Blue Castle Project | |
---|---|
Country | United States |
Location | about five miles west-northwest of Green River, Utah |
Coordinates | 39°00′50″N110°14′25″W / 39.013898°N 110.240249°W [1] |
Status | Proposed |
Construction began | originally projected: 2023. No updates on currently planned start of construction |
Commission date | 2028 (originally projected) |
Construction cost | $13.4 billion (projected) |
Owner | Blue Castle Holdings |
Nuclear power station | |
Reactor supplier | Westinghouse |
External links | |
Website | bluecastleproject |
The Blue Castle Project is a proposed nuclear power plant near Green River, Utah, United States. Originally projected for completion in 2030, it would have two 1500 megawatt reactors. It was originally proposed in 2007 by Transition Power Development, which became Blue Castle Holdings (BCH) in 2009. With no updates on the Blue Castle Holdings website since 2019, the project seems to be on hold.
After winning a three-year legal battle over water rights, Blue Castle began reviewing construction companies to work on building the plant. The project is projected to cost up to $20 billion, though BCH projected only $13.4 billion as of January 2017. The plant is expected to produce up to 4000 short term jobs during construction and about 1000 long term jobs in the Green River area.
Public reaction has varied since the project was originally proposed. There are several local and national environmental groups who oppose the project.
A project to build a $3-billion nuclear plant in eastern Utah was initially proposed in 2007 by Transition Power Development (TPD). [2] TPD planned to have a minimum of two 1500 megawatt reactors active when the plant went live, [2] [3] though the proposed site could support three reactors. [4] The plant is projected to "increase Utah's electrical capacity by approximately 50 percent". [5] The plant was proposed in part to support a projected 2016 need for power from Rocky Mountain Power, the main supplier of electrical power to the state of Utah. [3] Jon Huntsman Jr., the governor of Utah at that time, stated that he was opposed to any plan for a plant that did not include onsite spent fuel reprocessing. [2] At the time of the proposal, TPD had obtained rights to about half of the water needed to run the proposed two reactors. [3]
As part of the process, TPD started the process to lease 30,000 acre-feet (37 million cubic meters ) from the Kane County Water Conservancy District in 2009 to supply some of the water needed for operating the plant. [6] The project is projected to require about 55,000 acre⋅ft (68 million m3) of water to operate the proposed two reactors. [7] Officials from Utah and TPD met in 2009 with both Secretary of Energy Steven Chu and Secretary of the Interior Ken Salazar regarding the fast-tracking of new nuclear programs in the western United States. [8]
TPD became Blue Castle Holdings on September 28, 2009. [9] About a week later, Blue Castle signed an agreement with Page Electric Utility (PEU)—an electrical utility company in Page, Arizona—detailing how PEU could become an equity owner in the proposed plant. [10] BCH stated they had unanimous support for the plant from the Emery County Commission and the leadership of Green River, Utah in 2010. [11]
In October 2011, BCH met with members of the Nuclear Regulatory Commission and local Utah agencies in hearings regarding site surveys, emergency planning, and environmental concerns regarding the placement of the proposed plant near the Green River. The company was also waiting for approval on applications to lease the 53,500 acre⋅ft (66 million m3) of water needed to operate the plant. [12]
After a review period of more than two years, the water rights transfer was approved by an engineer working for the state of Utah. [13] [14] That decision was immediately challenged by a series of lawsuits. [14] After hearing testimony in September 2013, a 7th District Court judge upheld the decision of the state engineer. [15] [16] [17] The decision was appealed, but the appeals court upheld the decision of the 7th District Court judge in July 2016, stating the arguments by the plaintiffs were "often inadequately supported and briefed". [18] [19]
In 2017 BCH stated the licensing phase will go from 2017 to 2020. [4] Following the bankruptcy of Westinghouse Electric Company, the manufacturer of the planned AP1000 reactors, in March 2017, the Blue Castle CEO said their plans were unaffected and "We’re going to wait and see who buys Westinghouse ... They’re not going to go away as a company." [20] There have been no new announcements or updates on their website since 2019 [update] . [21]
The initial projected cost given by Blue Castle (operating then as Transition Power Development) was $3 billion. [2] By 2010, the cost of building the plant was estimated at $13–16 billion, [11] which climbed to $18–20 billion by the end of 2016. [22] BCH gave an estimated cost figure of $13.4 billion during a webinar in January 2017. [4]
The site is located about 5 miles (8.0 km) west-northwest of Green River, Emery County, Utah. [1] [23] A geological study was completed on the proposed site which included ten 600 feet (180 m) boreholes which were then studied using optical and acoustic methods. These results were reviewed by the Nuclear Regulatory Commission, who stated that "the geotechnical activities were adequately controlled with an appropriate level of quality assurance and no issues were identified". [4] Hydrological studies were done using 18 boreholes from 30–150 feet (9.1–45.7 m) in depth, and the data was being analyzed as of February 2016 [update] . Meteorological studies included two years of data collection. [4]
BCH plans to store spent fuel rods onsite for at least 100 years. [4]
Westinghouse will be producing the nuclear reactors for the power plant. [4] [24] In November 2016, BCH began looking for contractors to build the facilities. [24]
BCH stated they plan to begin construction in 2023, have the first reactor online in 2028, and the second reactor online in 2030. [4]
However, with no updates on the Blue Castle Holdings website since 2019, the project seems to be on hold [21] and no new construction start date has been released.
BCH projects about $500 million annually in revenue and state and local taxes paid. [4] A 2010 opinion piece in the Daily Herald suggested the plant would bring over 2000 short term jobs and 1000 high-paying long term jobs to the area. [25] In the January 2017 webinar, BCH stated there could be up to 4000 short term jobs and "800-1,000 people in long term good jobs" such as electricians and engineers. [4]
Howard Sierer suggested. in a January 2022 opinion piece for The Independent in St. George, that many of the workers in the coal mining industry could be transitioned to working at the Green River nuclear plant as a way to maintain support for local businesses and governments in the area. [26]
Public support in Utah for nuclear power around the time of the initial proposal was generally positive. A November 2007 editorial in the Provo Daily Herald newspaper stated 43 percent of polled Utahns supported the building of more nuclear power plants, [27] and another poll conducted in February 2008 showed 57 percent in favor. [28]
Utah Senator Bob Bennett stated in late 2008 that "if we are going to be serious about carbon emissions, we have to have a much larger nuclear component in our electric production" in November 2008. [29] Gary Kofford, the county commissioner for Emery County in 2008, stated that talk of building a nuclear plant near Green River was just speculation after TPD had been searching for a site for over a year. [30] An editorial in nearby Grand Junction, Colorado expressed tentative support for the project, especially in light of coal and gas plants being shut down despite growing energy demands. [31] The Utah State Legislature approved a joint resolution endorsing nuclear power as a viable option in March 2009. [32]
When TPD started the process to lease water from the Kane County Water Conservancy District, the Healthy Environment Alliance of Utah—an environmental advocacy group—indicated it may fight the lease. [6] A 2010 opinion piece in the Daily Herald stated that the trade off was acceptable between using about one percent of the water flowing in the Green River through Emery County every year, and bringing over 2000 short term jobs and 1000 high-paying long term jobs to the area. [25] Governor Gary Herbert expressed interest in letting "free enterprise...make Utah a net energy exporter" by using the technological power of Utah State University, the University of Utah, and Brigham Young University help those private businesses "create cleaner, cheaper sources of energy". [33]
During legislative hearings in February 2011, concern was expressed by citizens and the U.S. Fish and Wildlife Service regarding the water leased by BCH for the plant. They stated that it could negatively impact downstream people and wildlife. [34] Governor Herbert released a 10-year energy plan the following month that included options for nuclear power in Utah. A poll conducted shortly before the release of that plan showed a majority of those polled opposed locating a nuclear power plant in Utah. [35]
A forum hosted by the Sutherland Institute in July 2011 said that Utah was already burning coal and natural gas to provide power to California, and that nuclear power generation would be beneficial in reducing those carbon emissions. Members of the forum also expressed the opinion that cost concerns were "not grounded in any factual basis" due to the length of time since the last nuclear power plants were constructed. [36] Several Utah environmental groups, businesses, and individuals launched multiple lawsuits in March 2012 to challenge the proposed leasing of the water rights due to a perceived lack of scrutiny of the proposed Blue Castle project. [14] The lawsuits were eventually dismissed after appeal. [22] [19]
A 2013 letter from atmospheric scientist Ken Caldeira, professor of meteorology Kerry Emanuel, and climate scientists Tom Wigley and James Hansen encouraged environmental groups to support nuclear power reactors as a way to address environmental concerns such as climate change and pollution. HEAL Utah dismissed the letter, stating the scientists should be trying to persuade "utility executives and the president of the United States". [37]
In November 2016, HEAL Utah and other environmental groups filed complaints with the State of Utah claiming BCH had not made the contractually-required initial payments for the approved water rights. BCH stated it was renegotiating with the two water conservancy districts because the agreements "[needed] to be changed to reflect changed market conditions" because of delays caused by the three years of legal battles. [24]
Blue Castle Holdings (BCH) is the company that owns the Blue Castle project. It was cofounded in 2006 by Aaron Tilton. Other executives include Thomas Retson (formerly of GE Nuclear Energy), Nils Diaz (formerly head of the U.S. Nuclear Regulatory Commission), Robert Graber, and Reed Searle. [11] [38] BCH started a new subsidiary, Power Block Coin, in November 2017. It will provide power to data centers that support mining of cryptocurrency. [39]
Utah is a landlocked state in the Mountain West subregion of the Western United States. It is one of the Four Corners states, sharing a border with Arizona, Colorado, and New Mexico. It also borders Wyoming to its northeast, Idaho to its north, and Nevada to its west. In comparison to all the U.S. states and territories, Utah, with a population of just over three million, is the 13th largest by area, the 30th most populous, and the 11th least densely populated. Urban development is mostly concentrated in two regions: the Wasatch Front in the north-central part of the state, which includes the state capital, Salt Lake City, and is home to roughly two-thirds of the population; and Washington County in the southwest, which has somewhat more than 180,000 residents. Most of the western half of Utah lies in the Great Basin.
The Great Salt Lake is the largest saltwater lake in the Western Hemisphere and the eighth-largest terminal lake in the world. It lies in the northern part of the U.S. state of Utah and has a substantial impact upon the local climate, particularly through lake-effect snow. It is a remnant of Lake Bonneville, a prehistoric body of water that covered much of western Utah.
Emery County is a county in east-central Utah, United States. As of the 2020 United States Census, the population was 9,825. Its county seat is Castle Dale, and the largest city is Huntington.
Murray is a city situated on the Wasatch Front in the core of Salt Lake Valley in the U.S. state of Utah. Named for territorial governor Eli Murray, the city had a population of 50,637 as of the 2020 United States Census. Murray shares borders with Taylorsville, Holladay, South Salt Lake, Millcreek and West Jordan, Utah. Once teeming with heavy industry, Murray's industry mix has now shifted significantly toward healthcare, retail, and professional, scientific, and technical services. Known for its central location in Salt Lake County, Murray has been called the Hub of Salt Lake County. Unlike most of its neighboring communities, Murray operates its own police, fire, power, water, library, and parks and recreation departments and has its own school district. While maintaining many of its own services, Murray has one of the lowest city tax rates in the state.
Robert William Bishop is an American politician who served as the U.S. representative for Utah's 1st congressional district from 2003 to 2021. A member of the Republican Party, he became the dean of Utah's congressional delegation after the retirement of Orrin Hatch from the U.S. Senate in 2019.
TRAX is a light rail system in the Salt Lake Valley of Utah, in the United States, serving Salt Lake City and many of its suburbs throughout Salt Lake County. The system's official name, Transit Express, is rarely, if ever, used. The system is operated by the Utah Transit Authority (UTA). All TRAX trains are electric, receiving power from overhead wires.
Zion Nuclear Power Station was the third dual-reactor nuclear power plant in the Commonwealth Edison (ComEd) network and served Chicago and the northern quarter of Illinois. The plant was built in 1973, and the first unit started producing power in December 1973. The second unit came online in September 1974. This power generating station is located on 257 acres (104 ha) of Lake Michigan shoreline, in the city of Zion, Lake County, Illinois. It is approximately 40 direct-line miles north of Chicago, Illinois and 42 miles (68 km) south of Milwaukee, Wisconsin.
EnergySolutions, headquartered in Salt Lake City, Utah, is one of the largest processors of low level waste (LLW) in America, making it also one of the world's largest nuclear waste processors. It was formed in 2007 when Envirocare acquired three other nuclear waste disposal companies: Scientech D&D, BNG America, and Duratek.
In the United States, nuclear power is provided by 94 commercial reactors with a net capacity of 97 gigawatts (GW), with 63 pressurized water reactors and 31 boiling water reactors. In 2019, they produced a total of 809.41 terawatt-hours of electricity, which accounted for 20% of the nation's total electric energy generation. In 2018, nuclear comprised nearly 50 percent of US emission-free energy generation.
Red Leaf Resources, Inc, doing business as Green Leaf Carbon Technologies, is an oil-shale technology company based in Salt Lake City, Utah, United States. It is the developer of the shale oil extraction technology HCCO® Process. The company holds mineral leases in Utah for oil shale development that can support 75,000 bbl/day of oil production. Its Uintah Partners LLC subsidiary also holds surface rights in the Uinta Basin with a permit for a 40,000 barrel per day refinery. The company is affiliated with Questerre Energy Corporation.
The economy of Utah is a diversified economy covering industries such as tourism, mining, agriculture, manufacturing, information technology, finance, and petroleum production. The majority of Utah's gross state product is produced along the Wasatch Front, containing the state capital Salt Lake City.
Fremont Island is a 2,943.04-acre (11.91 km2) island located in Great Salt Lake in northern Utah, United States. State owned, it is the lake's third largest island after Stansbury Island and Antelope Island. The island has also been known by several other names, including mo'ko-mom-bĭtc, Castle Island, Coffin Island, Disappointment Island, and Miller Island.
Red Butte Creek is a small stream whose headwaters are found in the northeast part of Salt Lake County, Utah, United States. It flows west through the Red Butte Garden and Arboretum, by the University of Utah, Fort Douglas and flows southwesterly to Salt Lake City’s Liberty Park. With 7.25 sq mi (18.8 km2) of watershed, Red Butte Canyon is the smallest canyon of the seven canyons in eastern Salt Lake County. Its elevation ranges from 5,000 to 8,000 ft above sea level.
A high wind storm which began early in the morning of December 1, 2011, reached wind speeds as high as 102 miles per hour (164 km/h) in Centerville, Utah, United States and surrounding cities. Fruit Heights, a neighborhood just 15 miles from the Utah State Capitol, saw gusts of up to 146 mph (235 km/h) during the event. Damage was reported throughout Davis County, and extending into Weber and Salt Lake counties, ranging from Ogden down to Salt Lake City. That morning Mayor Ron Russell of Centerville declared a local state of emergency. Due to the extensive damage, Davis County declared a state of emergency later that evening. The windstorm extended throughout the Western United States, with power outages and structural damage also reported in California and Nevada.
Thorium-based nuclear power generation is fueled primarily by the nuclear fission of the isotope uranium-233 produced from the fertile element thorium. A thorium fuel cycle can offer several potential advantages over a uranium fuel cycle—including the much greater abundance of thorium found on Earth, superior physical and nuclear fuel properties, and reduced nuclear waste production. One advantage of thorium fuel is its low weaponization potential. It is difficult to weaponize the uranium-233 that is bred in the reactor. Plutonium-239 is produced at much lower levels and can be consumed in thorium reactors.
The 2020 Utah gubernatorial election was held on November 3, 2020, to elect the governor of Utah. Incumbent Republican governor Gary Herbert declined running for re-election to a third full term.
The West Davis Corridor is a 16-mile-long (26 km) freeway completely within Davis County in northern Utah. The corridor splits off from Interstate 15 (I-15) and U.S. Route 89 (US-89) along with the Legacy Parkway (SR-67) in Farmington and goes through the western confines of the Ogden–Clearfield metropolitan area before ending at an T-intersection with SR-193 in West Point.
Red Hills Renewable Energy Park is a 104 MWp (80 MWAC) photovoltaic power plant located about 3 miles northwest of the town of Parowan in Iron County, Utah. It was the largest solar facility in the state when it came online in December, 2015. The power is being sold under a 20-year power purchase agreement to Rocky Mountain Power which serves customers in Utah, Idaho, and Wyoming.