Ampang and Sri Petaling lines extension

Last updated
Ampang and Sri Petaling lines extension
Sri Petaling line LRT viaduct in Puchong Jaya (211106).jpg
LRT viaduct is being built under the extension project in Puchong
Overview
StatusOpened
Owner Prasarana Malaysia
LocaleMalaysia
Termini
Stations11
Service
Type Rapid transit
System Klang Valley Integrated Transit System
Services1
Operator(s) RapidKL
Depot(s)Putra Heights
History
Opened30 June 2016
Technical
Line length17.7 km
Operating speed70 km/h

The Ampang and Sri Petaling lines extension is an extension of the Sri Petaling line completed in 2016, extending 17.7 kilometres from Sri Petaling to Putra Heights, Malaysia.

Contents

History

Extensions to the LRT Kelana Jaya Line and Ampang and Sri Petaling Lines (formerly known as PUTRA and STAR LRT, respectively) were proposed by the Malaysian government in 2006. The proposal suggested extensions from Kelana Jaya and Sri Petaling to USJ and Puchong, respectively, converging at Putra Heights. [1] [note 1] The extension is named the "LRT Extension Project" (LEP) and will be part of a RM10 billion plan to expand Kuala Lumpur's public transport network.

The proposed extension included 17.7 km of elevated track to serve 11 new stations and extended the line terminus from Sri Petaling to Putra Heights. [2]

Opening

The initial section of the extension opened on 31 October 2015, with four new stations: Awan Besar, Muhibbah, Alam Sutera and Kinrara BK 5. The fare of the extension was free for one month while passengers had to change trains at Sri Petaling. [3] The second section opened five months later to Bandar Puteri, with intermediate stations at IOI Puchong Jaya, Pusat Bandar Puchong and Taman Perindustrian Puchong. [4]

The final extension, inclusive of the Kelana Jaya line, was completed and opened on 30 June 2016. The new stations along this extension are at Puchong Perdana, Puchong Prima, Putra Heights. [5]

Fare increases are based on the distance traveled on the extension. [6]

Services and rolling stock

For the extension, 50 new sets of six-car light rail vehicles (LRV) were ordered from CRRC Zhuzhou Locomotive Co., Ltd. Eight sets served the initial section from Sri Petaling to Kinrara BK 5. The trains were designed to provide more comfort for commuters. The new trains are equipped with wheelchair compartments, designated priority seating, walkthrough carriages, stainless steel seats, onboard destination displays, an integrated dynamic route map, and CCTV cameras for additional security, providing the line with these features for the first time. [7] [8] [9]

Infrastructure

As part of a green initiative, the extension includes green practices. Energy-efficient lights and rainwater harvesting systems were installed in every station. Windows were designed to allow sunlight into the stations. Construction utilized sustainable materials and recycling practices. [10]

Notes and references

Notes

  1. In addition to these two extensions, a new line between Kota Damansara and Cheras (later to become the Kajang line) was proposed to improve public transport in the Klang Valley. [1]

Related Research Articles

Subang Jaya City in Selangor, Malaysia

Subang Jaya is a city in Petaling District, Selangor, Malaysia. It comprises the southern third district of Petaling. It consists of the neighbourhoods from SS12 to SS19, UEP Subang Jaya (USJ), Putra Heights, Batu Tiga as well as PJS7, PJS9 and PJS11 of Bandar Sunway, the latter of which are partially jurisdictional within Petaling Jaya under the MBPJ. The city is governed by Subang Jaya City Council (MBSJ), which also governs other areas of the Petaling district, such as Puchong and Seri Kembangan. According to Subang Jaya City Council, Subang Jaya has a population of 642,100 in 2015, which makes it the sixth largest city in Malaysia by population.

UEP Subang Jaya Township in Selangor, Malaysia

UEP Subang Jaya is a major affluent township located in Subang Jaya, Selangor, Malaysia. It is located within the Mukim (sub-district) of Damansara in the district of Petaling.

Rapid KL Public transportation system in Malaysia

Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. With its coverage throughout Kuala Lumpur and Klang Valley areas, it was followed by a federal government restructuring of public transport systems in Kuala Lumpur after the bankruptcy of STAR and PUTRA Light Rapid Transit operators, the precursors to the Ampang/Sri Petaling Lines and Kelana Jaya Line respectively. In 2003, it had inherited bus services and assets formerly operated and owned by Intrakota and Cityliner after being bailed out. Four years later, the Malaysian government had bailed out KL Infrastructure Group, the owner and operation concession holder for the Kuala Lumpur monorail, and had placed it under ownership of Prasarana.

Kelana Jaya line Rapid transit line in Kuala Lumpur, Malaysia

The LRT Kelana Jaya Line is a medium-capacity light rapid transit (LRT) line and the first fully automated and driverless rail system in the Klang Valley, Malaysia. It forms a part of the Klang Valley Integrated Transit System in and around Kuala Lumpur, Malaysia. Servicing 37 stations, the line has 46.4 km of grade-separated tracks running mostly on underground and elevated guideways. Formerly known as the PUTRA LRT, It is operated as part of the RapidKL system by Rapid Rail, a subsidiary of Prasarana Malaysia. The line is named after its former terminus, Kelana Jaya station.

Puchong Town in Selangor, Malaysia

Puchong is a major town and a parliamentary constituency in Petaling District, Selangor, Malaysia.

Putra Heights Town in Selangor, Malaysia

Putra Heights is a residential township in Subang Jaya, Selangor, Malaysia. It is located within the mukim of Petaling District. The township is visible by the tall Bukit Cermin in Putra Heights.

Masjid Jamek LRT station LRT station in Kuala Lumpur, Malaysia

Masjid Jamek LRT station is a rapid transit station in Kuala Lumpur, Malaysia. It is the interchange station between two of Rapid KL's light rapid transit (LRT) systems, namely the LRT Ampang and Sri Petaling Lines and the LRT Kelana Jaya Line. The station is one of the only two stations that integrate the LRT lines, the other being Putra Heights station. The station is situated near, and named after the Masjid Jamek in central Kuala Lumpur.

Kelana Jaya LRT station

Kelana Jaya LRT station is a light rail station on the Kelana Jaya Line. It was the former western terminus for passenger services on the line. It is the start of the LRT Extension Project which extended the current terminus to Putra Heights station. It is also the namesake for the LRT line.

Transportation in the Klang Valley includes Kuala Lumpur, the capital city of Malaysia, and its surrounding areas. This includes a road network, a railway network, airports, and other modes of public transport. The Klang Valley is an urban conglomeration consisting of the city of Kuala Lumpur, as well as surrounding towns and cities in the state of Selangor. The Klang Valley has the country's largest airport, the Kuala Lumpur International Airport (KLIA), as well as the country's largest intermodal transport hub and railway station, Kuala Lumpur Sentral.

Rapid Rail Sdn Bhd is the operator of the rapid transit (metro) system serving Kuala Lumpur and the Klang Valley area in Malaysia. A subsidiary of Prasarana Malaysia, it is the sole operator of five rapid transit lines which collectively form the Rapid KL rapid transit system. The system currently consists of three light rapid transit (LRT) lines, two mass rapid transit (MRT) lines and a monorail line, with another MRT and LRT line currently under construction.

Kajang line Railway line in the Klang Valley, Malaysia

The MRT Kajang Line, previously known as the Sungai Buloh–Kajang Line, is a mass rapid transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the RapidKL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.

Ampang and Sri Petaling lines Malaysian passenger railway lines

The LRT Ampang Line and the LRT Sri Petaling Line are medium-capacity light rapid transit (LRT) lines in the Klang Valley, Malaysia. The combined network comprises 45.1 kilometres of tracks with 36 stations and was the first railway in Malaysia to use standard-gauge track and semi-automated trains. It is operated as part of the RapidKL system by Rapid Rail, a subsidiary of Prasarana Malaysia.

Putra Heights LRT station

Putra Heights is a Klang Valley Rapid Transit station in Putra Heights in the southern Subang Jaya. The station are the southern terminus for the Sri Petaling Line and Kelana Jaya Line. The station is located on the intersection of Persiaran Putra Indah and Persiaran Putra Perdana, next to E6 ELITE. Nearby places include Kampung Kuala Sungai Baru, Laman Putra, Putra Indah and Putra Point Commercial Centre.

Pusat Bandar Puchong LRT station

Pusat Bandar Puchong LRT station is a light rapid transit station at Puchong Town Centre, in Puchong, Selangor. It is operated under the Sri Petaling Line network, between Taman Perindustrian Puchong and IOI Puchong Jaya station. The station is located just beside the busy Damansara-Puchong Expressway (LDP). Like most other LRT stations operating in Klang Valley, this station is an elevated station, which consists of two side platforms.

Taman Perindustrian Puchong LRT station

Taman Perindustrian Puchong LRT station is a Light Rapid Transit station at Puchong Industrial Park, in Puchong, Selangor, Malaysia. It is part of the Sri Petaling Line, which is situated between Bandar Puteri station and Pusat Bandar Puchong station. Like most other LRT stations operating in Klang Valley, this station is elevated.

Bandar Puteri LRT station

Bandar Puteri LRT station is a Light Rapid Transit station situated in Bandar Puteri, Puchong. It is operated under the Sri Petaling Line network and is situated between Puchong Perdana and Taman Perindustrian Puchong station. Like most other LRT stations operating in Klang Valley, this station is elevated.

Puchong Prima LRT station

Puchong Prima LRT station is a Light Rapid Transit station at Puchong Prima, a township in Puchong, Petaling District, Selangor, Malaysia. It is served by the LRT Sri Petaling Line, which is situated between the terminus of the line, Putra Heights station and Puchong Perdana station.

Taman Putra Perdana is a township in Dengkil sub-district, Sepang District, Selangor, Malaysia. Although the township's postcode is 47100 / 47120 / 47130, which gives it Puchong postal address, it is actually in the Sepang constituency of Selangor, administered by the Sepang Municipal Council (MPSepang). The township was developed by Kenshine Corporation in 1997.

The following is an alphabetical list of articles related to Selangor.

The Kelana Jaya line extension is an extension of one of the Klang Valley LRT lines completed in 2016. It is 17 km in length from Kelana Jaya to Putra Heights.

References

  1. 1 2 "Kota Damansara-Cheras Rail Line Right on Track". The Star. 15 June 2008. Archived from the original on 27 October 2018.
  2. "George Kent-Lion Pacific JV gets Ampang Line extension job". Archived from the original on 12 September 2017. Retrieved 28 November 2018.
  3. "RapidKL: Free Rides on Ampang Line LRT Extension for One Month". The Star. 27 October 2015. Archived from the original on 25 November 2018. Retrieved 25 November 2018.
  4. "Prasarana announces partial opening of Sri Petaling LRT line". 28 March 2016. Archived from the original on 28 November 2018. Retrieved 28 November 2018.
  5. "Kelana Jaya and Ampang LRT Line Extension to Open on June 30 as Scheduled". New Straits Times. 25 June 2016. Archived from the original on 26 June 2016.
  6. "Integrated Fare Table". RapidKL. 25 July 2017. Archived from the original on 25 November 2018. Retrieved 25 November 2018.
  7. "'Amy' to hit the tracks in October". The Star. Kuala Lumpur. 30 January 2015. Retrieved 17 March 2015.
  8. Cheong, Sam (28 February 2014). "RapidKL gets 50 coaches for Ampang Line route". The Star. Kuala Lumpur. Retrieved 17 March 2015.
  9. "Ampang Line to get new trains in 2015". The Star. Kuala Lumpur. 21 October 2014. Retrieved 17 March 2015.
  10. "Extensions of Ampang and Kelana Jaya lines proceeding smoothly". The Star. 26 April 2014. Archived from the original on 25 November 2018. Retrieved 25 November 2018.