The Pontypool, Caerleon and Newport Railway was promoted independently to relieve congestion on the heavily worked Eastern Valley Line of the Monmouthshire Railway and Canal Company. The Great Western Railway put up half the capital, making it in effect a GWR subsidiary. It opened in 1874, and most long-distance passenger and goods traffic, especially the heavy mineral traffic, transferred to it. It amalgamated with the GWR in 1876.
The Llantarnam Link, connecting the upper Eastern Valley network, was opened in 1878 and from that time most local traffic transferred to the line.
The main line was increasingly used for long-distance passenger and goods traffic, especially from Bristol and the West of England after the opening of the Severn Tunnel. As local traffics declined and were extinguished, the PC&NR main line remained a key part of the North and West Route from the Severn to Shrewsbury and from there to the Mersey, and North Wales, and carries that traffic at the present day.
In 1845 the Monmouthshire Railway and Canal Company was authorised by the Newport and Pontypool Railway Act 1845 (8 & 9 Vict. c. clxix) to build a line from Newport to Pontnewynydd, a short distance north-west of Pontypool, connecting industrial areas there. There were already mineral tramways beyond Pontnewynydd, but they brought mineral products to the canal, where they had to be transshipped for onward conveyance to Newport.
The "Newport and Ponty-pool Railway", as it was called at first, was to be a standard gauge railway by-passing the canal and avoiding the delay and cost of the transshipment. The line was soon known as the Eastern Valley Line of the Monmouthshire Railway and Canal Company. The South Wales Main Line of the Great Western Railway was broad gauge at the time, and no connection between the two railways at Newport was contemplated. [1]
At the same time the Newport, Abergavenny and Hereford Railway had a bill in Parliament for its line; it was promoted independently and was to be standard gauge. In this period Parliament was concerned to restrict what it saw as unnecessary parallel routes, and in authorising the NA&HR line in 1846, it refused it permission to build south of Pontypool. The NA&HR had to make a junction with the MR&C company, and use its line from Pontypool to Newport. It also had to use the MR&CR passenger station there, although mineral traffic to the docks was considerably dominant, and a northward flow, of coal to the River Mersey for bunkering ships, developed strongly. [2] [3] [4]
There was a national financial crisis at the time of authorisation of these lines, and it proved impossible for some time to raise the capital for construction, which was much delayed. The Eastern Valley Line was eventually opened on 30 June 1852. The Newport, Abergavenny and Hereford Railway was opened to goods trains on 30 July 1852, and full public opening to passengers took place on 2 January 1854. [note 1]
The iron and coal production in the lines served by the Monmouthshire line developed very considerably over the succeeding years, and although the company doubled the track, there was severe congestion, and the NA&HR trains were adversely affected. [1]
The NA&HR built its Taff Vale Extension Line from Pontypool to Quakers Yard, opening progressively from 1855 to 1858. This east–west route intersected numerous valleys and as their own railway systems developed, many mineral sites used the Taff Vale Extension to pass their production towards London and the north-west of England. The NA&HR was merged with other companies to form the West Midland Railway in 1860, and that company in turn amalgamated with the Great Western Railway in 1863. Coal production at Aberdare was exceptionally buoyant, and much of the product was sent to London. [note 2] [4]
Traffic from the collieries and ironworks in the area of the Upper Eastern Valley was brought into Newport docks over the Eastern Valley Main Line. If it was to continue from Newport by rail, the load was transshipped at sidings at Waterloo Junction, near Ebbw Junction, within the Newport sidings complex; the GWR was still a broad gauge railway at this time. The traffic could then continue towards Gloucester on the GWR main line. [note 3] Newport GWR station itself was extremely congested at the time, and the transit over the Eastern Valley Line was in itself difficult. [5]
The Pontypool, Caerleon and Newport Railway (PC&NR) [note 4] was promoted in the 1865 session of Parliament to build a new route to avoid the lower part of the Eastern Valley Line: it was an independent company. It was to build a standard gauge railway totalling, with branches, twelve miles in extent, from a triangular junction at Pontypool to a triangular junction at Maindee, immediately east of Newport station. At Pontypool this gave access from Hereford over the NA&HR main line, and from their Taff Vale Extension Line. It appears [note 5] that the Blaenavon and Abersychan districts on the upper part of the Monmouthshire Railway were not to be connected at Pontypool, but by a connection to the Eastern Valley Main Line further south, near the 3 milepost from Newport, at a point where the River Usk makes a northward sweep near Malpas. Making the connection here would give access from the industrial sites intermediately on the Eastern Valley. (This connection was not actually made.)
At Maindee, the westward arm of the triangular junction, coupled with the proposed mixed gauge track, would give access to Newport High Street station of the GWR, and to Waterloo Junction, where transhipment from narrow (standard) gauge wagons to broad gauge already took place; [2] and also to the docks area in general. The eastern arm of the triangle to the future Maindee East Junction led nowhere, as there were no siding or other facilities to handle arriving narrow gauge trains.
Powers were taken for the Great Western Railway, the Midland Railway and the London & North Western Railway, or any of them, to use or work the line or to subscribe for shares in the company. Most importantly powers were taken for the laying of mixed gauge track on the GWR main line between Maindee West Junction and Waterloo Junction, and the use of Newport High Street GWR station. [6]
The proposal was speculative; the junctions with the broad gauge GWR would still require transshipping of goods and minerals for onward transit, and the eastward spur at Maindee did not lead to sidings where that might be done. Nevertheless, the possibility of the LNWR, who were running passenger trains to Newport over the Monmouthshire line, getting a firmer foothold at Newport was unattractive to the GWR, and it encouraged the new company. At the same time the Monmouthshire Railway and Canal Company was extremely hostile, as the new line would abstract much of their Eastern Valley business. [5]
The Pontypool, Caerleon and Newport Railway was incorporated by the Pontypool, Caerleon and Newport Railway Act 1865 (28 & 29 Vict. c. ccclxiv) on 5 July 1865. Authorised capital was £100,000, [7] of which the Great Western Railway subscribed £50,000. [2] However, by this time it was plain that commercial pressure would oblige the GWR to convert the broad gauge track on the South Wales Main Line to narrow (standard) gauge in the foreseeable future. Moreover, as the GWR had secured an alliance with the Caerleon line—subscribing half the capital put the GWR in charge—the LNWR was for the time being excluded. Consequently, in the meantime the GWR and the PC&NR did not hasten to construct the line. The alliance was strengthened in 1871 by an understanding between the two companies, under which the board of the PC&NR Company were entirely GWR nominees.
The alignment of the PC&NR to the GWR increased the hostility of the Monmouthshire Railway and Canal Company to the project, and this may explain the omission of the proposed connection near Caerleon. [5] [2]
With the gauge conversion of the GWR lines in South Wales completed in 1872, the construction of the Caerleon line was put in hand, and it was opened to goods traffic on 17 September 1874, and to passenger trains on 21 December 1874. [5] The London and North Western Railway was running passenger trains from Shrewsbury to Newport at the time, and these were transferred to Newport High Street station over the new line, enabling direct change of train for passengers there, from 1 January 1875. [note 6] [2]
The inauguration of the new line enabled the Great Western Railway to divert to the route all of its traffic from the Eastern Valley Line; this included its heavy flow of coal from Aberdare over the Taff Vale Extension Line and over the PC&NR line, turning east at Maindee to London and Southampton (via Basingstoke). Moreover, the inconvenience of transshipping local narrow gauge traffic at Waterloo Junction and continuing through Newport was eliminated. [2]
The opening of the line had a considerable effect on the Monmouthshire Eastern Valley Line, as much business was diverted away from their line.
The success of the transfer of traffic encouraged the GWR to propose a line connecting Sirhowy and Caerleon. The Taff Vale Extension Line was steeply graded and not without difficulty in operation, whereas the Sirhowy route would have easier gradients for the loaded mineral trains from Aberdare and elsewhere. It would avoid the use of the upper parts of the Monmouthshire Railway's Eastern Valley altogether; at the time the Monmouthshire company was suffering from a competitive disadvantage due to failure to modernise, and this new move threatened the further loss of a very considerable part of that company's business. At first the Monmouthshire opposed the GWR plans in the House of Commons, but the bill passed nonetheless, becoming the Newport, Abergavenny and Hereford Railway (Taff Vale Extension) Act 1853 (16 & 17 Vict. c. clxxviii). Seeing the situation clearly now, the Monmouthshire negotiated a 99-year lease [note 7] of its 51-mile network to the GWR, which was effective from 1 August 1875. As well as the railways, the canal network also passed to the GWR: both arms of the original Monmouthshire Canal, except for the northern two miles above Pontymoile, which had been converted to a railway in 1854, and the Brecon and Abergavenny Canal. [5]
The PC&NR was amalgamated with the GWR on 13 July 1876. [7]
The PC&N line gave access to Newport and to the South Wales Main Line eastwards at Maindee, but at its northern end it was connected to Pontypool Road. Traffic from the Taff Vale Extension Line and from the Hereford direction could run directly to it, but local traffic from the upper sections of the Eastern Valley Line could only reach it by reversing at the Coedygric sidings complex near Pontypool Road. Now that those lines were all in GWR hands, the time had come to connect them. A connecting line further south, joining the Eastern Valley Line with the PC&NR line near Cwmbran; it was 67 chains in length from Cwmbran Junction to Llantarnam Junction, and it opened in April 1878. [5] From the following year all through traffic and local passenger trains were diverted away from the lower Eastern Valley Line. [2]
The availability of the Maindee East Loop coupled with the opening of the Severn Tunnel in 1886 vastly simplified the transfer of coal traffic to London and also to Portland and Southampton, where bunkering Royal Navy and ocean-going commercial shipping was experiencing considerable growth. As far as passenger services were concerned, as well as trains from Cardiff and Newport to the Hereford and Shrewsbury line, a developing traffic ran from Bristol and the West of England after the opening of the Severn Tunnel in 1886 northwards from Maindee East Junction through Hereford. This enabled trains to reach the River Mersey (at Birkenhead) over track controlled solely or jointly by the GWR, whereas routing via Gloucester and Birmingham was dependent on the co-operation of competing companies. The route was marketed as "The North and West Route", and use of the route for through goods and passenger trains became very heavy. [2] [8]
Following 1945 coal business declined, gradually at first. The marginal pits in the Eastern Valley were hit, and the Eastern Valley line from Cwmbran Junction to Newport closed from 27 October 1963, all residual traffic being routed over the PC&NR line. Local passenger traffic declined too, and many wayside stations had closed from 30 April 1962, and this left no passenger station open on the former PC&NR. Only a basic Cardiff – Hereford – Shrewsbury service remained, although through freight business was reasonably buoyant. [2]
The Llantarnam Junction to Cwmbran Junction link line closed when the upper part of the Eastern Valley route closed in 1980; it had probably been dormant since the closure of the last mineral working to Hafodyrynys over the Taff Vale Extension line on 31 March 1979. [2]
Pontypool, Caerleon and Newport Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Cwmbran is a town in the county borough of Torfaen in South Wales.
The Rhymney Railway (RR) was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition.
The Brecon and Merthyr Tydfil Junction Railway (B&MR) was a railway company in Wales. It was originally intended to link the towns in its name. Finding its access to Merthyr difficult at first, it acquired the Rumney Railway, an old plateway, and this gave it access to Newport docks. This changed its emphasis from rural line to mineral artery.
There have been many railway stations in Newport, due to its importance as a port for the industrial Monmouthshire and Glamorganshire valleys. The only stations in use at the moment are Newport in the city centre and in the Western valley Pye Corner and Rogerstone.
Cwmbran railway station is in the northeast of Cwmbran town centre, within five minutes' walking distance. It is part of the British railway system owned by Network Rail and is managed by Transport for Wales, who operate all trains serving it. It lies on the Welsh Marches Line from Newport to Hereford. The station was opened at this site in 1986 to serve the commuter route to Newport and Cardiff, and shoppers to the town centre.
Pontypool and New Inn railway station is situated to the south east of Pontypool town centre between the town and the suburb of New Inn, Wales. The station was formerly called Pontypool Road until renamed just Pontypool in 1972 and then to the present name in 1994.
The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, mostly to transport the products of the Merthyr iron industries to ports on Swansea Bay.
The Pontypridd, Caerphilly and Newport Railway was built to bring the coal output of the Aberdare and Rhondda valleys directly to Alexandra Docks at Newport.
Newport Mill Street railway station was one of four stations in central Newport, Wales.
The Newport, Abergavenny and Hereford Railway was a railway company formed to connect the places in its name. When it sought Parliamentary authorisation, it was denied the southern section, and obliged to use the Monmouthshire Railway between Pontypool and Newport.
The Monmouthshire Railway and Canal Company was a canal and railway company that operated a canal and a network of railways in the Western Valley and Eastern Valley of Newport, Monmouthshire. It started as the Monmouthshire Canal Navigation and opened canals from Newport to Pontypool and to Crumlin from 1796. Numerous tramroads connected nearby pits and ironworks with the canal.
The Wye Valley Railway was a standard gauge railway that ran for nearly 15 miles (24 km) along the Lower Wye Valley between the towns of Chepstow and Monmouth, crossing several times between Wales and England. Opened on 1 November 1876, it was leased to, and worked by, the Great Western Railway (GWR), before being fully absorbed by the GWR in 1905.
The Alexandra Docks and Railway (ADR) was a company formed in 1882 from the former Newport Dock Company of 1865. There was considerable demand for dock accommodation in Newport, South Wales, chiefly for the export or coastal transport of iron ore and coal. The Newport Dock Company had built an earlier dock that was now outgrown.
The Coleford Railway was a railway company that constructed a short railway from near Monmouth to Coleford, close to the Forest of Dean. The company was sponsored by the Great Western Railway. It was built on part of the course of the Monmouth Railway, a horse-operated plateway, and it was intended that its primary business would be the conveyance of minerals and forest products from the Forest of Dean.
The Coleford, Monmouth, Usk & Pontypool Railway (CMU&PR) was a standard gauge railway of 16 miles (26 km) which ran from Monmouth to Little Mill, near Pontypool in Monmouthshire, Wales. It was intended to convey the mineral products of the Forest of Dean to the ironworks of South Wales, by connecting to the Newport, Abergavenny and Hereford Railway at Little Mill Junction. The NAHR made the onward connection over its Taff Vale Extension line. The CMU&PR intended to acquire the Monmouth Railway, actually a horse-operated plateway, and convert it to locomotive operation.
The Ross and Monmouth Railway was a standard gauge railway of 13 miles (21 km) which ran between Ross-on-Wye, in Herefordshire, England and Monmouth, Wales.
The Sirhowy Tramroad was a plateway built to convey the products of ironworks at Tredegar to Newport, South Wales. It opened in 1805 between Tredegar and Nine Mile Point, a location west of Risca, from where the Monmouthshire Canal Company operated a tramroad to Newport. The Sirhowy Tramroad was operated at first by horse traction, but early locomotives were used, and a passenger service was operated.
The Brynmawr and Blaenavon Railway was a railway line in South Wales, within the historic boundaries of Brecknockshire and Monmouthshire, originally built in 1866 and immediately leased to the London and North Western Railway to transport coal to the Midlands via the Heads of the Valleys line. The line was completed in the late eighteen sixties and the LNWR were operating passenger trains over the line by 1872. Eight years later it was extended to meet the Great Western Railway at Abersychan & Talywain. Here the line carried on down the valley through Pontypool Crane Street railway station to the coast at Newport. In 1922 the LNWR was grouped into the London, Midland and Scottish Railway. In later years the line saw a variety of GWR locomotives operating from pit to port; however, the railway retained its LNWR infrastructure up until the last days before its closure.
Cwmbran railway station was a station in the old village of Cwmbran in Torfaen in South Wales, UK.
Llantarnam railway station in Llantarnam village, Cwmbran in Torfaen, South Wales, UK was built as part of the Pontypool, Caerleon and Newport Railway.