Alexandra (Newport and South Wales) Docks and Railway

Last updated

The Alexandra (Newport and South Wales) Docks and Railway (ADR) was a company formed in 1882 from the former Newport Dock Company of 1865. There was considerable demand for dock accommodation in Newport, South Wales, chiefly for the export or coastal transport of iron ore and coal. The Newport Dock Company had built an earlier dock that was now outgrown.

Contents

Changing demand, particularly for blending coal, created a need to bring coal to Newport from the Taff and Cynon valleys, and the Pontypridd, Caerphilly and Newport Railway was formed to build the line; nominally independent, it shared many directors and major shareholders. It opened in 1884, and was absorbed by the ADR in 1897.

Prior to 1914 the Alexandra Docks were superlative in the world in terms of water area within the docks and ability to handle large vessels. The decline of the mineral extractive industries of South Wales resulted in a corresponding decline of activity by the ADR and its successor owners. However it is now active and successful as a general dock facility as part of Associated British Ports.

Monmouthshire Railway and Canal

The mineral wealth of the area north and north-west of Newport was considerable, but until the latter part of the eighteenth century, available means of transport for the production was extremely limited; there were few roads, and those that did exist were very poor, so that even conveyance on the backs of pack animals was costly and difficult.

This resulted in the promotion of a canal, to connect both Pontnewynydd (north-west of Pontypool) and Crumlin, to a location close to wharves on the River Usk at Newport. This project became the Monmouthshire Canal Navigation, authorised by Act of Parliament in 1792. It was opened in stages from 1796; the authorising Act permitted the building of tramroad connection from mines and ironworks within seven miles of the canal to connect to the canal itself, and many such connections were made. The Canal Navigation company was later authorised to construct wharves on the River Usk at Newport, and in time a large number of riverside wharves, nearly all on the west bank, were made. In fact a plateway was built in 1802 to relieve the canal, which further enhanced the volume of trade. [1] [2] [3]

Newport Town Dock

The tidal range at Newport is large, and the transshipment from canal barges to sea-going ships was laborious, and in time there were calls for a floating dock to eliminate some of the difficulty. In July 1835 Parliamentary authority was given for the construction of a dock in Newport; it became known as the Town Dock, and it opened in October 1842. During and soon after the construction process, the volume of trade increased very considerably, and the Newport Dock Company Act of 1854 authorised an extension to the Town Dock. From the Town Dock's 4 acres, the total area became 11+12 acres, and the extension was opened in 1858.

Still the volume of trade increased, as did the size of vessels in use, and dissatisfaction with the dock accommodation increased. [3]

Railways

At this period it was natural that heavy minerals and all bulky goods from or to locations outside Newport would be conveyed by rail. The South Wales Railway had opened its main line through Newport in 1850, connecting to London and the network of the Great Western Railway. [4]

In the 1840s the Monmouthshire Canal Company had realised that its plateway track was inefficient and obsolescent, and from 1849 it rebuilt its route using more modern forms of railway. It now styled itself the Monmouthshire Railway and Canal Company. [1]

At the same time the Newport, Abergavenny and Hereford Railway was completing its line, which gave a direct railway connection to the River Mersey in connection with other friendly companies. [5]

The South Wales Railway was a broad gauge line, whereas the rebuilt Monmouthshire lines were narrow (standard) gauge. The Newport Abergavenny and Hereford Railway used the Monmouthshire line to reach Newport, and the London and North Western Railway developed an alliance with the NA&HR, intending to secure access for itself to Newport. (The Great Western Railway, as successor to the South Wales Railway, converted its South Wales routes to narrow (standard) gauge in 1872.) [6]

Alexandra Dock

The unsatisfactory nature of the Town Dock and its extension encouraged the development of plans for an additional dock built on a much larger scale. This scheme became the Alexandra Dock, and the Alexandra (Newport) Dock Company was incorporated by Act of 6 July 1865 to build it. [7] [8] As well as construction of the dock itself, the scheme included a connecting railway line between the dock and the Monmouthshire and Great Western Railways. [9]

Alexandra Dock was opened on 10 April 1875. During the construction period the volume of traffic handled at Newport continued to increase rapidly, and a second dock was planned, and opened in 1893; the original Alexandra Dock was renamed Alexandra North Dock, and the new dock was the South Dock. It too proved inadequate for the business on offer, and an extension to it was opened, forming a total deep water area of 125 acres. The course of the lower part of the Ebbw River was diverted to make space for the dock. [6] [3] [7] [9]

Connecting Pontypridd

Although the volume of minerals moved through the Newport dock complex was buoyant, it was observed that the best quality steam coal, was being extracted in the Taff and Cynon valleys. This coal was in demand worldwide, chiefly for bunkering and industrial use; moreover blending of coal was becoming important: coal of different qualities was required in the same ship for the purpose.

Cardiff Docks were geographically the usual point of export for the coal from the Taff and its tributaries, but the port had become notorious for congestion and delay, with complaints from ships' masters that they had to stand off for days at a time waiting for a berth to load at Cardiff. If a railway could be built from Pontypridd to Newport, the coalfield there could use Newport Docks as an alternative.

The Brecon and Merthyr Railway had by this time built a line between Caerphilly and Newport, and the gap from Pontypridd to Caerphilly was only 5 miles. The result was a proposal for a line connecting Pontypridd and Newport, through Caerphilly: the Pontypridd, Caerphilly and Newport Railway. It was heavily in the interest of the Alexandra Dock Company for this line to be built, and it gave the new company its full support. It was authorised by Parliament on 8 August 1878, [note 1] but it did not open until 25 July 1884. There had been an attempted run with a mineral train on 7 July 1884 but it was detained by the GWR on the grounds that the company operating the train did not have the Parliamentary right to use the GWR track. [note 2] [8] [10]

There were two distinct sections of the PC&NR: [note 3] from Pontypridd to Caerphilly, and from Bassaleg to Mendalgief Junction, south and east of the GWR main line. At Mendalgief Junction the internal track of the Alexandra Company started. The gap between Caerphilly and Bassaleg was closed by the Rhymney Railway and the Brecon & Merthyr Railway, over which the PC&NR had running powers. [9]

Although the PC&NR was only a short line it was steeply graded against the loaded traffic, and the transit from Pontypridd involved working over six different railways' networks. In 1891 a separate alignment was opened near Machen to ease the worst of the adverse gradients. [6] [3]

From 28 December 1887 the PC&NR operated a passenger service between Pontypridd and Newport; however it had no locomotives of its own and the Alexandra company provided the engine power. [9]

Internal dock lines

The PC&NR route had the characteristics of an ordinary local railway, and was quite distinct from the internal track at Alexandra Dock. This commenced at East Mendalgief Junction. By 1914 the siding complex covered over 50 acres of ground.

Free stacking space was given for up to 90 days for steel rails and iron ore that had arrived by rail and was awaiting shipping. [11]

Newport Town Dock

The Alexandra (Newport) Dock Company underwent a capital reconstruction in 1882, changing its name to The Alexandra (Newport and South Wales) Docks and Railway Company; [7] more capital was needed for the continuing dock construction work. In 1883 the Company acquired the Town Dock, effective from 1 January 1884. The purchase price was £149,000; this was less than one-third of the money the Newport Dock Company had expended, at nearly £483,000; at the time the (Town) Dock Company was unable to meet interest payments. [3] [8]

Acquiring the PC&NR

The ADR was highly profitable due to the huge volumes of minerals passing through its docks. (The financial difficulty referred to above was in capital, the money for new construction.) Friendly relations between it and the PC&NR were maintained, and in 1890 running powers were mutually exchanged and co-operative working consolidated. It only remained to find an auspicious time for amalgamation, and acquisition of the PC&NR by the Alexandra Company was authorised by Parliament on 6 August 1897. [6] [7] The PC&NR had 7+12 miles of route, whereas prior to the merger, the Alexandra company had 1+34 miles of running line; however it had 108 miles of siding. [9]

Locomotives

For all this time, the Alexandra company's network (largely sidings at the docks) and the PC&NR network had been worked by other companies. On 30 April 1906 [note 4] the Alexandra took over the working of its own mineral traffic, of course on the former PC&NR as well. It had quickly to acquire and hire in the necessary locomotives. Notable among the new fleet were ten condensing tank engines purchased second hand from the Mersey Railway, which was electrifying its system. The condensing apparatus was removed in due course, [6] and they were fitted with cabs in place of the weatherboards. [8] [9]

Hopwood, writing in 1919, said that the company possessed 35 locomotives, all tank engines; there were 19 of the 0-6-0 type, seven 2-6-2s, three 0-6-4s and 3 0-6-2s, an 0-4-2 and two 0-4-0s. [9]

A locomotive passing into GWR ownership at the end of 1922 was originally a double-framed 0-6-0 built for the Metropolitan Railway. It had been sold to the Alexandra in 1880, and was converted to an 0-6-2 in 1921. It was withdrawn by the GWR in 1926. [12] [8] [9]

Passenger services

The PC&NR had wished to operate passenger trains in to Newport High Street, the GWR station, in 1883, but the GWR had refused the facility. Relations had eased somewhat by 1887 and the Alexandra company operated a passenger service between Pontypridd and Newport High Street, over the PC&NR which was still nominally independent. The Great Western Railway itself took over this service from 1 January 1899. From that date the Alexandra Company operated no passenger services at Newport, its home location.

In the first decade of the twentieth century, attention was given to ways in which local passenger services might be operated at lower cost in thinly populated areas. The Alexandra Company acquired a railmotor, a single coach vehicle with a small integrated locomotive, and it started a service between Caerphilly and Pontypridd, Tram Road Halt. The last named was just short of the junction with the Taff Vale Railway at Pontypridd, so avoiding paying toll charges to that company. Most of the intermediate stopping places were newly installed, of the lightest possible construction, the arrangement being that the railmotor had fixed steps to allow passengers to board and alight at ground level. The service was extended to run from Machen to Tram Road Halt later, and a second railmotor was purchased. [6] [8] Semmens observes that even with the imminent grouping, and thence amalgamation of the Alexandra Company with the GWR, the railmotor service "still did not run into the main station at Pontypridd." [12]

Road passenger services

Also in the first decade of the twentieth century the Alexandra Company operated motor omnibus services within Newport Borough; it had the powers to do so as long as they did not compete with any municipal passenger tram route. Two 14-seat buses were acquired from the London and South Western Railway for the purpose. The arrangement lasted from 1906 to 1933. [6]

Grouping of the railways

Following the Railways Act 1921, most of the railway companies of Great Britain were compulsorily "grouped" into four larger units: the old Great Western Railway and certain large South Wales companies - of which the ADR was one - were "constituents" (in contradistinction to smaller companies that were "subsidiaries") of the larger Great Western Railway. At the grouping, the issued capital of the ADR was £3.66 million, with net income in 1921 of £194,875, and paying a dividend in 1921 of 5% on ordinary stock. It had 9+14 miles of running lines (but 100 miles of sidings capable of holding 12,000 wagons), 38 locomotives and four passenger carriages. There were 690 goods wagons, and 1,707 employees. [12]

The merger with the Great Western took effect from 25 March 1922. [13] Hutton asserts that it seems probable that the former PC&NR lines transferred to the Newport District of the GWR. [3] [11]

Nationalisation and after

In 1948 the railways of Great Britain were taken into national ownership under British Railways. The British Transport Commission was a supervisory body intended to oversee all the nationalised transport systems. Under the Transport Act 1962; the British Transport Docks Board (BTDB) was established as a nationally owned body, and the Newport Docks were transferred to it.

The Transport Act 1981 was intended to privatise the BTDB, and in 1982 the docks became part of Associated British Ports, a private sector company with certain statutory powers.

The dock can (2002) handle vessels up to 40,000 dwt, and has a combined water area of 125 acres. The only rail access is from the former GWR main line at Alexandra Dock Junction, facing for trains approaching from Newport passenger station. [11]

Decline of the railways

The motor bus service in Newport was mirrored from the 1930s by independent road passenger and goods services in the rural parts of the Alexandra's network as the quality of public roads in rural areas improved. This led to a decline in profitability of the railway's passenger and goods business, although the mineral traffic held up for the time being. After World War II and nationalisation of the railways, the decline accelerated, and the PC&NR passenger service between Pontypridd and Machen was closed from 17 September 1956. A workmen’s service continued between Newport and Caerphilly until 1 July 1963. Glyntaff goods depot, a short distance south of Pontypridd on the PC&NR, continued in use until closure on 29 July 1967. [6]

Notes

  1. Morgan says that this was a truncated form of the proposal. He implies that the PC&NR wished to build their own line all the way to Newport, but were obliged by Parliament to share the B&M route.
  2. At this time access to the Alexandra Dock system required the transit of a short piece of GWR route.
  3. Here PC&NR means the Pontypridd, Caerphilly and Newport Railway. Nearby, later, was another PC&NR: the Pontypool, Caerleon and Newport Railway.
  4. Barrie and Baughan, page 108; May 1906 according to Hopwood; on page 10 Morgan quotes 30 April 1903, although he says that the TVR gave notice that in ‘’intended’’ to cease working the trains. It is possible that the intention was not given effect for three years.

Related Research Articles

<span class="mw-page-title-main">Taff Vale Railway</span> Railway company and line in South Wales

The Taff Vale Railway (TVR) was a standard gauge railway in South Wales, built by the Taff Vale Railway Company to serve the iron and coal industries around Merthyr Tydfil and to connect them with docks in Cardiff. It was opened in stages in 1840 and 1841.

<span class="mw-page-title-main">Cardiff Railway</span>

From 1839 the Trustees of the Marquis of Bute, operated a large dock operation in Cardiff, the "Bute Docks". This was very successful, but was overwhelmed by the huge volume of coal exported through Cardiff. At the same time it was seen that railway companies, especially the Taff Vale Railway (TVR), were making money conveying the coal to the docks.

The Rhymney Railway was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition.

The Brecon and Merthyr Tydfil Junction Railway (B&MR) was a railway company in Wales. It was originally intended to link the towns in its name. Finding its access to Merthyr difficult at first, it acquired the Rumney Railway, an old plateway, and this gave it access to Newport docks. This changed its emphasis from rural line to mineral artery.

<span class="mw-page-title-main">Pontypridd railway station</span> Railway station in Rhondda Cynon Taf, Wales

Pontypridd railway station serves the town of Pontypridd in Rhondda Cynon Taf, Wales. It is located at the junction of the Merthyr line and the Rhondda line and has for many years been the only station serving the town.

<span class="mw-page-title-main">Barry Railway Company</span> Former railway and docks company in South Wales

The Barry Railway Company was a railway and docks company in South Wales, first incorporated as the Barry Dock and Railway Company in 1884. It arose out of frustration among Rhondda coal owners at congestion and high charges at Cardiff Docks as well the monopoly held by the Taff Vale Railway in transporting coal from the Rhondda. In addition, the Taff Vale did not have the required capacity for the mineral traffic using the route, leading to lengthy delays in getting to Cardiff.

The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, mostly to transport the products of the Merthyr iron industries to ports on Swansea Bay.

The South Wales Mineral Railway was a railway built to serve collieries in the upper Afan Valley, and bring their output to a dock at Briton Ferry, in South Wales. It opened in stages, in 1861 and 1863. It was built on the broad gauge and had steep gradients, including a rope worked incline near Briton Ferry.

The Pontypool, Caerleon & Newport Railway was promoted independently to relieve congestion on the heavily worked Eastern Valley Line of the Monmouthshire Railway and Canal Company. The Great Western Railway put up half the capital, making it in effect a GWR subsidiary. It opened in 1874, and most long-distance passenger and goods traffic, especially the heavy mineral traffic, transferred to it. It amalgamated with the GWR in 1876.

Newport Docks is the collective name for a group of docks in the city of Newport, south-east Wales.

The Vale of Glamorgan Railway Company was built to provide access to Barry Docks from collieries in the Llynfi, Garw and Ogmore valleys. Proposed by the coalowners but underwritten by the wealthy Barry Railway Company, it opened in 1897 from near Bridgend to Barry, in Wales.

The Pontypridd, Caerphilly and Newport Railway was built to bring the coal output of the Aberdare and Rhondda valleys directly to Alexandra Docks at Newport.

The Newport, Abergavenny and Hereford Railway was a railway company formed to connect the places in its name. When it sought Parliamentary authorisation, it was denied the southern section, and obliged to use the Monmouthshire Railway between Pontypool and Newport.

The Monmouthshire Railway and Canal Company was a canal and railway company that operated a canal and a network of railways in the Western Valley and Eastern Valley of Newport, Monmouthshire. It started as the Monmouthshire Canal Navigation and opened canals from Newport to Pontypool and to Crumlin from 1796. Numerous tramroads connected nearby pits and ironworks with the canal.

The Llantrisant and Taff Vale Junction Railway was a railway company that constructed a standard gauge line in South Wales, connecting Llantrisant and the Taff Vale Railway near Treforest. It ran through thinly populated country, and linked to a number of iron mines, collieries and other mineral sites. It opened in stages in 1863 and 1864. In 1865 through passenger trains from the Cowbridge Railway ran over the line, to Pontypridd, although for some time there were no passenger stations on its own network. At the Llantrisant end, it was reliant on broad gauge railway companies which were not always friendly to it. The company leased its line to the Taff Vale Railway in 1870.

The Llancaiach Branch railway line was a mineral branch line in Glamorganshire, South Wales. It was authorised in 1836 as part of the Taff Vale Railway, and its purpose was to connect collieries at Llancaiach and bring their output to Cardiff for onward shipment. It was designed by Isambard Kingdom Brunel and built on the standard gauge. It opened in 1841 from a junction with the Merthyr line immediately south of Abercynon. It was intended to be horse worked, and included a self-acting rope-worked inclined plane near the junction. The collieries were slow to use the line, preferring their customary use of a tramroad and the Glamorganshire Canal, and the value of the line was diminished when the Taff Vale Extension line, an east-west connecting line belonging to the Newport, Abergavenny and Hereford Railway, intersected it and cut off the colliery connections, and the line became dormant.

The Sirhowy Tramroad was a plateway built to convey the products of ironworks at Tredegar to Newport, South Wales. It opened in 1805 between Tredegar and Nine Mile Point, a location west of Risca, from where the Monmouthshire Canal Company operated a tramroad to Newport. The Sirhowy Tramroad was operated at first by horse traction, but early locomotives were used, and a passenger service was operated.

The 1661 Class was William Dean's second design of tank locomotive for England's Great Western Railway. Like the 1813 Class which preceded them, there were 40 1661s, turned out of Swindon Works in two batches.

<span class="mw-page-title-main">Ely Valley Railway</span> Railway in south Wales, United Kingdom

The Ely Valley Railway (EVR) was a broad gauge railway company in South Wales, which opened a mineral line between Llantrisant station on the South Wales Railway main line and pits at Mwyndy and Penrhiwfer in 1860.

Pontypridd Tram Road was a railway station in Pontypridd, Wales. From 1904 to 1922, it served as the Pontypridd terminus of the Alexandra Docks and Railway's local passenger service between Pontypridd and Caerphilly.

References

  1. 1 2 Aubrey Byles, The History of the Monmouthshire Railway and Canal Company, Village Publishing, Cwmbran, 1982, ISBN   0 946043 00 0
  2. Charles Hadfield, The Canals of South Wales and the Border, David and Charles, Newton Abbot, second edition 1967, ISBN   0 7153 4027 1
  3. 1 2 3 4 5 6 John Hutton, The Newport Docks and Railway Company, Silver Link Publishing Limited, Peterborough, 1996, ISBN   1 85794 087 3
  4. E T MacDermot, History of the Western Railway, volume I part II, published by the Great Western Railway, London, 1927
  5. Rex Christiansen, A Regional History of the Railways of Great Britain: volume 13: Thames and Severn, David & Charles (Publishers) Limited, Newton Abbot, 1981, ISBN   0 7153 8004 4
  6. 1 2 3 4 5 6 7 8 D S M Barrie, revised Peter Baughan, A Regional History of the Railways of Great Britain: volume 12: South Wales, David St John Thomas, Nairn, 1994, ISBN   0 946537 69 0
  7. 1 2 3 4 E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  8. 1 2 3 4 5 6 H Morgan, South Wales Branch Lines, Ian Allan Ltd, Shepperton, 1984, ISBN   0 7110 1321 7
  9. 1 2 3 4 5 6 7 8 H L Hopwood, "The Alexandra (Newport and South Wales) Docks and Railway", Railway Magazine, September 1919
  10. James Page, ‘’Forgotten Railways: South Wales’’, David & Charles, Newton Abbot, 1979, ISBN   0 7153 7734 5
  11. 1 2 3 John Hutton, The Newport Docks and Railway Company, Silver Link Publishing Limited, Kettering, 2002, ISBN   1 85794 163 2
  12. 1 2 3 Peter Semmens, A History of the Great Western Railway: I: Consolidation 1923 - 1929, George Allen and Unwin London, 1985, reprinted by Studio Editions, 1990, ISBN   0 04 385104 5
  13. Pall Mall Gazette 20 March 1922