| S Tupi | |
| History | |
|---|---|
| | |
| Name | Tupi |
| Namesake | Tupi |
| Builder | Howaldtswerke-Deutsche Werft |
| Laid down | 8 March 1985 |
| Launched | 28 April 1987 |
| Commissioned | 6 May 1989 |
| Identification | Pennant number: S-30 |
| Status | Active |
| General characteristics | |
| Class and type | Tupi-class submarine |
| Displacement | |
| Length | 61.2 m (200 ft 9 in) |
| Beam | 6.25 m (20 ft 6 in) |
| Draft | 5.5 m (18 ft 1 in) |
| Propulsion |
|
| Speed |
|
| Range |
|
| Endurance | 50 days [1] |
| Test depth | 500 m (1,600 ft) |
| Complement | 30 |
| Armament |
|
Tupi(S30) is the lead boat of the Tupi-class submarine of the Brazilian Navy. [2] [3]
The boat was built at Howaldtswerke-Deutsche Werft in Germany and was launched on 28 April 1987 and commissioned on 6 May 1989.
Media related to S30 Tupi (submarine, 1989) at Wikimedia Commons