The Bawtry to Haxey railway line was a line built on the border of Nottinghamshire, Lincolnshire and Yorkshire, opening in 1912. It was part of an earlier scheme to convey coal from a new colliery at Tickhill to Grimsby for export. After authorisation, its promoters did not proceed with construction, and when the South Yorkshire Joint Railway was built, serving Tickhill and other developing pits, that line was a better outlet for the minerals and the promoters lost interest in the Tickhill line.
Eventually the Great Northern Railway adopted the powers and built the line, but it never carried mineral trunk hauls and became simply an insignificant agricultural siding. It closed in 1964 or 1965.
Towards the end of the nineteenth century, a new colliery was being developed at Tickhill, in South Yorkshire about three miles west of Bawtry. Rail access to Grimsby was critical to the commercial success of the pit, and the owners promoted the Tickhill Light Railway. This was to run from the colliery at Tickhill to a junction with the Great Northern Railway at Bawtry, on the East Coast Main Line, and from there it was to run on to a junction with the Great Northern and Great Eastern Joint Railway at Haxey. It was expected to be able to continue from there to Goole over the Axholme Joint Railway, at the time being promoted by the North Eastern Railway and the Lancashire and Yorkshire Railway jointly. The section from Bawtry to Haxey followed closely the route originally authorised to the Great Northern Railway in 1846, but never built by them. [1] [2]
The promoters of the proposed line got a Light Railway Order dated 7 Aug 1901 for a line from Haxey to Bawtry and Tickhill. However, at this stage they did nothing towards construction, and meanwhile the Axholme Joint Railway was opened to Haxey on 3 November 1904. [3] [1]
Although they did not take any steps toward construction, the impending opening of the Axholme line may have prompted the Tickhill promoters to renew their authorisation: on 22 Sept 1904 they were granted an Extension of Time Order. [3]
On 30 May 1907 the Great Northern Railway board decided to apply for an order to take over the Tickhill Light Railway's powers themselves, paying £2,300 to the original promoters; the transfer was granted in July 1908. The intended junction at Haxey was simplified; originally it had been proposed to cross directly to the Axholme Joint Railway, but this was not needed by the Great Northern Railway; the simplification would save £10,000. Still not making this a priority, in June 1910 the board ordered construction between Bawtry and Haxey, as soon as land could be obtained, at an estimated cost of £88,000. Haxey was on the Great Northern and Great Eastern Joint Line; as the connection was planned to bring coal to the line for transport south, the Great Eastern Railway agreed to pay for part of Haxey junction. The Great Eastern Railway interest must have been to get access for its trains to the Tickhill colliery area, although they would have needed to construct the Bawtry to Tickhill section themselves. [4]
A trade periodical reported in November 1911 that
A start has been made in the last few days on the new line which the Great Northern Railway are constructing between Bawtry and Haxey and which will be a valuable link in view of prospective colliery developments. The line which will be eight miles long is to cost £30,000 and will occupy about twelve months in construction. The contractors are Messrs H. Lovatt Ltd. Collieries have been spoken of at South Carr and Misterton and for these, together with the new pit to be sunk at Harworth [this became [Harworth Main Colliery], the line will be very valuable. Some months ago, a survey was made for a siding from the Harworth Colliery to connect with the Great Northern line near Scrooby. As most of the coal will go eastward, the connection will very likely be carried to Bawtry, in which event it would be an easy matter to extend the line via Harworth to Tickhill and link up with the Five Companies' line. The Order gives power to carry the line to Tickhill. [5]
Harworth was located midway between Rossington and Firbeck. The exploration lease was held by a German combine headed by Hugo Stinnes. A line connecting the site to the East Coast Main Line at Scrooby was authorised in August 1912 and a temporary line laid for the sinkers, using a German locomotive. With the outbreak of war, all work at Harworth was suspended in August 1914. [6]
The Bawtry to Haxey line was opened for goods traffic only on 26 August 1912; [note 1] it consisted of eight miles of single line. In the meantime the Tickhill colliery had been connected to the South Yorkshire Joint Railway, and construction of the Bawtry to Tickhill section was no longer planned. As predicted by the Iron and Coal Trades Review, the Harworth connection to the main line was made at Scrooby, south of Bawtry and facing south. As a result there was no coal traffic on the Haxey line. There were sidings at Misson goods depot, an agricultural location intermediately on the line, and a private siding for Yorkshire Amalgamated Products. There were three sand and gravel quarries, two near Bawtry and one about half a mile west of Misson. Passenger trains were never contemplated. [8] [6] [2]
It is very doubtful if through traffic was carried between Bawtry and Haxey. It is possible that the central portion of the line was lifted and shipped to France during World War I. The Haxey end was used for wagon storage, having been closed to ordinary traffic before 1923. About three-quarters of a mile of track eastwards from Misson was removed about that time. In 1950 a locomotive went on to the Haxey stub to move wagons and derailed due to the poor state of the track, and immediate permanent closure of the eastern extremity followed. [2]
The western end from Bawtry continued in use due to the sand traffic; in London North Eastern Railway days, two round trips daily were often required. According to Squires, there was no run-round facility on the branch, so returning trains were propelled to Bawtry. [2] However, the Ordnance Survey map for 1921 shows a passing loop to the south of the line at Misson, [9] while in 1964 there was a much longer passing loop to the north of the line as well. [10]
Instead of becoming a trunk haul mineral line, the section from Bawtry to Misson was little more than a farming siding and this finally closed on 1 April 1965, or 7 December 1964, according to other authorities. [11] [2]
The Great Northern Railway (GNR) was a British railway company incorporated in 1846 with the object of building a line from London to York. It quickly saw that seizing control of territory was key to development, and it acquired, or took leases of, many local railways, whether actually built or not. In so doing, it overextended itself financially.
The South Yorkshire Joint Railway was a committee formed in 1903, between the Great Central Railway, the Great Northern Railway, the Lancashire and Yorkshire Railway, the Midland Railway and the North Eastern Railway to oversee the construction of a new railway in the Doncaster area of South Yorkshire, England. The five companies had equal rights over the line, each of the companies regularly working trains over it.
The Axholme Joint Railway was a committee created as a joint enterprise between the Lancashire and Yorkshire Railway (L&Y) and the North Eastern Railway (NER) and was established by the North Eastern Railway Act of 31 July 1902. It took over the Goole and Marshland Railway, running from Marshland Junction near Goole to Reedness Junction and Fockerby, and the Isle of Axholme Light Railway, running from Reedness Junction to Haxey Junction. Construction of the Goole and Marshland Railway had begun in 1898, and by the time of the takeover in early 1903, was virtually complete. The Isle of Axholme Light Railway was started in 1899, but only the section from Reedness Junction to Crowle was complete at the takeover. The northern section opened on 10 August 1903, and the line from Crowle to Haxey Junction opened for passengers on 2 January 1905.
The West Riding and Grimsby Railway was a railway company that promoted a line between Wakefield and Doncaster, in Yorkshire, England. There was also a branch line connection from Adwick le Street to Stainforth, which gave access towards Grimsby. The company was promoted independently, but it was sponsored by the Manchester, Sheffield and Lincolnshire Railway and the Great Northern Railway, and became jointly owned by them.
The A631 is a road running from Sheffield, South Yorkshire to Louth, Lincolnshire in England. It passes through the counties of South Yorkshire, Nottinghamshire and Lincolnshire. The road has many towns on its route including Rotherham, Maltby, Gainsborough and Market Rasen. It is mostly single road throughout its length but has some stretches of dual carriageway as well.
The Great Northern and Great Eastern Joint Railway, colloquially referred to as "the Joint Line" was a railway line connecting Doncaster and Lincoln with March and Huntingdon in the eastern counties of England. It was owned jointly by the Great Northern Railway (GNR) and the Great Eastern Railway (GER). It was formed by transferring certain route sections from the parent companies, and by the construction of a new route between Spalding and Lincoln, and a number of short spurs and connections. It was controlled by a Joint Committee, and the owning companies operated their own trains with their own rolling stock. The Joint Line amounted to nearly 123 miles (198 km) of route.
Misson is a village and civil parish in Nottinghamshire, England. It is located 12 miles north of Retford, and not directly accessible from the rest of Nottinghamshire, as it is on the north bank of the River Idle. Misson Springs, which lie north of the village itself, is the northernmost place within the county. The parish also includes the hamlet of Newington, at its western edge. According to the 2001 census it had a population of 698, increasing to 711 at the 2011 census, and marginally more to 713 residents at the 2021 census.
Haxey and Epworth railway station served the towns of Haxey and Epworth on the Isle of Axholme, Lincolnshire, England. It closed to passengers in 1959 and completely in 1964.
Park Drain was a railway station in Nottinghamshire, close to the border with Lincolnshire. It was on the line between Gainsborough and Doncaster. It closed in 1955 to passengers, and completely in 1964, although the line on which it was located remains open.
Haxey Junction railway station was a station south of the town of Haxey, on the Isle of Axholme in Lincolnshire, England. It was the terminus of the Axholme Joint Railway which ran from Marshland Junction near Goole, and was adjacent to Haxey and Epworth station on the Great Northern and Great Eastern Joint Railway line which ran from Doncaster to Lincoln. Both stations are now closed, although the former Great Northern and Great Eastern Joint Railway line is still operational.
Bawtry railway station was situated to the east of the town of Bawtry, South Yorkshire, England on the Great Northern Railway main line between Retford and Doncaster.
The Bourne and Sleaford Railway was promoted as a branch of the Great Northern Railway to fend off an expected incursion by the rival Great Eastern Railway. It was authorised by Parliament in 1865, but not opened until 1871 and 1872. Although agricultural traffic provided healthy business, the rural character of the line never produced much passenger trade, and it was closed to passengers in 1930. The line was severed and ceased to be a through line in 1956 and closed completely in 1965.
Potteric Carr is a large area of land to the southeast of Doncaster, in Yorkshire, England, over 3,000 acres (12 km2) in size.
The Methley Joint Railway was a short English railway line constructed by the Bradford, Wakefield and Leeds Railway company, connecting its Leeds direction line with other companies' eastward routes to York, the north-east, and Goole. The line connected collieries along its route. The BW&LR changed its name to the West Yorkshire Railway at the same time. The line was double track, just over five miles in length, between junctions at Lofthouse and Methley.
The Grantham and Lincoln railway line was a line in Lincolnshire, built by the Great Northern Railway to shorten the distance between the town of Grantham and city of Lincoln. It had already formed a network in Lincolnshire, but the route from London and points south and west of Grantham was very indirect.
The Lincolnshire lines of the Great Northern Railway are the railways, past and present, in the English county built or operated by the Great Northern Railway.
The Bradford, Wakefield and Leeds Railway was an independent railway company that built a line between Wakefield and a junction close to Leeds, in Yorkshire, England. It opened its main line in 1857, and was worked by the Great Northern Railway. The line shortened the GNR route to Leeds.
The East and West Yorkshire Union Railway was promoted in 1883 to connect the Hull and Barnsley Railway at Drax with Leeds. The company was unable to raise the money it needed to build the line, and it substantially reduced its scope to connecting collieries around Rothwell with the existing main line network nearby. This was successful, with trains running from 1890, but the company decided it would find a way to connect to Leeds and operate a much truncated passenger service, from Rothwell. It sponsored the South Leeds Junction Railway to make a connection from Rothwell to the Midland Railway at Stourton; the SLJR was soon re-absorbed by the E&WYUR. The passenger service started on 4 January 1904 but it was a disastrous failure, and it was soon withdrawn from 1 October 1904.
The Great Northern Railway developed an extensive network over time, having started in 1846 with the intention of connecting London and York, as well as other major Yorkshire towns. The Great Northern Railway in Yorkshire was a major part of that, although the GNR did not succeed in reaching York as it originally intended. By acquiring running powers it reached Leeds, Bradford and Halifax over other companies' lines, as well as Barnsley Sheffield and Grimsby, and then York too. After acquiring local companies it developed a network, chiefly in West Yorkshire. Later it built lines north and west of Bradford into hilly terrain, and these were very expensive to build, and never repaid the initial cost.
The Leen Valley lines of the Great Northern Railway were railway branch lines built to access the collieries in the Nottinghamshire coalfield in England. The Midland Railway had long been dominant in the area, but there was resentment against its monopolistic policies from coalowners, who encouraged the Great Northern Railway to build a line. The Leen Valley Line was opened in 1881; it ran as far as Annesley colliery. A passenger service was run the following year, and very considerable volumes of coal were hauled.