Hollandse Kust West Offshore Wind Farm

Last updated
Hollandse Kust West
Hollandse Kust West Offshore Wind Farm
Country
  • Netherlands
Location
Coordinates 52°41′N3°46′E / 52.68°N 3.77°E / 52.68; 3.77
Owner(s)
Wind farm
Type
Distance from shore
  • 53 km (33 mi)
Site area
  • 176 km2 (68 sq mi)
Power generation
Make and model Vestas V236-15.0MW (VI)
Units planned52 × 15 MW (VI)
Nameplate capacity 760 MW (VI)
760 MW (VII)
700 MW (VIII)
External links
Website https://ecowende.nl/

Hollandse Kust West Wind Farm (officially Hollandse Kust (West) Wind Farm Zone) is a planned offshore wind farm in the Dutch part of the North Sea. The wind farm consists of 3 sites with a capacity of around 700 MW each. The farm is located around 53 km off of the Dutch coast. [1] it is the third offshore wind farm in the Netherlands after the Hollandse Kust Zuid and Hollandse Kust Noord wind farms to be built without subsidies .

Contents

Originally only 2 sites were planned. A possible third site was added in 2022.

Wind Farms

Hollandse Kust (West) VI

The tender for this site was won by Ecowende, a consortion of Shell and Eneco. [2] The wind farm will be built by Van Oord. [3]

Hollandse Kust (West) VII

The tender for the second site was won by Oranje Wind Power II, a subsidiary of RWE. The site will have an installed capacity of around 760 MW. [4]

Hollandse Kust (West) VIII

The site was added in 2022. The tender for this site is expected to be held in 2026 or 2027. [5]

See also

Related Research Articles

<span class="mw-page-title-main">Borssele</span> Village in Zeeland, Netherlands

Borssele is a village in the Dutch province of Zeeland. It is a part of the municipality of Borsele, and lies about 12 km east of Vlissingen. The municipality name is spelled with a single s while the name of the town is spelled with a double s.

<span class="mw-page-title-main">Egmond aan Zee Offshore Wind Farm</span> Dutch offshore wind farm in the North Sea

Offshore Windpark Egmond aan Zee (OWEZ) is an offshore wind farm in the Dutch part of the North Sea, located approximately 10 km from the coast near Egmond aan Zee. It was the first large-scale offshore wind farm to be built off the Dutch North Sea coast. The wind farm was built by NoordzeeWind, a joint venture consisting of Shell and Nuon.

Royal Van Oord is a Dutch maritime contracting company that specializes in dredging, land reclamation and constructing man made islands. Royal Van Oord has undertaken many projects throughout the world, including land reclamation, dredging and beach nourishment. The company has one of the world's largest dredging fleets.

<span class="mw-page-title-main">Burbo Bank Offshore Wind Farm</span>

The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.

<span class="mw-page-title-main">Innogy Nordsee 1</span>

Innogy Nordsee 1-2-3 is a large wind farm complex off Germany's coast. It is built 40 kilometres (25 mi) north of the island of Juist, within an area of around 100 square kilometres (39 sq mi) and in water 26–34 metres (85–112 ft) deep. It includes three wind farms: Innogy Nordsee 1 with 54 turbines, Innogy Nordsee 2 with 48 turbines, and Innogy Nordsee 3 with 60 turbines. In total, 162 wind turbines with a capacity of 6.15 megawatts (MW) will be used.

<span class="mw-page-title-main">Offshore wind power</span> Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

<span class="mw-page-title-main">Belwind Offshore Wind Farm</span>

The Belwind Wind Farm is located on Bligh Bank, 46 kilometres (29 mi) from the Belgian port of Zeebrugge, and has been built in two phases. It has a 330 MW production capacity and an estimated annual output of 1.1 TWh. Phase 1 had a 165 MW production capacity.

<span class="mw-page-title-main">Wind power in Belgium</span> Overview of wind power in Belgium

Wind power in Belgium has seen significant advancements, starting with the generation of electricity from offshore wind farms in 2009. By 2020, the capacity of these offshore farms reached 2,262 megawatts (MW), matching the combined output of Belgium's largest nuclear reactors, Doel 4 and Tihange 3. Concurrently, the development of on-shore wind energy, which remained minimal until 2004, experienced significant growth, with installed capacity and production doubling annually from 96 MW in 2004 to 2,476.1 MW by 2021. The percentage of electricity demand met by wind grew to about 14.4% by 2020.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of May 2024, wind power in the Netherlands has an installed capacity of 11,611 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

<span class="mw-page-title-main">Renewable energy in the Netherlands</span>

Despite the historic usage of wind power to drain water and grind grain, the Netherlands today lags 21 of the 26 other member states of the European Union in the consumption of energy from renewable sources. In 2022, the Netherlands consumed just 15% of its total energy from renewables. According to statistics published by Eurostat, it was the last among the EU countries in the shift away from global warming-inducing energy sources. The leading renewable sources in the country are biomass, wind, solar and both geothermal and aerothermal power. In 2018 decisions were made to replace natural gas as the main energy source in the Netherlands with increased electrification being a major part of this process.

<span class="mw-page-title-main">Rampion Wind Farm</span> Wind farm off the Sussex coast

Rampion is an offshore wind farm developed by E.ON, now operated by RWE, off the Sussex coast in the UK. The wind farm has a capacity of 400 MW. The wind farm was commissioned in April 2018 and was the first offshore wind farm for the whole south coast of England.

<span class="mw-page-title-main">Windpark Noordoostpolder</span> Onshore and near-shore wind farm in Flevoland, the Netherlands

Windpark Noordoostpolder is an onshore and near-shore wind farm in Flevoland, the Netherlands. Upon completion in 2017, it was the largest wind farm in the Netherlands, and as of 2019 it is still one of the largest. Owner-operators are members of the Koepel Windenergie Noordoostpolder, a partnership of more than 100 agricultural entrepreneurs from the North East Polder (Noordoostpolder), and Innogy, a subsidiary of German energy company RWE.

Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2023, a total of 277 turbines are expected to be built and produce a capacity of 3.6 GW, enough to power 6 million homes.

Gemini is a 600 megawatt (MW) offshore wind farm off the coast of the Netherlands. Construction started in 2015 with final commissioning in 2017. At the time of completion it was the second largest offshore wind farm on Earth after the London Array.

<span class="mw-page-title-main">Borssele Offshore Wind Farm</span>

Borssele Offshore Wind Farm is an offshore wind farm in the Dutch part of the North Sea, on the border with Belgium. It consists of 5 sites and 3 farms with a total capacity of 1502.5 MW.

Hollandse Kust Zuid Wind Farm is an offshore wind farm being built in the Dutch part of the North sea. The farms consists of 4 sites and 2 wind farms. Both farms are developed by Vattenfall as a single project. The farm will have a total installed capacity of 1529 MW. The farm consists of 139 Siemens Gamesa 11.0-200 DD wind turbines with a capacity of 11 MW each.

Hollandse Kust Noord Wind Farm is an offshore wind farm in the Dutch part of the North sea. The wind farm zone consists of a single site. The farm will consist of 69 wind turbines with a capacity of 11 MW each and will have a total output of 759 MW.

The United Kingdom became the world leader of offshore wind power generation in October 2008 when it overtook Denmark.

References

  1. "Hollandse Kust (west) Wind Farm Zone | RVO.nl". english.rvo.nl. Retrieved 2023-08-21.
  2. "Ecowende - Windpark Hollanse Kust West". Ecowende (in Dutch). Retrieved 2023-08-21.
  3. Buljan, Adrijana (2023-09-08). "Van Oord to Build Hollandse Kust West VI – 'The Most Ecological Wind Farm Yet'". Offshore Wind. Retrieved 2023-09-10.
  4. RWE. "Hollandse Kust West VII: RWE successful in Dutch offshore wind tender". www.rwe.com. Retrieved 2023-08-21.
  5. Durakovic, Adnan (2022-06-13). "The Netherlands Sets Tendering Timelines for 13.4 GW of Offshore Wind". Offshore Wind. Retrieved 2023-08-21.