | 39 (4) | 30 (−1) | 22 (−6) | 5 (−15) | −2 (−19) | −2 (−19) |
Average precipitation inches (mm) | 15.31 (389) | 8.80 (224) | 10.42 (265) | 6.70 (170) | 4.52 (115) | 3.32 (84) | 1.78 (45) | 1.92 (49) | 4.83 (123) | 10.52 (267) | 15.97 (406) | 14.15 (359) | 98.24 (2,496) |
Average snowfall inches (cm) | 13.1 (33) | 10.6 (27) | 3.4 (8.6) | 0.2 (0.51) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 2.2 (5.6) | 12.9 (33) | 42.4 (107.71) |
Average extreme snow depth inches (mm) | 11.7 (30) | 8.7 (22) | 5.6 (14) | 0.2 (0.51) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 0.0 (0.0) | 2.4 (6.1) | 9.6 (24) | 17.3 (44) |
Average precipitation days (≥ 0.01 in) | 20.8 | 17.2 | 20.5 | 17.8 | 14.2 | 13.6 | 7.0 | 6.5 | 11.2 | 17.4 | 21.3 | 20.9 | 188.4 |
Average snowy days (≥ 0.1 in) | 4.1 | 3.1 | 2.4 | 0.2 | 0.1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1.2 | 5.5 | 16.6 |
Source 1: NOAA [4] | |||||||||||||
Source 2: National Weather Service [5] |
Rock Island Dam is a hydroelectric dam on the Columbia River, in the U.S. state of Washington. Chelan County Public Utility District's Rock Island Dam and Hydro Project was the first dam to span the Columbia, having been built from 1929 to 1933. It is located near the geographical center of Washington, about 12 miles (19 km) downstream from the city of Wenatchee. By river, the dam is 235 miles (378 km) south of the Canada–US border and 453 miles (729 km) above the mouth of the river at Astoria, Oregon. The dam's reservoir is called Rock Island Pool.
Hydroelectricity, or hydroelectric power, is electricity generated from hydropower. Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and also more than nuclear power. Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has a dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel-powered energy plants. However, when constructed in lowland rainforest areas, where part of the forest is inundated, substantial amounts of greenhouse gases may be emitted.
An underground power station is a type of hydroelectric power station constructed by excavating the major components from rock, rather than the more common surface-based construction methods.
The Skagit River is a river in southwestern British Columbia in Canada and northwestern Washington in the United States, approximately 150 mi (240 km) long. The river and its tributaries drain an area of 1.7 million acres (690,000 hectares) of the Cascade Range along the northern end of Puget Sound and flows into the sound.
Ross Lake is a large reservoir in the North Cascade mountains of northern Washington state, United States, and southwestern British Columbia, Canada. The lake runs approximately north–south, is 23 miles (37 km) long, up to 1.5 miles (2.5 km) wide, and the full reservoir elevation is 1,604 feet above sea level.
The McAlpine Locks and Dam are a set of locks and a hydroelectric dam at the Falls of the Ohio River at Louisville, Kentucky. They are located at mile point 606.8, and control a 72.9 miles (117.3 km) long navigation pool. The locks and their associated canal were the first major engineering project on the Ohio River, completed in 1830 as the Louisville and Portland Canal, designed to allow shipping traffic to navigate through the Falls of the Ohio.
Flaming Gorge Dam is a concrete thin-arch dam on the Green River, a major tributary of the Colorado River, in northern Utah in the United States. Flaming Gorge Dam forms the Flaming Gorge Reservoir, which extends 91 miles (146 km) into southern Wyoming, submerging four distinct gorges of the Green River. The dam is a major component of the Colorado River Storage Project, which stores and distributes upper Colorado River Basin water.
The Baker River is an approximately 30-mile (48 km), southward-flowing tributary of the Skagit River in northwestern Washington in the United States. It drains an area of the high North Cascades in the watershed of Puget Sound north of Seattle, and east of Mount Baker. With a watershed of approximately 270 square miles (700 km2) in a complex of deep valleys partially inside North Cascades National Park, it is the last major tributary of the Skagit before the larger river reaches its mouth on Skagit Bay. The river flows through Concrete, Washington, near its mouth and has two hydroelectric dams owned by Puget Sound Energy.
Diablo Dam is one of three dams along the upper Skagit River in Whatcom County, Washington and part of the Skagit River Hydroelectric Project that supplies Seattle with some of its power needs. The dam was built in Diablo Canyon, a gorge of solid granite with vertical walls rising 160 feet (49 m) from the river bed, yet were less than 100 feet (30 m) apart. Construction began in 1927, and was completed in 1930. The dam began generating electricity in 1936.
Ocoee Dam Number 1 is a hydroelectric dam on the Ocoee River in Polk County in the U.S. state of Tennessee. The dam impounds the 1,930-acre (780 ha) Parksville Reservoir, and is the farthest downstream of four dams on the Toccoa/Ocoee River owned and operated by the Tennessee Valley Authority. Completed in 1911, Ocoee No. 1 was one of the first hydroelectric projects in Tennessee.
Mammoth Pool Dam is a hydroelectric dam located on the San Joaquin River in the southern Sierra Nevada mountain range of California, about 45 miles (72 km) northeast of Fresno. It forms Mammoth Pool Reservoir and lies within the Sierra National Forest. The dam and reservoir were named after a large natural pool in the river that was once located above the present dam site.
Lake Shannon is a long, narrow reservoir on the Baker River in Skagit County, Washington in the United States. Formed in the 1920s by the construction of an arch dam just above the town of Concrete, the lake is approximately 7.5 miles (12 km) long and averages 0.6 miles (1 km) wide when full. Located just outside the western boundary of North Cascades National Park, Lake Shannon serves as the lower reservoir for Puget Sound Energy's Baker River Hydroelectric Project.
Lower Baker Dam is a dam across the Baker River one mile north of Concrete, Washington. It forms a reservoir called Lake Shannon which stretches 7.5 miles (12.1 km) upstream. The dam is operated by Puget Sound Energy as part of the Baker River Hydroelectric Project.
Hauser Dam is a hydroelectric straight gravity dam on the Missouri River about 14 miles (23 km) northeast of Helena, Montana, in the United States. The original dam, built between 1905 and 1907, failed in 1908 and caused severe flooding and damage downstream. A second dam was built on the site in 1908 and opened in 1911 and comprises the present structure. The current Hauser Dam is 700 feet (210 m) long and 80 feet (24 m) high. The reservoir formed by the dam, Hauser Lake, is 25 miles (40 km) long, has a surface area of 3,800 acres (1,500 ha), and has a storage capacity of 98,000 acre-feet (121,000,000 m3) of water when full.
Baker Lake is a lake in northern Washington state in the United States. The lake is situated in the Mount Baker-Snoqualmie National Forest and Baker River valley southwest of North Cascades National Park and is fed by the Baker River along with numerous smaller tributaries. The lake is approximately 10 miles (16 km) north of the town of Concrete, Washington.
The Upper North Fork Feather River Project is a hydroelectric scheme in the Sierra Nevada of California, within Lassen and Plumas Counties. The project consists of three dams, five power plants, and multiple conduits and tunnels in the headwaters of the North Fork Feather River, a major tributary of the Feather—Sacramento River systems. The total installed capacity is 362.3 megawatts (MW), producing an annual average of 1,171.9 gigawatt hours (GWh). The project is also contracted for the delivery of irrigation water between March 31 and October 31 of each year. The project is owned and operated by Pacific Gas and Electric Company.
The Electron Hydroelectric Project, originally known as the Puyallup Project, is a hydroelectric power plant operated by Electron Hydro LLC on the Puyallup River in Pierce County, Washington. It generates 22 megawatts (30,000 hp) of electricity and is operated and maintained by approximately 20 full-time employees.
The Snoqualmie Falls Hydroelectric Plant is located just north of Snoqualmie in King County, Washington state, US. It is situated about 22 mi (35 km) east of Seattle. Located just below the Snoqualmie Falls, the power plant consists of two power houses, Plant 1 and Plant 2. Plant 1 was completed in 1899 and is located underground. It is the first completely underground hydroelectric power plant ever built in the world. Plant 2 was built in 1910 and is located along the right bank of the Snoqualmie River. Both plants receive water from a small reservoir created by a weir atop the falls. Plant 1 has an installed capacity of 13.7 MW and Plant 2 a capacity of 40.2 MW for a total installed capacity of 53.9 MW, enough to power 40,000 homes.
The Koma Kulshan Project is a 13.3 MW run-of-the-river hydroelectric generation facility on the slopes of Mount Baker, a stratovolcano in Washington state's North Cascades. The project commenced commercial operation in October 1990, and is owned by a Covanta Energy–Atlantic Power joint venture. It supplies Puget Sound Energy via a Power Supply Agreement (PSA) contract. Its single turbine is a Pelton wheel supplied by Sulzer Escher Wyss.
Electricity in the Puget Sound region is a significant factor in people's lives, an enabler for the modern economy, and has a unique relationship with the region's environment.