Bradley Branch

Last updated

Bradley Branch
Bradley Branch Lock 1 beneath Midland Metro bridge QF.jpg
Lock No. 1 lies beneath the West Midlands Metro
Specifications
Length0.6 miles (0.97 km)
Locks9
StatusFilled in
History
Date completed1849
Date closed1950s
Geography
Start pointWednesbury Oak
End pointMoorcroft Junction, Moxley
Branch ofBirmingham Canal Navigations
Bradley Branch
BSicon uSKRZ-Euq.svg
BSicon ueFABZq+lr.svg
BSicon uSTRq.svg
BSicon uSTRq.svg
BSicon uSTRq.svg
Walsall Canal, Moorcroft Jn
BSicon uexSTR.svg
BSicon gmABZgl exu+.svg
BSicon gSTR+r.svg
BSicon ugWHRF.svg
BSicon uexFGATEd.svg
BSicon ugWHRF.svg
1
Lock and basins
BSicon gmKRZu.svg
BSicon uxmKRZu.svg
BSicon STRq.svg
BSicon STRq.svg
BSicon STRq.svg
Midland Metro (ex GWR)
BSicon gSTRl.svg
BSicon gmABZg+r exu+.svg
BSicon ugHWHRF.svg
BSicon gmABZgr exu+.svg
Tank Foundry Basin
BSicon uexFGATEd.svg
2
Lock
BSicon gFABZgl+l.svg
BSicon ugDOCKr.svg
Triangular basin
BSicon gSKRZ-Au.svg
A4098 Bradley Bridge
BSicon gFGATEd.svg
3
Lock
BSicon ugHWHRF.svg
BSicon gFABZgr+r.svg
Boiler Works Basin
BSicon gSTR+l.svg
BSicon gFABZlr+lr.svg
BSicon gSTRq.svg
BSicon gSTRq.svg
BSicon ugHWHRF.svg
Basin to collieries
BSicon ugWHRF.svg
BSicon gSTR.svg
Bradley Colliery Basin
BSicon gFGATEd.svg
4
Lock
BSicon gFGATEd.svg
5
Lock
BSicon gFGATEd.svg
BSicon ugWHRF.svg
6
Lock
BSicon gFGATEd.svg
BSicon gSTRl.svg
BSicon gSTR+r.svg
7
Lock
BSicon gABZgl.svg
BSicon gSTR+r.svg
BSicon ugWHRF.svg
Wednesbury Old Oak Ironworks
BSicon gFGATEd.svg
BSicon ugWHRF.svg
BSicon gSTR.svg
8
Lock
BSicon gFGATEd.svg
BSicon ugHWHRF.svg
BSicon gFABZlr+lr.svg
BSicon ugDOCKr.svg
9
Lock
BSicon gSTR+l.svg
BSicon gFABZq+lr.svg
BSicon gFABZqlr.svg
BSicon gFABZq+lr.svg
BSicon gFABZlr+lr.svg
BSicon gSTRq.svg
Rotten Brunt line
BSicon gSTR.svg
BSicon gSTR.svg
BSicon ugWHRF.svg
BSicon gSTR.svg
BSicon guENDE.svg
BSicon gSTRl.svg
BSicon gSTRq.svg
BSicon gSTRq.svg
BSicon gSTRr.svg
Old line of loop
BSicon uCONTf.svg
Wednesbury Oak Loop

The Bradley Branch or Bradley Locks Branch was a short canal of the Birmingham Canal Navigations in the West Midlands, England. Completed in 1849, it included nine locks, and had a number of basins which enabled it to service local collieries and industrial sites. The locks were unusual, as they had a single gate at both ends, rather than double gates at the bottom end. The route closed in the 1950s, and the top seven locks were covered over and landscaped.

Contents

Since 2008, there have been calls for the branch to be reopened. In 2015 the results of a feasibility study for reopening were published, and the scheme was branded the Bradley Canal, since it would involve the restoration of the Bradley Branch and a connecting link from the top of the canal, using parts of the Wednesbury Oak Loop and the Rotton Brunt line. The plan has been spearheaded by the Birmingham and Black Country Wildlife Trust, rather than navigation interests, but there is an understanding that boats using the route will ensure that the many other benefits of reopening will be sustainable.

History

The area around Bradley and Wednesbury was occupied by coal mines and ironstone mines, and the ironmaster John Wilkinson built a furnace and ironworks near Bradley. [1] The Birmingham Canal Navigations (BCN) Old Main Line wound its way through the area in a circuitous fashion, following the 473-foot (144 m) contour. It had been authorised by Act of Parliament on 28 February 1768, and was opened for traffic between Wolverhampton and the Worcester & Birmingham Canal at Gas Street Basin on 21 September 1772. [2] A little further to the north, the Broadwaters Canal was built by the Birmingham & Birmingham & Fazeley Canal Company, an amalgamation of two rival concerns once an Act of Parliament had been obtained. This descended from the Birmingham main line through the eight Ryder's Green locks, [3] and followed the 408-foot (124 m) contour. [4] Once the Broadwaters Canal was extended to reach Walsall Town Basin in 1799, it became known as the Walsall Canal.

Several branches were built from the Broadwaters Canal to serve the growing coal-field through which it ran. Just to the south of Bradley was the Gospel Oak colliery, and a branch to this had been authorised by the 1783 Act, but work did not start until 1791, and the intention to build some locks at the far end was abandoned when it was decided to build the Bradley Hall Extension instead. This was not specifically authorised by the enabling Act, but was covered by the general powers that the Act contained. Following lengthy discussion, the decision to proceed was made in November 1794. The extension would leave the Broadwaters Canal at Moorcroft Junction, and would rise through three locks to reach Bradley Hall colliery. The cost of the work was estimated to be £1,383, just £45 more than a level canal. The mines were responsible for supplying the water to operate the locks, and the owners were told that the locks were a replacement for those not built on the Gospel Oak branch. Despite these statements, the company then entered into arbitration to ensure that the colliery companies could not make any claims against the canal company because of the change of plan. The branch opened in 1796, and the arbitration was completed two years later. [5] [6]

The upper 6 locks of the Bradley Branch, around 1890, showing the locks and lagoons Bradley Canal.jpg
The upper 6 locks of the Bradley Branch, around 1890, showing the locks and lagoons

The BCN Old Main Line became the Wednesbury Oak Loop when it was bypassed in the 1830s by a straighter route, originally planned as a deep cutting, but which incorporated the Coseley Tunnel, construction of which was authorised in 1835. The new line and tunnel were opened on 6 November 1837. [7] The Loop was itself shortened at some point, when the Rotton Brunt Line was built, which cut across a large meander. [8] The Wyrley and Essington Canal merged with the Birmingham Canal Navigations in 1840, and links between the two canal systems included the Walsall Extension Canal, which ran northwards from Walsall to meet the Wyrley and Essington at Birchills Junction. [9] A private canal, to Bradley Marr works, left the Wednesbury Oak Loop and descended through a staircase of two locks, although it did not reach either Bradley Colliery or Wilkinson's furnace at Lower Bradley. [10] [11] With the Walsall Canal now providing a link to the south or the north, six locks were built in a straight line from the Rotton Brunt Line to the Bradley Hall line, which was straightened and its three locks rebuilt. [10] It was opened in 1849, becoming known as the Bradley Branch or Bradley Locks Branch, [12] and closed in the 1950s. [13]

When the canal was built, it was made quite wide, and the locks were all constructed on the northern side of the canal, rather than centrally to the channel, as most locks built previously on the BCN had been. This was probably to make the task of duplicating them easier, if this became necessary. This arrangement created a large lagoon on the southern side of the lock, at the end of which a simple cascade weir allowed surplus water to flow into the next pound. The lagoons increased the volume of water in the short pounds. The locks were built with a single gate at the top and at the bottom, whereas most locks built previously on the BCN had double gates at the bottom end of the lock. [14]

After closure, the top seven locks were filled in and the area was landscaped. It is thought that the locks and the stone walls which formed the margins of the canal are largely complete below the landscaping. The bottom two locks were partially restored using a grant from the Heritage Lottery Fund, and were then filled in to protect the brickwork from damage, with a view to full restoration at some time in the future. Between the bottom lock and Moorcroft Junction, the canal is level with the Walsall Canal and so is still in water, although it is heavily overgrown. [15]

Restoration proposals

Hover mouse pointer over a canal junction to see its name BCN canal map Wednesbury Oak.svgToll End JunctionTame Valley Junction (click for article)
Hover mouse pointer over a canal junction to see its name
Map of Wednesbury Oak Loop (shown in pink), an original part of James Brindley's Birmingham Canal, and its modern neighbours. The canals as they stand today are shown as solid lines. The Bradley Branch (top of map) linked the BCN Old Main Line and the Walsall Canal through nine locks.

At some time prior to 2008, the Birmingham Canal Navigations Society suggested that the route could be restored, since the only structure which obstructed such a plan was the bridge at the end of the navigable section of the Wednesbury Oak Branch, and it would open up some additional circular cruising routes. [16]

In November 2013, following discussions with other interested parties, the West Midlands Waterway Partnership agreed to seek funding for a detailed feasibility study into restoration of the Bradley Canal. [17] The report was funded by the Canal & River Trust, the Inland Waterways Association, the Birmingham and Black Country Wildlife Trust, through their Nature Improvement Area Fund, and the Birmingham Canal Navigations Society, with support from the Department for Environment, Food and Rural Affairs (DEFRA), the Department for Communities and Local Government (DCLG), the Environment Agency, the Forestry Commission and Natural England. The feasibility study was carried out by the consultants Moss Naylor Young. [18] In late 2015 the study found the restoration to be feasible. [19]

The aims of the restoration include the creation of a through route from the Wolverhampton Level of the Birmingham Canal main line to the Walsall Canal and the Tame Valley Canal. As well as the Bradley Branch, it includes part of the Wednesbury Oak Loop and other minor sections, and so has been labelled the 'Bradley Canal' to avoid confusion. The section affected is some 1.5 miles (2.4 km) long, and includes the nine locks of the Bradley Branch. While there are two existing routes between the ends of the Bradley Canal, that via Tipton is 9 miles (14 km) long and the route via Wolverhampton is 17 miles (27 km). The re-opened route would thus provide a much more direct link. [20]

The restored section would start near the Bradley Workshops of the Canal and River Trust at the end of the Wednesbury Oak Loop, where most of the lockgates for narrow canals are made. The only major obstacle is the road bridge carrying Bradley Lane over the canal near the workshops, which has been lowered. This would require re-alignment of the canal or the road. The rest of the route is free from development, and is protected by local planning agreements. The restoration route continues along the filled-in Wednesbury Oak Loop, and along part of the Rotten Brunt line, which cut off a loop in the Wednesbury Oak Loop. It then follows the line of the Bradley Arm, descending through nine locks to reach the Walsall Canal, the top seven of which are filled in. [20]

The idea of restoring the canal was originally put forwards by the Birmingham and Black Country Wildlife Trust, which suggested it to Moss Naylor Young. They believe that the project will deliver enhancements for wildlife and to habitat, will result in some urban regeneration, and will be beneficial for recreation, heritage restoration and general education. Although their aim is not primarily concerned with navigation, they recognise that navigation will create an active and managed waterfront, which will ensure the success of the other benefits. [20] The estimated cost of the proposal is between £7 and £8 million, and the findings were announced by the Canal and River Trust on 11 November 2015. There is local support from a residents association, and as a result of the announcement, the Canal and River Trust have pledged to hold an open day at Bradley Workshops, and the Birmingham Canal Navigations Society stated that their annual spring cruise on 2 April 2016 would include the navigable section of the Wednesbury Oak Loop up to Bradley Workshops. [21]

The proposed restoration is now (2020) being co-ordinated by the Bradley Canal Restoration Society. [22] [23]

Route

The canal left the Walsall Canal at Moorcroft Junction. As the towpath for the Walsall Canal was on the western bank, there was a towpath bridge immediately to the west of the junction. To the south of the canal was a sand pit, already marked "old" in 1890, and a chemical works, while to the north was Moorcroft Old Colliery. The southern site is now occupied by industrial units, while much of the colliery site has become Moorcroft Wood. The south-western corner was occupied by an isolation hospital in 1937, and the north-western edge is now occupied by Moorcroft Wood Primary School. There was a small basin to the south of the canal, just before the first lock was reached. Another basin turned off to the north after the lock. The Great Western Railway crossed immediately after the lock. [24]

A further basin on the north bank served Tank Foundry in 1890, but by 1937, the works had expanded and the basin had been closed. The whole complex was labelled Bradley Boiler and Engineering Works in 1937, and straddled the road, called Oak Road in 1890, but later renamed Great Bridge Road, which is still its modern name. The road crossed the canal at Bradley Bridge, below the second lock and a triangular basin on the south bank, which served a colliery. To the south was a large expanse of workings, labelled Willingsworth Collieries, but already disused in 1890. The third lock was immediately west of the road bridge, and another large basin serving the engineering works was located just above it. [24]

Lock No. 2, the only other visible lock of the original nine Bradley Branch Lock 2 QF.jpg
Lock No. 2, the only other visible lock of the original nine

To the north of the next section lay Bradley Colliery. Pits 1 and 2 were close to the canal and were served by a basin. A tramway ran from the basin to pits 3 and 4 in 1903. To the south was a long basin, which left the main line opposite the north basin. It ran to some coal shafts. Housing had been built along its eastern edge by 1938, with the construction of Myrtle Terrace, and by 1967, over half of it had been filled in, and the far end was occupied by houses on Bartlett Close, although the middle section had been used to lengthen the gardens on Myrtle Terrace. Four more locks followed, after which there was a basin on the south bank which served the Wednesbury Oak Iron Works. A network of canals at a higher level, which joined the Wednesbury Oak Loop also served the area, but had been filled in by 1919, when a network of railway sidings served the adjacent Wednesbury Oak Furnaces. The furnaces and sidings had all disappeared by 1937. The final two locks raised the level to the Wolverhampton Level of the Wednesbury Oak Loop. The section where it joined was a straight cut, made to bypass a much longer loop, which broadly followed the boundary of the Weddell Wynd Community Woodland. [24]

One feature of the canal which is obvious from the maps concerns the locks and their associated lagoons. Locks 2 and 4 to 8 all have a central island in the middle of a wide canal, with a lock on the north side, and a large lagoon on the south side, which is labelled "overflow" at the downstream end where the cascade weir was. There is no evidence on the maps for a similar structure at locks 1, 3 or 9. Locks 1 and 3 both had additional basins above them, and lock 9 drew its water from the Rotton Brunt Line and the Wednesbury Oak Loop. [24]

Points of interest

Map all coordinates using: OpenStreetMap  
Download coordinates as: KML

See also

Bibliography

Related Research Articles

<span class="mw-page-title-main">Birmingham and Fazeley Canal</span> Canal in the United Kingdom

The Birmingham and Fazeley Canal is a canal of the Birmingham Canal Navigations in the West Midlands of England. Its purpose was to provide a link between the Coventry Canal and Birmingham and thereby connect Birmingham to London via the Oxford Canal.

<span class="mw-page-title-main">Wyrley and Essington Canal</span> Narrow canal in the Midlands, England

The Wyrley and Essington Canal, known locally as "the Curly Wyrley", is a canal in the English Midlands. As built it ran from Wolverhampton to Huddlesford Junction near Lichfield, with a number of branches: some parts are currently derelict. Pending planned restoration to Huddlesford, the navigable mainline now terminates at Ogley Junction near Brownhills. In 2008 it was designated a Local Nature Reserve.

<span class="mw-page-title-main">Birmingham Canal Navigations</span>

Birmingham Canal Navigations (BCN) is a network of canals connecting Birmingham, Wolverhampton, and the eastern part of the Black Country. The BCN is connected to the rest of the English canal system at several junctions.

<span class="mw-page-title-main">Spon Lane Locks Branch</span>

The Spon Lane Locks Branch is an 800-yard section of the BCN Main Line canal in Oldbury, England, which forms a connecting canal "sliproad" where the Old BCN Main Line crosses the New BCN Main Line at the Stewart Aqueduct. It runs westwards from Spon Lane Junction via the three Spon Lane Locks to Bromford Junction. It was originally part of the Wednesbury branch of Birmingham Canal which opened in 1769. At the top lock, there is a rare example of a split bridge, which enabled a horse to cross the canal without being detached from the barge. The rope passed through a gap at the centre of the bridge between its two halves. However, this particular example is a modern reconstruction, dating from 1986. These are probably the oldest working locks in the country. There is pedestrian access to a tow path for its entire length, but being narrow and muddy, it is not suitable for cyclists.

<span class="mw-page-title-main">Dudley Canal</span>

The Dudley Canal is a canal passing through Dudley in the West Midlands of England. The canal is part of the English and Welsh connected network of navigable inland waterways, and in particular forms part of the popular Stourport Ring narrowboat cruising route.

<span class="mw-page-title-main">Cannock Extension Canal</span>

The current Cannock Extension Canal is a 1.8-mile (2.9 km) canal in England. It runs from Pelsall Junction on the Wyrley and Essington Canal, north to Norton Canes Docks and forms part of the Birmingham Canal Navigations. Historically, it ran to Hednesford, and served a number of collieries, which provided the main traffic. It opened in 1863, and the northern section closed in 1963, as a result of mining subsidence.

The BCN Main Line, or Birmingham Canal Navigations Main Line describes the evolving route of the Birmingham Canal between Birmingham and Wolverhampton in England.

<span class="mw-page-title-main">Water levels of the Birmingham Canal Navigations</span>

The Birmingham Canal Navigations (BCN), a network of narrow canals in the industrial midlands of England, is built on various water levels. The three longest are the Wolverhampton, Birmingham, and Walsall levels. Locks allow boats to move from one level to another.

<span class="mw-page-title-main">Titford Canal</span>

The Titford Canal is a narrow (7 foot) canal, a short branch of the Birmingham Canal Navigations (BCN) in Oldbury, West Midlands, England.

<span class="mw-page-title-main">Walsall Canal</span>

The Walsall Canal is a narrow canal, seven miles (11 km) long, forming part of the Birmingham Canal Navigations, and passing around the western side of Walsall, West Midlands, England.

<span class="mw-page-title-main">Tame Valley Junction</span> Canal junction

Tame Valley Junction, also known as Doe Bank Junction, is a canal junction at the western limit of the Tame Valley Canal where it meets the Walsall Canal, south of Walsall, in the West Midlands, England.

Horseley Fields Junction

Horseley Fields Junction is a canal junction at the western limit of the Wyrley and Essington Canal where it meets the BCN Main Line, at Horseley Fields east of Wolverhampton, in the West Midlands, England.

<span class="mw-page-title-main">Ogley Junction</span> Canal junction in the English Midlands

Ogley Junction, on the Staffordshire county border near Brownhills, West Midlands, England, is a historic canal junction on the Wyrley and Essington Canal where the Anglesey Branch left the main line.

Catshill Junction

Catshill Junction is a canal junction at the northern limit of the Daw End Branch Canal where it meets the Wyrley and Essington Canal main line, near Brownhills, in West Midlands, England.

<span class="mw-page-title-main">Pelsall Junction</span> Canal junction in England

Pelsall Junction is a canal junction at the southern limit of the Cannock Extension Canal where it meets the Wyrley and Essington Canal main line, near Pelsall, West Midlands, England.

Birchills Junction

Birchills Junction is the canal junction at the northern limit of what is now called the Walsall Canal where it meets the Wyrley and Essington Canal main line, near Walsall, West Midlands, England. It opened in 1798, but lasted for little more than a year, until it was re-opened in 1841 when a connecting link was built to the Birmingham Canal Navigations' southern route to Walsall.

<span class="mw-page-title-main">Rumer Hill Junction</span>

Rumer Hill Junction was a canal junction on the Cannock Extension Canal where the Churchbridge Branch left to join the Hatherton Canal. The junction, along with the northern section of the canal was abandoned in 1963. The Churchbridge Branch and Rumer Hill Junction were subsequently obliterated by opencast mining.

<span class="mw-page-title-main">Wednesbury Old Canal</span>

Wednesbury Old Canal is part of the Birmingham Canal Navigations (BCN) in West Midlands (county), England. It opened in 1769, and although parts of it were abandoned in 1955 and 1960, the section between Pudding Green Junction and Ryder's Green Junction is navigable, as it provides a link to the Walsall Canal. A short stub beyond Ryder's Green Junction is connected to the network but difficult to navigate.

<span class="mw-page-title-main">Bromford Junction</span>

Bromford Junction is a canal junction at the foot of the Spon Lane Locks where the Spon Lane Locks Branch meets the BCN New Main Line near Oldbury in the West Midlands, England.

<span class="mw-page-title-main">Wednesbury Oak Loop</span>

The Wednesbury Oak Loop, sometimes known as the Bradley Arm, is a canal in the West Midlands, England. It is part of the Birmingham Canal Navigations (BCN), and was originally part of James Brindley's main line, but became a loop when Thomas Telford's improvements of the 1830s bypassed it by the construction of the Coseley Tunnel. The south-eastern end of the loop was closed and in parts built over, following the designation of the entire loop as "abandoned" in 1954, including the section which was filled in at the beginning of the 1960s to make way for the Glebefields Estate in Tipton.

References

  1. Shill 2005, p. 28.
  2. Hadfield 1985, pp. 64–68.
  3. Hadfield 1985, pp. 71–72.
  4. Hadfield 1985, pp. 66–67.
  5. Broadbridge 1974, p. 86.
  6. "Bradley Locks, Bradley Branch Canal". Black Country History. Archived from the original on 1 July 2017. Retrieved 21 January 2012.
  7. Hadfield 1985, p. 88.
  8. Moss 2015, p. 3.
  9. Hadfield 1985, p. 99.
  10. 1 2 Shill 2010, p. 1.
  11. Moss 2015, p. 4.
  12. Hadfield 1985 , pp. 318–319
  13. Moss 2015, p. 1.
  14. Moss 2015, pp. 4, 28.
  15. Moss 2015, pp. 17–18.
  16. "BCNS Gallery". Archived from the original on 23 November 2008.
  17. "West Midlands Waterways Partnership minutes" (PDF). Canal and River Trust. 7 November 2013. Item 5. Archived (PDF) from the original on 2 March 2016.
  18. Moss 2015, p. ii.
  19. "Progress Roundup". Navvies. Waterway Recovery Group (274): 42. January 2016.
  20. 1 2 3 "Bradley Canal Restoration Feasibility Study". Biodiversity Action Reporting System. Archived from the original on 3 March 2016. Retrieved 20 February 2016.
  21. "Plans to Restore Bradley Arm". Waterways World. January 2016. ISSN   0309-1422.
  22. "Bradley Canal restoration launches". Waterways World. February 2020. ISSN   0309-1422.
  23. "Bradley Canal Restoration Society". BCRS. Archived from the original on 26 September 2020. Retrieved 4 January 2020.
  24. 1 2 3 4 Ordnance Survey, 1:2500 map, 1890/1919/1938/1967/modern.
  25. All coordinates: WGS84, from Google, with reference to Ordnance Survey map 1:10560 SO99SE dated 1955

Commons-logo.svg Media related to Bradley Branch Canal at Wikimedia Commons

Coordinates: 52°33′02″N2°03′03″W / 52.5506°N 2.0509°W / 52.5506; -2.0509 (approx mid-point)