Port Jefferson Branch

Last updated

Port Jefferson Branch
LIRR DE30AC 407 at Stony Brook.jpg
DE30AC #407 enters Stony Brook station, pulling an eastbound train towards Port Jefferson in 2022
Overview
StatusOperational
Owner Long Island Rail Road
Locale Nassau and Suffolk County, New York, USA
Termini
Stations10
Service
Type Commuter rail
System Long Island Rail Road
Services
Operator(s) Metropolitan Transportation Authority
Ridership9,428,532 (annual ridership, 2022)
History
Opened1854–1873
Technical
Track gauge 4 ft 8+12 in (1,435 mm)
Electrification Third rail,  750 V DC (west of Huntington)
Route map
Port Jefferson Branch
BSicon CONTg@G.svg
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon INTACC.svg
9.3 mi
15 km
Jamaica
AirTrain JFK notext logo.svg NYCS-bull-trans-E-Std.svg NYCS-bull-trans-J-Std.svg NYCS-bull-trans-Z-Std.svg
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon DST.svg
BSicon STR+GRZq.svg
Zone 3
Zone 4
BSicon CONTgq.svg
BSicon ABZgr+r.svg
BSicon LSTR.svg
Hempstead intermediate stops
BSicon dSTR+l.svg
BSicon dABZgr.svg
BSicon dHST.svg
BSicon dSTR.svg
BSicon dHUBaq.svg
BSicon dHST.svg
BSicon dHUBq.svg
BSicon dpHST.svg
BSicon dHUBq.svg
BSicon dHUBeq.svg
14.9 mi
24 km
Floral Park
BSicon dCONTgq.svg
BSicon dSTRr.svg
BSicon dSTR.svg
BSicon HSTACC.svg
16.2 mi
26.1 km
New Hyde Park
BSicon HSTACC.svg
17.3 mi
27.8 km
Merillon Avenue
BSicon ACC.svg
18.6 mi
29.9 km
Mineola
BSicon ABZgl.svg
BSicon CONTfq.svg
BSicon STR+GRZq.svg
Zone 4
Zone 7
BSicon HSTACC.svg
20.4 mi
32.8 km
Carle Place
BSicon HSTACC.svg
21.4 mi
34.4 km
Westbury
BSicon hACCa.svg
24.8 mi
39.9 km
Hicksville
BSicon lhSTRa@fq.svg
BSicon CONTgq.svg
BSicon hABZgr.svg
BSicon hSTRe.svg
BSicon eHST.svg
Landia (closed)
BSicon HSTACC.svg
29.1 mi
46.8 km
Syosset
BSicon STR+GRZq.svg
Zone 7
Zone 9
BSicon HSTACC.svg
31.9 mi
51.3 km
Cold Spring Harbor
BSicon MFADEg.svg
BSicon BL.svg
BSicon ABZgnl.svg
BSicon nENDEeq.svg
BSicon ELCe.svg
BSicon ACC.svg
34.7 mi
55.8 km
Huntington
BSicon HSTACC.svg
37.4 mi
60.2 km
Greenlawn
BSicon eABZgl.svg
BSicon exCONTfq.svg
BSicon HSTACC.svg
39.6 mi
63.7 km
Northport
BSicon STR+GRZq.svg
Zone 9
Zone 10
BSicon HSTACC.svg
43.4 mi
69.8 km
Kings Park
BSicon eABZgl.svg
BSicon exCONTfq.svg
BSicon ACC.svg
47.1 mi
75.8 km
Smithtown
BSicon HSTACC.svg
49.9 mi
80.3 km
St. James
BSicon eHST.svg
Flowerfield (closed)
BSicon HSTACC.svg
53.1 mi
85.5 km
Stony Brook
BSicon eHST.svg
Setauket (closed)
BSicon KACCxe.svg
57.5 mi
92.5 km
Port Jefferson
BSicon exCONTf.svg
57.5 mi
92.5 km
Wading River
Extension
BSicon exSTR.svg
57.5 mi
92.5 km
Wading River
Extension
BSicon exHST.svg
BSicon exHST.svg
BSicon exHST.svg
BSicon exKBHFe.svg
Distances shown from Long Island City

The Port Jefferson Branch is a rail line and service owned and operated by the Long Island Rail Road in the U.S. state of New York. The branch splits from the Main Line just east of Hicksville and runs northeast and east to Port Jefferson. Several stations on the Main Line west of Hicksville are served primarily by trains bound to/from the Port Jefferson branch, so LIRR maps and schedules for the public include that part of the Main Line in the "Port Jefferson Branch" service.

Contents

The Port Jefferson Branch is one of the busiest branches of the LIRR, with frequent electric service to Huntington where electrification ends, and diesel service east of Huntington continuing to Port Jefferson. The MTA also refers to the line as the "Huntington/Port Jefferson Branch" or "Huntington Branch".

Service

Port Jefferson Branch service (as distinct from the physical trackage called the Port Jefferson Branch) extends east from Floral Park, where the Hempstead Branch separates from the Main Line. The line west of Huntington is electrified and double tracked. Electrification extends east of Huntington, past a layup track used to store electric trains, to a point between the Park Avenue and Lake Road grade crossings. East of there, the line is single-track, with a double-ended freight siding at Greenlawn, an interlocked passing siding east of Northport, and further interlocked sidings at Kings Park, Smithtown and Stony Brook passenger stations, allowing trains traveling in opposite directions to pass each other.

Electric trains on the branch operate between Manhattan (Penn Station or Grand Central) and Huntington, providing local service on the branch. Trains to the Ronkonkoma Branch provide supplemental service; these usually run express, stopping only at Mineola and/or Hicksville. Additional service to Mineola is provided by Oyster Bay Branch trains, and a handful of Montauk Branch trains also stop at Mineola and Hicksville on weekdays, though the vast majority of Montauk Branch trains that run on the Main Line do not stop. Service on the non-electrified portion of the branch between Port Jefferson and Huntington is usually provided by diesel shuttles; transfers generally occur at Huntington between diesel shuttles and electric trains to/from city terminals. During rush hours, the branch sees extra service, including direct service between stations east of Huntington and Hunterspoint Avenue, Long Island City, or Penn Station.

Stations on the electrified portion that have the heaviest traffic include Mineola (Main Line), Hicksville (Main Line), and Huntington. On the non-electrified portion, the heaviest traffic tends to be to the Stony Brook station where Stony Brook University is located.

History

The line from Hicksville to Syosset was chartered in 1853 as the Hicksville and Syosset Railroad and opened in 1854. The LIRR later planned to extend to Cold Spring Harbor, but Oliver Charlick, the LIRR's president, disagreed over the station's location, so Charlick abandoned the grade and relocated the extension south of Cold Spring, refusing to add a station stop near Cold Spring for years. Another argument at Huntington led to the line bypassing the town two miles (3 km) to the south, though a station was built. The line was extended from Syosset past Huntington to Northport in 1868, [1] and in 1873 the 1870-chartered Smithtown and Port Jefferson Railroad opened from a mile south of Northport to Port Jefferson, [2] turning the old line into Northport into the Northport Branch, the result of another argument between Charlick and Northport. [3]

The Woodville Road Bridge in Shoreham which once carried the Wading River Extension of the branch. Woodville Road old LIRR Bridge in Shoreham, NY.JPG
The Woodville Road Bridge in Shoreham which once carried the Wading River Extension of the branch.

The Port Jefferson Branch was extended to Wading River in 1895, and became known as the Wading River Branch. The line was once slated to continue eastward and rejoin the Main Line at either Riverhead or Calverton. From 1905 to 1928, Wading River was also the site of an LIRR demonstration farm. The other one was east of Medford station on the Main Line.

The grade crossing with New York Avenue in Huntington was eliminated in 1909 as that road was lowered below grade. [4] :53 In 1910 and 1911 work was undertaken to reduce grades and eliminate sharp curves along the line between Syosset and Huntington. The project eliminated grade crossings, shortened the line by 3,300 feet (1.0 km), and provided two million yards of excavated material that could be used for the reconstruction of Jamaica station. [5] :21–22 In 1911, the line's second track was extended from Hicksville to Cold Spring. [6] :22 In 1985, the second track was extended from just east of Syosset to just west of Huntington to alleviate a single-track bottleneck.

The line east of Port Jefferson was abandoned in 1938. The right-of-way is now owned by the Long Island Power Authority and used for power lines. A parallel rail trail for bicycling, running, and walking opened in 2022. [7] The Port Jefferson Branch was electrified from Mineola to Huntington Station in 1970. The former Northport Branch was abandoned in 1985, and the Kings Park Psychiatric Center spur (see below) was abandoned in 1988.

Kings Park Psychiatric Center Spur

The

The former crossing of the Kings Park Psychiatric Center spur with NY 25A, now the beginning of the Kings Park Hike and Bike Trail, Kings Park Hike & Bike Trail from NY 25A.jpg
The former crossing of the Kings Park Psychiatric Center spur with NY 25A, now the beginning of the Kings Park Hike and Bike Trail,

Kings Park Psychiatric run-off (KPPC) is an abandoned spur off the Port Jefferson Branch for the Kings Park Psychiatric Center. This spur started just west of Kings Park station, ran north of the station house, crossed Indian Head Road (Suffolk CR 14) and then curved north to cross New York State Route 25A, where it ran along the western edge of the hospital property, and ended at the Hospital's coal power plant.

This spur was first used in 1896 for coal and passenger use on Sundays. [4] :78 The route was the second-largest spur in the Long Island Rail Road system when it was first completed. The route came to an end during the late 1980s. [8] Nowadays, this abandoned route is a right-of-way for biking and is open to the public today. Only small fragments of rail remain, as it most of it was removed during the demise of the complex. [9]

Electrification

On October 19, 1970, electrification was extended 16 miles (26 km) from Mineola to Huntington, the eastern limit of electrification on the branch. This was the first major LIRR electrification project since the electrification of the Babylon Branch in 1925 between Lynbrook and Babylon. The project was completed for $69 million, and received funding from a 1967 state transportation bond issue and the United States Department of Transportation. With the completion of electrification to Huntington, six trains would run from electric territory on the branch in the morning, and five would return in the evening, providing direct service to Brooklyn and Penn Station without a change at Jamaica. [10]

Since then, the LIRR has aspired to extend electrification beyond Huntington. In the 1980s, the railroad prepared to extend electrification to at least Northport, or Smithtown, although electrification of the Ronkonkoma Branch on the Main Line was seen as a higher priority, in part because the Main Line's central location in Suffolk County would benefit a larger number of people.

In December 1983, the LIRR announced that it was taking steps in the electrification of the branch, with the first step being the addition of a second electrified track from Syosset to Huntington. The second built along the south side of the existing track. [11] The second track was expected to be open in 1986. In August 1983, Long Island Lighting Company started relocating its power line along the right-of-way between these points. The following month a contract to prepare the site and to construct the roadbed for the track was awarded for $9.5 million. In December 1983, grading and construction work was expected to begin that month, and track installation was scheduled to be completed by the end of 1985. As part of the project, the 800 feet (240 m) south platform was to be extended to accommodate 12-car trains. The design of the project to Northport was completed, and preliminary designs were expected to be completed by early 1984. [12]

On August 6, 1984, a groundbreaking ceremony was held at Kings Park station for the inauguration of a project to install high-level platforms at that station in preparation of the electrification of the line from Huntington to Smithtown. Kings Park would receive high-level platforms first, with Greenlawn, Northport, and Smithtown also slated to receive them. Work was to be completed in two phases. In the first phase, expected to be completed by the end of 1984, six-car high-level platforms would be installed. These platforms would be extended to accommodate twelve-car trains in the second phase, to be done by the middle of 1985. [13]

Bruce McIver, president of the LIRR at the time, estimated in 1986 that electrification of the branch would cost $320 million, including new rolling stock. He argued that the limited funds the railroad had set aside for electrification would be better spent on other improvements, such as signal and yard upgrades near Penn Station. Financial constraints acted as another obstacle to electrification to Northport. [14] McIver also did not want to electrify the branch in a piecemeal fashion and wanted to wait until the railroad had the funds to electrify from Huntington to Port Jefferson all at once. In anticipation of electrification, from late 1985 to early 1986, the LIRR built full-length high-level platforms at all stations between Huntington and Port Jefferson. Because electrification has not occurred, these 12-car platforms are unique in the LIRR's diesel territory; the high-level platforms along the Montauk, Greenport and Oyster Bay diesel branches are all much shorter. Work to install centralized traffic control between Smithtown and Port Jefferson started in fall 1974 and was completed in March 1975. This project was intended to improve safety and to increase train speed. The change allowed bidirectional service in single-track territory with the use of passing sidings. [15]

On June 9, 1986, double-tracking of the line between Syosset and Huntington was completed, and seven additional trains (two diesels and five electric) were added to the schedule. [16] The second track sped some trips by up to 15 minutes, and increased operational flexibility. The $41 million project started in September 1983 and included the widening of bridges at West Rogues Path and Woodbury Road, [17] five rubberized grade crossings, and the installation of a six-car length platform on the new second track at Cold Spring Harbor. Construction for the project required off-peak service outages starting in June 1985, [18] and its completion was delayed from fall 1985 due to delays in property acquisition in Cold Spring Harbor. [19]

Instead of electrification, the LIRR ultimately pursued dual-mode locomotives that could switch between diesel power and electric power to serve Penn Station (where diesel emissions are banned). Senator Norman Levy said that "The people who ride the line would have just about all the positive aspects of electrification with this proposal." [20] The LIRR's dual-mode locomotives debuted in the late 1990s, providing two round trips during weekday rush hours between Penn Station and Port Jefferson, the first time a one-seat ride was available. [21]

Proposed electrification extension

In 2015, multiple parties renewed calls for electrification of the branch. The LIRR estimated that electrification would cost up to $18 million per track mile, so electrification of the 23 miles from Huntington to Port Jefferson could cost approximately $414 million. [22] [23] [24] In its 20-Year Needs Assessment, the agency lists electrification eastward as a long-term goal. [25]

In September 2018, LIRR President Phillip Eng said the LIRR is still exploring the possibility of electrifying the remaining section of track between Huntington and Port Jefferson. [26]

Grade crossing eliminations

The Port Jefferson Branch and Main Line have been known to have some of the most hazardous grade crossings in the country.[ citation needed ] On April 28, 1998, a bridge over Herricks Road opened, replacing a grade crossing which was once "labeled the most hazardous in the United States by the National Transportation Safety Board." The grade-crossing elimination project was initiated after an incident on March 14, 1982, when a van with ten teenagers got struck at the four-lane wide rail crossing with the crossing gates down, killing nine of them. The project took five years and cost $85 million. Work continued for a year to widen the overpass to allow for a future third track. [27]

Other crossings eliminated along the branch include Mineola Boulevard in Mineola (1930), crossings within Hicksville when the station was elevated in the early 1960s, and Charlotte Avenue in Hicksville (1973). Ten years later in 2008, the four-lane wide Roslyn Road in Mineola was eliminated in the same fashion. Several hazardous crossings still exist west of Huntington east of DIVIDE interlocking, such as Robbins Lane and Jackson Avenue in Syosset. East of Huntington, Park Avenue in Huntington and Main Street in Port Jefferson are considered quite hazardous.

The Third Track project closed the seven remaining grade crossings on the Main Line, namely those in Westbury, Mineola, and New Hyde Park. [28] [29] The first two crossings that underwent elimination would be Urban Avenue in Westbury and Covert Avenue in New Hyde Park. Construction to eliminate began from February–April 2019 with the closures of both roads. On the weekend of July 20–21, 2019, the trestle carrying the three tracks was installed at Urban Avenue. After construction of retaining walls, pedestrian walkway, and the repaving of the road, Urban Avenue was officially reopened on September 5, 2019. Covert Avenue underwent the installation of a three-track trestle on the weekend of August 24–25 and reopened on October 12, 2019. New Hyde Park underwent the installation of a three-track trestle on the weekend of July 11–12, 2020, and reopened in August 2020. [28] [29]

By mid-2021, Main Street in Mineola, the pedestrian crossing at Mineola's station, and 12th Street in New Hyde Park were permanently closed to pedestrian and vehicular traffic, while Willis Avenue in Mineola and School Street in Westbury received trestles, with the roads crossing underneath. From May 2020 to November 2020, School Street underwent a grade crossing elimination and reopened less than two years after a violent accident occurred involving a pick-up truck and two trains. On October 24, 2020, the stretch of the line in New Hyde Park was officially grade-separated following the permanent closure of the 12th Street crossing. By late 2020, the only remaining grade crossings on the Main Line between Hicksville and Floral Park were located in Mineola. In November 2020, Willis Avenue's elimination project began that saw its Main Line and Oyster Bay Branch crossings eliminated with the road going underneath the tracks. Main Street and the pedestrian crossing were removed shortly thereafter. [28] [29]

After the Third Track Project was completed, all Main Line grade crossings from Hicksville westward were eliminated, noise from horns was reduced to the benefit of residents along the tracks, and carbon emissions from idling vehicles was eliminated. [28] [29] The elimination and reopening of Willis Avenue on September 3, 2021, officially marked the completion of the grade crossing elimination aspect of the Third Track Project, and the branch being fully grade-separated west of Hicksville. [28] [29]

Infrastructure improvements

New electric yard

Lacking a yard to store its electric trains, the branch has storage space for just three 12-car electric trainsets (at the South Side track extension east of Huntington). As a result, electric trains must deadhead to Huntington for rush hour service from as far away as West Side Yard in Manhattan, about 37 miles (60 km) away. A new yard for electric trains would resolve this inefficiency and allow more frequent service on the branch.

In the early 2000s, the MTA performed environmental studies for over a dozen potential sites for a yard between Huntington and Smithtown. [30] Sites beyond Huntington would require extending the electrical infrastructure, which adds expense.

Communities near the sites opposed the MTA's efforts to advance work on a new yard, arguing that the MTA was too secretive and that the increased train service and train movements would hurt their communities and decrease their quality of life. One commenter asserted that a yard would turn the communities along the line into the MTA's "storage closet" for East Side Access. Other opponents of the plan argued that the MTA should extend electrification to Port Jefferson and use its existing diesel rail yard. [31] [32]

The MTA budgeted $8 million in its 2015–2019 Capital Program for environmental studies, design work, and land acquisition for a new electric yard. (Construction would be funded in a future Capital Program.) [33] [34] As of 2019, the MTA was also considering other options, including extending electrification and/or a second track from Huntington to Port Jefferson. [35]

In February 2022, local leaders urged the MTA to consider a Superfund site near the Port Jefferson Station—the former Lawrence Aviation Industries site—for the electric storage yard, as well as extending electrification from Huntington to Port Jefferson. The MTA has not moved forward with this plan or any others. [36] [37]

Third track between Floral Park and Hicksville

The Post Avenue Bridge near Westbury station, which was replaced in October 2017 to accommodate a third track LIRR 7090 (37182735573).jpg
The Post Avenue Bridge near Westbury station, which was replaced in October 2017 to accommodate a third track
Construction of new platforms at the Mineola station in 2021 to accommodate the third track Mineola LIRR station 2021a.jpg
Construction of new platforms at the Mineola station in 2021 to accommodate the third track

To accommodate a projected increase in Long Island Rail Road ridership following completion of the East Side Access project to Grand Central Terminal, and to expand local and reverse-peak service, a third track was built on the Main Line between Floral Park and Hicksville. [38] [39] The construction project, also known as the LIRR Expansion Project, included purchasing properties in the track's right of way, eliminating grade crossings (in conjunction with New York State Department of Transportation), relocating existing stations, and reconfiguring Mineola Station. The project was stalled by fierce opposition from the villages of Floral Park, New Hyde Park, and Garden City, [40] [41] [42] which advocated that construction and the resulting increased train service will reduce the quality of life in their neighborhoods. These villages did, however, support the station improvements and the elimination of grade crossings that the LIRR has planned in conjunction with the third track, and called for the LIRR to complete them in lieu of third track expansion, but the MTA has long insisted that a third track is a necessary component of LIRR's East Side Access expansion. [43] In March 2015, LIRR president Patrick Nowakowski declared that the LIRR would not proceed with the project without the support of the local communities. [44]

Small segments of the third track already existed: one segment between Merillon Avenue and Mineola, built in the vicinity of Herricks Road during the grade crossing elimination project that took place in 1998, [45] and another was built during a 2014–2018 renovation project at Hicksville station, which connected Track 1 at Hicksville station to the North Siding track located about 3,000 feet (910 m) west of the station. This short segment would eventually become the eastern end of the Third Track, and already allowed for a slight increase in peak-hour service upon its completion. [46] [47] The MTA had also left provisions for a third track in construction of other infrastructure along the line, such as the Mineola Intermodal Center located adjacent to Mineola station, Mineola Boulevard Bridge, Roslyn Road Underpass in Mineola, and the replacement Ellison Avenue Bridge over the Main Line in Westbury. [48] [49] [50] [51]

In January 2016, Governor Andrew Cuomo announced a transportation improvement plan which included several million dollars in funding to restart third track development. [52] [53] Governor Cuomo said that unlike previous third track proposals, his plan would involve building the third track within existing LIRR right of way, which would reduce the number of existing homes and businesses affected by installation of the third track. [54] While previous proposals would have affected around 250 properties, 80 of which were homes, Governor Cuomo's proposal would only require taking small amounts of property from 50 properties in total, including around 20 homes. [54] This reduction in properties affected was accomplished by shifting the alignments of tracks in some areas to make room for the third track within the right-of-way and building a shorter third track than previous proposals, resulting in a 9.8-mile (15.8 km) three-track segment starting at Floral Park (the easternmost station shared by the Hempstead Branch and Main Line, where the Hempstead Branch and Main Line split from a 4-track corridor into two distinct pairs of tracks), instead of the previously planned 11.5-mile (18.5 km) segment starting from Queens Village. [52] [55] Despite the promise of mitigation efforts, several local politicians denounced the governor's plan within a day of its announcement; Floral Park's mayor told The New York Times that "we thought this was dead and buried", [52] while New Hyde Park's mayor pledged to "fight the governor vehemently on this" and a local state senator called the governor's plan "dead on arrival." [56]

In December 2017, the LIRR awarded a contract for the project to the consortium 3rd Track Constructors for $1.8 billion, with construction beginning in 2018 and completion estimated for 2022. [57] [58] [59] The first part of the contract included the reconstruction of the Carle Place, Mineola, and Floral Park stations; the construction or reconstruction of six railroad crossings and underpasses; and the construction of a parking structure at Mineola station. A groundbreaking ceremony for the Third Track project was held on September 5, 2018. [60] [61] All eight grade crossings in the Third Track construction area were removed by February 2021. [62] :7 The first phase of the third track opened on August 15, 2022, [63] [64] and a second phase opened on August 30. [65] The entirety of the third track was complete by October 3, 2022. [66] [67]

Stations

West of New Hyde Park, trips go on to terminate at Penn Station, Hunterspoint Avenue, Grand Central, or Jamaica. [68] Stations east of Port Jefferson on the former Wading River Branch were abandoned on October 3, 1938.

Zone [69] LocationStation Miles (km)
from Long Island City [70]
Date
opened
Date
closed
Connections / notes
4 New Hyde Park New Hyde Park Wheelchair symbol.svg 16.2 (26.1)c. 1837 Nassau Inter-County Express: n24 , n25
Originally named Hyde Park
Garden City Park Merillon Avenue Wheelchair symbol.svg 17.3 (27.8)1837Originally named Clowesville, then Garden City
Mineola Mineola Wheelchair symbol.svg 18.6 (29.9)1837 [71] Long Island Rail Road: Ronkonkoma, Montauk, Oyster Bay branches
Nassau Inter-County Express: n22 , n22X , n23 , n24 , n40 , n41
Originally named Hempstead, then Branch or Hempstead Branch
7 Carle Place Carle Place Wheelchair symbol.svg 20.4 (32.8)1842 [72] Nassau Inter-County Express: n22
Originally named Carll Place
Westbury Westbury Wheelchair symbol.svg 21.4 (34.4)1837 [71] Nassau Inter-County Express: n22 , n35
New Cassel New Cassel 18751876
Hicksville Hicksville Wheelchair symbol.svg 24.8 (39.9)1837 [71] Long Island Rail Road: Ronkonkoma Branch
Nassau Inter-County Express: n20H , n22 , n24 , n48 , n49 , n78 , n79 , n80
Syosset
Landia 1952October 3, 1973
Syosset Wheelchair symbol.svg 29.1 (46.8)1854
Woodbury 1875c. 1901Replaced by Cold Spring Harbor
9 West Hills Cold Spring Harbor Wheelchair symbol.svg 31.9 (51.3)c. 1901
Huntington Station Huntington Wheelchair symbol.svg 34.7 (55.8)1868 Suffolk County Transit: 1
Huntington Area Rapid Transit: H10 , H20
Terminus of electrification
Greenlawn Greenlawn Wheelchair symbol.svg 37.4 (60.2)c. 1868Huntington Area Rapid Transit: H30
Originally named Centreport
East Northport Northport Wheelchair symbol.svg 39.6 (63.7)1873Suffolk County Transit: 7
Huntington Area Rapid Transit: H40
Originally named New Northport, then Northport East
10 Kings Park Kings Park Wheelchair symbol.svg 43.4 (69.8)1872Originally named St. Johnsland
Smithtown Smithtown Wheelchair symbol.svg 47.1 (75.8)1872Suffolk County Transit: 5
St. James St. James Wheelchair symbol.svg 49.9 (80.3)1873
Flowerfield 19101958
Stony Brook Stony Brook Wheelchair symbol.svg 53.1 (85.5)1873Suffolk County Transit: 51
SBU Transit: Outer Loop, Railroad Routes 1, Railroad Route 2
East Setauket Setauket 1873June 27, 1980 [73]
Port Jefferson Station Port Jefferson Wheelchair symbol.svg 57.5 (92.5)January 13, 1873 [74] Suffolk County Transit: 51 , 53 , 55 , 62
Port Jefferson Jitney
Miller Place Miller Place 60.5 (97.4)18981938
Rocky Point Rocky Point 64.4 (103.6)June 27, 1895 [75] [76] 1938Freight house still exists as a lumber yard
Shoreham Shoreham 65.7 (105.6)19001938
Wading River Wading River 68.7 (110.6)June 27, 1895 [75] [76] 1938

Bibliography

Related Research Articles

<span class="mw-page-title-main">Long Island Rail Road</span> Commuter rail system on Long Island, New York

The Long Island Rail Road, often abbreviated as the LIRR, is a railroad in the southeastern part of the U.S. state of New York, stretching from Manhattan to the eastern tip of Suffolk County on Long Island. The railroad currently operates a public commuter rail service, with its freight operations contracted to the New York and Atlantic Railway. With an average weekday ridership of 354,800 passengers in 2016, it is the busiest commuter railroad in North America. It is also one of the world's few commuter systems that runs 24/7 year-round. It is publicly owned by the Metropolitan Transportation Authority, which refers to it as MTA Long Island Rail Road. In 2023, the system had a ridership of 75,186,900, or about 253,800 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">Port Washington Branch</span> Long Island Rail Road branch

The Port Washington Branch is an electrified, mostly double-tracked rail line and service owned and operated by the Long Island Rail Road in New York, in the United States. It branches north from the Main Line at the former Winfield Junction station, just east of the Woodside station in the New York City borough of Queens, and runs roughly parallel to Northern Boulevard past Mets-Willets Point, Flushing, Murray Hill, Broadway, Auburndale, Bayside, Douglaston, Little Neck, and then crosses into Nassau County for stops in Great Neck, Manhasset, and Plandome before terminating at Port Washington.

<span class="mw-page-title-main">Hicksville station</span> Long Island Rail Road station in Nassau County, New York

Hicksville is a station on the Main Line and Port Jefferson Branch of the Long Island Rail Road located in Hicksville, New York. It is the busiest station east of Jamaica and Penn Station by combined weekday/weekend ridership.

<span class="mw-page-title-main">Oyster Bay Branch</span> Long Island Rail Road branch

The Oyster Bay Branch is a rail line and service owned and operated by the Long Island Rail Road in the U.S. state of New York. The branch splits from the Main Line just east of Mineola station, and runs north and east to Oyster Bay. The branch is electrified between East Williston and Mineola. The branch opened in segments between 1865 and 1889.

<span class="mw-page-title-main">Babylon Branch</span> Long Island Rail Road branch

The Babylon Branch is a rail service operated by the Long Island Rail Road in the U.S. state of New York. The term refers to the trains serving Montauk Branch stations from Valley Stream east to Babylon; in other words, the Babylon Branch is a rail service rather than an actual track. The electrification of the Montauk Branch ends east of the Babylon station, so the Babylon Branch is mostly served by electric trains.

<span class="mw-page-title-main">Ronkonkoma Branch</span> Long Island Rail Road branch

The Ronkonkoma Branch is a rail service operated by the Long Island Rail Road (LIRR) in the U.S. state of New York. On LIRR maps and printed schedules, the "Ronkonkoma Branch" includes trains running along the railroad's Main Line from Hicksville to Ronkonkoma, and between Ronkonkoma and the Main Line's eastern terminus at Greenport. The section of the Main Line east of Ronkonkoma is not electrified and is referred to as the Greenport Branch.

<span class="mw-page-title-main">West Hempstead Branch</span> Long Island Rail Road branch

The West Hempstead Branch is an electrified rail line owned and operated by the Long Island Rail Road (LIRR). It runs between Valley Stream and West Hempstead, in Nassau County, New York, United States.

<span class="mw-page-title-main">Hempstead Branch</span> Long Island Rail Road branch

The Hempstead Branch is an electrified rail line and service owned and operated by the Long Island Rail Road in the U.S. state of New York. The branch begins at the Main Line at Queens Interlocking, just east of Queens Village station. It parallels the Main Line past Bellerose to Floral Park, where it splits southward and continues east via the village of Garden City to Hempstead Crossing. There it turns south to the final two stations, Country Life Press and Hempstead.

<span class="mw-page-title-main">Mineola station (LIRR)</span> Transportation hub in Nassau County, New York

The Mineola Intermodal Center is an intermodal center and transportation hub in the village of Mineola, Nassau County, New York, U.S. It contains the Mineola Long Island Rail Road station – one of the railroad's busiest stations – in addition to one of the Nassau Inter-County Express bus system's main hubs, located adjacent to the southern train platform.

<span class="mw-page-title-main">Westbury station (LIRR)</span> Long Island Rail Road station in Nassau County, New York

Westbury is a station on the Long Island Rail Road's Main Line. All trains for the Port Jefferson Branch and Ronkonkoma Branch run through it, though only some trains on the Port Jefferson branch stop. It is located at Union and Post Avenues in Westbury, New York. It is 23.4 miles (37.7 km) from Penn Station. The station is fully wheelchair accessible. It has two side platforms and three tracks.

<span class="mw-page-title-main">Main Line (Long Island Rail Road)</span> Long Island Rail Road branch

The Main Line is a rail line owned and operated by the Long Island Rail Road in the U.S. state of New York. It begins as a two-track line at Long Island City station in Long Island City, Queens, and runs along the middle of Long Island about 95 miles (153 km) to Greenport station in Greenport, Suffolk County. At Harold Interlocking approximately one mile east of Long Island City, the tracks from the East River Tunnels and 63rd Street Tunnel into Manhattan intersect with the Main Line, which most trains use rather than using the Long Island City station.

The Long Island Rail Road is a railroad owned by the Metropolitan Transportation Authority in the U.S. state of New York. It is the oldest United States railroad still operating under its original name and charter. It consolidated several other companies in the late 19th century. The Pennsylvania Railroad owned the Long Island Rail Road for the majority of the 20th century and sold it to the State in 1966.

<span class="mw-page-title-main">Syosset station</span> Long Island Rail Road station in Nassau County, New York

Syosset is a station on the Long Island Rail Road's Port Jefferson Branch in Syosset, New York. It is located at Jackson Avenue and Underhill Boulevard, south of New York State Route 25A, but north of Jericho Turnpike and the Long Island Expressway. Syosset's downtown was built around the station. There are no public transportation connections at the station, but taxi service is available.

<span class="mw-page-title-main">Roslyn station (LIRR)</span> Long Island Rail Road station in Nassau County, New York

Roslyn is a station on the Long Island Rail Road's Oyster Bay Branch. It is located at Lincoln Avenue and Railroad Avenue, west of Roslyn Road and south of Warner Avenue, in Roslyn Heights, Nassau County, New York.

<span class="mw-page-title-main">Greenlawn station</span> Long Island Rail Road station in Suffolk County, New York

Greenlawn is a station on the Port Jefferson Branch of the Long Island Rail Road near the intersection of Boulevard Avenue and Broadway in Greenlawn, New York, a few blocks north of Pulaski Road. It is the first station east of Huntington on the non-electrified section of the branch.

<span class="mw-page-title-main">Carle Place station</span> Long Island Rail Road station in Nassau County, New York

Carle Place is a station along the Main Line of the Long Island Rail Road (LIRR). It is served by trains on the Port Jefferson Branch at all times while most Ronkonkoma Branch trains and all Montauk Branch trains bypass the station. It is located at Cherry Lane and Atlantic Avenue in Carle Place, New York.

<span class="mw-page-title-main">Wyandanch station</span> Long Island Rail Road station in Suffolk County, New York

Wyandanch is a station along the Main Line of the Long Island Rail Road. It is located on Straight Path and Long Island Avenue, off Acorn Avenue in Wyandanch, New York. All parking near the station is free, and maintained either by Suffolk County or the Town of Babylon.

Bellaire was a station stop along the Hempstead Branch of the Long Island Rail Road. The station was located between 211th Street and 212th Street between 99th Avenue and Jamaica Avenue in Bellaire, Queens.

<span class="mw-page-title-main">Northport Traction Company</span>

Northport Traction Company was a trolley service in the Town of Huntington in New York. It ran from 1902 to 1924 and served East Northport and Northport, New York. The company only had one line throughout its history which ran from Northport to Northport Harbor, at what is today Cow Harbor Park. Unlike Huntington Railroad to the west, Northport Traction Company never expanded beyond either Northport or East Northport, and no record exists of any proposal to do so.

References

  1. "PRR Chronology, 1868" (PDF). (93.8  KiB), June 2004 Edition
  2. "PRR Chronology, 1873" (PDF). (100  KiB), February 2005 Edition
  3. Ziel, Ron; Foster, George H. (1987). Steel Rails to the Sunrise. Mattituck: Amereon House. pp. 13–14. ISBN   0-8488-0368-X.
  4. 1 2 Morrison, David D. (October 28, 2013). Long Island Rail Road: Port Jefferson Branch. Arcadia Publishing. ISBN   9781439644218.
  5. "The Long Island Railroad Twenty-Ninth Annual Report For The Year Ending December 31st, 1910". Report of ..., Trustee[S] of the Property of the Debtor, for the Year Ended ...1949-1953. Long Island Railroad Company. 1911.
  6. "The Long Island Railroad Thirtieth Annual Report For The Year Ending December 31st, 1911". Report of ..., Trustee[S] of the Property of the Debtor, for the Year Ended ...1949-1953. Long Island Railroad Company. 1912.
  7. Borruto, Ana (June 16, 2022). "The North Shore Rail Trail — linking Port Jeff to Wading River — is done after 50 years". Greater Long Island.
  8. Mileposts 43-44 Kings Park (Bob Emery Map; September 1957; TrainsAreFun.com)
  9. Kings Park State Hospital Spur (Train Web)
  10. "Start New Timetable On Electrified Section". New York Daily News. October 19, 1970. Retrieved March 19, 2023 via Newspapers.com.
  11. "Letters to the Long Island Editor; L.I.R.R.'s Plans For Electrification". The New York Times. September 2, 1984. ISSN   0362-4331 . Retrieved February 27, 2019.
  12. Goldman, Ari L. (December 4, 1983). "Amount of L.I.R.R. Fare Rise Weighed". The New York Times. ISSN   0362-4331 . Retrieved February 27, 2019.
  13. Hanrahan, Michael (August 7, 1984). "Kings Park station work begins". New York Daily News. Retrieved March 19, 2023 via Newspapers.com.
  14. McQuiston, John T. (November 24, 1985). "Pulling the Plug on Electrification". The New York Times. ISSN   0362-4331 . Retrieved January 5, 2016.
  15. Stadler, Derek (August 16, 2016). ""Port Jefferson Blues": The Smithtown Commuter Saga". Derek Stadler. Archived from the original on October 7, 2021. Retrieved May 6, 2018.
  16. "Port Jefferson Branch Timetable Effective June 9, 1986". Flickr. Long Island Rail Road. February 27, 2019. Retrieved February 27, 2019.
  17. "LIRR adds 7 new trains Monday". New York Daily News. June 5, 1986. p. 340. Retrieved February 27, 2019.
  18. "LIRR halts trains for track work". New York Daily News. June 11, 1985. Retrieved March 19, 2023 via Newspapers.com.
  19. Bleyer, Bill (June 7, 1986). "7 Trains Added to Line". Newsday. p. 17. Retrieved March 19, 2023 via Newspapers.com.
  20. McQuiston, John T. (February 23, 1986). "L.I.R.R. Electrification: New Plans, New Delays". The New York Times. ISSN   0362-4331 . Retrieved January 5, 2016.
  21. Lambert, Bruce (May 31, 1997). "The 4:49 to Port Jefferson: A Spoardic Promise of Modernity". The New York Times. ISSN   0362-4331 . Retrieved January 5, 2016.
  22. Castillo, Alfonoso A. (February 15, 2015). "Port Jefferson backs electrification of LIRR line". Newsday. Retrieved January 6, 2016.
  23. Schwartz, David M.; Brand, Rick (March 4, 2015). "Suffolk planning panel calls for LIRR electrification". Newsday. Retrieved January 6, 2016.
  24. Murdocco, Rich (March 9, 2015). "Now Is Not the Time to Electrify More LIRR Tracks". Long Island Press. Retrieved May 3, 2015.
  25. "MTA 2015-2034 20-Year Capital Needs Assessment" (PDF). mta.info. Metropolitan Transportation Authority. p. 70. Retrieved January 5, 2016.
  26. Castillo, Alfonso A. (September 26, 2018). "LIRR to power up a seldom-used rail link to alleviate service disruptions". Newsday. Retrieved September 26, 2018.
  27. Draffen, Duayne (April 28, 1998). "16 Years After Death of 9 Teen-Agers, Rail Bridge Opens". The New York Times. ISSN   0362-4331 . Retrieved May 8, 2015.
  28. 1 2 3 4 5 Castillo, Alfonso A. (June 23, 2018). "LIRR Expansion to kick off with 10 major projects". Newsday. Retrieved April 21, 2019.
  29. 1 2 3 4 5 "Governor Cuomo Announces Groundbreaking of Historic Long Island Rail Road Third Track". Governor Andrew M. Cuomo. September 5, 2018. Retrieved April 21, 2019.
  30. "Planned Service Changes" (PDF). Archived from the original (PDF) on December 19, 2005.
  31. John Rather (August 27, 2000). "L.I.R.R. Expansion: The Other Shoe Drops". The New York Times. ISSN   0362-4331 . Retrieved January 5, 2016.
  32. John Rather (November 30, 2003). "The Proposed L.I.R.R. Yard Draws Fire". New York Times. ISSN   0362-4331 . Retrieved January 5, 2016.
  33. "Planned Service Changes". Archived from the original on April 11, 2008.
  34. "MTA 2015-2019 Capital Program, pages 24, 97 and 208" (PDF). Retrieved January 5, 2016.
  35. "Long Island Rail Road Committee Meeting - March 2019" (PDF). mta.info. Metropolitan Transportation Authority. March 25, 2019. p. 46. Retrieved March 25, 2019.
  36. "Port Jefferson Station Superfund site sale eyed to recoup back taxes, electrify LIRR branch". December 29, 2021.
  37. "Suffolk County Leaders: Lawrence Aviation presents real potential for LIRR electrification". February 11, 2022.
  38. "MTA - Planning Studies". Metropolitan Transportation Authority. Archived from the original on March 6, 2014.
  39. "Main Line Corridor Improvements Project Presentation" (PDF). Metropolitan Transportation Authority . Retrieved January 7, 2016.
  40. Stephanie Mariel Petrellese (November 11, 2005). "Floral Park Mayor To Address LIRR Expansion". The Garden City News. Archived from the original on March 22, 2006. Retrieved December 23, 2006.
  41. Carisa Keane (June 24, 2005). "Residents: MTA/LIRR Needs to Get on Right Track". New Hyde Park Illustrated News. Archived from the original on September 27, 2007. Retrieved December 23, 2006.
  42. Stephanie Mariel Petrellese (December 15, 2006). "Village Meets With LIRR On "Third Track" Project". The Garden City News. Archived from the original on January 12, 2007. Retrieved December 23, 2006.
  43. Nardiello, Carolyn (September 16, 2008). "Third-Track Plan Isn't Dead, L.I.R.R. Insists" . The New York Times. ISSN   0362-4331 . Retrieved July 31, 2012.
  44. Castillo, Alfonso A. (March 3, 2015). "3rd track plan conditional on community support, LIRR chief says". Newsday. Archived from the original on March 10, 2016. Retrieved October 20, 2015.
  45. Robert Gearty (April 22, 1998). "END'S NEAR FOR A KILLER LIRR X'ING". New York Daily News. Archived from the original on March 7, 2016. Retrieved November 2, 2015.
  46. "Governor Cuomo Announces Final Design for Revitalized Hicksville Station". Metropolitan Transportation Authority. February 24, 2015. Retrieved November 2, 2015.
  47. Nunez, Jenifer (February 24, 2015). "LIRR finalizes Hicksville Station design; includes East Side Access work". RT&S. Retrieved January 7, 2016.
  48. "$24.3 MILLION LIRR ROAD CROSSING ELIMINATION PROJECT IN MINEOLA COMPLETED". New York State Department of Transportation. December 31, 2008. Retrieved November 4, 2015.
  49. "National Steel Bridge Alliance 2009 Bridge Prize Competition" (PDF). Retrieved November 4, 2015.
  50. "Application for Transportation Investment Generating Economic Recovery (TIGER) Funds Ellison Avenue Bridge Reconstruction, page 3" (PDF). Metropolitan Transportation Authority . Retrieved November 2, 2015.
  51. "40,000 Customers Facing Delays This Weekend, Oct. 24-25, as LIRR Installs a New Bridge in Westbury". Metropolitan Transportation Authority. October 22, 2015. Retrieved November 2, 2015.
  52. 1 2 3 Fitzsimmons, Emma G. (January 5, 2016). "Cuomo Revives Long-Stalled Plan to Add Track to L.I.R.R." . The New York Times . ISSN   0362-4331 . Retrieved January 7, 2016.
  53. Third Main Line Track project web site
  54. 1 2 Madore, James T. (January 5, 2016). "Andrew Cuomo tells Long Island Association he'll push LIRR third track, LI Sound tunnel". Newsday . Archived from the original on January 6, 2016. Retrieved January 7, 2016.
  55. "LIRR Main Line Expansion Will Ease Commuting and Attract Businesses and Jobs" (Press release). Metropolitan Transportation Authority. January 5, 2016. Retrieved January 7, 2016.
  56. Manskar, Noah (January 7, 2016). "Cuomo revives LIRR third track plans". The Island Now. Archived from the original on January 10, 2016. Retrieved January 8, 2016.
  57. Berger, Paul (December 13, 2017). "MTA Awards $1.8 Billion Contract to Expand Long Island Rail Road". The Wall Street Journal . Retrieved January 25, 2018.
  58. Castillo, Alfonso A. (December 13, 2017). "MTA approves $1.9B contract to design, build LIRR 3rd track". Newsday . Archived from the original on January 26, 2018. Retrieved January 25, 2018.
  59. Klar, Rebecca (December 20, 2017). "MTA approves $1.8B contract for third track project". The Island Now. Retrieved January 25, 2018.
  60. "LIRR Third Track Project Moving Forward Despite Concerns Of Residents". CBS New York. September 5, 2018. Retrieved September 6, 2018.
  61. Rivoli, Dan (September 5, 2018). "Cuomo continues infrastructure tour with Long Island Rail Road groundbreaking". New York Daily News. Retrieved September 6, 2018.
  62. "Capital Program Oversight Committee Meeting May 2021". Metropolitan Transportation Authority. May 26, 2021. Retrieved May 26, 2021.
  63. "LIRR unveils 1st section of new express lane track". Yahoo! Sports. August 15, 2022. Retrieved August 15, 2022.
  64. "First section of LIRR's Third Track expansion debuts Monday morning". News 12 - The Bronx. August 14, 2022. Retrieved August 15, 2022.
  65. "MTA Announces Opening of Second Section of LIRR Main Line Third Track". City Life Org. August 30, 2022. Retrieved August 31, 2022.
  66. Duggan, Kevin (October 3, 2022). "'Third' time's the charm: MTA finishes $2.5 billion LIRR Third Track project". amNewYork. Retrieved October 15, 2022.
  67. Vantuono, William C. (October 4, 2022). "LIRR Completes Third Track Project". Railway Age. Retrieved October 15, 2022.
  68. "LIRR Port Jefferson Branch Timetable". New York: Metropolitan Transportation Authority. May 23, 2023.
  69. "New Fares — Effective April 21, 2019". Metropolitan Transportation Authority . Retrieved April 27, 2020.
  70. 1 2 3 Brooklyn Advocate, Long Island Rail Road, February 1837
  71. "Long Island Railroad Company". Brooklyn Daily Eagle . Brooklyn, NY. May 28, 1842. p. 3.
  72. "Setauket Station Closing". Newsday. June 27, 1980. Retrieved March 19, 2023 via Newspapers.com.
  73. "Port Jefferson". The Brooklyn Daily Eagle . January 13, 1873. p. 4. Retrieved April 2, 2021 via Newspapers.com. Open Access logo PLoS transparent.svg
  74. 1 2 "Wading River Branch Inspected". The Brooklyn Daily Eagle . May 25, 1895. p. 7. Retrieved April 2, 2021 via Newspapers.com. Open Access logo PLoS transparent.svg
  75. 1 2 Allen 1895, p. 236.
Template:Attached KML/Port Jefferson Branch
KML is not from Wikidata