Brecon and Merthyr Tydfil Junction Railway

Last updated

The Brecon and Merthyr Tydfil Junction Railway (B&MR) was a railway company in Wales. It was originally intended to link the towns in its name. Finding its access to Merthyr difficult at first, it acquired the Rumney Railway, an old plateway, and this gave it access to Newport docks. This changed its emphasis from rural line to mineral artery.

Contents

It opened at the Brecon end to a point near Dowlais in 1863, and in 1865 it opened a disconnected section from Rhymney to Newport. In due course the company connected the two sections and reached Dowlais and Merthyr, but had to concede sharing a route with the powerful London and North Western Railway.

The B&MR was always short of money, and was notable for its prodigious gradients, but it survived until the grouping of 1923, when it became part of the Great Western Railway. Its network declined steeply after 1945, and passenger operation ceased in 1962. Goods and mineral operation also lost its market, and as of 2020, only a short stub to a quarry at Machen remains rail connected.

History

System map of the Brecon and Merthyr Railway in 1884 B&MR.png
System map of the Brecon and Merthyr Railway in 1884

Brecon was an important regional centre in mediaeval times, due to its location at the confluence of the River Honddu and the River Usk. Its relatively remote location meant that transport was always an important consideration.

The difficult terrain southwards would require crossing the ridge of the Brecon Beacons into the high ground at the head of the South Wales Valleys, and the first turnpike connected eastward to Abergavenny and south-westward to Swansea.

The Brecknock and Abergavenny Canal, later part of the Monmouthshire and Brecon Canal, was opened to Brecon in 1800 continuing the alignment to the east. [1] [ page needed ] [2]

In 1816 the Hay Railway was opened; this was a horse-drawn plateway 24 miles long, connecting Brecon to Hay, and later Eardisley. [3] [ page needed ]

Industry south of the Brecon Beacons was linked in to the canal when the Brinore Tramway (or Bryn Oer Tramway opened in 1815. It connected the industrial site of Brinore, near Trevil, north of Tredegar, to Talybont-on-Usk, on the Brecknock and Abergavenny Canal. [4] [ page needed ]

Brecon and Merthyr Railway Act

In the 1859 session of Parliament, the Brecon and Merthyr Bill was considered. It proposed a railway from a junction with the Dowlais Railway of 1851 near its terminus at Dowlais, to Brecon near the head of the canal. The Dowlais Railway was built chiefly to serve the Dowlais iron company, so that the proposed B&MR would provide an outlet, via the canal, for its products. It also connected Dowlais and Merthyr in difficult terrain—it included a rope worked incline—that might save expense for the B&MR in reaching Merthyr. [5] [ page needed ] [6]

Brecon and Merthyr Junction Railway Act 1859
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 22 & 23 Vict. c. lxviii

During the progress of the bill the Brecon to Talybont section was dropped, conceding the part of the route to another planned railway company; this failed to get authorised, but this was too late for the B&MR to reinstate the omitted section. The railway as authorised by the Brecon and Merthyr Junction Railway Act 1859 (22 & 23 Vict. c. lxviii) on 1 August 1859 was from Dowlais to Talybont. [7]

A railway further north got authorised: the Hereford, Hay and Brecon Railway. It had made arrangements with the larger Newport, Abergavenny and Hereford Railway to work it.

The Hay Railway was intent as this stage on selling its line, and the Hereford, Hay and Brecon Railway proposed to purchase it, simplifying the issue of land acquisition. After considerable negotiation, the HH&BR agreed to partition the Hay Railway, conceding part to the Mid Wales Railway and the southern section from Talyllyn to Brecon was granted to the B&M. These arrangements were ratified by the Hay Railway Act 1860 (23 & 24 Vict. c. clxxix) of 6 August 1860. [5] [ page needed ] [8] [ page needed ] [9]

Brecon and Merthyr Railway (Extensions) Act 1860
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 23 & 24 Vict. c. xvii
Dates
Royal assent 15 May 1860
Text of statute as originally enacted

Accordingly, relying on the confirmation of the agreement, the B&MR was able to get powers to extend from Talybont through Talyllyn to Brecon, by Brecon and Merthyr Railway (Extensions) Act 1860 (23 & 24 Vict. c. xvii) of 15 May 1860. A triangular junction would be formed at Talyllyn with the Mid Wales Railway. Mutual running powers arrangements were agreed. [5] [ page needed ]

Construction

The first sod was turned on 18 January 1860; the contractors were David Davies and Thomas Savin, and a lease arrangement was concluded with them for ten years in which they guaranteed the proprietors 5% interest on capital.

The Beacon Tunnel (official railway name 'Torpantau Tunnel') was completed by 11 January 1862 and on 28 August 1862 a trial run for the directors was undertaken between Pant and Talyllyn. The section between Talyllyn and Brecon was much slower to construct, partly because it was still in use by the Hay Railway; Talyllyn tunnel needed to be opened out with that traffic in operation.

It was possible to run a locomotive through to Brecon on 1 January 1863, and on 12 February Captain Rich of the Board of Trade carried out an inspection for approval of passenger operation. There was still a delay, but some revenue goods train operation took place in April 1863. [5] [ page needed ]

Opening

The entire line between Brecon and Pant, 19 miles of single line, opened on 1 May 1863. [7] First stations were Brecon (temporary station), Talyllyn (temporary station), Talybont, Dolygaer, and Pant. A horse omnibus connected for Merthyr; in due course the Dowlais Railway was to make the connection to the ironworks for mineral traffic. [5] [ page needed ] The engineer for the line was Henry Conybeare, who described it as a good locomotive road throughout. Coming south, locomotives were going to have to ascend the Seven Mile Bank, making a 925 feet climb. [3] [ page needed ]

Extending the network

While construction was in progress, the B&MR was busy getting Parliament to approve its plans for extension. In the 1861 session it obtained authority to build down the Bargoed Rhymney valley, but the Rhymney Railway was given similar powers and they were mutually exclusive. Eventually the powers were divided, the Rhymney Railway building up to Deri Junction, and the B&MR building down to that point from the north.

In 1862 the B&MR got powers to abandon the Dowlais Railway connection that had become superfluous, and to connect directly to the Taff Vale Railway at Merthyr. [5] [ page needed ]

The Rumney Railway

Torpantau station in 1957 Torpantau Station - meeting a Brecon - Newport train geograph-2568908-by-Ben-Brooksbank.jpg
Torpantau station in 1957

The Rumney Railway had been incorporated in 1825 and opened in 1826 as a horse operated plateway, running from the ironworks at Rhymney to Bassaleg, near Newport, connecting there with the Sirhowy Railway and giving access to Newport Docks. Some steam locomotive operation was undertaken after about 1854, and in 1861 Parliamentary powers were taken to modernise the line and adapt it for passenger operation. It is evident that the true objective was to sell the line to one or other more modern neighbouring company as a going concern. It was the Brecon and Merthyr Railway that acquired it for £90,000 under powers of 28 July 1863. [5] [ page needed ] [10]

The B&MR had got hold of an obsolescent railway but with it came access to Newport over the Monmouthshire Railway from Bassaleg. The B&MR now had to set about the modernisation of the line itself, including a considerable amount of easing of the sharp curves. Captain Rich, after two refusals, agreed to reopening for passenger operation following his inspection on 7 June 1865, and the line opened to passenger operation between Pengam and Newport Dock Street (Monmouthshire Railway) on 14 June 1865; the operation was extended up to Rhymney from 16 April 1866, and in 1867 coal traffic started running. [7]

The Rhymney station was about a mile down the valley from the Rhymney Railway's equivalent. [11] [ page needed ]

Passenger stations on the B&MR section of this route were now Rhymney, New Tredegar, Bargoed, Pengam, Maesycwmmer, Bedwas, Machen, Church Road, Rhiwderin, and Bassaleg. This part of the B&MR was detached by ten miles from the section towards Brecon, running down the east side of the Rhymney River, opposite the Rhymney Railway itself on the west side. [5] [ page needed ] [11] [ page needed ]

Financial danger

The company's trains were being worked by Thomas Savin and John Ward, who paid the proprietors 5% on their capital, but early in 1866 [or 1865 [12] ] the contractor failed. Suddenly the B&MR was unable to deal with its own financial commitments and it starting to miss debenture payments, and the Company went into administration. This meant that it was unable to complete the Merthyr branch, and the restrictive clauses in its Acts meant that it oriented from opening the line through to Newport. [3] [ page needed ]

In 1868 and again in 1870 financial arrangements were made with creditors, which enabled the company to carry on; debentures were converted to debenture stock and the company was enabled to continue. [5] [ page needed ]

Completing to Merthyr, Dowlais and Newport

Finishing the line to Merthyr was the obvious priority, and Alexander Sutherland was commissioned to find a means to do so. The obstruction hitherto had been the objection of the Crawshay Estate to the line coming through the grounds of Cyfarthfa Castle. Sutherland redesigned the route further west avoiding the Estate. This was at the expense of much difficulty of engineering, and of operation later. [5] [ page needed ]

The line was opened in part, from Pontsticill to Cefn, on 1 August 1867. [7] The new line joined the Vale of Neath Railway line at Rhydycar Junction, immediately south of Merthyr station, opening on 1 August 1868. The VoNR station at Merthyr was used. [3] [ page needed ]

This now released the legal obstruction to the opening to Newport; the part of this from Pant to Dowlais Top had opened on 1 August 1867, [7] and from Dowlais Top to Pengam was opened on 1 September 1868. [7] Three trains ran daily from Brecon to Newport Dock Street.

This section from Dowlais to Pengam ran through the Bargoed Rhymney Valley. Both the B&MR and the Rhymney Railway had wished to build a line through this, but the defile near Bargoed made that physically impossible and at length a compromise was reached: the Rhymney Railway would build up from Bargoed to Deri Junction, and the B&MR would build down from Dowlais to Deri Junction. There would be a limited mutual exchange of running powers.

At Bargoed the Rhymney Railway and the B&MR trains exercising running powers were on the west side of the valley, and the B&MR from its Rhymney station was on the east side. A north-west to south-east diagonal connection was built as part of the work. [3] [ page needed ] [11] [ page needed ]

The location of the stations at Dowlais was determined by the through lines on which they were sited, and in 1865 the B&MR had obtained powers to make a short branch to a central location in Dowlais. It opened from Pant on 23 June 1869. The Dowlais station, at Lloyd Street, was later (in 1924) renamed Dowlais Central. [5] [ page needed ] [3] [ page needed ] [7]

LNWR connections

The London and North Western Railway was encroaching from the east by means of the Merthyr, Tredegar and Abergavenny Railway which it had acquired, and it was obvious that it sought to reach Dowlais and Merthyr. In an Act of 15 July 1867 it obtained authority to make junctions with the B&MR near Dowlais Top and near Dowlais (Central), where its new alignment would bring the two railways close together. The LNWR line was to pass Dowlais heading north, in tunnel under Pant station, curving west and south to join the B&MR line at Morlais Junction. The connections were made on 1 January 1873.

The connection at Dowlais Top was used for the exchange of goods and mineral traffic, and was removed about 1933. The connection near the B&MR central station at Dowlais was made by curving from northward to join the B&MR southward at Ivor Junction just outside the B&MR station; LNWR trains used the B&MR station from that time. On 4 May 1885 the LNWR opened a station at Dowlais High Street, somewhat to the east of Dowlais, and from that date transferred its passenger calls to that station. [5] [ page needed ] [3] [ page needed ]

The goods traffic of the LNWR (and its successors) continued to be exchanged at Dowlais (Central) B&MR station until 22 November 1954, from which date such traffic ran via Pontsticill Junction.

The LNWR still wanted good access to Merthyr and in 1874 promoted a Bill for a new line getting access to the town. The B&MR opposed this in Parliament, but a compromise was reached by which the B&MR's own Merthyr line would be made joint with the LNWR in consideration of the LNWR refunding half the original cost of construction of that line. This was agreed, but the LNWR had to build an expensive connecting line from a new junction, Penywern Junction, on its line to the B&MR Dowlais (Central) station, running northward in tunnel to a westward junction with the B&MR line at Morlais Junction.

The line took four years to construct, but the LNWR took formal joint ownership of the relevant part of the B&MR line in 1875, ensuring that it retained access in the event of the B&MR negotiating with rivals. The LNWR line opened on 1 June 1879, when the LNWR trains were able to run to Merthyr High Street station. [5] [ page needed ]

Hereford, Hay and Brecon Railway

East end of Brecon station in 1949 Brecon 2 railway station 1891736 f6a793a8.jpg
East end of Brecon station in 1949

The Brecon and Merthyr Railway had opened its first main line between Brecon and Pant on 1 May 1863. Trains of the Hereford, Hay and Brecon Railway, worked by the Mid Wales Railway, started working in to Brecon from 19 September 1864

An east loop was built at Talyllyn, forming a triangular junction there, enabling goods trains from Merthyr to the north to run direct; this opened on 21 September 1864.

The original partitioning of the Hay Railway had been a negotiated compromise, and led to an arrangement that was less than ideal; the Hereford, Hay and Brecon Railway agreed to amalgamate with the Brecon and Merthyr Railway, and this was ratified by Act of 5 July 1865. [9]

This appeared to be satisfactory, but it emerged in 1867 that the preference shareholders had not been agreed by the preference shareholders, and the amalgamation was held to be void. An Act of 1868 confirmed the separation of the two companies once again and the HH&BR was reincorporated by Act of 26 July 1869. It needed a company to work its trains for it, and after a false start the Midland Railway performed this task, from 1 October 1869. The Midland Railway had a presence at Hereford using running powers, and had long sought an entry into South Wales. [3] [ page needed ] [8] [ page needed ]

The working arrangement was converted into a lease (of the HH&BR by the Midland) from 1874 and acquired the Swansea Vale Railway in the same year. When it negotiated an arrangement to run its trains over the Neath and Brecon Railway from 1877, it had achieved its goal of reaching Swansea. This brought a considerable volume of additional traffic to the route, and proved lucrative for the Brecon and Merthyr, whose line formed part of the chain from Hereford to Swansea. [5] [ page needed ] [9]

Brecon arrangements

Brecon Free Street station, looking west towards Neath in 1962 Brecon 1 railway station 1891956 7df3ef5c.jpg
Brecon Free Street station, looking west towards Neath in 1962

The first Brecon and Merthyr Railway station at Brecon was at Watton; it was always intended as a temporary station, but the arrival of the HH&BR trains and Mid Wales Railway's own trains overloaded the accommodation significantly.

The Neath and Brecon Railway opened its line at Brecon from the west in 1867, but during its construction it became clear that its attitude to the B&MR was unfriendly. It was also desperately short of money, and opened its line to a separate temporary station at Free Street. A connection was made between the two stations, but it was not suitable for passenger operation. [5] [ page needed ] Nevertheless, Barrie observes:

As late as July 1869… the Neath and Brecon Engineer, admitted to a House of Lords select committee that if any passengers for east of Brecon arrived by train at Mount Street their tickets were collected, they were put on the engine, and run forward on the high level line to a point opposite and above the Watton station. (There was also a loop line direct from the Free Street extension into Watton Yard, but the Neath & Brecon witnesses claimed that the B&M would not let them use it, but kept the points locked. [13]

By 1870 a contract was let to build a new station at Free Street, intended to be a Joint station for all the railway companies (although wholly owned by the B&MR), and it opened on 1 March 1871. Nonetheless the Neath and Brecon Railway continued to use its own station until 1874, when its passenger trains moved to Free Street, the former station being relegated to goods traffic. Watton had already adopted that role. [5] [ page needed ]

Caerphilly

The Old Rumney Railway had secured authorisation in its Act of 1861 for a line from Machen to Caerphilly, and after the acquisition of the Old Rumney by the B&MR this was constructed, opening in 1867. [7] It served mainly collieries and factories.

On 8 August 1878 the Pontypridd, Caerphilly and Newport Railway was incorporated. It was heavily sponsored by the Alexandra (Newport) Dock Company, which wished to bring the coal resources of the Rhondda and Cynon (Aberdare) valleys to Newport Docks. Traffic agreements were secured with the Taff Vale Railway to achieve the connection, as well as with the B&MR and the Rhymney Railway.

In 1882 the B&MR decided to double the line between Bassaleg, Machen and Abertysswg in anticipation of considerable extra business on the route. [5] [ page needed ]

The Great Western Railway, by now owner of the Monmouthshire Railway system, was less cooperative. The PC&NR [note 1] was to use the B&MR from Machen to Bassaleg, but needed to pass over a mile or so of the Monmouthshire Western Valley line to reach Newport Docks, and the GWR did not make the facility available at first, on 7 July 1884. After a stand-off the use of the line was conceded.

In 1882 the Newport Docks company reconstituted itself as the Alexandra (Newport and South Wales) Docks and Railway and was clearly in the lead over the affairs of the PC&NR, and it obtained powers in 1883 to build an additional double track alongside the Western Valley line from Bassaleg. This opened in April 1886.

The approach to Machen on the B&MR Caerphilly branch was on a steeply graded single line, and working the heavy mineral traffic over it was inconvenient; the PC&NR obtained powers to build a second, nearly parallel single line on easier gradients: the Machen Loop. This was opened on 14 September 1891 [7] an immediately transferred to B&MR ownership. The new and old single lines were operated as a double track. Waterloo and Fountain Bridge platforms for the railmotor stopping trains, were on the separated single lines and accordingly had a service in one direction only respectively. [5] [ page needed ]

Barry Railway

The Barry Railway was founded to provide an alternative port for the export of the coal and mineral resources of South Wales, following decades of dissatisfaction with the facilities at Cardiff and Newport, and with the railway connections to those places.

The first section of line opened in 1888 and in the following year coal was hauled from the Rhondda Valley, and the Company moved on to providing a connection from the Rhymney Railway at Penrhos, west of Caerphilly.

In 1898 it obtained powers to make another connection, this time with the B&MR between Bedwas and Maesycwmmer. This was a significant civil engineering undertaking, crossing the Rhymney Valley on a large structure known as Llanbradach viaduct.

The new line opened on 2 January 1905. The Barry Railway had running powers for mineral traffic in the upper part of the B&MR network in the Rhymney Valley; other traffic was hauled by the local company and exchanged at Duffryn Isaf. [5] [ page needed ]

Grouping

Most of the railways of Great Britain were formed into one or other of four new larger companies, in a process referred to as the "grouping", following the Railways Act 1921. The Brecon and Merthyr Railway was a subsidiary [note 2] of the new Great Western Railway; the change took effect on 1 July 1922.

There had, of necessity, been capital reconstructions in 1882 and 1902. In the twentieth century interest was paid on preference shares, and in 1918 – 1921 this was as high as 4%, but on preference shares only. [5] [ page needed ]

At 31 December 1921, the B&MR had issued capital of £2.07 million; net income in 1921 of £66,577; dividend in 1921 on ordinary shares: nil; locomotives taken over by the GWR: 47; number of passenger carriages 90; number of freight wagons 640; employees 842. Single track mileage was 82miles-44chains en route mileage of 59miles-66 chains. [14] [ page needed ]

From 1923

Many of the ironworks of the Merthyr and Dowlais areas were declining steeply or indeed closing in this period, and the B&MR network's dependency on those industries made it extremely vulnerable. A traffic pooling arrangement for mineral traffic between the GWR and the London Midland and Scottish Railway was agreed in 1933, and this resulted in a switch for much traffic to more efficient routes, avoiding the long and difficult climb through the Brecon Beacons and Talyllyn, and this reduced the volume of traffic.

The hillside above New Tredegar had shown itself to be unstable resulting in temporary closure of the line in 1916, [7] and more serious slips took place in September 1928, April 1929 and April 1930. This resulted in the closure of the upper portion of the branch from 14 April 1930; the only working colliery on the affected section could equally well be served by the former Rhymney Railway branch. [5] [ page needed ] [11] [ page needed ]

From 1948

Under British Railways ownership after nationalisation, the decline in use of the railway continued, affecting all classes of traffic.

The passenger service between Dowlais Central (the former B&MR terminus at Dowlais) and Pant was withdrawn from 28 June 1952. For a period workmen's trains continued but these were ended on 2 May 1960.

The Machen to Pontypridd passenger service, instituted but not worked by the PC&NR, was closed down on 15 September 1956.

The Merthyr to Pontsticill service was withdrawn from 13 November 1961 and the main line service from Newport to Brecon, and also the New Tredegar branch closed from 31 December 1962. On the same date, the services from Hereford and Moat Lane were also closed down, so that Brecon had no passenger train service.

There remained a Caerphilly – Machen – Newport unadvertised service for workmen as the only passenger operation on the B&MR network; that too closed on 1 July 1963. [5] [ page needed ]

Goods and mineral traffic between Deri Junction and Pant was withdrawn on 5 August 1963, followed by that between Brecon and Merthyr, and also Pontsticill and Dowlais Central, on 4 May 1964. Brecon continued as a non-rail-connected coal depot until 9 November 1964.

Bedwas to Pengam closed completely on 31 December 1962. The Waterloo section of line, built to ease gradients and congestion approaching Machen, was closed on 20 July 1964, but the residual freight traffic was diverted through Radyr and the Caerphilly to Machen section closed from 20 November 1967. [5] [ page needed ]

Ogilvie Colliery on the Deri line remained in use until 3 September 1978. [11] [ page needed ]

By 1980 only one short section of 10.5 miles (16.9 km) survived, serving coal traffic to Bedwas Navigation Colliery, from Newport via Bassaleg and Nine Mile Point. When the Bedwas colliery closed, the section of the branch between Bedwas and Machen was also closed, in 1985. The section between Machen and Bassaleg Junction has experienced sporadic stone traffic from Hanson Aggregates' limestone quarry, east of Machen. [5] [ page needed ]

1878 accident

The B&MR was subject to a number of accidents; the extreme gradients were often a cause. On 2 December 1878 a particularly tragic accident took place. A goods and mineral train was descending the seven-mile bank, and inadequate wagon brakes had been applied. The train got out of control, and derailed near Talybont, running down the embankment slope. The train consisted of 22 wagons of coal, three of goods, 11 empties, and a brake van; it was worked by three 0-6-0 saddle tank engines; the aggregate weight of the train was 397 tons. Two drivers and two firemen were killed. [7]

Rolling stock

Initially, the B&MR was worked by the contractor Thomas Savin, who provided locomotives and rolling stock from a fleet that was also used to work several other Welsh lines, such as the Mid Wales Railway. Savin went bankrupt in February 1866 and fourteen of his 56 locomotives then came into B&MR ownership. [15]

Later locomotive classes of the Brecon and Merthyr Tydfil Junction Railway
WheelsQuantityFinal B&MR nos.BuilderYearTo GWRFirst GWR nos.To BRExtinctNotesRef
2-4-0 210, 21 Sharp, Stewart & Co. 18651904Ordered by Savin. No. 21 originally 9 [16]
0-6-0ST 1218–29Sharp, Stewart & Co.1865–721905Ordered by Savin [17]
0-6-0ST230–31 Avonside Engine Co. 18741921Ex-Neath and Brecon Railway, acquired 1877 [18]
0-6-0ST217–18Sharp, Stewart & Co.188122190–11934No. 18 originally 11 [19]
0-6-0ST121–8, 13–161884–86122177–881934 [20]
2-4-0T 69–12, 21, 25Robert Stephenson & Co.1888–89, 1898, 190451402/12/52/8/601924 [21]
0-6-2ST 419, 20/3/6 Vulcan Foundry 1894, 190541674/7/92, 18331928 [22]
0-6-0ST522, 24, 27–291896, 190052169–731932 [23]
0-6-0ST332–34 Swindon Works 1886–8731685/93/41934Ex-GWR 1661 Class, acquired 1906–07 [24]
4-4-0PT 135Swindon Works18981916Ex-GWR No. 1490, acquired 1908 [24]
0-6-2T 8 36–43 Robert Stephenson & Co.1909–10, 1914811, 21, 332, 504, 698, 888, 1084, 111371951Allotted 421–8 in 1946; except for 11, 332, 504, 1084 these were renumbered in 1947. [25]
4-4-2T 144 Beyer Peacock & Co 1879113911922Ex-LSWR 46 class, acquired 1914 [26]
0-6-2T6 45–50 Robert Stephenson & Co.1915, 192161372–5, 1668/7061954Renumbered 431–6 during 1947–50 [26]
0-6-0T 135 Kerr, Stuart & Co. 1917121611929Ex-Railway Operating Division, acquired 1920 [27]

Whilst the B&MR was absorbed by the GWR on 1 July 1922, its locomotives were not taken into stock until the four-week period that ended on 8 October that year. At the time, there were 47 locomotives allocated to five depots: Bassaleg (29 locomotives), Brecon (13), Dowlais (2), Rhymney (2) and Talyllyn (1). All were tank locomotives: most were of the 0-6-0T (23 locomotives) and 0-6-2T (18) wheel arrangements, there were also 2-4-0T (5) and 4-4-2T (1). Many of the locomotives were withdrawn by the end of 1934, leaving 14 0-6-2T; of these, one was withdrawn in 1947 and the remainder were inherited by British Railways in 1948, the last two being withdrawn in 1954. [28]

Bassaleg locomotive depot opened in 1875. The GWR gave it the code BSG, and it closed in 1926 – the locomotives were transferred to Newport (Ebbw Junction) depot. [29]

Brecon locomotive depot was shared with the Cambrian Railways, it opened in 1863 on the southern side of Watton station. The GWR gave it the code BCN and number 39. At the end of 1947, it had 14 locomotives: nine 0-6-0, four 0-6-0PT and one 0-4-2T. British Railways initially gave it the code 89B but in November 1959 it became a sub-shed of Oswestry, so the locomotives allocated to Brecon carried the 89A code of Oswestry. Regional boundary changes at the end of 1960 moved Oswestry into the London Midland Region, but Brecon remained in the Western Region, and again gained its own code, this time 88K. It closed in December 1962. [30]

Dowlais locomotive depot was on the western side of Dowlais Central station; it opened in 1898. The GWR gave it the code CVU and number 78, altering the code to DLS in 1940. At the end of 1947, it had a single locomotive – ex-TVR O4 class 0-6-2T no. 292. British Railways made it a sub-shed of Merthyr, so the locomotives allocated to Dowlais carried the 88D code of Merthyr. It closed in May 1960. [31]

Rhymney closed by 1930. Talyllyn was a sub-shed of Brecon, and closed in 1922. [32]

There were 114 coaching stock vehicles (76 four-wheel and 38 six-wheel) taken into GWR stock on 24 July 1922, of which 91 (60 third-class, 18 composite, 11 brake third and two saloons) were passenger carrying, and the remainder (17 brake vans, three horse boxes, two carriage trucks and an inspection car) non-passenger. There were also three "market vans", authorised to run in passenger trains. Virtually all of these were withdrawn within a few years of grouping – only two were still in stock at the end of 1928: a third-class coach, withdrawn in 1930; and a brake van (used as a breakdown van), withdrawn in 1948. [33]

The main workshops for locomotives, carriages and wagons were at Machen; it was open by 1863, and was reconstructed in 1875. The works was about half a mile east of Machen station on the northern side of the line ( 51°35′44″N3°07′49″W / 51.5956°N 3.1303°W / 51.5956; -3.1303 (Machen works) ). Although overhaul of the whole rolling stock fleet was carried out there, new construction was confined to wagons, including the three "market vans". One locomotive, no. 25, part-built by Robert Stephenson & Co., was completed at Machen during 1898. After the Grouping, the GWR rationalised the workshops inherited from the various railways of South Wales, and the Caerphilly works of the former Rhymney Railway was selected for enlargement. The work was completed in 1926, and Machen works, just a few miles to the north-east, was then closed. [34] [35] [36] [37]

Traffic managers and general managers

Alfred Henshaw, 1863 – 1894. John Gall 1894 – 1903. Herbert R. Price 1903 – 1922. [5] [ page needed ]

Locomotive Superintendents

Following the death of Dunbar, the post remained vacant until the GWR absorbed the B&MR locomotive stock on 1 July 1922. During this period, H. F. H. Gibson, the chief draughtsman, was in charge of the B&MR locomotive department. [34]

Topography

Brecon & Merthyr Tydfil Junction Railway
BSicon exCONTg.svg
Brecon (Watton)
BSicon exKDSTa.svg
BSicon exBHF.svg
Brecon Free Street
BSicon exBS2l.svg
BSicon exBS2r.svg
BSicon exHST.svg
Groesffordd Halt
BSicon CONTg.svg
BSicon exTUNNEL1.svg
Talyllyn Tunnel
674 yd
616 m
Merthyr High Street
BSicon xABZgl.svg
BSicon eABZq+l.svg
BSicon KBHFeq.svg
BSicon exHST.svg
Talyllyn Junction
Maerdy Junction
BSicon exSTR2.svg
BSicon exSTRl.svg
BSicon exSTRc3.svg
BSicon exKRZo.svg
BSicon exENDEeq.svg
BSicon exABZgl+l.svg
BSicon exCONTfq.svg
Brandy Junction
BSicon exSTRc1.svg
BSicon exKRZ2+4o.svg
BSicon exSTRc3.svg
BSicon POINTERf@f.svg
BSicon exSTR2.svg
BSicon exSTRc3.svg
Ynysfach Junction
BSicon exSTRc1.svg
BSicon exABZg+l.svg
BSicon exABZ2+4r.svg
BSicon exSTRc13.svg
BSicon exHST+4.svg
Talybont-on-Usk
Ynysfach Ironworks
BSicon exSTR.svg
BSicon exSTRc1.svg
BSicon exKBST4.svg
BSicon exSTR.svg
Rhydycar Junction
BSicon exSTRc2.svg
BSicon exABZg3.svg
BSicon exHST.svg
Pentir Rhiw
BSicon exkSTRc2.svg
BSicon exSTR+1.svg
BSicon exSTRc4.svg
BSicon exkKRZ3+lu.svg
BSicon exkSTR2+r.svg
BSicon exkSTRc3.svg
BSicon exSTR.svg
Cyfarthfa Junction
BSicon exkABZg+1.svg
BSicon exkSTR2.svg
BSicon exKBSTaq.svg
BSicon exkSTR+4.svg
BSicon exSTR+r.svg
BSicon exSTR.svg
Cwm Colliery
BSicon exKRWgl.svg
BSicon exkSTRc1.svg
BSicon exKRW+r.svg
BSicon exkSTRl+4.svg
BSicon exABZg+r.svg
BSicon exSTR.svg
Llwyngelyn Junction
BSicon exSTR.svg
BSicon exCONTf.svg
BSicon exHST.svg
BSicon exSTR.svg
Heolgerrig Halt
BSicon exCONTf.svg
BSicon exKBSTaq.svg
BSicon exABZgr.svg
BSicon exSTR.svg
Cyfarthfa Steelworks
Cefn Viaduct
BSicon exhSTRae.svg
BSicon exSTR.svg
Cefn Coed
BSicon exHST.svg
BSicon exTUNNEL1.svg
667 yd
610 m
Pontsarn Halt
BSicon exHST.svg
BSicon uKHSTa.svg
BSicon exSTR.svg
Torpantau
Pontsarn Viaduct
BSicon exhSTRae.svg
BSicon uHST.svg
Dolygaer
Morlais Junction
BSicon exSTRc2.svg
BSicon exABZg3.svg
BSicon uHST.svg
Pontsticill Junction
Dowlais Central
BSicon exSTRc2.svg
BSicon exKBHFa.svg
BSicon exTUNNEL3+1.svg
BSicon uSTRc2.svg
BSicon exSTRc4.svg
BSicon exABZgl.svg
BSicon uSTR3.svg
BSicon POINTERg@fq.svg
BSicon exSTRr.svg
Morlais Tunnel
1040 yd
951 m
BSicon exSTRc2.svg
BSicon exKRZ3+1o.svg
BSicon uSTRc2.svg
BSicon exSTRc4.svg
BSicon POINTERg@lg.svg
BSicon uSTR3+1.svg
BSicon ABZ3+1xg.svg
BSicon uSTRc4.svg
Pontsticill Junction
Pantysgallog
(High Level) Halt
BSicon exSTR+1.svg
BSicon exlHST~L.svg
BSicon exSTRc4.svg
BSicon exKRWl.svg
BSicon exlHST~R.svg
BSicon uSTR+1.svg
BSicon exKRW+r.svg
BSicon uSTRc4.svg
Pant Junction
BSicon exLSTR.svg
BSicon uSTR.svg
BSicon ulHST~F.svg
BSicon exlHST.svg
Pant
Brecon & Merthyr Rly
Brecon Mountain Rly
BSicon exLSTR.svg
BSicon exl-HST.svg
BSicon ulHST~G.svg
BSicon exSTR.svg
Dowlais Top
(LNWR)
 
BSicon exkSTR2.svg
BSicon ex3STR2.svg
BSicon ex-3STRq.svg
BSicon ex3ABZg3.svg
Dowlais Top Junction
BSicon exkSTRc1.svg
BSicon exkSTRl+4.svg
BSicon exKRZu.svg
BSicon exCONTfq.svg
BSicon exCONT4+f.svg
BSicon exHST.svg
Pantywaun Halt
Fochriw Colliery
BSicon exKBSTaq.svg
BSicon exSTRc2.svg
BSicon exABZqr.svg
BSicon exSTRr.svg
BSicon exSTR3.svg
Fochriw Junction
Fochriw
BSicon exHST+1.svg
BSicon exSTRc4.svg
BSicon kSTRc2.svg
BSicon kSTR3+l.svg
BSicon exSTR+l.svg
BSicon CONTfq.svg
Ogilvie Village Halt
BSicon exHST.svg
BSicon kSTR+1.svg
BSicon exHST.svg
Rhymney Lower & Pontlottyn
Ogilvie Colliery
BSicon exKBST2.svg
BSicon exSTR+c3.svg
BSicon LSTR.svg
BSicon exHST.svg
Abertysswg
BSicon exSTRc1.svg
BSicon exABZg+4.svg
BSicon exHST.svg
McLaren Colliery Halt
Darran and Deri
BSicon exHST.svg
BSicon exHST.svg
New Tredegar Colliery Platform
BSicon exSTRc2.svg
BSicon exABZg3.svg
BSicon exHST.svg
New Tredegar
Groes-Faen Colliery
BSicon exKBST1.svg
BSicon exSTR+c4.svg
BSicon LSTR.svg
BSicon exHST.svg
Elliot Pit Halt
Groesfaen Colliery Platform
BSicon exHST.svg
BSicon exkSTRc2.svg
BSicon STR.svg
BSicon exkSTR3+l.svg
BSicon exSTR.svg
BSicon exKBSTeq.svg
Cwmtysswg Colliery
BSicon exSTR.svg
BSicon ekABZg+1.svg
BSicon exHST.svg
Cwmsyfiog Halt
Bargoed North Junction
BSicon eBS2l.svg
BSicon BS2r.svg
BSicon exHST.svg
Cwmsyfiog and Brithdir
Bargoed
BSicon dBHF-L.svg
BSicon exdKBHFa-R.svg
BSicon exHST.svg
Aber Bargoed
Bargoed South Junction
BSicon cdSTRc2.svg
BSicon dSTR3.svg
BSicon exv-ABZg3.svg
BSicon excSTRc2.svg
BSicon exHST3.svg
Bargoed Colliery Halt
BSicon cSTRc2.svg
BSicon STR3+1.svg
BSicon cSTRc4.svg
BSicon exABZg+1.svg
BSicon exSTRc4.svg
Aberbargoed Junction
BSicon dLSTR+1.svg
BSicon STRc4.svg
BSicon exdHST.svg
Pengam
BSicon exlCONTg@F.svg
BSicon exHST.svg
Fleur-de-Lis Platform
BSicon exkSTR2.svg
BSicon exkABZg2.svg
Maesycwmmer Junction
BSicon exkSTRc1.svg
BSicon exkSTRl+4.svg
BSicon exKRZu+xk1.svg
BSicon exkABZq+4.svg
BSicon exCONTfq.svg
BSicon exLSTR.svg
BSicon exSTR.svg
to Pontypool
 
Gwernydomen Halt
BSicon exHST.svg
BSicon exHST.svg
Maesycwmmer
BSicon exABZg2.svg
BSicon exCONTgq.svg
BSicon exSTRc3.svg
BSicon exABZgr.svg
Barry Railway
to Barry Junction
Fountain Bridge Halt
BSicon exSTRc1.svg
BSicon exSTRg.svg
BSicon exHST+4.svg
BSicon exHST.svg
Waterloo Halt
BSicon exHST2.svg
BSicon exSTRc3.svg
BSicon exSTRf.svg
BSicon exHST.svg
Bedwas
BSicon exSTRc1.svg
BSicon exlHST~F.svg
BSicon exABZg+4.svg
BSicon exHST.svg
Trethomas
BSicon exlHST~G.svg
BSicon exKRWl.svg
BSicon exKRWg+r.svg
BSicon exHST.svg
Machen
BSicon xABZg+l.svg
BSicon KBSTeq.svg
Machen Quarry
BSicon eHST.svg
Church Road
BSicon eHST.svg
Rhiwderin
BSicon eHST.svg
Bassaleg
BSicon CONTf@F.svg
to Alexandra Docks
 

The Pontsarn viaduct is 455 feet (139 m) long and 92 feet (28 m) height, whilst the Cefn Coed (or Pontycapel) viaduct is 770 feet (230 m) long with a height of 115 feet (35 m).

Torpantau tunnel through the Beacons was 667 yards (610 m) long. At an elevation of 1,313 feet (400 m), it was the highest railway tunnel above sea level anywhere in Britain. [39] Exiting from south-east portal of the tunnel, the line descended for 7 miles (11 km) along a 1:38 (2.6%) gradient by the side of Glyn Collwyn and the (later: 1931) Talybont reservoir. [39]

Talyllyn tunnel was situated at the west end of the former Talyllyn station, about 5 miles (8.0 km) to the east of Brecon. It is 674 yards (616 m) long, and was originally built in 1816 for the Hay Railway. [5] [ page needed ] [3] [ page needed ]

Location list, Brecon to Dowlais

Merthyr loop line

Bargoed Rhymney line

Rhymney to Newport

Caerphilly to Machen

Brecon Mountain Railway

The Brecon Mountain Railway operates a narrow-gauge steam-hauled tourist line along the former Brecon and Merthyr Railway trackbed over a 5.5-mile (8.9 km) section of the B&MR, from Pant through Pontsticill to Torpantau, a distance of five miles. [43]

Remaining vehicles

Only one B&MR coach has survived into the present day; the body (only) of coach No.111 stands in a private residence at Armscote. (2017) [44] A goods wagon, no.197 is currently (2017) at the Severn Valley Railway. [45]

National Cycle Network

Some sections of the route have become part of the National Cycle Network. These routes are NCN 4 (Celtic Trail) between Machen and Trethomas, NCN 469 between Bargoed and Fochriw and NCN 8 (Taff Trail) between Torpantau and Talybont Reservoir. NCN 468 runs from Aberbargoed northwards.

Notes

  1. There was another, unconnected PC&NR in the vicinity: the Pontypool, Caerleon and Newport Railway.
  2. Only the larger lines qualified to be "constituents". The Rhymney Railway was not much greater in capitalisation, but its net income was nearly seven times that of the B&MR; the constituent companies were the GWR itself; the Alexandra (Newport & South Wales Docks and Railway, the Barry Railway, the Cambrian Railways, the Cardiff Railway, the Rhymney Railway and the Taff Vale Railway.

Related Research Articles

<span class="mw-page-title-main">Taff Vale Railway</span> Railway company and line in South Wales

The Taff Vale Railway (TVR) was a standard gauge railway in South Wales, built by the Taff Vale Railway Company to serve the iron and coal industries around Merthyr Tydfil and to connect them with docks in Cardiff. It was opened in stages in 1840 and 1841.

The Rhymney Railway (RR) was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition.

<span class="mw-page-title-main">Barry Railway Company</span> Former railway and docks company in South Wales

The Barry Railway Company was a railway and docks company in South Wales, first incorporated as the Barry Dock and Railway Company in 1884. It arose out of frustration among Rhondda coal owners at congestion and high charges at Cardiff Docks as well the monopoly held by the Taff Vale Railway in transporting coal from the Rhondda. In addition, the Taff Vale did not have the required capacity for the mineral traffic using the route, leading to lengthy delays in getting to Cardiff.

The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, mostly to transport the products of the Merthyr iron industries to ports on Swansea Bay.

The Dulas Valley Mineral Railway was incorporated in 1862 to bring coal from the Onllwyn area north-east of Neath to the quays there, and in the following year was reconstituted as the Neath and Brecon Railway. The line was opened as far as Onllwyn in 1863.

The Pontypridd, Caerphilly and Newport Railway was built to bring the coal output of the Aberdare and Rhondda valleys directly to Alexandra Docks at Newport.

The Merthyr, Tredegar and Abergavenny Railway, also known as the Heads of the Valleys line, was a railway line which operated between 1860 and 1958 between the Monmouthshire town of Abergavenny and the Glamorgan town of Merthyr Tydfil in South East Wales.

The Newport, Abergavenny and Hereford Railway was a railway company formed to connect the places in its name. When it sought Parliamentary authorisation, it was denied the southern section, and obliged to use the Monmouthshire Railway between Pontypool and Newport.

The Monmouthshire Railway and Canal Company was a canal and railway company that operated a canal and a network of railways in the Western Valley and Eastern Valley of Newport, Monmouthshire. It started as the Monmouthshire Canal Navigation and opened canals from Newport to Pontypool and to Crumlin from 1796. Numerous tramroads connected nearby pits and ironworks with the canal.

Abergavenny Junction railway station was a station situated near the junction made between the London and North Western Railway's Heads of the Valleys line and the West Midland Railway's Newport, Abergavenny and Hereford Railway, which served the town of Abergavenny in the Welsh county of Monmouthshire.

The Hereford, Hay and Brecon Railway (HH&BR) was a railway company that built a line between Hereford in England and a junction with the Mid-Wales Railway at Three Cocks Junction. It opened its line in stages from 1862 to 1864. It never had enough money to operate properly, but the Midland Railway saw it as a means of reaching Swansea, and from 1869 the Midland Railway was given exclusive running powers over the HH&BR. There was then a long-running dispute over whether the Midland inherited rights of access previously granted to the HH&BR.

<span class="mw-page-title-main">Mid-Wales Railway</span>

The Mid-Wales Railway was conceived as a trunk route through Wales connecting industrial areas in North West England with sea ports in South West Wales. The company was prevented from reaching its goal by competing proposals in Parliament, and it was only able to build a line between Llanidloes and a junction with the Brecon and Merthyr Railway 5 miles (8 km) east of Brecon. The line was 70 miles (110 km) long and opened in 1864. The company found it impossible to raise the share subscription, but the contractor partnership of Davies and Savin agreed to build the line and take shares in payment,

The Rumney Railway in Wales was a 4 ft 2 in plateway built to connect the ironworks at Rhymney to the Monmouthshire Canal Company's tramroad near Newport, Wales providing a connection the wharves at the Newport Docks. The line was opened in 1826. It was later converted to a standard gauge railway,

The Alexandra Docks and Railway (ADR) was a company formed in 1882 from the former Newport Dock Company of 1865. There was considerable demand for dock accommodation in Newport, South Wales, chiefly for the export or coastal transport of iron ore and coal. The Newport Dock Company had built an earlier dock that was now outgrown.

The Sirhowy Tramroad was a plateway built to convey the products of ironworks at Tredegar to Newport, South Wales. It opened in 1805 between Tredegar and Nine Mile Point, a location west of Risca, from where the Monmouthshire Canal Company operated a tramroad to Newport. The Sirhowy Tramroad was operated at first by horse traction, but early locomotives were used, and a passenger service was operated.

<span class="mw-page-title-main">Bassaleg Junction railway station</span> Disused railway station in Bassaleg, Newport, Wales

Bassaleg Junction was a railway station which served the village of Bassaleg, Monmouthshire.

<span class="mw-page-title-main">Hengoed Viaduct</span> Multi-arched railway viaduct over a river

Hengoed Viaduct is a disused railway viaduct located above the village of Maesycwmmer, in Caerphilly county borough, South Wales. Grade II* listed, it was originally built to carry the Taff Vale Extension of the Newport, Abergavenny and Hereford Railway (NA&HR) across the Rhymney River, and is now part of National Cycle Route 47.

<span class="mw-page-title-main">Torpantau railway station</span> Former railway station in Wales

Torpantau railway station is a station in the Welsh county of Brecknockshire, and the northern terminus of the narrow gauge Brecon Mountain Railway.

<span class="mw-page-title-main">Maesycwmmer railway station</span> Former railway station in Wales

Maesycwmmer railway station was situated on the Bassaleg and Bargoed line, serving the adjoining village of Maesycwmmer, which lies on the east bank of the Rhymney River in the historic county of Monmouth. It was located at 12 miles 44 chains (20.2 km) from Newport. The line was built by the Brecon and Merthyr Railway, and passed to the Great Western Railway in 1923 and to British Railways in 1948. The line was double track and the station had simple up and down platforms.

<span class="mw-page-title-main">Pontsticill railway station</span> Former railway station in Wales

Pontsticill railway station is an intermediate station on the Brecon Mountain Railway at Pontsticill, in the historic Welsh county of Brecknockshire, now Merthyr Tydfil County Borough.

References

  1. Hadfield, Charles (1967). The Canals of South Wales and the Border (second ed.). Newton Abbot: David and Charles. ISBN   0-7153-4027-1.
  2. Barrie, D.S. (May 1960). "Railways to Brecon—1". Railway Magazine.
  3. 1 2 3 4 5 6 7 8 9 Barrie, D.S.M. (1994). A Regional History of the Railways of Great Britain: volume 12: South Wales. revised by Peter Baughan. Nairn: David St John Thomas. ISBN   0-946537-69-0.
  4. Evans, Christopher J. (1912). Breconshire. Cambridge University Press.
  5. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Barrie, D.S.M. (1980) [1957]. The Brecon and Merthyr Railway. Trowbridge: The Oakwood Press. ISBN   0-85361-087-8.
  6. "The Dowlais Railway". Railway Magazine. the Why and the Wherefore. October 1937.
  7. 1 2 3 4 5 6 7 8 9 10 11 Hopwood, H.L. (August 1918). "The Brecon and Merthyr Railway: Its History and Locomotives". Railway Magazine.
  8. 1 2 Christiansen, Rex (1981). A Regional History of the Railways of Great Britain - volume 13 - Thames and Severn . Newton Abbot: David & Charles. ISBN   0-7153-8004-4.
  9. 1 2 3 Clinker, C.R. (June 1960). "Railways to Brecon—2". Railway Magazine.
  10. Thompson, Norman (April 1909). "The Brecon and Merthyr Tydfil Junction Railway". Railway Magazine.
  11. 1 2 3 4 5 6 Mitchell, Vic; Smith, Keith (2009). Rhymney and New Tredegar Lines. Midhurst: Middleton Press. ISBN   978-1-906008-48-2.
  12. Barrie 1980, p. 115.
  13. Barrie 1980, p. 121.
  14. Semmens, Peter (1990) [1985]. History of the Great Western Railway: 1: Consolidation, 1923 – 1929 (Studio Editions reprint ed.). London: George Allen and Unwin. ISBN   0-04385104-5.
  15. Davies, F.K.; Firth, J.M.; Lucking, J.H.; Thomas, R.E.; Allcock, N.J.; Sterndale, A.C.; Barrie, D.S.M.; Reed, P.J.T.; Mountford, E.R. (April 1966). White, D.E. (ed.). The Locomotives of the Great Western Railway, part ten: Absorbed Engines, 1922–1947. RCTS. pp. K196–7. ISBN   0-901115-20-7.
  16. Davies et al. 1966, p. K200.
  17. Davies et al. 1966, pp. K200–1.
  18. Davies et al. 1966, p. K201.
  19. Davies et al. 1966, pp. K201–2.
  20. Davies et al. 1966, p. K202.
  21. Davies et al. 1966, p. K204.
  22. Davies et al. 1966, pp. K204–5.
  23. Davies et al. 1966, p. K205.
  24. 1 2 Davies et al. 1966, p. K206.
  25. Davies et al. 1966, pp. K206–7.
  26. 1 2 Davies et al. 1966, p. K208.
  27. Davies et al. 1966, p. K209.
  28. Davies et al. 1966 , pp. K196, K207, K208, K210–1
  29. Sterndale, A.C.; Parker, L.T.; Smith, C.; Reed, P.J.T.; Tabor, F.J.; Davies, F.K.; Allcock, N.J.; Lucking, J.H. (May 1974). White, D.E. (ed.). The Locomotives of the Great Western Railway, part twelve: A Chronological and Statistical Survey. Kenilworth: RCTS. pp. M25, M26. ISBN   0-901115-28-2. OCLC   499807460.
  30. Lyons, E.T. (1974) [1972]. An Historical Survey of Great Western Engine Sheds 1947. Headington: Oxford Publishing Co. pp. 260, 272. ISBN   0-902888-16-1.
  31. Lyons 1974, p. 243.
  32. Sterndale et al. 1974, p. M26.
  33. Mountford, E.R. (1978). A Register of G.W.R. Absorbed Coaching Stock 1922/3. Blandford: Oakwood Press. pp. 45–49.
  34. 1 2 3 Davies et al. 1966 , p. K196
  35. Mountford 1978 , pp. 45, 48
  36. Sterndale et al. 1974, pp. M18–M19.
  37. Kidner, Roger W. (1995). The Rhymney Railway. The Oakwood Library of Railway History. Headington: Oakwood Press. p. 54. ISBN   0-85361-463-6. OL9.
  38. Locomotive Magazine 15 June 1909 page 106
  39. 1 2 Holland, Julian (2013). Exploring Britain's Lost Railways. London: Times books. p. 184. ISBN   9780007505418.
  40. Quick, M.E. (2002). Railway Passenger Stations in England Scotland and Wales—A Chronology. The Railway and Canal Historical Society.
  41. Cooke, R.A. (1997). Atlas of the Great Western Railway, 1947. Didcot: Wild Swan Publications Limited. ISBN   1-874103-38-0.
  42. Cobb, Col M.H. (2003). The Railways of Great Britain – A Historical Atlas. Shepperton: Ian Allan Publishing Limited. ISBN   07110-3003-0.
  43. "Home". Brecon Mountain Railway. Archived from the original on 29 December 2005.
  44. "Brecon & Merthyr 111 Five Compartment". Vintage Carriages Trust.
  45. "B&MR 197 Goods Wagon built 1902". Vintage Carriages Trust.

Further reading