Llanidloes and Newtown Railway

Last updated

The Llanidloes and Newtown Railway (L&NR) was a railway company between Llanidloes and Newtown in Montgomeryshire, Wales. It was promoted locally when plans for trunk railways passing through the locality were cancelled; local people saw that a railway connection was essential to the flannel industry in the district. The 17-mile (27 km) line opened in 1859, and at first was isolated from any other railway, but from 1861 it became connected to Oswestry by an allied railway company, and other companies also connected to it. From 1864 the company was incorporated into the new Cambrian Railways company.

Contents

Serving a thinly populated and remote area, the line was never commercially successful, and the long-distance through routes passing through did not succeed in bringing great traffic volumes to the line. When Llanidloes station was to be extended and improved, the Manchester and Milford Railway (M&MR), then under construction, undertook to pay a one-third share of the cost of the works, and of future maintenance and operation of the station. The M&MR later decided to alter the course of its line and never reached Llanidloes, but continued to be liable for heavy charges for a station it did not connect with.

Major route closures took place in the region in the 1960s, but a portion of the L&NR, from Newtown to Moat Lane, continues in use, carrying passenger trains on the Shrewsbury to Aberystwyth line.

Before the Llanidloes and Newtown Railway

The Llanidloes and Newtown Railway in 1859 Newtown&llanidloes.png
The Llanidloes and Newtown Railway in 1859

At the end of the eighteenth century, the local industry of Mid Wales was already fairly well provided with canals, although the mountainous terrain made their engineering difficult. After 1830 attention was being given to railway communication with Ireland and a Royal Commission was established in 1836 to enquire into the matter. Charles Blacker Vignoles reported in 1837 on his recommended route to reach Dublin, which was to use a natural harbour at Porthdinllaen on the north coast of the Llŷn Peninsula. Vignoles proposed a railway route to Porthdinllaen from Shrewsbury via Oswestry, Chirk, Bala, Barmouth, Harlech, and Pwllheli, although a route similar to the present Chester – Holyhead route was considered, and rejected. [1]

Isambard Kingdom Brunel was considering a London to Dublin route at the same time, and he too favoured Porthdinllaen as a ferry port. His line would have been 7 ft 14 in (2,140 mm) broad gauge and run from Ludlow through Craven Arms, Montgomery and Newtown. However at this stage these schemes were merely proposals and had not achieved traction in gaining financial commitment. In fact George Stephenson, favouring the easier gradients of the Chester to Holyhead line, was persuasive, and when the Chester and Holyhead Railway was authorised on 4 July 1844, any scheme for Porthdinllaen was futile. [2]

In 1852 a further proposal was published, for a Montgomeryshire Railways Company; it would run from Shrewsbury through Minsterley (rather than Welshpool), Newtown, Llanidloes and Llangurig to Aberystwyth. The London and North Western Railway, by now dominant in North Wales, took over the scheme but altered the route avoiding Llanidloes, and in fact the western part of this scheme was dropped before it went before Parliament. [3]

Llanidloes and Newtown Railway proposed

A southbound train at Llanidloes station Llanidloes station, with southbound Mid-Wales line train geograph-2540463-by-Ben-Brooksbank.jpg
A southbound train at Llanidloes station

There was considerable disappointment in Llanidloes, that the town was now to be passed by, and much interest was shown in building their own line to Newtown, where a connection would be made with the Montgomeryshire line when it was built. A meeting was held at Llanidloes on 30 October 1852 under the chairmanship of George Hammond Whalley MP. A prospectus was approved: capital of £60,000 would be needed to build the line, and annual receipts were estimated at £8,250, offering a dividend of 7 per cent. The route was surveyed by Rice Hopkins. The bill went forward to the 1853 Parliamentary session. Serious errors in Hopkins’ levels were exposed, but the scheme was quickly rectified and the Act of Parliament was passed on 4 August 1853. [3]

Authorisation and construction

Statue of David Davies at Llandinam David Davies Llandinam - geograph.org.uk - 1389119.jpg
Statue of David Davies at Llandinam

The Llanidloes and Newtown Railway received its authorising Act on 4 August 1853. Commercial prospects seemed excellent; Whalley was elected chairman. [3] [4] The authorisation led to a period of elation within the company, and immediately a long extension line to Shrewsbury was suggested. However, the new company quickly found great difficulty in raising subscriptions to build its own line. It was not until September 1855 that the first construction contract was awarded; that went to David Davies of Llandinam. In time Davies became prominent in construction and mining in Wales. Soon Davies got the contract for the whole line; he took into partnership Thomas Savin of Llwyn-y-maen.

The original plan was for a double-track line but this was amended to single-track, with bridges built for later doubling. [3] [4]

Some progress was made with construction, but by the end of 1857 all available money had been expended and work stopped, and Davies and Savin were working elsewhere. Early in 1859, Davies and Savin offered to finish the line, in exchange for all unissued shares and debentures, on paper a 25 per cent rise on the original contract value, and to lease and work the line. The chairman was against acceptance, but a committee of shareholders considered that there was no realistic alternative, and voted in favour. The lease was incorporated into the 21 July 1859 Llanidloes and Newtown Railway (Canal Extension) Act. (The proposed canal extension was to be a short tramway to the Shropshire Union Canal basin at Newtown, but it was never built.) The railway construction was resumed with the excavation of Scafell cutting. The company engineer was now Benjamin Piercy of Trefeglwys, as Rice Hopkins had died. [3] [5]

Opening

Moat Lane Junction Station in 1957 Moat Lane Junction Station 2028276 b303249d.jpg
Moat Lane Junction Station in 1957

The line was finished to a temporary terminus at Newtown, and goods trains started running on 30 April 1859. The company was not in a position to operate passenger trains for some time; the necessary Board of Trade approval was received on 6 or 9 August and passenger train operation started on 2 September 1859. [note 1] [3] [4] [5] [6] These were the first passenger trains to run in mid-Wales. Intermediate stations were at Dolwen, Llandinam and Caersws, and working of the single line was by timetable. There was no intermediate crossing place.

Four locomotives were ordered from Sharp, Stewart and Company of Manchester to work the 12-mile (19 km) line, and Davies and Savin used other engines for the construction. The first, Dove, reached Llandinam in 1857. It was brought by road from Oswestry on a special road wagon pulled by 14 horses. Dove was probably a second hand Sharp, Roberts 2-2-2 locomotive acquired from the Birmingham and Derby Junction Railway. It was followed by locomotives named Squirrel, Llewellyn and Enterprise. At this stage the L&NR was isolated and all stores were carried by canal to Newtown and carted across the town to the station. [7] [5]

Connecting railways

The Llanidloes and Newtown Railway in 1864 Newtown&llanidloes1864.png
The Llanidloes and Newtown Railway in 1864

The isolated state of the L&NR was not to last for long; the Oswestry and Newtown Railway opened on 10 June 1861, connecting the Llanidloes and Newtown Railway to the rest of the railway network via Oswestry and the Great Western Railway. [7] The Newtown and Machynlleth Railway followed, opening on 3 January 1863, running westward from Moat Lane Junction, so that the southern (Llanidloes) end of the L&NR was now a spur branch line. The existing Moat Lane station (Caersws) was closed and replaced by one nearer Newtown, at the junction at Moat Lane. [7] [4] From 14 August 1860 Llandloes and Newtown Railway trains ran through to Abermule, on the Oswestry and Newtown Railway. [8]

Southward connections

Llanidloes Station in 1990 Former railway station, Llanidloes (geograph 1469638).jpg
Llanidloes Station in 1990

Llanidloes was now the southern termination of the lines in the area, but two ambitious schemes to connect to Llanidloes were in hand. On 1 August 1859, the Mid-Wales Railway was authorised by Parliament. This scheme had been radically cut back during the Parliamentary hearings; only a few months previously its promoters called it "the Mid-Wales section of the Manchester, Liverpool, Swansea & Milford Haven Junction Railway," but it was authorised from Llanidloes as far as Newbridge-on-Wye only, passing through Rhayader. [9] [10] The authorised line was not what the Mid-Wales proprietors wanted, and in 1860 they returned to Parliament. This time they were more successful, and another Mid-Wales Railway Act was passed on 3 July 1860. This confirmed the previous year's approval, and extended it to Three Cocks, giving access to Brecon and Merthyr. [11]

Later that month, on 23 July 1860, the Manchester and Milford Railway was authorised to build a line south from Llanidloes through Strata Florida, Tregaron and Lampeter to Pencader. [12] Unnoticed at the time was the fact that the authorised route southward out of Llanidloes was nearly identical for the Mid-Wales Railway and the Manchester and Milford Railway. [10] [13]

After some argumentation, this difficulty was resolved by the Llanidloes and Newtown Railway undertaking to build the duplicated section of line, granting running powers over the line to both companies, and, it hoped, to build a joint station at Llanidloes. This was authorised by Act of 17 July 1862. The point of divergence of the two routes was near Penpontbren Farm, nearly two miles (3 km) south of Llanidloes station. The Manchester and Milford Railway constructed its line from the southern extremity, northwards, and the process was slow due to money shortages. The Mid-Wales Railway too was subject to cash problems, but most of its line from Penpontbren to Rhayader was made ready by March 1863, despite the difficult terrain. [10]

Meanwhile the Llanidloes and Newtown Railway progressed with its Llanidloes to Penpontbren section; this was made with two single lines, the eastern for the Mid-Wales Railway, and the western for the Manchester and Milford Railway. Captain Tyler approved the section for the Board of Trade in January 1864. The Manchester and Milford Railway which was still building far to the south west, but when it should eventually reach Penpontbren a full double junction would have to be made there. [10] Early in 1864 the through station built at Llanidloes in readiness for the opening of the Mid-Wales Railway to Brecon was completed and the L&NR used this station and closed its old terminus to passenger use. [14]

Belatedly the M&MR made a start in building from Penpontbren. Its contractor finished the work between Penpontbren and Llangurig ("and half a mile beyond"), [15] a distance of a little over three miles (5 km) from Penpontbren, in February 1864. In that month, an M&MR goods train reached Llangurig. [16] Most of the Mid-Wales Railway was opened on 23 August 1864. [10] [17] The Mid-Wales Railway and the Manchester and Milford Railway were obliged by the agreement to pay 5% interest on the L&NR construction cost of the line to Penpontbren. Moreover the new station at Llanidloes was to be joint between the three companies, with operating and maintenance cost, as well as interest at 5% on construction cost, shared equally between them. [13]

Holden [16] portrays this from the M&MR's point of view:

...the L. & N. had taken the opportunity presented by the cost-sharing agreement and the Act of 1862 to build itself an unnecessarily extravagant station, whose main building stands to this day [1979], a gaunt reminder dominating the outskirts of the town. So while the joint line cost £16,000, outlay on the station amounted to more than £20,000.

In February 1864 the M&MR was reviewing its strategy. The most difficult construction was yet to be made, and Newtown was beginning to appear an unattractive destination. Construction of the M&MR had reached Strata Florida, and the company made the decision to turn west from there, to reach Aberystwyth instead, abandoning the plan to reach Llangurig, and abandoning its two miles (3 km) of completed line there. [10] [17] The M&MR was nevertheless committed to pay its one-third of the operating cost and interest charges for the Llanidloes station, even though it now had no intention of reaching Llanidloes. [13] In addition the M&MR had to pay their share of the Penpontbren signalmen's wages. [18] The situation was only resolved when the Great Western Railway leased the M&MR in 1911. [19]

The track provided for the M&MR from Llanidloes to Penpontbren was unused for many years, until in July 1872 Penpontbren Junction was commissioned, the section now working as a double line. In 1879 all traffic worked over the down line, for reasons not recorded. The Llangurig branch, as it had become, was lifted in 1882, with a short section of the branch being retained as a siding. [10]

Christiansen [20] has a slightly different account:

The Penpontbren section, finished by February 1864, was double, but only the down line was ever used. This agreed with the original intention, which was to double the line only when the L&NR was doubled. From Penpontbren the M&MR turned west for three miles [5 km] to the village of Llangurig, sheltered under the Plynlimon range. This section was ready and signalled by February 1864 and earthworks were also completed for a short distance beyond the village.

Apart from contractors' trains, only one goods train ever reached Llangurig. Money had run out: not surprisingly since by 31 December 1863 only £7,953 had been raised by the M&MR against its authorised capital of £666,000. To conquer the mountains beyond Llangurig a spectacular line was planned with two tunnels totalling one and a half miles [2.4 km] and a viaduct 280 ft [85 m] high. Although a tunnel was started, work soon stopped.

Consolidation

This multitude of small independent railway companies in the area was hardly sustainable, and amalgamation was agreed. By an authorising Act in 1864, the Cambrian Railways company was created, formed of the Llanidloes and Newtown Railway, the Oswestry and Newtown Railway, the Newtown and Machynlleth Railway, and the Oswestry, Ellesmere and Whitchurch Railway. The Aberystwith and Welsh Coast Railway joined the consortium just over a year later. [4] [7] [21]

On 25 July 1864 an Act was passed authorising the amalgamation of the L&NR with three more of the five railways forming the main line—the Oswestry & Newtown, Newtown & Machynlleth and the Oswestry, Ellesmere & Whitchurch—to form the Cambrian Railways. A fifth line, the Aberystwith and Welsh Coast Railway, joined the consortium just over a year later. [14] [22]

Decline

The Mid-Wales Railway served a thinly-populated rural area, and its operational costs were increasing at a time when income was declining. When the Mid-Wales line closed, the portion of the Llanidloes and Newtown Railway between Moat Lane Junction and Llanidloes closed too, for all traffic with one exception, on 30 December 1962. [23] The single exception was cement traffic from Aberthaw to Llanidloes, for use in constructing the dam for Clywedog Reservoir, three miles (5 km) west of Llanidloes. This traffic continued until 2 October 1967, when that part of the line closed. [24]

Traction

The original L&NR locomotives were of the 0-4-2 tender type, built by Sharp in 1859–60. Nothing is known of Llewelyn, which was the property of Davies and Savin, but Milford was an 0-4-2 saddle tank built by Sharps in 1859 for them. In Cambrian days, various Cambrian engines were drafted in, and later the GWR Dean Goods was used on the line. Under British Railways, the two- and three-coach passenger trains were worked by ex-LMS 2-6-0s. Occasionally BR standard 2-6-0 engines appeared on trains proceeding only as far as Llanidloes, to which (from Moat Lane) the route classification was “yellow”. [4]

Train service

The original passenger timetable for the line showed four trains each way, weekdays only, taking 35 minutes for the journey. After the line had been opened to Aberystwyth, this was increased to five trains, with two on Sundays. The 1910 timetable showed a service of nine trains a day. There were still nine trains (one of these being a school train) in 1960, with no Sunday service.

Although the trains were well patronised compared with many lines in Mid-Wales, the Western Region of British Railways applied for permission to close the line completely. This was rejected, but the passenger service from Moat Lane to Brecon was withdrawn (together with all freight services south of Llanidloes) from December 31, 1962. [4]

The section between Newtown and Moat Lane Junction remains in use as part of the Shrewsbury to Aberystwyth line. Although Newtown station remains open, this was not part of the L&NR system, but was on the Oswestry and Newtown Railway.

Locations

Gradients

The line is undulating from Newtown to the approach to Moat Lane Junction. From there it climbed steadily at about 1 in 225 all the way to Llanidloes, but with about 58 mile (1 km) of 1 in 132 between Dolwen and Llanidloes. [30]

Notes

  1. Earlier sources quote 2 September 1859; but Quick has done more recent research and gives 11 August 1859, explaining that the 2 September date probably resulted from a previous source assuming that the public opening followed the formal. In reality, the formal opening was later, on 31 August. Some newspapers described that as the opening and gave no mention of the earlier use.
  2. This is incorrectly shown on Cobb's map, which follows an error in CR Clinker, Clinker's Register of Closed Passenger Stations, Avon-Anglia, 1988 edition

Related Research Articles

<span class="mw-page-title-main">Cambrian Railways</span> British railway company (1864–1922)

The Cambrian Railways owned 230 miles (370 km) of track over a large area of mid Wales. The system was an amalgamation of a number of railways that were incorporated in 1864, 1865 and 1904. The Cambrian connected with two larger railways with connections to the northwest of England via the London and North Western Railway, and the Great Western Railway for connections between London and Wales. The Cambrian Railways amalgamated with the Great Western Railway on 1 January 1922 as a result of the Railways Act 1921. The name is continued today in the route known as the Cambrian Line.

<span class="mw-page-title-main">Llangurig</span> Human settlement in Wales

Llangurig is both a village and a community in Montgomeryshire, Powys, Wales. The population was 723 in the 2011 UK Census. The community includes the hamlet of Cwmbelan.

<span class="mw-page-title-main">Newtown railway station (Wales)</span> Railway station in Powys, Wales

Newtown railway station is a railway station serving Newtown, Powys, Wales.

The Aberystwith and Welsh Coast Railway was a standard gauge railway company, running a line along the west coast of Wales.

<span class="mw-page-title-main">Carmarthen–Aberystwyth line</span> Former railway line in Wales

The Carmarthen–Aberystwyth line was originally a standard-gauge branch line of the Great Western Railway (GWR) in Wales, connecting Carmarthen and Aberystwyth.

The Manchester and Milford Railway was a Welsh railway company, intended to connect Manchester and the industrial areas of North West England with a deep-water port on Milford Haven, giving an alternative to the Port of Liverpool.

<span class="mw-page-title-main">Llanidloes railway station</span> Former railway station in Wales

Llanidloes railway station is a former junction railway station in Llanidloes, Powys, Wales. The Cambrian Railways, which completed the building in 1864, designed it to be both the station for the town and its company headquarters. This dual purpose gave Llanidloes station an imposing appearance.

<span class="mw-page-title-main">Strata Florida railway station</span> Former railway station in Wales

Strata Florida was a railway station in Wales, on the former Carmarthen to Aberystwyth Line; it served the villages of Ystrad Meurig, Pontrhydfendigaid and Ffair Rhos. The Manchester and Milford Railway (M&MR) opened from Pencader to Aberystwyth on 12 August 1867; the line went into receivership from 1875 to 1900. The site is now part of the Ystwyth Trail, a shared-use rail trail between Aberystwyth and Tregaron.

<span class="mw-page-title-main">Vale of Clwyd Railway</span> Former railway line in North Wales


The Vale of Clwyd Railway (VoCR) was a standard-gauge line, which connected the settlements of Rhyl, St Asaph and Denbigh in North Wales. It opened in 1858, at first without a connection to the main line at Rhyl, but this was provided in 1862. At Denbigh, a connection could be made on to the Mold and Denbigh Junction Railway. Although the area became popular with holidaymakers from the 1920s, the line never realised its potential; it closed to passengers in 1955 and completely in 1968.

<span class="mw-page-title-main">Mid-Wales Railway</span>

The Mid-Wales Railway was conceived as a trunk route through Wales connecting industrial areas in North West England with sea ports in South West Wales. The company was prevented from reaching its goal by competing proposals in Parliament, and it was only able to build a line between Llanidloes and a junction with the Brecon and Merthyr Railway 5 miles (8 km) east of Brecon. The line was 70 miles (110 km) long and opened in 1864. The company found it impossible to raise the share subscription, but the contractor partnership of Davies and Savin agreed to build the line and take shares in payment,

<span class="mw-page-title-main">Shrewsbury and Chester Railway</span> Former railway company

The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title the Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.

The Crewe and Shrewsbury Railway was a railway company which was previously owned by the London and North Western Railway (LNWR), built to connect Crewe with the Shrewsbury and Hereford Railway which was jointly owned with GWR.

<span class="mw-page-title-main">Moat Lane Junction railway station</span> Former railway station in Powys, Wales

Moat Lane Junction was a railway junction in Montgomeryshire near to the village of Caersws in mid-Wales. It was the junction where the Newtown and Machynlleth Railway opened in 1863 diverged from the Llanidloes and Newtown Railway which opened four years earlier. Although having only three through platforms, by rural standards it was a busy interchange station and in its heyday possessed a refreshment room.

The Oswestry and Newtown Railway was a British railway company that built a line between Oswestry in Shropshire and Newtown Montgomeryshire, now Powys. The line opened in stages in 1860 and 1861. It was conceived to open up the area to rail transport, when local opinion formed the view that the trunk railway companies would not do so. Subscription money for the construction proved very difficult to generate. It was the action of a contractor partnership, Davies and Savin, in agreeing to accept shares as the majority of their payment for construction work, that saved the company from failure.

The Oswestry, Ellesmere and Whitchurch Railway was a railway company that constructed a line from Whitchurch via Ellesmere to Oswestry. Most of the line was in Shropshire but part entered Flintshire, now Wrexham County Borough. It was seen as a link from the local railways around Newtown to the London and North Western Railway, breaking the local monopoly of the Great Western Railway. It opened as a single line in 1863 and 1864. Throughout the construction period it was short of money, and was paid for by the contractor, who took shares. Sporadically through its life it became a useful part of a through route for mineral trains, but it never developed greatly.

The Wrexham and Ellesmere Railway was a railway line that ran from Wrexham in North Wales, to Ellesmere in Shropshire, England. The line opened in 1895 and closed in 1962, except for a residual goods service which itself closed in 1981.

<span class="mw-page-title-main">Llangurig branch</span> Railway line in the UK

The Llangurig branch was a part of a proposed scheme by the Manchester and Milford Railway (M&MR) to connect industrialised Northwest England with the West Wales deep water port of Milford Haven. After various financial and construction difficulties, the 1.5 miles (2.4 km) of the Llangurig branch is noted as being the shortest lived working branch line in the United Kingdom, receiving only one train.

<span class="mw-page-title-main">Newtown and Machynlleth Railway</span>

The Newtown and Machynlleth Railway was a railway company in Wales. It built a line from a junction with the Llanidloes and Newtown Railway near Caersws to the market town of Machynlleth; the line opened in 1862. Newtown had become the hub of railway lines in the district. Machynlleth was an important town, and extension from there to Aberystwyth and to the coast northward was in the minds of the promoters.

<span class="mw-page-title-main">Llangurig railway station</span>

Llangurig railway station was intended to serve the village and rural locale of Llangurig in the Welsh county of Powys. The station, which was on the Llangurig branch, was built and operated by the Manchester and Milford Railway (M&MR). It was to be located in a shallow rock cutting just above the village.

<span class="mw-page-title-main">Llandinam railway station</span> Former railway station in Powys, Wales

Llandinam railway station was a station serving Llandinam, Powys, on the Llanidloes and Newtown Railway (L&NR) line. The L&NR was authorised in August 1853; construction began in October 1855 and the line was opened between those points for goods traffic only on 30 April 1859 – passengers were carried from 31 August 1859. Llandinam was one of three intermediate stations on the 13-mile line. The station was opened in 1859 by David Davies who was born in Llandinam and was a major contractor for building the line. In July 1864 the L&NR amalgamated with three other railways to create the Cambrian Railways, which in January 1922 amalgamated with the Great Western Railway which itself became part of British Railways in 1948.

References

  1. C B Vignoles, Report on the Various Lines by which a Railway could be Carried from London to Port-Dinllaen in North Wales, in the First Report of the Commissioners Appointed to Enquire into the Manner in Which Railway Communications can be Most Advantageously Promoted in Ireland, HMSO, London, 1837, page 32 onwards
  2. Rex Christiansen and R W Miller, The Cambrian Railways: volume I: 1852-1888, David & Charles, Newton Abbot, 1971, ISBN   0 7153 5236 9, pages 14 to 16
  3. 1 2 3 4 5 6 Christiansen, pages 19 and 20
  4. 1 2 3 4 5 6 7 Andrew Muckley, Llanidloes and Newtown Railway, in the Railway Magazine, February 1963
  5. 1 2 3 Peter E Baughan, Regional History of the Railways of Great Britain, volume XI, North and Mid Wales, David St John Thomas Publisher, Nairn, 1991, ISBN   0 946537 59 3, pages 149 and 150
  6. Michael Quick, Railway Passenger Stations in England, Scotland and Wales: A Chronology, the Railway and Canal Historical Society, Richmond, Surrey, fifth (electronic) edition, 2019, page 472
  7. 1 2 3 4 Christiansen and Miller, pages 22 and 23
  8. Baughan, page 151
  9. R W Kidner, The Mid-Wales Railway, Oakwood Press, Usk 2003, ISBN   0 85361 606 X, pages 15 and 16
  10. 1 2 3 4 5 6 7 Baughan, pages 204 to 208
  11. Donald J Grant, Directory of the Railway Companies of Great Britain, Matador Publishers, Kibworth Beauchamp, 2017, ISBN   978 1785893 537, page 381
  12. Grant, page 356
  13. 1 2 3 J S Holden, The Manchester and Milford Railway, Oakwood Press, Tarrant Hinton, 1979, ISBN   0 85361 244 7, pages 15 to 18
  14. 1 2 3 Christiansen and Miller, page 26
  15. Kidner, page 32
  16. 1 2 Holden, pages 43 and 44
  17. 1 2 Baughan, page 227
  18. Holden, page 51
  19. Holden, page 96
  20. Christiansen and Miller, pages 112 and 113
  21. Baughan, pages 154 and 155
  22. Christiansen and Miller, page 71
  23. Baughan, page 213
  24. Baughan, page 169
  25. Cl 29 = list of opening dates, 1929 to mid 1960s, (compiled by C R Clinker; original at Brunel University)
  26. 1 2 Quick
  27. Christiansen and Miller, volume 2, page 194
  28. Col M H Cobb, The Railways of Great Britain: A Historical Atlas, Ian Allan Limited, Shepperton, 2002
  29. R A Cooke, Atlas of the Great Western Railway as at 1947, Wild Swan Publications, Didcot, 1997, ISBN   0 906867 65 7
  30. Christiansen and Miller, page 24