1 Undershaft | |
---|---|
General information | |
Status | Proposed |
Type | Office |
Address | 1 Undershaft |
Town or city | London, EC3 |
Country | United Kingdom |
Coordinates | 51°30′51″N0°04′54″W / 51.514242°N 0.081583°W |
Client | Aroland Holdings |
Height | |
Architectural | 294 m (965 ft) [1] |
Technical details | |
Floor count | 74 |
Floor area | 117,000 m2 (1,259,378 sq ft) (office) [2] |
Design and construction | |
Architecture firm | Eric Parry Architects |
Structural engineer | WSP [3] |
1 Undershaft is a skyscraper planned for the City of London financial district. The scheme is being developed by Aroland Holdings [4] and designed by Eric Parry Architects. It is set to replace the St Helen's tower, and if built will be the second-tallest building in London and the United Kingdom at 294 metres. Its height above sea level will match that of the Shard at just shy of 310 metres, making them appear the same height on the skyline.
The building is the third design for a skyscraper at 1 Undershaft, replacing two previous proposals designed by architects Avery Associates and Eric Parry themselves respectively. The second proposal, nicknamed 'The Trellis' due to its external cross bracing, was given approval in November 2016, but this design was ultimately discarded in favour of a quad-segmented tower revealed in August 2023.
The substantial changes entailed will result in 1 Undershaft needing to once again apply for planning permission from the City of London Corporation. [5] Construction is planned to take around five years subject to planning, with enabling works starting in 2024, construction work starting in late 2025 after the demolition of St Helen's tower, and completion in 2029. [2] [5]
In January 2015, early plans emerged of a replacement office building for the St Helen's tower in Undershaft within London's Square Mile. [6] The proposal, named 1 Undershaft, was designed by Avery Associates; who began working on the scheme in collaboration with the then-owner of the site, Simon Halabi, in 2010. [7] At 270 m (890 ft), it would have become the third-tallest building in London and the United Kingdom, behind The Shard and 22 Bishopsgate. [8]
In July 2015, details of a revised scheme by the new owners of the site, Aroland Holdings, were reported. The plans were for a skyscraper of 304 m (997 ft) designed by Eric Parry Architects. [9] According to some reports, the design could be "modelled on Cleopatra's Needle". [10]
In December 2015, the new design was released for a tower of 294.6 m (967 ft) with 73 floors. [11] [12] Subject to planning permission, it was set to become the tallest building in the Square Mile when completed and the second-tallest building in London and the United Kingdom, behind The Shard. [8] A consultation process took place in autumn 2015. [9] On 8 February 2016, a planning application was submitted for the development, [13] with a decision expected to be made in September 2016. [14]
However, a revised planning application was submitted by the developer which reduced the proposed height by 4.66 m (15.3 ft) to 289.9 m (951 ft), due to possible interference with the flight paths of the nearby London City Airport. Each floor was reduced in height by 50 mm and structural floor beam depths were changed. In addition, the level of the soffit was decreased and the viewing gallery height reduced, which was intended to be double height. Despite its height reduction, the proposed height will still make 1 Undershaft the second-tallest building in London and the United Kingdom upon completion. [15]
Following a recommendation by planning officers for approval, the scheme was approved by the City of London Corporation on 28 November 2016, with 19 votes in support and two against; final approval was given by Mayor of London Sadiq Khan on 12 December 2016. [16] [17] [18] The start date for construction of the scheme has not yet been decided, but building work is expected to be finished anywhere between six and 10 years from its approval date, [19] with demolition of the St Helen's building currently on the site expected to take 18 months and construction of 1 Undershaft due to take between three and four years. [20]
The second design's proposed skyscraper is rectangular in shape and slightly tapers as it gets higher. [21] Developer Aroland Holdings, a British Virgin Islands entity of undisclosed ultimate ownership, [4] originally wanted 1 Undershaft to be taller than the proposed height. However, the height has been limited by the Civil Aviation Authority (CAA) to avoid intruding on flight paths. In addition, the building's crown, which was intended to resemble Cleopatra's Needle, was not accepted by City planners who wanted "a less demonstrative top. They didn't want another overt shape". [21]
The tower is designed to be built 10.5 m (34 ft) off the ground in order to create public space underneath the building. To make room for the public space, the core will need to be positioned to the side of the tower. As a result, bronze-coloured diamond-shaped external cross-bracing will be required, giving the building its nickname The Trellis. [11] [22] [23]
A public square is also part of the proposed scheme, with 2,178 m2 (23,444 sq ft) of retail space below ground level. [24] [21] The top of the skyscraper is set to have London's highest viewing gallery free for public access (which could include a museum run by the Museum of London), [25] and a restaurant. [11] [21]
In 2017, a bogus bond financing scheme supposedly funding the construction of 1 Undershaft was launched in the United Kingdom. A £30 million tranche of 9-year bonds was issued by Trade Mark International Limited, a Cayman Islands-registered limited company. An accompanying website, www.trademarktint.com, was registered by Paul Mantoura.
A number of investors subscribed for the bonds, yielding 10% per annum coupons and a capital guarantee at maturity, through Paul Mantoura and his Platinum Associates firm in Brazil. However, when investors stopped receiving communications in 2020, Intel Suisse, a financial investigation specialist firm, was called in and discovered the fraud: Trade Mark International never existed. The webhost firm confirmed Paul Mantoura's ownership of the website, which he acquired in 2017 and is now offline. [26]
In August 2023, Eric Parry Architects revealed a substantially revised design for 1 Undershaft, prompted by changes to working habits following the COVID-19 pandemic, [2] as well as to improve the building's sustainability credentials. [5] In place of the previous cross-braced and tapered tower, this redesign proposes a tower segmented into four vertical blocks, increasing the usable floor area by 30%. At 294m, the building will be the tallest in the City and second tallest in London as a whole.
A public roof garden on the 10th floor has been added, extending over a curved canopy above the corner of Leadenhall Street and St Mary Axe; several winter gardens up to approximately 1,530 m2, external office terrace spaces up to 1,370 m2, and around 110,000 m2 of workspace, up from the second design's 90,000 m2. The public viewing gallery, shared with the Museum of London, remains part of the proposals. [2]
St Helen's is a commercial skyscraper in London, United Kingdom. It is 118 metres (387 ft) tall and has 23 floors. The postal address is No. 1, Undershaft, though the main entrance fronts onto Leadenhall Street, in the City of London financial district.
The Shard, also referred to as the Shard London Bridge and formerly London Bridge Tower, is a pyramid-shaped 72-storey mixed-use development supertall skyscraper, designed by the Italian architect Renzo Piano, in Bermondsey, London, that forms part of The Shard Quarter development. Standing 309.6 metres high, The Shard is the tallest building in the United Kingdom, the seventh-tallest building in Europe, and the second-tallest outside Russia behind the Varso Tower in Warsaw, which beats the Shard by less than half a metre. The Shard replaced Southwark Towers, a 24-storey office block built on the site in 1975.
22 Bishopsgate, also known as Horizon 22, is a commercial skyscraper in London, England. Completed in 2020, it occupies a prominent site in Bishopsgate, in the City of London financial district, and stands 278 m (912 ft) tall with 62 storeys. The project replaces an earlier plan for a 288 m (945 ft) tower named The Pinnacle, on which construction was started in 2008 but suspended in 2012 following the Great Recession, with only the concrete core of the first seven storeys. The structure was later subjected to a re-design, out of which it became known by its postal address, 22 Bishopsgate. It is the second tallest building in the United Kingdom and the seventeenth tallest building in Europe.
Salesforce Tower, 110 Bishopsgate is a commercial skyscraper in London. It stands 230 metres (755 ft) tall including its 28-metre (92 ft) mast making it the second tallest building in the City of London financial district and the fifth tallest in Greater London and the United Kingdom, after the Shard in Southwark and One Canada Square at Canary Wharf. 110 Bishopsgate is located on Bishopsgate and is bordered by Camomile Street, Outwich Street and Houndsditch.
The V Building was a proposed 51-storey residential skyscraper approved for construction on Broad Street on the Westside of the city centre of Birmingham, England. The tower was part of the larger Arena Central development scheme on the former ATV / Central Television Studios, closed in 1997. The entire development site covered an area of 7.6 acres (31,000 m2). On completion the development was set to include offices, shops, restaurants, cafes, leisure/entertainment, fitness centre and hotel. It was to have been built on the site of a multi-level underground car park next to Alpha Tower, one of the tallest buildings in Birmingham. The total cost of the entire scheme was expected to be £400 million and of the tower, £150 million.
Mercury City Tower is a supertall skyscraper located on plot 14 in the Moscow International Business Center (MIBC), in Moscow, Russia. Occupying a total area of 173,960 square metres (1,872,500 sq ft), the mixed-use building houses offices, apartments, a fitness center, and retail stores.
The Millennium Tower is a planned skyscraper whose construction will start in 2025. When completed in 2030, it will be the European Union's second tallest building and Germany's tallest building. It will contain Germany's tallest observation deck with a panoramic view over Frankfurt. The tower will have a height of 288 m (945 ft) and 67 stories. The architect of the tower is Ferdinand Heide and the client is CA Immo.
Istanbul Sapphire, or Sapphire, is a residential skyscraper located in the central business district of Levent in Istanbul, Turkey.
One Bayfront Plaza is a proposed supertall skyscraper in Miami, Florida, U.S. The building, construction of which has been approved, would stand at 1,049 feet (320 m), with 93 floors,[A] becoming the tallest building in Miami and Florida. One Bayfront Plaza would primarily consist of offices and hotel space, but also would include a retail mall, condominiums, and parking garage on the lower levels, as well as possibly an observation deck at the top. The entire project consists of over 1,400,000 square feet (100,000 m2) of Class A office and hotel space, as well as a total building area of over 4,000,000 square feet (371,612 m2) including the large podium. One Bayfront Plaza is the first skyscraper over 1,000 feet (305 m) to be approved for construction in Miami. The building's primary advocate was real estate developer Tibor Hollo, who has won several awards for his 55 years as a developer in Miami, and is currently the president of Florida East Coast Realty.
One Bloor, previously One Bloor East and Number One Bloor, is a mixed-use skyscraper at the intersection of Bloor Street and Yonge Street in downtown Toronto, Ontario, Canada. The project was initially launched by developer Bazis International Inc. in 2007, before being cancelled and re-developed by Great Gulf. As of 2018, it is the tenth-tallest residential building outside of Asia and the 40th tallest residential building in the world.
Deansgate Square, formerly known as Owen Street, is a residential skyscraper cluster on the southern edge of Manchester City Centre, England, consisting of four towers, the tallest of which is 201 metres (659 ft). The site is just south of Deansgate railway station and north of the Mancunian Way, bounded by Deansgate, Owen Street and the River Medlock. The towers sit at different angles to each other, with a slight bevel, or 'cut back', on each side of each building which ensures the towers catch the light at different times of day.
Jeddah Tower or Burj Jeddah, previously known as Kingdom Tower, is a skyscraper construction project in Jeddah, Saudi Arabia. It is planned to be the first 1-kilometre-tall (3,281 ft) building and would be the world's tallest building or structure upon completion, standing 180 m (591 ft) taller than the Burj Khalifa. Located in the north side of Jeddah, it is the centrepiece of the Jeddah Economic City project. After almost five years of inactivity, development work on the project resumed in 2023.
The City of Capitals is a mixed-use complex composed of two skyscrapers and an office building located on plot 9 in the Moscow International Business Center in Moscow, Russia with a total area of 288,680 square metres (3,107,300 sq ft). The two skyscrapers are named after the two historical capitals of Russia: Moscow and Saint Petersburg. Construction of the complex began in 2005, with the office building completed in 2008 and the two skyscrapers completed in 2009.
Bridgewater Heights is a skyscraper apartment building in Manchester, England, west of Oxford Street.
Australia 108 is a residential supertall skyscraper in the Southbank precinct of Melbourne, Victoria, Australia. Having officially topped out in June 2020, it became the tallest building in Australia by roof height, surpassing the Eureka Tower, and the second-tallest building in Australia by full height, surpassed by Q1 Tower.
Sky City, or Sky City One, was an 838-metre-tall (2,749 ft) planned skyscraper in the city of Changsha, Hunan in south-central China. The prospective builders, Broad Sustainable Building, estimated it would take just 90 days to construct. Including the 120 days required for prefabrication before on-site work commenced, the sum of time needed was 210 days. Pre-construction activities were halted in August 2013 after government regulators required additional approvals.
Wardian London is an ultra-luxury residential complex located in the centre of Canary Wharf’s financial district from Eco World-Ballymore and designed by architect firm Glenn Howells. The scheme consists of two skyscrapers that completed in 2020, is one of the tallest residential developments in London and the United Kingdom.
4/C, also known as 4th & Columbia, is a proposed supertall skyscraper in Seattle, Washington, United States. If built, the 1,020-foot-tall (310 m), 91-story tower would be the tallest in Seattle, surpassing the neighboring Columbia Center, and the first supertall in the Pacific Northwest. The project has been under development by Miami-based Crescent Heights since 2015 and undergone several design changes and modifications under three architecture firms. As of 2023, 4/C is expected to have 1,090 residential units—apartments up to the 64th floor and condominiums from the 65th to 90th floor—along with several coworking and retail spaces. The latest version was designed by Skidmore, Owings & Merrill.
South Quay Plaza is a residential-led development under construction on the Isle of Dogs, London, England, within the borough of Tower Hamlets. It is being developed by Berkeley Group Holdings and was designed by architect Foster + Partners. The site of the development lies to the immediate north of Marsh Wall and to the immediate south of the financial district Canary Wharf. The entire development is scheduled for completion in 2028.