Vale of Clwyd Railway | |
---|---|
Overview | |
Other name(s) | VoCR |
Status | Closed |
Locale | North Wales |
Termini | |
Stations | Foryd, Rhuddlan, St Asaph, Llannerch, Trefnant and Denbigh |
Service | |
Type | Standard gauge |
Operator(s) | London and North Western Railway (from 1867) |
History | |
Commenced | 23 June 1856 |
Planned opening | 23 June 1856 |
Opened | 5 October 1858 |
Completed | 5 October 1858 |
Connection to Rhyl | 1 January 1862 |
Passengers Closure | 19 September 1955 |
Absorbed by LNWR | 15 July 1867 |
Closed | 1 January 1968 |
Technical | |
Line length | 10 mi (16 km) |
Number of tracks | Single line with space for double track |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The Vale of Clwyd Railway (VoCR) was a standard-gauge line, which connected the settlements of Rhyl, St Asaph and Denbigh in North Wales. It opened in 1858, at first without a connection to the main line at Rhyl, but this was provided in 1862. At Denbigh, a connection could be made on to the Mold and Denbigh Junction Railway. Although the area became popular with holidaymakers from the 1920s, the line never realised its potential; it closed to passengers in 1955 and completely in 1968.
The Chester and Holyhead Railway completed its main line in 1850. There was a considerable area of agricultural land south of the line, towards Denbigh, and a number of schemes were put forward to serve the area. The C&HR found itself short of funds to complete its main line, so it was left to independent promoters to put a scheme forward.
This proved to be the Vale of Clwyd Railway, which was authorised by Parliament on 23 June 1856. Contracts for construction were awarded to David Davies and Thomas Savin. [1] [2]
The line was 10 miles (16 km) in length, built as a single line with space on the formation for double track later. Construction was fairly rapid, and the line opened on 5 October 1858, for passengers and goods. There were four trains each way every weekday. [1] [2] The Denbigh station was a temporary structure, and the permanent building opened in December 1860.
Stations were at Foryd, Rhuddlan, St Asaph, Trefnant and Denbigh. A VoCR director, Whitehall Dod, had the right to stop trains adjacent to his estate at Llannerch, a mile north of Trefnant, until December 1871 when that right expired. [note 1] There was also a siding for a brickworks at the locality. The siding was extended during World War II for use in connection with an army stores depot. [2] [3] [4]
In 1860, the Company sought powers to enter Rhyl station with their trains; the station was on the main line, now controlled by the London and North Western Railway. The LNWR was agreeable, but demanded reciprocal running powers to Denbigh, obviously an unequal trade; as a result, the deal did not go ahead.
Hugh Robert Hughes of Kinmel Hall owned land at Foryd beach and a pier there, from which he operated steamers. He had hoped that the Vale of Clwyd Railway would run to his pier and make connections there, but this would have involved crossing the Chester and Holyhead Railway main line; that company objected, chiefly because they feared competing steamer traffic to Liverpool from Hughes' pier. However, the VoCR had laid a temporary branch siding to the beach from their Foryd station, for the purpose of acquiring track ballast. Hughes took possession of the branch siding, saying that he would use it for ordinary railway purposes and connect with the VoCR at Foryd station.
The C&HR forcibly ejected Hughes' men from the branch line, but Hughes secured an injunction in his favour and the short branch was operated as a full railway to and from the pier. The feared steamers to Liverpool operated in connection. However, the steamer operator discovered that the VoCR was negotiating with the LNWR to lease the line to the larger company; other internal hostilities surfaced and the VoCR was riven with dissension. [2]
Denbigh was not destined to be a terminus; the Denbigh, Ruthin and Corwen Railway was authorised on 23 July 1860. This, coupled with the Vale of Llangollen Railway and an extension to Corwen, meant that a viable route from Ruabon and the Great Western Railway could be created.
At this time, there was every likelihood of the Great Western Railway reaching Rhyl, an important regional centre, along the lines from Ruabon via Llangollen and Corwen. For some time this seemed inevitable but, in time, the GWR lost interest and the scheme was not pursued. [5]
On 30 June 1862, the extension sought by the pier owner Hughes was passed in Parliament; now the VoCR could legally reach the beach and a new pier, and a proper junction with the C&HR line (now under LNWR control) could be made. Goods traffic started in the latter half of 1864 and, after some difficulty, the extension was passed for passenger operation, but this was never acted upon. [6]
In December 1862, the Oswestry Advertiser newspaper reported that additional passenger services would be provided by attaching passenger coaches to goods trains:
"much increased accommodation, making... six trains daily between Rhyl and Denbigh and five between Ruthin and Rhyl... the Company do not of course guarantee exact time with the goods trains, having made these arrangements at the request of several inhabitants... in the Vale." [7]
In 1864, the LNWR was formally authorised to work the VoCR line, as they had been doing informally, and the company was absorbed by the LNWR by Act of 15 July 1867. [1] [8]
Bradshaw's Guide for 1895 listed the train service; there were six trains each way between Denbigh and Rhyl, calling at all stations. Most of the trains made reasonable connections at Denbigh. [9]
At the beginning of 1923, the railways of Great Britain were grouped into four new large companies, under the Railways Act 1921. The LNWR was a constituent of the new London Midland and Scottish Railway. Seaside holidays were increasingly popular and the North Wales coast was an attractive destination. The passenger trains service was augmented accordingly and seventeen trains ran each way daily in the summer in the 1930s. [10]
Nevertheless, the line remained a rural outpost and use of the line declined; it was closed to passengers on 19 September 1955 and completely from 1965. [10]
Today, only the northern section of the trackbed remains intact as far as the North Wales Expressway, just before St Asaph station.
Vale of Clwyd Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Rhyl is a seaside town and community in Denbighshire in Wales. The town lies on the coast of North Wales, at the mouth of the River Clwyd.
Rhyl railway station is on the Crewe to Holyhead North Wales Coast Line and serves the holiday resort of Rhyl, Wales.
The Chester and Holyhead Railway was an early railway company conceived to improve transmission of Government dispatches between London and Ireland, as well as ordinary railway objectives. Its construction was hugely expensive, chiefly due to the cost of building the Britannia Tubular Bridge over the Menai Strait. The company had relied on Government support in facilitating the ferry service, and this proved to be uncertain. The company opened its main line throughout in 1850. It relied on the co-operation of other railways to reach London, and in 1859 it was absorbed by the London and North Western Railway.
The Mold and Denbigh Junction Railway was a railway company that built a 16-mile (26 km) railway line in North Wales. It formed a link between the Mold Railway and the Vale of Clwyd Railway towards Rhyl.
Penyffordd railway station serves the village of Penyffordd in Flintshire, Wales. The station is 7¼ miles (12 km) north of Wrexham Central on the Borderlands Line.
The Llanelly Railway and Dock Company was an early Welsh railway system. It opened its first short line and a wet dock at Llanelly in 1834, and soon went on to build a longer line from Llanelly to serve pits in the Amman Valley, and then on to Llandilo, reached in 1857. The Llanelly company leased and worked the Vale of Towy Railway on to Llandovery, from 1858.
Corwen railway station refers to two stations, on different sites, which have existed in the town of Corwen in Denbighshire, Wales.
The Denbigh, Ruthin and Corwen Railway was a standard gauge railway line that connected Corwen with Denbigh via Ruthin in North Wales.
The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, mostly to transport the products of the Merthyr iron industries to ports on Swansea Bay.
Rhuddlan was a railway station located in Rhuddlan, Denbighshire. It first opened in 1858 as part of the Vale of Clwyd Railway, and afterwards under the auspices of several different companies. The station closed to passengers on 19 September 1955, some seven years after nationalisation.
Trefnant is a village and community in Denbighshire, Wales. It is located on the A525 road in the Vale of Clwyd, about halfway between St Asaph (Llanelwy) to the north and Denbigh to the south. At the 2001 Census, the community had a population of 1,409, increasing to 1,581 at the 2011 Census.
The Kinmel Camp Railway, otherwise known as the Kinmel Park Railway, was a 3-mile (4.8 km) long standard gauge railway built to serve Kinmel Camp near Rhyl in north Wales.
The Bangor and Carnarvon Railway was a railway company promoted to build a branch railway connecting Caernarfon with the main line at Bangor, in north-west Wales. It opened in 1852 as far as Port Dinorwic and was extended to Caernarfon later in the same year.
The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title the Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.
The Mold Railway was a railway company that built a line in north-east Wales. The line linked Mold to Chester and it opened on 14 August 1849. The company built a mineral branch line to Ffrith, opened in November 1849. Mold itself was an important regional centre, and contained considerable mineral resources.
Foryd railway station was a railway station built to serve Kinmel Bay, then in Flintshire but now in Conwy County Borough, Wales.
The Bethesda branch line was a 4+1⁄4-mile (6.8 km) railway branch line between Bangor and Bethesda in Gwynedd, North Wales. Its primary purpose was to bring quarried slate down to the main line for onward transport.
Townshend Mainwaring was a British Conservative Party politician.
The Llandudno branch line is a three-mile railway branch to the town from the main line at Llandudno Junction, Wales. It was opened in 1858, and it encouraged the development of the town as a tourist and holiday destination. Due to the popularity of the town, the station facilities at Llandudno station were progressively improved. Deganwy, on the branch line, was for some time a useful port.
Foryd Pier railway station served the village of Kinmel Bay, known as Foryd at the time, in the historical county of Flintshire, Wales, from 1859 to 1885 on the Vale of Clwyd Railway.