Vorotan Cascade | |
Country | Armenia |
---|---|
Location | Syunik Province |
Purpose | Hydroelectricity Irrigation |
Status | Operational |
Construction began | 1961 |
Owner(s) | ContourGlobal [1] [2] [3] |
Operator(s) | ContourGlobal Hydro Cascade CJSC [4] |
Website www | |
Spandaryan HPP | |
Location | Shaghat |
Coordinates | 39°34′25″N45°54′47″E / 39.57361°N 45.91306°E |
Status | Operational |
Opening date | 1989 |
Dam and spillways | |
Type of dam | Embankment type, mixed rockfill and earthfill |
Height (foundation) | 89 m (292 ft) |
Height (thalweg) | 83 m (272 ft) |
Length | 315 m (1,033 ft) |
Width (crest) | 10 m (33 ft) |
Reservoir | |
Creates | Spandaryan Reservoir |
Total capacity | 257,000,000 m3 (208,000 acre⋅ft) |
Active capacity | 218,000,000 m3 (177,000 acre⋅ft) |
Surface area | 10.8 km2 (4.2 sq mi) |
Maximum length | 7 km (4.3 mi) |
Maximum width | 3 km (1.9 mi) |
Maximum water depth | 73 m (240 ft) |
Normal elevation | 2,060 m (6,760 ft) |
Power Station | |
Turbines | 2 X 38 MW |
Installed capacity | 76 MW |
Annual generation | 210 GWh |
Shamb HPP | |
Location | Shamb |
Coordinates | 39°26′13″N46°09′00″E / 39.43694°N 46.15000°E |
Status | Operational |
Opening date | 1978 |
Dam and spillways | |
Type of dam | Concrete spillway dam (Angeghakot Dam) Embankment dam, sandy gravel and soil (Tolors Dam) |
Height (thalweg) | 23.4 m (77 ft) (Angeghakot Dam) 69 m (226 ft) (Tolors Dam) |
Length | 188 m (617 ft) (Tolors Dam) |
Reservoir | |
Creates | Angeghakot Reservoir Tolors Reservoir |
Total capacity | 3,400,000 cubic metres (2,800 acre⋅ft) (Angeghakot Reservoir) 96,000,000 m3 (78,000 acre⋅ft) (Tolors Reservoir) |
Active capacity | 80,000,000 m3 (65,000 acre⋅ft) (Tolors Reservoir) |
Normal elevation | 1,651.1 m (5,417 ft) |
Power Station | |
Turbines | 2 X 85.5 MW |
Installed capacity | 171 MW |
Annual generation | 320 GWh |
Tatev HPP | |
Location | Tatev |
Coordinates | 39°25′39″N46°22′15″E / 39.42750°N 46.37083°E |
Status | Operational |
Opening date | 1970 |
Dam and spillways | |
Type of dam | Embankment type, sandy gravel |
Height (thalweg) | 41 m (135 ft) |
Length | 107 m (351 ft) |
Spillway capacity | 312 m3/s (11,000 cu ft/s) |
Reservoir | |
Creates | Tatev Reservoir |
Total capacity | 13,600,000 m3 (11,000 acre⋅ft) |
Active capacity | 1,800,000 m3 (1,500 acre⋅ft) |
Normal elevation | 1,335.4 m (4,381 ft) |
Power Station | |
Hydraulic head | 568.8 m (1,866 ft) |
Turbines | 3 x 52.4 MW Pelton turbines |
Installed capacity | 157.2 MW |
Annual generation | 670 GWh |
The Vorotan Cascade, or the ContourGlobal Hydro Cascade, [5] is a cascade on the Vorotan River in Syunik Province, Armenia. It was built to produce hydroelectric power and provide irrigation water. The Vorotan Cascade consists of three hydroelectric power plants and five reservoirs with a combined installed capacity of 404.2 MW. It is one of the main power generation complexes in Armenia. [6] [7]
The planning process of the Cascade began just after the Conference of the State Planning Commission held in 1951. In 1954, it was highlighted that with proper infrastructure and careful planning, Armenia's energetic hydro resources might allow it to become an electricity exporter to neighbouring energy deficit areas like Azerbaijan and Iran. It was anticipated that the activation of the Cascade would cut the import of oil products to the country by half. The design work of the Complex began in 1954 and it was constructed between 1961 and 1989. The Tatev hydroelectric power plant (HPP) was completed in December 1970, the Shamb HPP in 1978, and the Spandaryan HPP] in 1989. [8] Despite the plans, Azerbaijan was against the import of electricity from Armenia, thus hindering the scheduled renovation and capacity expansion to take place at the end of the 1970s. The Vorotan Cascade continued to supply electricity mainly to non-ferrous metallurgy industry in nearby Agarak.[ citation needed ]
After Armenia gained independence, the Voratan Cascade belonged to the state-owned energy company Armenergo. In 1997, the Vorotan cascade was separated from Armenergo into a separate state owned company. [9]
Modernization of the cascade started in 2003 by help of the €2.7 million grant of the European Union which was used for rehabilitation of the Tatev HPP of the Vorotan Cascade, and the Argel HPP. [10] Rehabilitation works were conducted by Voith Siemens Hydro Power Generation. [10] [11] Next rehabilitation project was launched in 2010, financed by the €51 million credit from the German development bank KfW. [12] [13] Rehabilitation works started in 2012. [12]
In 2015, ContourGlobal purchased the Vorotan Cascade operating company for US$180 million. [14] ContourGlobal has started a six-year refurbishment program to modernize the plants and improve their operational performance, as well as safety, reliability, and efficiency, with the total investment of $70 million. [12] [15] This is the biggest investment US investment in Armenia. The International Finance Corporation, a member of the World Bank Group, did 20% of the total investment. [14]
The Vorotan River has length of 178 kilometres (111 mi), the fall of 1,223 metres (4,012 ft), and the natural annual flow of 18.6 cubic metres per second (660 cu ft/s) for the link of Tatev. The source of the river is on 3,045 metres (9,990 ft) of the height and starts like a stream, accepting numerous ponds and streams.
The Vorotan Cascade includes a system of three power plants which are Spandaryan, Shamb and Tatev, and five reservoirs which are Spandaryan, Angeghakot, Tolors, Tatev and a daily regulation reservoir. [7] The Spandaryan Reservoir in the vicinity of Tsghuk and Gorhayq villages, is the starting point of the complex. From there water flows through a pressurized tunnel to the Spandaryan HPP. From the Spandaryan HPP water flows to the Angeghakot Reservoir and continues its journey to the Tolors Reservoir which is located in the area of Sisian and Ayri. From that reservoir the water flows to the Shamb HPP. From Shamb reservoir that was constructed beyond the Shamb HPP water reaches the regulation pool, from where it proceeds to the Tatev HPP via a turbine pipe. [8]
Power Plant | Year | Units | Installed Capacity (MW) | Coordinates |
---|---|---|---|---|
Spandaryan HPP | 1989 | 2 X 38 MW | 76 | 39°39′00″N45°51′00″E / 39.65000°N 45.85000°E |
Shamb HPP | 1978 | 2 X 85.5 MW | 171 | 39°26′13″N46°09′00″E / 39.43694°N 46.15000°E |
Tatev HPP | 1970 | 3 x 52.4 MW | 157.2 | 39°25′39″N46°22′15″E / 39.42750°N 46.37083°E |
Total | 7 | 404.2 |
The Vorotan Cascade is one of the main power generation complexes in Armenia. It provides both peak and base load power. It is used also for the grid stabilization. [7] The Tatev HPP has installed capacity of 157.2 MW, the Shamb HPP has installed capacity of 171 MW, and the Spandaryan HPP has installed capacity of 76 MW. Total installed capacity of Vorotan Cascade is 404.2 MW and it generates 1.16 GWh of electricity annually. [8]
The water stores of the Vorotan Complex are also used for irrigation in nearby village and town areas. [6]
The Tatev HPP is located near the Vorotan village on the left bank of the Vorotan River at the altitude of 730 metres (2,400 ft). [10] It is one of Armenia's largest hydroelectric power plants, with installed capacity of 157.2 megawatts (210,800 hp) and annual generation of 670 GWh. [8] Power is generated by three Pelton turbines of 52.4 megawatts (70,300 hp) each. [11] The plant is unique has it is the highest-head hydroelectric power plant in the territory of the former Soviet Union and by using Pelton turbines. [8]
The plant includes the Tatev Dam which is a 41-metre (135 ft) high and 107-metre (351 ft) embankment type dam of sandy gravel. It includes also the daily regulation reservoir. [7] The dam creates the Tatev Reservoir. [8]
The water intake on the left bank of the Vorotan River has capacity of 25 cubic metres per second (880 cu ft/s) and the spillway has total capacity of 312 cubic metres per second (11,000 cu ft/s). Water runs from the water intake through the 18-kilometre (11 mi) long free-flow diversion tunnel to the delivery chamber. The 139.4-metre (457 ft) long and 4-metre (13 ft) high tail-water canal is connected with an irrigation water outlet. The pressure chamber has a diameter of 20 metres (66 ft) and the threshold level of 1,293.05 metres (4,242.3 ft). It is connected to the plant by a 1,855-metre (6,086 ft) pressure conduit, and to the 80,000-cubic-metre (65 acre⋅ft) daily regulation reservoir by the sluice-feeder. The rated head of the plant is 568.8 metres (1,866 ft). [8]
The Shamb HPP is located near the village of Shamb on the right bank of the Vorotan River at the altitude of 1,328 metres (4,357 ft). [10] It is one of the largest hydroelectric power plant having an installed capacity of 171 megawatts (229,000 hp) and annual generation of 320 GWh. [8]
Shamb HPP includes the Angeghakot and Tolors dams which create the Angeghakot and Tolors reservoirs. The Angeghakot Dam is a 23.4-metre (77 ft) high concrete spillway dam. [8] The Tolors Dam is a 69-metre (226 ft) high and 188-metre (617 ft) long embankment type dam of sandy gravel and soil. [8] [7] The Angeghakot and Tolors reservoirs are connected by a 10.5-kilometre (6.5 mi) free-flow tunnel which has throughput capacity of 23 cubic metres per second (810 cu ft/s). Water runs from the Tolors Reservoir to the plant through a 6.9-kilometre (4.3 mi) diversion pressure tunnel which turns into a 1,260-metre (4,130 ft) single-lane penstock. [8]
The Spandaryan HPP is located near Shaghat at the altitude of 1,694 metres (5,558 ft). [10] It is the upper hydroelectric power plant on the cascade commissioned in 1989. The plant has an installed capacity of 76 MW and a projected annual electricity generation of 210 GWh. [8]
The Spandaryan Dam creates the cascade's upper reservoir, the Spandaryan Reservoir. The 83-metre (272 ft) high and 315-metre (1,033 ft) long Spandaryan dam is an embankment type, mixed rockfill and earthfill with clayey soiled bottom. [7]
Its water intake infrastructures includes a pressure tunnel, a spillway culvert, and the Vorotan–Arpa tunnel for releasing water into Lake Sevan. The structures have 30.5 cubic metres per second (1,080 cu ft/s), 80 cubic metres per second (2,800 cu ft/s) and 15 cubic metres per second (530 cu ft/s) water outlays respectively. The last, the fourth structure is a surface spillway with a 160 cubic metres per second (5,700 cu ft/s) installed capacity and inclining drop. The pressure tunnel is 8.2 kilometres (5.1 mi) long and it ends with a surge tank with capacity of 1,900 cubic metres (67,000 cu ft). The surge tank is connected to plant by 2,168-metre (7,113 ft) penstock. [8]
Spandaryan Reservoir is located southeast of Gorayk, in Spandaryan in the Vorotan River basin. It is connected to Arpa River and Arpa River basin by a 9-mile (14 km) long tunnel. [16] It reportedly has a breeding colony of lesser kestrels, the only known in Armenia. [17]
The reservoir's length is 7 kilometres (4.3 mi), its width varies from 2.5 to 3 kilometres (1.6 to 1.9 mi), and its depth is 73 metres (240 ft). The surface area of the reservoir is 10.8 square kilometres (4.2 sq mi). [18] It has 218,000,000 cubic metres (177,000 acre⋅ft) active and 257,000,000 cubic metres (208,000 acre⋅ft) total capacities. The normal elevation of water level is 2,060 metres (6,760 ft) while 2,030 metres (6,660 ft) is the absolute minimum. [8]
The Angeghakot Reservoir has 3,400,000 cubic metres (2,800 acre⋅ft) of total capacity. The reservoir has throughput capacity of 500,000 cubic metres per second (18,000,000 cu ft/s) and the spillway has capacity of 198 cubic metres per second (7,000 cu ft/s). [8]
The Tolors Reservoir has a total capacity of 96,000,000 cubic metres (78,000 acre⋅ft) and active capacity of 80,000,000 cubic metres (65,000 acre⋅ft). The normal elevation of water level is 1,651.1 metres (5,417 ft) while 1,625.5 metres (5,333 ft) is the minimum. [8]
The Tatev Reservoir has total capacity of 13,600,000 cubic metres (11,000 acre⋅ft) and active capacity of 1,800,000 cubic metres (1,500 acre⋅ft). The normal elevation of water level is 1,335.4 metres (4,381 ft) while 1,333.8 metres (4,376 ft) is the minimum. [8]
The Robert-Bourassa generating station, formerly known as La Grande-2 (LG-2), is a hydroelectric power station on the La Grande River that is part of Hydro-Québec's James Bay Project in Canada. The station can generate 5,616 MW and its 16 units were gradually commissioned between 1979 and 1981. Annual generation is in the vicinity of 26500 GWh.
Lake Qaraoun is an artificial lake or reservoir located in the southern region of the Beqaa Valley, Lebanon. It was created near Qaraoun village in 1959 by building a 61 m-high (200 ft) concrete-faced rockfill dam in the middle reaches of the Litani River. The reservoir has been used for hydropower generation, domestic water supply, and for irrigation of 27,500 ha.
The Tsankov Kamak Hydroelectric Power Plant, also Tsankov Kamak HPP, comprises an arch dam and hydroelectric power plant (HPP) on the territory of the village of Mihalkovo, southwestern Bulgaria. It is situated on the Vacha River in Smolyan Province, on the borders of Pazardzhik Province and Plovdiv Province, roughly 40 kilometres (25 mi) southwest of Plovdiv and downstream (north) of the town of Devin. It is a part of the Dospat–Vacha Hydropower Cascade (500.2 MW) development of the Vacha River involving five dams and seven power stations in the provinces of Smolyan, Plovdiv and Pazardzhik, 250 kilometres (160 mi) southeast of the capital Sofia. The other four dams are Dospat, Teshel, Vacha and Krichim.
The Ponmudi Dam is a concrete gravity dam built across the Panniyar river which is a tributary of Periyar river at Konnathady panchayath of Konnathadi village in Idukki district of Kerala, India. The dam was constructed in 1963 as a part of a hydroelectric project. Construction was led by E.U.Philipose, Superintending Engineer, Kerala State Electricity Board. It has a length of 288.80 metres (947.5 ft). The hydropower component of the dam has an installed capacity of 30 MW with firm power of 17 MW, generating 158 GWh annually. Taluks through which the river flow are Udumbanchola, Devikulam, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.
The Samanala Dam is a dam primarily used for hydroelectric power generation in Sri Lanka. Commissioned in 1992, the Samanalawewa Project is the third-largest hydroelectric scheme in the country, producing 405 GWh of energy annually. It was built with financial support from Japan and the United Kingdom. It is notable for a large leak on its right bank. Power production continues as planned despite the leakage, and the water from the leak now provides two thirds of the water issued by the reservoir for agriculture in downstream areas.
The Badush Dam is an unfinished multi-purpose dam on the Tigris River, located near Badush, 16 kilometres (9.9 mi) northwest of Mosul in the Ninawa Governorate, northern Iraq.
Rangit Dam, which forms the headworks of the Rangit Hydroelectric Power Project Stage III, is a run-of-the-river hydroelectric power project on the Ranjit River, a major tributary of the Teesta River in the South Sikkim district of the Northeastern Indian state of Sikkim. The project's construction was completed in 1999. The project is fully functional since 2000. The project was built at a cost of Rs 4922.6 million. The average annual power generation from the 60 MW project is 340 GWh with firm power of 39 MW.
The Farkhad Dam is a hydroelectric and irrigation dam on the Spitamen in Sughd Province, Tajikistan. It is a part of the Naryn-Syr Darya Cascade. The dam is located on the territory of Tajikistan and controlled by Tajikistan, while the Farkhad hydropower station, operated by Uzbekenergo.
Irganai Dam is a hydroelectric dam in the Untskul region of Dagestan, Russia. It is located on the river Avar Koisu.
The Paulo Afonso Hydroelectric Complex, also known as the Paulo Afonso Complex, is a system of three dams and five hydroelectric power plants on the São Francisco River near the city of Paulo Afonso in Bahia, Brazil. The complex exploits an 80-metre (260 ft) natural gap on the river, known as the Paulo Afonso Falls. Constructed in succession between 1948 and 1979, the dams support the Paulo Afonso I, II, III, IV and Apollonius Sales (Moxotó) power plants which contain a total of 23 generators with an installed capacity of 4,279.6 megawatts (5,739,000 hp).
The Salto Osório Hydroelectric Power Plant is a dam and hydroelectric power plant on the Iguazu River near Osório in Paraná, Brazil. It is the second dam upstream of the Iguazu Falls and was completed in 1979. The power station has a 1,078 MW capacity and is supplied with water by a rock-fill embankment dam.
The Salto Santiago Hydroelectric Power Plant is a dam and hydroelectric power plant on the Iguazu River near Santiago in Paraná, Brazil. It is the third dam upstream of the Iguazu Falls and was completed in 1979. The power station has a 1,420 MW capacity and is supplied with water by a rock-fill embankment dam.
The Luiz Carlos Barreto de Carvalho Dam is an embankment dam on the Grande River near Fronteira in São Paulo, Brazil. The dam serves an associated hydroelectric power plant with a 1,050 megawatts (1,410,000 hp) installed capacity.
The Ivaylovgrad Dam(язовир "Ивайловград") is located in the eastern Rhodope Mountains and is situated on the Arda river, Southern Bulgaria. There are another two large dams of the Arda upstream - Kardzhali Dam and Studen Kladenets Dam to the west of Ivaylovgrad Dam.
The Entracque Power Plant, also known as The Upper Gesso Plant, is a pumped-storage hydroelectric power station located in Valle Gesso just south of Entracque, Italy. The power station contains pump-generators for two co-located but hydraulically separated power schemes; the Chiotas-Piastra Plant and Rovina-Piastra Plant. Both plants use separate upper reservoirs but use Lago della Piastra as their common lower reservoir. To produce power, water is released from the upper reservoirs to the power station located at the lower reservoir. The pump-generators re-fill the reservoirs and the process repeats as needed. The Chiotas' upper reservoir, Lago del Chiotas, is located much higher in the valley and larger than Rovina's Lago della Rovina which affords it the ability to produce more electricity. The installed capacity of Chiotas is 1,184 megawatts (1,588,000 hp) with a hydraulic head of 1,048 m (3,438 ft) while Rovina has an installed capacity of 133.67 megawatts (179,250 hp) and a head of 598 metres (1,962 ft). Construction on the plant began in 1962 and operations started in 1982. It is owned and operated by Enel.
Geehi Dam is a major ungated rockfill embankment dam across the Geehi River in the Snowy Mountains of New South Wales, Australia. The reservoir impounded by the dam is known as Geehi Reservoir.
Sevan–Hrazdan Cascade is a complex of hydroelectric power plants on the Hrazdan River and its tributaries between the Lake Sevan and Yerevan in Armenia. They use irrigation water flow from the Lake Sevan and streams waters of Hrazdan River. The cascade is owned by the International Energy Corporation (IEC), a subsidiary of Tashir Group owned by Samvel Karapetyan.
The Toulnustouc generating station, is a hydroelectric power generating station managed by Hydro-Québec on the Toulnustouc River in the territory of Côte-Nord, Quebec, Canada. It has an installed capacity of 526 MW. The power station is fed by water from a dam and dyke that contain the Lake-Sainte-Anne reservoir.
The Mavrovo Hydropower System is a collection of three hydroelectric power plants in North Macedonia. It plays a crucial role in electricity generation within the region. The system includes Vrutok HPP, Rаven HPP, and Vrben HPP. The largest capacity is in the hydropower plant "Vrutok" with four generators. Several kilometers downstream towards Gostivar is the second power plant, "Raven," with three generators. The final power plant in the system is located in the village of Vrben and operates with two generators.
The Batak Hydroelectric Cascade is situated in the Pazardzhik Province, southern Bulgaria and is among the first hydroelectric cascades in the country. Inaugurated on 6 September 1959, it includes seven reservoirs and three underground hydro power plants — Batak, Peshtera and Aleko with a combined installed capacity of 254.2 MW, producing an average of 796 GWh annually.