Van Railway

Last updated

The former track bed. Van Railway Track bed - geograph.org.uk - 218191.jpg
The former track bed.
A 1912 Railway Clearing House map showing railways in Central Wales, including the Van Railway (upper right) Central Wales District RJD 154.jpg
A 1912 Railway Clearing House map showing railways in Central Wales, including the Van Railway (upper right)

The Van Railway was a standard gauge railway in mid Wales. The line was built in 1871 to link the highly productive lead mines at Van, near Llanidloes to the main Cambrian line at Caersws. The mines closed in 1920, but the railway remained open until 1940.

Contents

Route

The line ran westwards from Caersws along the Cerist and Trannon river valleys, with halts near Penisafmanledd and Y Fan. An underground railway portal has been restored at the mine site.

Traffic

Passengers were carried from 1873 until 1879. General freight was carried by the Cambrian Railways in 1896, to which company the line was leased. [1] The railway was a private venture by Earl Vane, who also leased the mine to the mining company and was the chairman of the Cambrian Railway Company. It was built by David Davies of Llandinam, the contractor and colliery owner. [2]

John Ceiriog Hughes

Until his death in 1887, John Ceiriog Hughes was Manager of the Van Railway, and it is said that many passengers "made pilgrimage along its short length ... for a chance of conversing with one of (Wales') most notable characters". [1]

Related Research Articles

Caersws railway station Railway station in Powys, Wales

Caersws railway station is a railway station on the Cambrian Line in mid-Wales, serving the village of Caersws. It is notable that there is a distance of 22 miles (35 km) between this station and Machynlleth, the longest distance between two intermediate stations in Wales.

The Aberystwith and Welsh Coast Railway was a standard gauge railway company, running a line along the west coast of Wales.

Penygroes railway station

Penygroes railway station was located in Penygroes, Gwynedd, Wales.

The Denbigh, Ruthin and Corwen Railway was a standard gauge railway line that connected Corwen with Denbigh via Ruthin in North Wales.

Thomas Savin

Thomas Savin was a British railway engineer who was the contractor who built many railways in Wales and the Welsh borders from 1857 to 1866. He also in some cases was an investor in such schemes.

The Mawddwy Railway was a rural line in the Dyfi Valley in mid-Wales that connected Dinas Mawddwy with a junction at Cemmaes Road railway station on the Newtown and Machynlleth Railway section of the Cambrian Railways.

Strata Florida railway station

Strata Florida was a railway station in Wales on the former Carmarthen to Aberystwyth Line serving the villages of Ystrad Meurig, Pontrhydfendigaid and Ffair-rhos. The Manchester and Milford Railway (M&MR) opened from Pencader to Aberystwyth on 12 August 1867. The line went into receivership from 1875 to 1900.

The Vale of Clwyd Railway (VoCR) was a standard-gauge line which connected the towns of Rhyl and Denbigh via St Asaph in North Wales.

The Vale of Towy Railway (VoTR) was a Welsh railway that provided an 11.25 mile-long extension of the Llanelly Railway from Llandeilo to Llandovery. It was incorporated by Act of Parliament of 10 July 1854 and opened on 1 April 1858.

The Llanidloes and Newtown Railway (L&NR) was a railway company between Llanidloes and Newtown in Montgomeryshire, Wales. It was promoted locally when plans for trunk railways passing through the locality were cancelled; local people saw that a railway connection was essential to the flannel industry in the district. The 17-mile (27 km) line opened in 1859, and at first was isolated from any other railway, but from 1861 it became connected to Oswestry by an allied railway company, and other companies also connected to it. From 1864 the company was incorporated into the new Cambrian Railways company.

The Red Wharf Bay branch line was a standard gauge railway line in Anglesey, Wales, a branch off the Anglesey Central Railway. It opened fully in 1909, but closed to passengers in September 1930. Freight operations continued until 3 April 1950, and the tracks were lifted during the summer of 1953.

The Morda Tramway refers to two industrial railways south of Oswestry, on the border between England and Wales. They connected the coal pits around Morda to transport networks, the first to the Montgomery Canal and the second to the Cambrian Railways at Whitehaven.

The Shrewsbury and Welshpool Railway (S&WR) is a standard gauge railway which connects the towns of Shrewsbury and Welshpool. It opened in 1861 and the majority of the railway continues in use.

Hay Railway

The Hay Railway was an narrow gauge horse-drawn tramway in the district surrounding Hay-on-Wye in Brecknockshire, Wales. The railway connected Eardisley in Herefordshire, England, with Brecon in Wales. The Brecon terminus was Watton Wharf on the Brecknock and Abergavenny Canal.

The Elan Valley Railway (EVR) was a Welsh industrial railway built to assist in the construction of the Elan Valley Reservoirs in mid Wales. It was in operation from 1896 to about 1912/1916.

The Conway and Llanrwst Railway was a standard gauge railway built to connect the Welsh coastal town of Conway, nowadays addressed by its Welsh name of Conwy, with the inland towns of Llanrwst and Betws y Coed. It opened in 1863 and was eventually absorbed into the lines operated by the London and North Western Railway. In 2008 it continues to operate as part of the Conwy Valley Line.

Mid-Wales Railway

The Mid-Wales Railway was a railway company intended to make a trunk route through Wales, connecting industrial areas of north west England with sea ports in south west Wales. In fact it was prevented from reaching its goal by competing proposals in Parliament, and it was limited to a line between Llanidloes and a junction with the Brecon and Merthyr Railway 5 miles (8 km) east of Brecon. It was 70 miles (110 km) in length and opened in 1864. It had found it impossible to raise share subscription, but the contractor partnership of Davies and Savin agreed to build the line and take shares in payment,

Carno railway station Former railway station on the Cambrian Line, Wales which is proposed for reopening

Carno is a closed railway station in Carno, on the Cambrian Line, that was part of the Newtown and Machynlleth Railway. The station was closed in 1965 as part of the Beeching Cuts though there are proposals to re-open it.

Ely Valley Railway Railway in south Wales, United Kingdom

The Ely Valley Railway (EVR) was a broad gauge railway company in South Wales, which opened a mineral line between Llantrisant station on the South Wales Railway main line and pits at Mwyndy and Penrhiwfer in 1860.

Newtown and Machynlleth Railway

The Newtown and Machynlleth Railway was a railway company in Wales. It built a line from a junction with the Llanidloes and Newtown Railway near Caersws to the market town of Machynlleth; the line opened in 1862. Newtown had become the hub of railway lines in the district. Machynlleth was an important town, and extension from there to Aberystwyth and to the coast northward was in the minds of the promoters.

References

  1. 1 2 Gasquoine, C. P. (1973). The Story of the Cambrian. Christopher Davies Ltd.
  2. Johnson, Peter (2013). The Cambrian Railways - a new history. Oxford Publishing Co. ISBN   978 0 86093 644 2.