Llanelly Railway

Last updated

The Llanelly Railway and Dock Company was an early Welsh railway system. It opened its first short line and a wet dock at Llanelly in 1834, and soon went on to build a longer line from Llanelly to serve pits in the Amman Valley, and then on to Llandilo, reached in 1857. The Llanelly company leased and worked the Vale of Towy Railway on to Llandovery, from 1858.

Contents

Responding to competitive pressure the company obtained authorisation to connect its network to Swansea and Carmarthen, but the failure of a contractor put the company into financial difficulty, and a financial reconstruction later led to the Swansea and Carmarthen lines passing to the London and North Western Railway, while the original core system was taken over by the Great Western Railway.

The line from Swansea to Llandovery became part of the Central Wales Line connecting to Shrewsbury and the north-west, but after the 1960s only the Llanelli to Llandovery line and short colliery connections in the Amman Valley remained in use.

Before 1971 many place names had Anglicised spelling. The railway system was slow to convert the names of railway locations. For consistency, this article generally uses contemporary spellings.

Prior to the Llanelly Dock Company

In the eighteenth century minerals had been extracted in the area around Llanelly, and smelting of metals was taking place locally well before the end of that century. Conveyance of heavy minerals over the primitive roads of the day was an expensive and difficult business. Alexander Raby purchased mineral-bearing lands about 1795 and constructed tramways to bring the minerals to a smelting plant he owned at Furnace, near Llanelly. The tramways were wooden waggonways, and they extended to a harbour at Llanelly for onward transport of the finished product by coastal shipping.

There were extensive mineral deposits further inland at Cross Hands, and exploitation of the minerals needed a longer railway; the distance was 16 miles and Raby was the prime mover in the formation of the Carmarthenshire Railway or Tramroad Company for the purpose. The tramroad was the first railway in Wales to obtain an authorising act of Parliament, which it did in June 1802 with the Carmarthenshire Railway or Tramroad Company Act 1802 (42 Geo. 3. c. lxxx); the capital was £250,000. [1] [ page needed ]

Charles Nevill came to Llanelly and in 1804 established a copper works with an associated harbour facility.

There were extensive deposits of anthracite coal at Llangennech on the River Loughor estuary east of Llanelly, and about this time an expansion of the mining there took place, with associated construction of short tramroads. The Llangennech Coal Company was formed, and concentrated on shipping from Spitty (or Yspitty) on the Loughor. However the available quays were suitable only for small vessels, and the main trade was lighterage to Llanelly Harbour for transhipment, incurring additional expense. [note 1] [1] [ page needed ]

When it was decided to develop the St Davids pit above Dafen, the opportunity to improve transport to the sea showed itself; a railway directly from Dafen to a new quay at Machynis Pool (now spelt Machynys) was feasible; there would need to be an incline down from St Davids to Dafen.

The Llanelly Railroad and Dock Company

Llanelly Railway and Dock Act 1828
Act of Parliament
Coat of Arms of the United Kingdom (1816-1837).svg
Long title An Act for making and maintaining a Railway or Tram Road from Gelly Gille Farm, in the Parish of Llanelly in the County of Carmarthen, to Machynis Pool in the same Parish and County; and for making and maintaining a Wet Dock at the Termination of the said Railway or Tram Road at Machynis Pool aforesaid.
Citation 9 Geo. 4. c. xci
Dates
Royal assent 19 June 1828
Text of statute as originally enacted
Llanelly Railroad and Dock Company network in 1842 Llanelly Dock 1842.png
Llanelly Railroad and Dock Company network in 1842

The proprietors of the Llangennech Coal Company promoted a bill in Parliament, to make a wet dock for vessels up to 300 tons at Machynis with wharves and warehouses, and build the railway to St Davids. The Llanelly Railway and Dock Act 1828 (9 Geo. 4. c. xci) was passed on 19 June 1828, authorising the Llanelly Railroad and Dock Company, with share capital of £14,000. [2] [ page needed ] Only horse traction could be used. At the time of the Committee hearings 83% of the capital had already been subscribed. [1] [ page needed ] The upper terminal was described as Gelly Gille Farm. [3] [ page needed ]

Priestley[ page needed ] reported on the act:

This work was projected for the purpose of conveying the minerals and other productions of the country near its line to the sea, and the dock was for the readier shipment and landing of the exports and imports to be conveyed thereon... [By the authorising act] the proprietors are incorporated under the style of "The Llanelly Railroad and Dock Company.”... The dock [is] to be so constructed as to be large enough for ships of three hundred tons burthen, with slips, poles, beacons, warping and mooring buoys, chains and capstans, and the company are to build wharfs, warehouses and other works necessary for the purposes of the act.

The length of the railway is two miles and three hundred yards, in which distance there is a rise of 68 feet above high water-mark; the dock is two hundred yards by fifty-five at the bottom, calculated to hold twenty-one vessels of three hundred tons as mentioned above; the depth is 16 feet below high-water-mark of the highest spring tides, and the flood-gates at the entrance are 36 feet wide. Mr. F. Foster estimated the whole at £11,736, 3s. 4d. including £8,074, 10s. the cost of the dock and other conveniences. The engineer’s estimate was subscribed for in equal portions by Messrs. D. T. Shears, J. H. Shears, T. Margrave and W. Ellwood, Jun. [4] [ page needed ]

The act stipulated that the railway and the dock could only be opened together, not independently, and that had to be within five years. In fact the seam at the St Davids pit proved more elusive than expected, and was finally found in June 1832 at a depth of 660 feet, the deepest in Wales at the time.

Llanelly Railway and Dock Act 1833
Act of Parliament
Coat of Arms of the United Kingdom (1816-1837).svg
Citation 3 & 4 Will. 4. c. lii

The delay meant that the works could not be completed within the authorised time, and a second act of Parliament, the Llanelly Railway and Dock Act 1833 (3 & 4 Will. 4. c. lii), was obtained allowed a time extension; it also permitted the use of steam locomotives on the line. [1] [ page needed ]

The dock at Machynis, now called the New Dock, was completed in 1834, although the dock and railway appear to have been first used on 16 July 1833. It was stated to be the first public wet dock in Wales.

The existence of the railway and the dock quickly led to considerable business, especially in the foreign export of coal; the East India Company was a particularly important customer. Not only the Llangennech Coal Company but numerous other pits came to use the line and the dock. [1] [ page needed ]

The company paid a 3% dividend in 1837 and 1838 and paid a remarkable 12% in 1839. [1] [ page needed ] [5] [ page needed ]

Horse traction was used exclusively on the line for several years, but from January 1858 a locomotive was employed. [1] [ page needed ]

Extending northwards

With opening of the dock and the Dafen line in 1834, the directors were already thinking of a railway line northwards from Llanelly and Llangennech to Llandilo. Such a line would open up access to known important coal deposits in the valley of the River Amman, and Llandilo was an important agricultural centre.

Llanelly Railway and Dock Company Act 1835
Act of Parliament
Coat of Arms of the United Kingdom (1816-1837).svg
Citation 5 & 6 Will. 4. c. xcvi

The Llanelly Railway and Dock Company Act 1835 (5 & 6 Will. 4. c. xcvi) was passed on 21 August 1835, and the company was retitled the Llanelly Railway and Dock Company. The line was to run from the south side of the New Dock, avoiding interference with the Dafen line which ran to the north side. The main line would run through Llangennech, Pontardulais and Llandebie. There were to be thirteen branches, mostly short spurs to nearby pits but including one to Gelli Fawr and Garnant, and another to Cross Hands on Mynydd Mawr, later to be known as the Mountain Branch, [1] [ page needed ] or Great Mountain Branch. [6] [ page needed ]

Opening to Pontardulais and Cwmamman

The line from Pontardulais to the New Dock at Llanelly was opened for mineral traffic on 1 June 1839. [3] [ page needed ] [6] [ page needed ]

From Pontardulais construction was directed towards the Amman Valley as having greater income potential than the rural route towards Llandilo. From Pontardulais to Cwmamman (later called Garnant) was opened on 10 April 1840 and the line was extended to Gwaun-cae-Gurwen on 6 May 1841. [1] [ page needed ] [6] [ page needed ] There were two rope worked inclines on the branch, one of them a mile in length. [3] [ page needed ]

The (Great) Mountain branch opened on 6 May 1841 to goods and mineral traffic only; the route, included a half mile balanced cable incline at a gradient of 1 in 12. [6] [ page needed ]

In 1841 the company provided a return to the Board of Trade summarising certain aspects of the line's operation; significant portions of the line were operated by horse traction only. Where locomotives were used the speed was limited to 9 miles per hour. There was stated to be "scarcely any passenger traffic, coal and mineral produce being the chief and almost only trade over the line to Llanelly". [7] [ page needed ] The passenger business appears to have been achieved by attaching passenger vehicles to mineral trains, without an organised timetable. Two locomotives were in use on the line from 1840. [1] [ page needed ]

In June 1842 a further branch was opened, from Garnant (Cwmamman) to Brynamman. [8] The continuing expansion of the mineral business resulted in five locomotives being in use on the line by 1847. [1] [ page needed ]

Contract operation and passengers

The South Wales Railway was planning a trunk main line from near Gloucester to Fishguard. The Llanelly company attempted to sell its line to the South Wales Railway, but that approach did not bear fruit, and in January 1850 a contract was made with Ianson, Fossick and Hackworth to work and maintain the line. They operated a through passenger service between Swansea and Llandilo from May 1850, consisting of omnibuses at each end and railway transit from Pontardulais and Duffryn. The contract had been intended to operate for seven years but it was terminated by mutual consent in August 1853. [3] [ page needed ]

In 1850 the passenger trains on the line appeared in Bradshaw's guide; stations were at Llanelly Dock, Bynea, Llangennech, Pontardulais, Cross Inn and Garnant.

South Wales Railway

By this time the South Wales Railway (SWR) was constructing its 7 ft 14 in (2,140 mm) line from near Gloucester to Fishguard. (The western terminal was later changed to Neyland). The South Wales Railway, routed east to west, needed to cross both the lines of the Llanelly company, and the latter started to make obstructions to the process. The exact configuration of the crossing was not laid down in the South Wales Railway Act 1845 (8 & 9 Vict. c. cxc), and in the event of failure to agree arrangements the matter would have gone to a jury for determination. The Llanelly had experienced difficulty in obtaining subscriptions to complete its intended line to Llandilo, and for some time held out for the purchase by the SWR of its entire network for £230,000. [1] [ page needed ]

The SWR had no wish to acquire a narrow gauge (as 4 ft 8+12 in or 1,435 mm standard gauge was described at the time) mineral branch line, and for some time considered a viaduct to avoid the flat crossing of the Llanelly lines, which seemed to be the point at issue. The issue continued fruitlessly until the SWR opened its main line in October 1852; a flat crossing was provided and the Llanelly Company insisted on controlling the crossing. An exchange goods shed was built at the SWR station, served by a spur from the Llanelly Railway, opened in June 1853. [1] [ page needed ] [3] [ page needed ]

The dock at Llanelly

The Llanelly Railway and Dock network in 1858 Llanelly Dock 1858.png
The Llanelly Railway and Dock network in 1858

The dock at Llanelly was not walled, but had unimproved sloping margins; timber jetties with shoots were erected for loading vessels. The harbour pool was gated, and from time to time the provision of a second set of gates forming a lock was considered, but not proceeded with. Hydraulic machinery was provided from March 1858 by the Llanelly Dock Hydraulic Company, an entity evidently established for the purpose.

With the South Wales Railway established, there was pressure to connect the dock at Llanelly to it by a broad gauge connection so as to bring business to the dock. The dock was an intrinsic part of the Llanelly company's business, but once again it engaged in attempts to get the SWR to pay for the branch. These were fruitless, and the Llanelly company eventually built it, opening it in January 1859. [1] [ page needed ]

Extending to Llandilo

Llanelly Railway and Dock Act 1853
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 16 & 17 Vict. c. clxix

The company now returned to the extension to Llandilo; with the financial performance improved, it was possible to seek further finance, and in 1853 it obtained the Llanelly Railway and Dock Act 1853 (16 & 17 Vict. c. clxix) re-authorising the Llandilo line with considerable new capital. Included was the possibility of building it to the broad gauge and converting the existing network similarly, leaving open the option of selling the concern to the SWR.

On 1 March 1855 a contract was let for the work, and the line was opened ceremonially to Llandilo on 20 January 1857, [note 2] and to the public on 24 January. [3] [ page needed ] [6] [ page needed ]

A local newspaper reported that it was now possible to look forward to the day when Llandilo would be connected by rail with ports in the north of England. [5] [ page needed ]

Vale of Towy Railway

Llandovery railway station building in 2011 Llandovery railway station building - geograph.org.uk - 2882794.jpg
Llandovery railway station building in 2011

The connection to the north of England was to be facilitated by the independent Vale of Towy Railway. In 1853 a parliamentary bill had been presented, and as it was unopposed, its passage easily led to royal assent being granted to the Vale of Towy Railway Act 1854 (17 & 18 Vict. c. cl) on 10 July 1854, for a line from Llandovery to Llandilo. Capital was £55,000 and mixed gauge track was authorised, as sale to the Great Western Railway or its allies was still contemplated. It opened its line to passengers on 1 April 1858, but goods trains had been running since either 17 February or 1 March. It was just over 11 miles long and had five wooden viaducts over the Towy. [9] [ page needed ] It was worked by the Llanelly company. [1] [ page needed ] [6] [ page needed ]

There were intermediate stations at Lampeter Road (later renamed Llanwrda), Llangadog, and Glanrhyd from the outset. [note 3] and a station was opened at Talley Road shortly after the general opening to passengers. The Llanelly Railway station at Llandilo was used by Vale of Towy trains.

Vale of Towy Railway (Leasing) Act 1858
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 21 & 22 Vict. c. cxlvii
Llanelly Railway and Dock Act 1860
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 23 & 24 Vict. c. clxi

The Vale of Towy Railway (Leasing) Act 1858 (21 & 22 Vict. c. cxlvii) came into force on 2 August 1858 and authorised the Llanelly Railway and Dock Company (LR&DC) to lease the Vale of Towy line. The lease was for an initial ten years with an option later to extend it. In fact the LR&DC became alarmed that other railway companies were taking an interest in the Vale of Towy, and they included conversion of the lease term to perpetuity in the Llanelly Railway and Dock Act 1860 (23 & 24 Vict. c. clxi), which they obtained on 23 July 1860.

In fact the act authorised but did not compel the conversion of the lease term, and negotiations between the two companies were tense and protracted, and in July 1865 Vale of Towy shareholders rejected a draft lease that had been negotiated. Already in November 1863 the Central Wales Extension Railway had approached the Vale of Towy about a lease; this line was to connect from the north, and eventually formed part of the Central Wales line, on which the passenger operation is marketed at the present time as the Heart of Wales Line. [1] [ page needed ]

The Swansea Vale Railway

Glanrhyd station in 1999 Glanrhyd station (remains) geograph-3561399-by-Ben-Brooksbank.jpg
Glanrhyd station in 1999

The Swansea Vale Railway had started life as a mineral line running north-east from Swansea. In 1861 it obtained an act of Parliament, the Swansea Vale Railway Extension Act 1861 (24 & 25 Vict. c. clxii), giving authorisation to extend to Brynamman, approaching from the east; this part of the line was known as the Swansea Vale Extension Railway, and it opened on 1 January 1864 for mineral traffic.

By the end of 1864 through operation between the Swansea Vale Extension and the Llanelly Railway was established at Brynamman, and the two lines formed a significant through route for goods traffic from Swansea to Liverpool. In May 1864 a passenger service to Brynamman was established on the Swansea Vale line. The Llanelly company decided to start its own passenger service to Brynamman, extending the existing Garnant branch service. The Board of Trade were asked to carry out the necessary formal inspection to approve passenger working, but the proposed method of operation, by telegraph and block system, was not considered safe for passenger operation on a single line. A further inspection in March 1865 noted that the terminus station at Brynamman was to be on a gradient of 1 in 57, an arrangement also considered unsafe, and authorisation was again postponed.

Authorisation for passenger working on the Llanelly line was given on 20 March 1865; it is not recorded how the considerable gradient easement was achieved. It appears that the two companies had their Brynamman stations alongside one another. The Llanelly company announced that passenger services would start on 20 March 1865; Garnant station appears to have been closed, and was relocated "half a mile down the branch" and re-opened at the same time. The SVR was authorised to open its passenger service to Brynamman on 27 February 1868, and agreement was reached for interchange arrangements at the station. [1] [ page needed ] The Swansea Vale Railway was absorbed by the Midland Railway. [8] [10]

Llanelly Railway and Dock network

The sequence of stations at Llanelly developed over time; the first (1839) station was close to the dock, on the direct line from Llandilo. In 1852 a platform was opened adjacent to the newly opened South Wales Railway station, reached by a line on from the earlier station by a westward sweep close to the dock itself, then running for some distance immediately on the south side of the South Wales Railway main line, which was broad gauge at this time.

The connecting line towards the SWR station was made more direct, and a third "Dock" station opened in 1869 replacing the first station.

In this period, trains called at both stations, referred to as "Llanelly" and "Dock" (or "Llanelly Docks") in timetables respectively. In 1879, the layout and station arrangements were simplified, as described below. [1] [ page needed ]

Reaching Swansea and Carmarthen

Throughout this period, Swansea had been growing in importance as an industrial centre, and its docks had been, much extended and enhanced. At the same time Llanelly Dock had stagnated, and its limitations were evident. The Swansea Vale extension line to Brynamman (aligned to the Midland Railway) and the South Wales Railway (by now absorbed by the Great Western Railway) gave easy access for local industry to Swansea, to the disadvantage of Llanelly. At the same time Carmarthen was an important centre in its own right, and the importance of the harbours on Milford Haven was growing. The Llanelly company could not afford to ignore the potential of a connection to Swansea and Carmarthen, even though it would diminish the value of its own dock.

Since the company was short of capital, the way forward had to include a means of financing the new lines. On successive days in October 1860, rival entrepreneurs waited on the Llanelly Board with proposals for connecting the line. Richard Kyrke Penson, Thomas Savin and a man named Johns proposed that the Llanelly company promote railways from Pontardulais to Swansea, from Llandilo to Carmarthen, and from Llandovery to Brecon, which they would finance. Accordingly, they would take a ten-year lease of the Llanelly Company; at the time the Llanelly Company was only earning 1% and an apparently guaranteed 4% (after five years) appeared very attractive. The following day Henry Robertson appeared proposing joint construction of the Swansea and Carmarthen lines with the Central Wales Railway, and running powers over the Central Wales line from Craven Arms, not far from Shrewsbury on the Shrewsbury and Hereford Railway. [5] [ page needed ]

The Llanelly directors favoured Penson and his partners, and the arrangement was agreed at a shareholders' extraordinary general meeting on 31 October 1860. The partners soon turned out to be insubstantial, as Johns and then Savin withdrew.

Having lost their source of finance and project management, the Llanelly company proceeded with the Swansea and Carmarthen lines themselves, running into considerable practical and financial difficulties from landowners and otherwise in the process. The Central Wales Extension Railway was naturally keen for the lines to be completed, and it facilitated friendly contact with the London and North Western Railway and the Llanelly company; could not the LNWR finance the new railways; in fact would not full amalgamation be desirable? [5] [ page needed ]

Proposals were worked up for a new line from Pontardulais to Swansea, taking a southern sweep through Dunvant, where there were said to be extensive unworked coal measures. There was to be a branch from that line to Penclawdd. A second line was to run from Llandilo back to Carmarthen, joining the Carmarthen and Cardigan Railway at a junction at Abergwili, a mile or so north of Carmarthen. The C&CR was broad gauge at that time, and a third rail to make mixed gauge would need to be laid.

Llanelly Railway (New Lines) Act 1861
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 24 & 25 Vict. c. ccxvi

Notwithstanding considerable opposition, the Llanelly Railway (New Lines) Act 1861 (24 & 25 Vict. c. ccxvi) was passed on 1 August authorising these routes. The act separated the company for financial purposes into two undertakings, the "Original Line", and the "New Lines" (the Swansea line and the Carmarthen line). This seems not to have been intended for any other purpose than clarity of accounting, but it was later to encourage an unforeseen separation.

The line at Swansea was to divide there, the passenger terminal being at a low level, and a high level line was to continue to the docks, crossing the River Tawe.

Opening to Carmarthen

Construction of the line was considered to offer no great difficulty, but the Board of Trade inspector's report of May 1865 required considerable improvements before opening.

The company dragged its feet over complying with even trifling improvements required, and moreover started running passenger excursion trains on 29 May 1865 (to an Eisteddfod), and a regular passenger service from 1 June 1865. First goods trains ran on 8 or 14 November 1865. [1] [ page needed ] [note 4] [3] [ page needed ]

The line diverged from the old main line at Carmarthen Valley Junction; stations were at Golden Grove, Llanarthney and Abergwili and also Llandilo Bridge and Nantgaredig. Income on the line was seriously less than had been planned for, and in particular the lucrative through traffic to western harbours was disappointing.

Opening to Swansea

A former LMS Stanier Black 5 at Swansea Victoria. Swansea Victoria Station 2063471 f2b84c70.jpg
A former LMS Stanier Black 5 at Swansea Victoria.

On 9 November 1865 mineral traffic started on the Swansea line, although volumes were small at first. [note 5] The failure of the financing scheme had forced the Llanelly company into borrowing at high rates of interest. Moreover, the poor income on the Carmarthen line further reduced the company's trading situation. The New Lines section of the Llanelly Company, which was separately financed, was plunged into financial difficulty, and it went into administration in January 1867. [1] [ page needed ]

Passenger operation on the Swansea line started on 14 December 1867. [1] [ page needed ] [3] [ page needed ] [9] [ page needed ] The first through train from Llandovery to Swansea ran on 1 January 1868. The Penclawdd branch from Gower Road at the same time to serve local collieries (and later the Elba steel works). [6] [ page needed ]

The LNWR outmanoeuvres the Llanelly Company

In July 1867 Richard Moon of the LNWR and some other directors made a tour of Wales, during which they met the directors of the Llanelly Company. The Llanelly proposed offering running powers over their line in return for financial help from the LNWR. Moon was an astute negotiator, and did not disclose the LNWR's wish to gain access for LNWR traffic on the Central Wales line to and from Swansea. He simply agreed to consider the Llanelly proposal. Meanwhile, the lease of the Vale of Towy line was nearing its full term and had to be renegotiated. The Vale of Towy was naturally playing off possible lessees against one another, and was looking for a hefty cash lease charge; cash which the Llanelly could not find. The consequence was that the LNWR shared the lease with the Llanelly Company, paid off some Llanelly debt, and accepted the offer of running powers, at a stroke getting LNWR access to Swansea and Carmarthen as well as Llanelly and Brynamman. [5] [ page needed ]

The big companies take over

The Llanelly Railway and Dock network after the separation of the New Lines in 1873 Llanelly Dock 1873.png
The Llanelly Railway and Dock network after the separation of the New Lines in 1873

The New Lines being in receivership, there arose criticisms that the solvent original line was funding the deficit of the New Lines, and a receiver, John Henry Koch, was appointed in 1870. He moved to create a truly independent company, the Swansea and Carmarthen Railway, which was incorporated on 16 June 1871. [1] [ page needed ] [6] [ page needed ] The New Lines were worked by the LNWR from 1 July 1871. [6] [ page needed ]

A series of petty disputes over working arrangements and charges arose, and the LNWR announced that it (through the Swansea and Carmarthen Railway) would start operating the train service on the Vale of Towy line.

The Great Western Railway converted the gauge of its lines in South Wales in 1872, in a massive operation. The former obstruction to through operation, most important for mineral traffic, was removed. The Llanelly Company observed that the Swansea and Carmarthen Railway, which it had created itself, was aligned to the LNWR, and the Llanelly had become a smaller network and felt itself vulnerable.

At the same time the GWR observed that the LNWR now had access to Swansea, and saw that if the Llanelly company failed its lines would fall into the hands of the LNWR. Accordingly, an agreement was struck, whereby the GWR took over the Llanelly company's original lines from 1 January 1873. Ordinary Llanelly shareholders were to receive 5% dividends paid by the GWR, rising to 5.5% from 1877. The Llanelly company had retained a share (with the LNWR) of the lease of the Vale of Towy, and that line now became joint between the GWR and the LNWR. [1] [ page needed ] [6] [ page needed ]

The antagonism between the S&CR and the Llanelly company (or between the LNWR and the GWR) grew over the following period to the point where passengers and goods customers were seriously inconvenienced. The matter was finally brought to a close when the LNWR acquired the Swansea line in 1873 (authorised by the Swansea and Carmarthen and London and North Western Railway Act 1873 (36 & 37 Vict. c. cxciii) of 1 July). The LNWR operated four passenger and three goods trains a day to Swansea, as well as two goods trains to Llanelly. [1] [ page needed ]

This left the Carmarthen line as the only asset of the Swansea and Carmarthen line. As it had no significant income except as a through line, it was vulnerable commercially. In 1873 it changed its name to the Central Wales and Carmarthen Junction Railway. The little company decided to be robust in its dealings with the LNWR and a dispute led to the LNWR discontinuing working of local traffic from 1 April 1880, only accepting passengers and goods from local stations to and from its own line. The antagonism dragged on for many years, finally being resolved when the CW&CJR sold its line to the LNWR for £137,500 cash, from 1 July 1891. [5] [ page needed ]

The LNWR extended the Penclawdd branch by 1+34 miles to Llanmorlais in 1877 and a passenger service was started on 1 March 1884. [1] [ page needed ]

The view from Euston

G P Neele, Superintendent of the line on the LNWR, had accompanied Richard Moon on the 1867 visit, and later recorded his view of the events:

Between the Great Western and the North Western a singular fate attended the Llanelly Railway. Amalgamations and absorption of small lines have been common enough but disintegration is unusual; in this case however it was carried out. The line from Llandovery to Llandilo became joint London and North Western and Great Western Railway:- the portion from Llandilo, Pantyffynnon and Pontardulais and thence to Llanelly became Great Western property:- from Pontardulais to Swansea the North Western were proprietors; running powers being exercised over the intervening distance to Llandilo.

The remaining portion of the Llanelly system ran from Llandilo Bridge to a junction at Abergwili with the Carmarthen line. This became North Western property, but between Llandilo and Llandilo Bridge there existed a piece of debatable ground about 34 mile (1.2 km) with disputed powers which led to some difficulties in 1871.

At Abergwili the line entered on a mixed gauge (1+12 miles or 2.4 kilometres) to Carmarthen and at that town reached the termination of the narrow gauge; the line thence to Carmarthen Junction where the Great Western was joined being exclusively broad gauge.

This Llanelly group of lines, all narrow gauge, was far from being up to date. The stations and platforms were dilapidated, the crossing loops short, the permanent way weak. [11]

Route simplification at Llanelly

The Llanelly company's passenger trains approached from the north-east and crossed the GWR (former South Wales Railway) main line obliquely on the level. The line then ran on to a Llanelly Dock station. In 1879 a connecting spur was laid in at the point of intersection, and approaching trains from Pontardulais joined the GWR main line and ran to the GWR station.

On Monday, the Llanelly Dock Passenger Station will be closed by the Great Western Railway Company, and, in future, passengers will only be booked at Llanelly station. This will be a convenience as far as booking per London and North Western route is concerned, as, previously, passengers had to proceed to the dock to get their tickets, but passengers to and from the dock will, in future, have to tramp it, unless some of our buses take up the matter and run down there. Here is a good opening for a tramway. [12]

After 1879

The Vale of Towy Railway was jointly leased by the GWR and the LNWR; in 1884 that was converted to full joint ownership; the Vale of Towy was vested in the GWR and LNWR jointly by the London and North Western Railway Act 1884 (47 & 48 Vict. c. ccvii) of 28 July 1884. [13] [ page needed ]

The 1886 Brynamman West Station in 1962 Brynamman West Station 1929506 df602e8f.jpg
The 1886 Brynamman West Station in 1962

The Llanelly Railway station at Brynamman had always been cramped and inconvenient; in 1886 the GWR opened a new station to the west of the main road. It continued in use until passenger services were withdrawn in 1958. [1] [ page needed ]

Having been leased by the GWR, the Llanelly company was fully absorbed by that company on 1 July 1889. Correspondingly the Central Wales and Carmarthen Junction Railway was vested in the LNWR by the London and North-western Railway Act 1891 (54 & 55 Vict. c. cxxxvii) of 21 July 1891. [6] [ page needed ]

The line between Swansea and Pontardulais was doubled by the LNWR by 1894 [1] [ page needed ] The very basic Swansea passenger station erected by the Llanelly company was modernised and improved by the LNWR in 1882. [5] [ page needed ]

The twentieth century

The St Davids colliery, which had been the original purpose of the first Llanelly Railroad and Dock Company, was no longer the principal location for coal extraction in the area, and the incline operation was inconvenient. In 1903 the line was diverted from Dafen to new collieries at Penprys and Acorn Pits, and the St Davids incline was closed. [6] [ page needed ] [14] [ page needed ]

The first line to collieries at Gwaun-cae-Gurwen similarly involved difficult incline operation, and the GWR obtained an the Great Western Railway Act 1904 (4 Edw. 7. c. cxcvii) authorising a new line avoiding the inclined plane. It opened on 4 November 1907; it had a 1 in 40 ruling gradient. Two halts were opened on the new line, and railmotors operated a passenger service from 1 January 1908 to 1 May 1926. There were eight trips a day. The passenger service was suspended during the General Strike of 1926 and never resumed. The earlier line was shortened back in 1933, becoming known as the Cawdor branch, and was later used chiefly for wagon storage. [6] [ page needed ] [8]

For many years the Great Western Railway had suffered from congestion in the Swansea area; a particular difficulty was the severe gradients at Cockett which required heavy trains to be banked and resulted in lengthy line occupation times. In the early years of the twentieth century consideration was given to relieving the issue, and the decision was taken to construct what became the Swansea District Line. This long new line left the main line near Briton Ferry and looped round to the north of Swansea, joining the Llanelly line near Bynea.

To give good access for colliery traffic, there was a triangular junction there, so that coal traffic from the Amman valley could turn east on to the new line; at the same time express passenger trains (particularly Fishguard boat trains) could avoid Swansea using the line. The work was authorised on 15 August 1904, and opened throughout on 14 July 1913. [6] [ page needed ]

In 1913 the GWR undertook improvements to the line between Pontardulais and Llanelly, providing double track, and widening the connection at Llandilo Junction by the provision of a new line from Genwen Junction to Llandilo Jn. (Pontardulais tunnel remained single). [1] [ page needed ] [6] [ page needed ]

Throughout the first decades of the twentieth century, use of Llanelly Dock (now known as the Great Western Dock) declined; Swansea dock was nearer the centre of industry and was much enlarged and modernised over the years and Llanelly slowly became eclipsed.

The Gwaun-cae-Gurwen improvements of 1907 had been followed up by obtaining powers on 18 August 1911 to build a through line from there to Felin Fran on the Swansea District Line, intended to further enhance the access to pits in the area. The line was partly constructed but never opened, due to World War I. However, in September 1922 the GWR opened the Cwmgorse branch southward from Gwaun-cae-Gurwen to Duke Colliery; this was a short stub of the through line. In 1960 the branch was further extended to Abernant Colliery by British Railways, and the branch continued in use until 1980. [8]

From 1923

At the beginning of 1923 the main line railways of Great Britain were "grouped" under the terms of the Railways Act 1921. The LNWR was a constituent of the new London Midland and Scottish Railway group (LMS); the Great Western Railway absorbed numerous smaller concerns but continued in the same identity as before.

The LMS closed the Llanmorlais branch passenger service on 5 January 1931 and total closure of the branch followed on 2 September 1957. [1] [ page needed ] [6] [ page needed ]

Emlyn colliery on the Mountain branch closed about 1947 and the upper part of the branch fell into decline; the branches serving collieries were almost entirely dependent on the mining, and when that declined and moved away, the branches suffered accordingly.

After World War II following nationalisation, from the beginning of 1948 British Railways owned the railways in the area. The decline in mining continued and Cross Hands goods closed on 1 November 1950; the whole branch closed on 6 March 1963.

Llanelly Harbour Trust had taken control of the Great Western Dock at Llanelli, but a review of port facility requirements in the area resulted in closure, and the Trust ceased trading in 1951. In due course the GWR Dock was filled in. [1] [ page needed ]

Steam operation on the Llanelly network ceased in 1963 [1] [ page needed ]

The St Davids line, serving Dafen and beyond, closed completely on 4 March 1963. [6] [ page needed ]

The Brynamman passenger service was closed on 18 August 1958, [1] [ page needed ] and completely 28 September 1964. [6] [ page needed ] The Midland Railway station at Brynamman had closed 8 years earlier to passengers, on 25 September 1950. [1] [ page needed ] [6] [ page needed ]

The Carmarthen line closed on 9 September 1963.

The line from Pontardulais to Swansea closed to passengers on 15 June 1964, [6] [ page needed ] and from this date the passenger service on the Central Wales Line ran from Llanelli (later extended back to Swansea) to Shrewsbury. On 10 August 1964 the Central Wales line closed to through goods traffic, and to local freight in 1968. After closure of the Swansea line a section south from Pontardulais to Gorseinon colliery was retained. On 22 September 1974 a spur was opened onto Swansea District line enabling closure of the Pontardulais line. [1] [ page needed ]

Glanamman remained open for goods traffic until 30 January 1965. Llandilo Jn to Morfa Jn and most dock lines at Llanelly closed on 24 January 1966. [6] [ page needed ]

A modern coal train at Gwaun-Cae-Gurwen level crossing Gwaun-Cae-Gurwen level crossing - geograph.org.uk - 1276283.jpg
A modern coal train at Gwaun-Cae-Gurwen level crossing

The sole remaining colliery branch line was the line to Gwaun-cae-Gurwen. For some years this was dormant but in 2012 traffic started again, transporting coal required for blending purposes. [1] [ page needed ] [15] In view of the discontinuation of coal firing in the country it is likely that this traffic will not continue. (2016)

Gradients

Gradients on the main line from Llanelli to Llandilo were significant, climbing at 1 in 157 to 1 in 108 for several miles to a summit at Derwydd Road, then falling at 1 in 108 for two miles (3.2 km) to Ffairfach. Derwydd Road at 229 feet (69.8 m) is the third highest point on the Central Wales Line.

The Pontardulais to Swansea line was undulating with stiff alternating gradients; Dunvant was approached by 1+12 miles (2.4 km) at 1 in 72 eastbound and two miles /at 1 in 70 and 1 in 80 westbound. The Carmarthen line was gently graded all the way. [16] [ page needed ]

Chronology

Llanelly Railway and Dock Company
BSicon CONTg.svg
BSicon HST.svg
Llandovery
BSicon HST.svg
Llanwrda
BSicon exCONTg.svg
BSicon HST.svg
Llangadog
BSicon exCONTgq.svg
BSicon exABZr+r.svg
BSicon eHST.svg
Glanrhyd Halt
Abergwili
BSicon exHST.svg
BSicon eHST.svg
Talley Road Halt
Whitemill
BSicon exHST.svg
BSicon STR.svg
Nantgaredig
BSicon exHST.svg
BSicon STR.svg
BSicon exCONTg.svg
Llanarthney Halt
BSicon exHST.svg
BSicon STR.svg
BSicon exdKBHFa-L.svg
BSicon exdKBHFe-R.svg
Brynamman West
Dryslwyn
BSicon exHST.svg
BSicon STR.svg
BSicon exSTR.svg
BSicon exSTR+l.svg
BSicon exCONTfq.svg
Swansea District line
to Morriston Loop
Golden Grove
BSicon exHST.svg
BSicon STR.svg
BSicon exSTR.svg
BSicon exKHSTe.svg
Clydach
Llandilo Bridge
BSicon exHST.svg
BSicon STR.svg
BSicon exSTR.svg
BSicon exLSTRa.svg
Felin Fran via Abernant
(line never completed)
Llandeilo
BSicon exSTR.svg
BSicon HST.svg
BSicon exSTR.svg
BSicon xABZg+l.svg
BSicon KBSTeq.svg
Tairgwaith Colliery
BSicon exSTRl.svg
BSicon eABZgr.svg
BSicon exSTR.svg
BSicon eHST.svg
Gwaun-Cae-Gurwen
Ffairfach
BSicon HST.svg
BSicon exSTR.svg
BSicon eHST.svg
Red Lion Crossing Halt
Derwydd Road
BSicon eHST.svg
BSicon exSTR.svg
BSicon eHST.svg
Gors-Y-Garnant Halt
Llandybie
BSicon HST.svg
BSicon xKRWg+l.svg
BSicon KRWr.svg
BSicon STR.svg
BSicon eHST.svg
Garnant
Cross Hands
BSicon exvKBHFa.svg
BSicon STR.svg
BSicon eHST.svg
Gelli Ceidrim
BSicon exCONTf.svg
BSicon exKRWl.svg
BSicon eKRWg+r.svg
BSicon eHST.svg
Glanamman
Ammanford (Tirydail)
BSicon HST.svg
BSicon eHST.svg
Ammanford Colliery Halt
Parcyrhun Halt
BSicon eHST.svg
BSicon eHST.svg
Ammanford (GWR)
BSicon STR+c2.svg
BSicon STR3.svg
BSicon CONTg.svg
BSicon ABZg+1.svg
BSicon STRc4.svg
Llanelli Docks
BSicon eABZg+l.svg
BSicon exKDSTeq.svg
BSicon STR2.svg
BSicon STRc3.svg
Llanelli
BSicon BHF.svg
BSicon STRc1.svg
BSicon STR+4.svg
BSicon KRWgl.svg
BSicon KRW+r.svg
BSicon HST.svg
Pantyffynnon
Bynea
BSicon STR.svg
BSicon HST.svg
BSicon HST.svg
Pontarddulais
Llangennech
BSicon STR.svg
BSicon HST.svg
BSicon KRW+l.svg
BSicon xKRWgr.svg
BSicon STR.svg
BSicon STRl.svg
BSicon ABZqlr.svg
BSicon xKRZu+xr.svg
BSicon STR+r.svg
BSicon hKRZWae.svg
BSicon exSTRc2.svg
BSicon exSTR3.svg
BSicon CONTf.svg
Loughor
BSicon eHST2.svg
BSicon STRc3.svg
BSicon exHST+1.svg
BSicon exSTRc4.svg
Grovesend
BSicon STRc1.svg
BSicon STR2+4.svg
BSicon STRc3.svg
BSicon exHST.svg
Gorseinon
BSicon STRc1.svg
BSicon xKRZ2+4o.svg
BSicon STRc3.svg
Llanmorlais (LNWR)
BSicon exKHSTa.svg
BSicon xSTR+c1.svg
BSicon HST2+4.svg
BSicon STRc3.svg
Gowerton North
Penclawdd
BSicon exHST.svg
BSicon exSTR.svg
BSicon STRc1.svg
BSicon STR+4.svg
BSicon exKRWl.svg
BSicon exKRWg+r.svg
BSicon lCONTf@G.svg
Gowerton South
BSicon exHST.svg
Dunvant
BSicon exHST.svg
Killay
BSicon exHST.svg
Mumbles Road
BSicon exHST.svg
BSicon exCONTgq.svg
BSicon exKRZo.svg
BSicon exSTRq.svg
BSicon exSTR+r.svg
BSicon exABZg+l.svg
BSicon exLSTRq.svg
BSicon exABZgr.svg
Swansea Bay
BSicon exBHF.svg
BSicon exLSTRe.svg
Swansea Victoria
BSicon exHST.svg
Swansea Wind Street
BSicon exHST.svg
BSicon exKRW+l.svg
BSicon exKRWlr.svg
BSicon exKRW+r.svg
BSicon exLSTRa.svg
South Dock (Goods)
BSicon exKDSTe.svg
BSicon exBS2c2.svg
BSicon exBS2lr.svg
BSicon exBS2r.svg
BSicon exCONTf.svg
BSicon exCONTf.svg

Dafen Line

Goods and minerals only

Penprys Colliery Extension 1903 – 1963

Llanelly SWR

Llandilo Line

Vale of Towy section

Brynamman Line

Cawdor Branch

Mineral traffic only

Gwaun-cae-Gurwen Branch

Cwmgorse Colliery Branch 1922

Mountain Branch

Goods and minerals only

Carmarthen line

Swansea Line

Penclawdd Branch

See also

The Great Western Railway in West Wales

Notes

  1. In double handling; the coal was said to be susceptible to damage in the loading process.
  2. Denman; but on page 57 he says, referring to Llandilo, "The line from the south carried traffic from 1st January 1857, being formally opened on 21st January".
  3. Denman; but he says on page 57 that a "platform was erected allowing the station to open on 1st May 1858."
  4. Barrie[ page needed ] and Baughan[ page needed ] say 14 November 1865 in "South Wales" and Baughan says 14 November 1864 in "North and Mid Wales"
  5. Denman; in a caption to an image on page 73 he says that "goods" traffic started in January 1866. MacDermot agrees January 1866.

Related Research Articles

The Rhymney Railway (RR) was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition.

The Brecon and Merthyr Tydfil Junction Railway (B&MR) was a railway company in Wales. It was originally intended to link the towns in its name. Finding its access to Merthyr difficult at first, it acquired the Rumney Railway, an old plateway, and this gave it access to Newport docks. This changed its emphasis from rural line to mineral artery.

<span class="mw-page-title-main">Swansea Vale Railway</span>

The Swansea Vale Railway (SVR) was a railway line connecting the port of Swansea in South Wales to industries and coalfields along the River Tawe on the northern margin of Swansea, by taking over a tramroad in 1846. It was extended to Brynamman in 1868. Passengers were carried from 1860, and a loop line through Morriston was built.

The Burry Port and Gwendraeth Valley Railway (BP&GVR) was a mineral railway company that constructed a railway line in Carmarthenshire, Wales, by conversion of a canal, to connect collieries and limestone pits to the sea at Kidwelly. It extended its network to include Burry Port, Trimsaran and a brickworks at Pwll, later extending to Sandy near Llanelli. For a time the company worked the separate Gwendraeth Valleys Railway. The BP&GVR was notable because of the very low height of some overbridges, a legacy of the canal conversion.

<span class="mw-page-title-main">West Wales lines</span> Railway lines west of Swansea, Wales

The West Wales lines are a group of railway lines from Swansea through Carmarthenshire to Pembrokeshire, West Wales. The main part runs from Swansea to Carmarthen and Whitland, where it becomes three branches to Fishguard, Milford Haven and Pembroke Dock.

<span class="mw-page-title-main">Pantyffynnon railway station</span> Railway station in west Wales

Pantyffynnon railway station is a railway station serving the village of Pantyffynnon, in Carmarthenshire, Wales. It is situated on the Heart of Wales Line at its junction with the branch lines to Brynamman and Abernant.

<span class="mw-page-title-main">Pontarddulais railway station</span> Railway station in Swansea, Wales

Pontarddulais railway station serves the town of Pontarddulais and village of Hendy in Swansea, Wales. The station is located at street level not far from the town centre and the Loughor estuary. All trains serving the station are operated by Transport for Wales.

<span class="mw-page-title-main">Llandeilo railway station</span> Railway station in Carmarthenshire, Wales

Llandeilo railway station serves the town of Llandeilo, Carmarthenshire. The station is 30+34 miles (49 km) north east of Swansea on the Heart of Wales Line.

<span class="mw-page-title-main">Llandovery railway station</span> Railway station in Carmarthenshire, Wales

Llandovery railway station serves the market town of Llandovery, Carmarthenshire, Wales. The station is on the Heart of Wales Line 42 miles (68 km) north east of Swansea and is located at Tywi Avenue.

<span class="mw-page-title-main">Garnant</span> Village in Carmarthenshire, Wales

Garnant is a mining village in the valley of the River Amman in Carmarthenshire, Wales, north of Swansea. Like the neighbouring village of Glanamman it experienced a coal-mining boom in the 19th and early 20th centuries, but the last big colliery closed in 1936 and coal has been extracted fitfully since then. The village has the only Commissioners' church built in southwest Wales, traditionally a Methodist region.

The Amman Valley Railway Society is situated near the former Gwaun Cae Gurwen branch line, that runs alongside the River Amman, some 10 miles (16 km) north of Swansea in west Wales. Its primary focus is to construct Swansea 9 Lines, an eco-friendly tram system to the heart of Swansea and the surrounding areas. The project was originally based on a heritage railway proposal on a lines that formerly served the various collieries of the area north of Swansea and Llanelli.

The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, mostly to transport the products of the Merthyr iron industries to ports on Swansea Bay.

The Carmarthen and Cardigan Railway was a 7 ft 14 in broad gauge railway line in Wales that was intended to connect Carmarthen on the South Wales Railway with Cardigan. In fact, it was unable to raise the necessary capital and was loss-making from the time of opening the first short section of its line in 1860, and it was in receivership for much of its life. It eventually reached Llandysul in 1864 but was not extended further during its independent existence.

The South Wales Railway was a main line railway which opened in stages from 1850, connecting the Great Western Railway from Gloucester to South Wales. It was constructed on the broad gauge. An original aspiration was to reach Fishguard to engender an Irish ferry transit and transatlantic trade, but the latter did not materialise for many years, and never became an important sector of the business. Neyland was the western terminus of the line until 1906.

The Dulas Valley Mineral Railway was incorporated in 1862 to bring coal from the Onllwyn area north-east of Neath to the quays there, and in the following year was reconstituted as the Neath and Brecon Railway. The line was opened as far as Onllwyn in 1863.

The Rhondda and Swansea Bay Railway was a Welsh railway company formed to connect the upper end of the Rhondda Fawr with Swansea, with the chief objective of transporting coal and other minerals to Swansea docks. It was incorporated in 1882, but at first the connection to Swansea from Briton Ferry was refused.

<span class="mw-page-title-main">Pembroke and Tenby Railway</span> United Kingdom legislation

The Pembroke and Tenby Railway was a locally promoted railway in Pembrokeshire, Wales. It was built by local supporters and opened in 1863. The line, now known as the Pembroke Dock branch line, remains in use at the present day.

The Llanelly and Mynydd Mawr Railway was authorised in 1875. It made use of part of the long defunct Carmarthenshire Railway or Tramroad of 1801. The older line began running trains in 1803, and was a plateway of about 4 ft gauge, with horse traction, for the purpose of bringing minerals from the Mynydd Mawr to the sea for onward shipment at Llanelly Docks.

The Great Western Railway was a railway company that was dominant in West Wales, in the United Kingdom.

<span class="mw-page-title-main">Garnant railway station</span> Disused railway station in Garnant, Carmarthenshire

Garnant railway station served the village of Garnant, Carmarthenshire, Wales, from 1840 to 1958 on the Brynamman Branch.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Denman, Michael (2012). The Llanelly Railway and Dock Company: The Heart of Wales Pioneer. Ilminster: The Wider View. ISBN   978-0-9535848-9-5.
  2. Carter, E.F. (1959). An Historical Geography of the Railways of the British Isles. London: Cassell.
  3. 1 2 3 4 5 6 7 8 MacDermot, E.T. (1931). History of the Great Western Railway: volume II: 1863 - 1921. London: Great Western Railway.
  4. Priestley, Joseph (1831). Historical Account of the Navigable Rivers, Canals and Railways of Great Britain. London: Longman, Rees, Orme, Brown and Green.
  5. 1 2 3 4 5 6 7 Jones, Gwyn Briwnant; Dunstone, Denis (1999). The Origins of the LMS in South Wales. Llandysul: Gomer Press. ISBN   1-85902-671-0.
  6. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Barrie, D.S.M. (1994). A Regional History of the Railways of Great Britain: volume 12: South Wales. revised by Peter E. Baughan (second ed.). Nairn: David St John Thomas. ISBN   0-946537-69-0.
  7. Letter from Company Secretary dated 14 October 1841, quoted in Denman
  8. 1 2 3 4 Mowat, C.J. (December 1957). "Railways at Gwaun-Cae-Gurwen". Railway Magazine.
  9. 1 2 Baughan, Peter E. (1991). A Regional History of the Railways of Great Britain, volume XI, North and Mid Wales (second ed.). Nairn: David St John Thomas Publisher. ISBN   0-946537-59-3.
  10. Miles, John; Thomas, Keri; Watkins, Tudor (2017). The Swansea Vale Railway. Lydney: Lightmoor Press. p. 28. ISBN   978-1-911038-19-1.
  11. Neele, George P. (1904). Railway Reminiscences. London: McCorquodale & Co., Limited. p. 160.
  12. Cardiff Times. 6 September 1879 via British Newspaper Archive.{{cite news}}: Missing or empty |title= (help)(subscription required)
  13. Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. Wellingborough: Patrick Stephens Limited. ISBN   1-85260-049-7.
  14. 1 2 Cooke, R.A. (1997). Atlas of the Great Western Railway, 1947 (second ed.). Didcot: Wild Swan Publications Limited. ISBN   0-906867-65-7.
  15. Railway Magazine. June 2014.{{cite magazine}}: Missing or empty |title= (help)
  16. Organ, John (2009). Llandeilo to Swansea including the Llanelli and Carmarthen Branches. Midhurst: Middleton Press. ISBN   978-1-906008-46-8.
  17. Quick, M.E. (2002). Railway Passenger Stations in England Scotland and Wales—A Chronology. The Railway and Canal Historical Society.
  18. Cobb, Col M.H. (2003). The Railways of Great Britain—A Historical Atlas. Shepperton: Ian Allan Publishing Limited. ISBN   07110-3003-0.

Further reading