BARD Offshore 1

Last updated
BARD Offshore 1
Bard Offshore 2011.JPG
BARD Offshore 1
Country
  • Germany
Coordinates 54°21′30″N5°58′30″E / 54.3583°N 5.975°E / 54.3583; 5.975
StatusOperational
Commission date
  • 2010
Wind farm
Type
Hub height
  • 60 m (200 ft)
Rotor diameter
  • 122 m (400 ft)
Power generation
Units operational80 × 5 MW
Make and modelBARD 5.0 (80)
Nameplate capacity
  • 400 MW
External links
Website www.bard-offshore.de/en/projects/offshore/bard-offshore-1
Commons Related media on Commons
BARD Offshore 1
Wind farm layout
BARD Offshore 1's location in the wind farms of the German Bight Map of the offshore wind power farms in the German Bight.png
BARD Offshore 1's location in the wind farms of the German Bight

BARD Offshore 1 is a 400 megawatt (MW) North Sea offshore wind farm with 80 BARD 5.0 turbines. Since the owner could not buy such 5MW offshore wind turbines in sufficient numbers in 2006, Dr. Bekker set up its own production of turbines. This should serve as the legacy for his children. The systems were developed by aerodyn Energiesysteme GmbH. A plant for rotor blades and nacelle assembly was built in Emden and a plant for the offshore foundations in Cuxhaven. Two turbine prototypes were set up at the Rysumer Nacken in 2007, and another prototype in Hooksiel in 2008. Construction was finished in July 2013 [1] and the wind farm was officially inaugurated in August 2013. [2] The wind farm is located 100 kilometres (60 mi) northwest of the isle Borkum in 40-metre (130 ft) deep water. [3]

Contents

Laying of cables to connect the wind farm started on 23 July 2009. [4] The 200 km connection is the longest of its kind in the world. It is also the first connection of an offshore wind park realized as HVDC-transmission. Construction of the wind turbines began in March 2010. [5] The first turbine became operational at the beginning of December 2010. Construction was assisted by the purpose-built Wind Lift 1 barge / platform, which placed the 470 ton, 21 meter foundations on the sea bed.

The project has run into serious and unclear problems, including being three years behind schedule and, at a cost of €3 billion, run significantly over budget. A diver [6] and a worker died during construction. [7] [8] The farm was supposed to go online in August 2013, but a series of setbacks, including a fire at a transmission station in March 2014, have delayed its activation. [9] BARD went bankrupt in November 2013. [10] Problems include overvoltage and harmonics [11] between BARD and the BorWin 1 grid link and BorWin Alpha HVDC converter platform. [12]

BARD's original owner had decided to make all components within the company, and troubles from the custom transformer are unrelated to standard equipment used elsewhere. [13]

As of January 2015, most of the turbines were not supplying power to shore, costing ratepayers €2million per day. [14]

In September 2015, StatKraft and Ocean Breeze extended their contract for two years. [15]

By May 2016, the company website stated that the wind farm had produced 3 terawatt-hours (11 PJ), and was running stably at full capacity. [16]

Availability increased from 66% in 2014 to 95% by 2017. The feed-in tariff is €150/MWh to €190/MWh until 2024. [17] Macquarie Infrastructure and Real Assets purchased the facility in 2019. [18]

See also

Related Research Articles

<span class="mw-page-title-main">Wind power in Germany</span> Overview of wind power in Germany

Wind power in Germany is a growing industry. The installed capacity was 55.6 gigawatts (GW) at the end of 2017, with 5.2 GW from offshore installations. In 2019, a quarter of the country's total electricity was generated using wind power, compared to an estimated 9.3% in 2010.

<span class="mw-page-title-main">Riffgat</span> German offshore wind farm

Riffgat is an offshore wind farm 15 kilometres (9.3 mi) to the north-west of the German island of Borkum and north of the eponymous shipping channel in the southern North Sea. The wind turbines are built across an area of 6 square kilometres (2.3 sq mi). It consists of 30 turbines with a total capacity of 108 megawatt (MW), and is expected to generate enough electricity for 112,000 households.

<span class="mw-page-title-main">Offshore wind power</span> Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

<span class="mw-page-title-main">DanTysk</span>

DanTysk is a 288 megawatt (MW) offshore wind farm in the North Sea 70 kilometres (43 mi) west of the island Sylt, in the German EEZ at the border to Denmark. The wind farm operates 80 Siemens Wind Power's SWT-3.6-120 turbines with a capacity of 3.6 MW each.

<span class="mw-page-title-main">HVDC BorWin1</span>

HVDC BorWin1 is the first HVDC facility in the world to be built for importing power from an offshore wind park to shore, and the first to use voltage source converters (VSC) in Germany. It connects the offshore wind park BARD Offshore 1 and other offshore wind farms in Germany near Borkum to the European power grid. The facility was built by ABB and has a capacity of 400 MW at a bipolar voltage of ±150 kV. HVDC BorWin1, which leads from BorWin Alpha Offshore Platform to Diele substation, consists of a 75 kilometres (47 mi) of underground and 125 kilometres (78 mi) of submarine cable.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of August 2023, wind power in the Netherlands has an installed capacity of 8,865 MW, 27.7% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

<span class="mw-page-title-main">North Sea Link</span> Subsea electricity transmission line

The North Sea Link is a 1,400 MW high-voltage direct current submarine power cable between Norway and the United Kingdom.

HVDC DolWin1 is a high voltage direct current link built to transmit offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters are used and the total cable length is 165 km. The project was built by ABB and was handed over to its owner, TenneT, in July 2015, the fifth such project to be completed in Germany in 2015.

<span class="mw-page-title-main">HVDC HelWin1</span>

HVDC HelWin1 is a high voltage direct current (HVDC) link built to transmit Offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters are used and the total cable length is 130 km. The project was completed and handed over to its owner, TenneT, in February 2015.

<span class="mw-page-title-main">Westermost Rough Wind Farm</span>

Westermost Rough Wind Farm is an offshore wind farm 8 kilometres (5 mi) north east of Withernsea off the Holderness coast, in the North Sea, England. The farm covers an area of approximately 35 km2 (14 sq mi) with a generation capacity of approximately 210 MW. It became operational in May 2015.

<span class="mw-page-title-main">Trianel Windpark Borkum</span>

Trianel Windpark Borkum is an offshore wind farm near Borkum. Its first phase of 40 turbines rated at a total capacity of 200 MW is operational, with a planned, additional 200 MW in a second phase. The project was approved for construction in 2008 and will cost over €1 billion to construct once fully operational. Originally known as Borkum West II the name was changed to Trianel Windpark Borkum in early 2013.

<span class="mw-page-title-main">HVDC BorWin2</span>

HVDC BorWin2 is a high voltage direct current (HVDC) link built to transmit offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters are used and the total cable length is 200 km. The project was completed by the Siemens/ Prysmian consortium and handed over to its owner, TenneT, in January 2015, becoming the first such project to be completed.

HVDC DolWin3 is a high voltage direct current (HVDC) link to transmit Offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters with DC ratings of 900 MW, ±320 kV are used and the total cable length is 160 km.

HVDC BorWin3 is a high voltage direct current (HVDC) link under construction to transmit offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters with DC ratings of 900 MW, ±320 kV are used and the total cable length is 160 km. The project is the most recent of the German offshore HVDC projects to be awarded. It is being built by the Siemens/ Petrofac consortium with the offshore platform contract awarded to Drydocks World in Dubai. The project is expected to be handed over to its owner, TenneT, in 2019. The project started power transmission in August 2019. TenneT took control of operations in February 2020.

Hornsea Wind Farm is a Round 3 wind farm which began construction in 2018. Sited in the North Sea 120 km (75 mi) off the east coast of England, the eventual wind farm group is planned to have a total capacity of up to 6 gigawatt (GW).

Kriegers Flak is a 605 MW offshore wind farm in the Baltic Sea on the Danish part of the reef of the same name. It forms part of a new 400 MW interconnector between Denmark and Germany.

<span class="mw-page-title-main">Veja Mate Offshore Wind Farm</span>

Veja Mate is a German 402 MW offshore wind farm in the German Bight of the North Sea about 95 km northwest of Borkum. The wind farm consists of 67 Siemens Wind Power SWT-6.0-154 turbines, each with a 6 MW capacity.

<span class="mw-page-title-main">Baltic 2 Offshore Wind Farm</span>

EnBW Baltic 2 is an offshore wind farm in the German section of the Kriegers Flak reef in the Baltic Sea. The wind farm uses 80 Siemens SWT 3.6-120 wind turbines for a total capacity of 288 megawatt. Baltic 2 is connected to Germany via Baltic 1, but is also connected to Denmark via the adjacent offshore wind farm ″Kriegers Flak″ in 2020, creating a 400 MW AC offshore grid synchronized to the east Denmark network. The cable to Denmark costs €350m, of which €150m comes from the EU.

References

  1. Press release: Pioneering wind farm project BARD Offshore 1 successfully completed on the high seas Archived 2014-08-21 at the Wayback Machine
  2. German Federal Minister Inaugurates BARD Offshore 1
  3. 5-MW BARD Near-shore Wind Turbine Erected in Germany
  4. DDP: Laying cables to wind farm started (in German)
  5. Wind farm in the ocean ready to go (in German)
  6. "Tauchunfall im Windpark" Diving accident in the wind farm Die Welt , 27 July 2010. Accessed: 25 February 2015.
  7. Pressemitteilung der BARD-Gruppe vom 27. Januar 2012 Archived 2015-04-02 at the Wayback Machine (PDF; 117 kB)
  8. Mitteilung der DGzRS, retrieved, 4 February 2012 [ permanent dead link ]
  9. Germany's Expensive Gamble on Renewable Energy by Matthew Karnitschnig, The Wall Street Journal , August 26, 2014.
  10. "Bard is bankrupt". renewablesinternational.net. Archived from the original on 2016-03-04. Retrieved 2015-11-02.
  11. "Rätselhafter Defekt legt größten Windpark lahm" Enigmatic defect paralyzes largest wind farm Die Welt , 3 September 2014. Accessed: 25 February 2015.
  12. Knight, Sara (29 May 2015). "Politics block German offshore wind link". windpowermonthly.com. Archived from the original on 6 September 2015.
  13. "Größter deutscher Meereswindpark fällt aus" The largest German offshore wind park falls out Die Welt , 7 July 2014. Accessed: 25 February 2015.
  14. "Im größten Meereswindpark dreht sich wenig" In the largest offshore wind park little turns Die Welt , 26 January 2015. Accessed: 25 February 2015.
  15. "Statkraft vermarktet Strom aus Bard Offshore 1 für weitere zwei Jahre". windmesse.de.
  16. "Ocean Breeze | Home". Archived from the original on 2016-07-05.
  17. Heap, Richard (30 July 2020). "Bard Offshore 1: 'How we turned it around' - Richard Heap". www.awordaboutwind.com. Archived from the original on 14 August 2020.
  18. "Macquarie to acquire 400MW BARD Offshore 1 wind farm from Unicredit". 8 August 2019. Archived from the original on 21 October 2020.