Buckfastleigh, Totnes and South Devon Railway

Last updated

Buckfastleigh, Ashburton and South Devon Railway
Overview
Headquarters Newton Abbot
Locale England
Dates of operation18721897
Successor Great Western Railway
Technical
Track gauge 7 ft 14 in (2,140 mm)
Length10.03 miles (16.14 km)

The Buckfastleigh, Totnes and South Devon Railway built the broad gauge railway line from Totnes to Buckfastleigh and Ashburton in Devon, England.

Contents

History

In the first decades of the nineteenth century, Buckfastleigh and Ashburton were important towns in the region. Ashburton was an important stannary and woollen town, while Buckfastleigh had established woollen mills as well as other manufacturing industries. Both towns were on the coaching road from Plymouth to Exeter, and this transport link was important to their success.

When railways in the area began to be proposed, a number of alternative routes between Plymouth and Exeter were put forward, and a line through Buckfastleigh and Ashburton was considered. However the line actually adopted was the South Devon Railway which followed a more southerly course through Teignmouth, Newton Abbot and Totnes. This line opened in 1847, [note 1] and Buckfastleigh and Ashburton were not close to the new railway. They quickly found that other towns that were railway-connected gained in importance as their transport costs were reduced, and Buckfastleigh and Ashburton declined rapidly due to the competitive disadvantage.

It was clear to local people that the impact on the towns would be seriously negative, as the coach traffic would cease, and Buckfastleigh and Ashburton would be off the contemporary transport network. It appears that Totnes was concerned too, for on 14 June 1845 a public meeting there resolved that "it is most essential to the interest and welfare of this town to be connected by railway with the towns of Buckfastleigh and Ashburton as leading to develop the resources of this important town and agricultural district."

The enthusiasm to vote for the motion seems not to have been carried into urgent action, but on 27 July 1848 that a Totnes Buckfastleigh and Ashburton Railway obtained its authorising Act of Parliament; authorised capital was £130,000, and the engineer was Isambard Kingdom Brunel. At this time getting money was extremely difficult, and it proved impossible to raise the required capital; in 1851 the company was dissolved, with nothing done. [1] [ page needed ]

A viable scheme

Decline had been predicted for the industries of Buckfastleigh and Ashburton if they were isolated from the railway network, and the gloomy forecast proved true. In 1863 interested men of affairs promoted a new railway, this time to connect to the South Devon Railway (SDR) at Totnes, and to extend to the quayside on the River Dart. In due course on 25 June 1864 [note 2] [ page needed ] the Buckfastleigh, Totnes and South Devon Railway Company obtained an authorising Act of Parliament. [1] [ page needed ] [2] [ page needed ] [3] [ page needed ]

The main line was to be not quite ten miles (16 km) long. The short branch, a "railway or tramway", to the Quays at Totnes was on the south side of the SDR main line, and was to be horse-worked. The use of locomotives, stationary engines and ropes, or "atmospheric agency" (i.e. the now discredited atmospheric traction system), were all forbidden. The line was to be on the broad gauge. [4]

Raising the money was a little easier now than in 1848, but Ashburton's omission from the scheme cut off a large section of potential financial support, and the following year a further Act was obtained, on 26 May 1845, authorising an extension of the line to Ashburton; however the town remained absent from the Company name. [1] [ page needed ]

Construction and opening

Construction of the line was exceedingly slow due to difficulty in raising money. Although some work had been done in 1867, in 1868 it was reported that work was at a standstill, and that Parliamentary authority of an extension of time needed to be applied for. [5] [ page needed ]

In 1869 authority [note 3] was obtained to raise some money by the issue of 5% preference shares, [note 4] and certain debenture loans. [1] [ page needed ]

Opening—of the main line

At length the construction of the line was completed, and amid much rejoicing and festivity the line from Ashburton to Totnes SDR station opened for passenger and goods traffic on 1 May 1872; it was worked from the outset by the South Devon Railway. The traditional industries of the district in general had further declined, but the woollen mills of Buckfastleigh had resisted the trend, and they provided much of the goods traffic on the line: manufactured articles outwards and coal for the plant inwards. Passenger traffic on the line was significant, but not dominant.

The first half-year accounts (to 31 March 1873) showed gross receipts of £1893 10s 0d, and net profit of £1055 12s 7d after deduction of the SDR charges for working the line. 45,336 passenger journeys had been made, and over 12,000 tons of goods had been carried. [1] [ page needed ]

The Quay line

The construction of the tramway to the Quays had not been carried out with the main line, but by October 1873 it was reported that it was completed, but could not be opened because of required alterations to the signalling on the SDR at the junction with that company's main line at Totnes. However this was soon rectified and the Quay line opened 10 November 1873; it was for goods traffic only, and was horse-operated. [note 5]

An appeal against SDR charges

At the October 1873 Shareholders' Meeting the directors reported that the charges from the SDR for operating the line were higher than expected and were not in accordance with the agreement for working the line. £1,055 operating profit in a half-year was small on capital of £130,000 when debenture interest was to be paid first, and it would "leave nothing for Dividend". At the May 1874 meeting, the directors congratulated the shareholders on a successful outcome of the dispute; however the full year (1873) accounts now showed £4147 12s 10d gross profit, £2127 4s 0d net. The first half-year SDR charge before the dispute, and doubled to equate to a full year, were £1676 (44%), and the actual post-dispute charge was £2020 (49%).

It is difficult to follow how this was an improvement; however the Directors, on this and subsequent occasions, urged consignors to specify Totnes Quay as a destination in preference to Totnes SDR station, where terminal charges would be levied against the smaller Company. [1] [ page needed ]

The Great Western Railway

The South Devon Railway Company was working the Buckfastleigh line. On 1 February 1876 the SDR amalgamated with the Great Western Railway (GWR) and the Bristol and Exeter Railway (B&ER); the combined company was named the Great Western Railway. The GWR now assumed the role of working the Buckfastleigh line. [6] [ page needed ]

Change of gauge

The line had been built on the 7 ft 14 in (2,140 mm) broad gauge, which was the track gauge of the SDR to which it connected at Totnes. In 1892 the Great Western Railway, as successor to the SDR, altered the gauge of its lines in Devon and Cornwall to 4 ft 8+12 in (1,435 mm) standard gauge . [note 6] [7] The work was actually carried out over the weekend 20–23 May 1892, from which time the Buckfastleigh line was a standard gauge line.

Financial difficulties

The company had never been in good financial health, and the situation seems to have deteriorated after the initial years. By 1896 it was obvious that the company could not continue, and a liquidator was appointed pending sale. The GWR was the only possible purchaser, and the sale took effect on 1 July 1897. [note 7] The shareholders received £22,450 for their £130,000 investment. The GWR assumed the obligations of the debentures and preference share guarantees. [1] [ page needed ] [3] [ page needed ]

Under the GWR

The line had been saved by the GWR and indeed some improvement to it passenger carryings took place in the years up to the beginning of World War I. The GWR introduced its railmotor services for passenger trains on the branch, and later push and pull trains (often called auto-trains), in both cases reducing operating costs somewhat.

However Newton Abbot became increasingly the commercial centre in the locality, and Totnes lost importance. As road transport—for passengers as well as goods—became available the short road journey to Newton Abbot was decisive for most purposes and the line's traffic declined. The small-scale traditional industries of Buckfastleigh and Ashburton were now obsolescent and their potential railway traffic declined with them. [1] [ page needed ] Passenger tickets issued at Ashburton declined from 24,688 in 1903 to 13,851 in 1923 and 4,843 in 1933. [8] [ page needed ]

Nationalisation—and closure

The Transport Act 1947 brought most of the railways of Great Britain into national ownership under British Railways. This had little impact on the operational circumstances of the line, but the decline in usage became increasingly obvious. The decision was taken to close the line to passengers, and the last ordinary passenger train ran on 3 November 1958. Goods traffic on the line continued until Friday 7 September 1962. The following day the final revenue train ran, an enthusiasts' special passenger train. The main line was now closed.

However the Quay line served numerous industrial premises and remained in occasional use; it closed for general goods on 14 June 1965, and the service to the private sidings finished after 4 December 1967. [1] [ page needed ]

Reopening

It was re-opened as the "Dart Valley Railway", a heritage railway, on 5 April 1969, the opening ceremony being performed by Dr Richard Beeching. [note 8] In 1971 the line beyond Buckfastleigh was again closed and the A38 road was built on the route of the railway. The South Devon Railway Trust took over the running of the line on 1 January 1991.

Stations

Since the line re-opened as a heritage railway, a new Totnes (Riverside) railway station has been opened to avoid the need for trains to run into the Network Rail station. A footbridge over the river links the two stations. Staverton station was named Staverton Bridge when it reopened in April 1969, but the suffix "fell into disuse" in the 1980s. [8] [ page needed ]

Operations

Passenger trains arriving from Ashburton used the down platform at Totnes, and departing passenger trains to Ashburton used the up platform. In post-war operation, the first auto-train from Totnes to Ashburton started from the Down platform at Totnes, but could not convey passengers as there was no locking on the crossover from that platform.

The 1954 Service Timetable [9] shows eight daily return passenger trips, and a goods train each way.

Buckfastleigh had a crossing loop, but the loop line was for goods trains only and was not a running line. Staverton was an intermediate block post but not a staff station.

Gradients

The line climbed steadily from Totnes to Ashburton, with gentle gradients as far as Staverton, then stiffening to 1 in 264 and 1 in 118; after Buckfastleigh the gradients become considerable, at 1 in 62 typically. [1] [ page needed ]

Notes

  1. To Totnes; it had opened the previous year to Newton, later called Newton Abbot; and the following year from Totnes to Plymouth, Laira Green.
  2. According to Kingdom and Awdry; Carter says 25 July 1864.
  3. Buckfastleigh, Totnes and South Devon Railway Act, 1869
  4. Subscribers were guaranteed their 5% if the Company made enough net profit to pay that, and this dividend took precedence over the dividend for ordinary shares.
  5. Except for a stub at the main line end, where locomotives were permitted after 24 August 1874.
  6. The South Devon Railway had obtained Parliamentary authority to do so, including the track of the Buckfastleigh company, in 1875.
  7. Kingdom[ page needed ] refers to this as an amalgamation, but it was clearly a forced sale.
  8. Beeching had become notorious in railway circles for the Beeching cuts, in which many passenger routes in Great Britain were closed; however the Ashburton line closed several years before Beeching entered the railway industry.

Related Research Articles

South Devon Railway (heritage railway) Heritage railway in Devon, England

The South Devon Railway (SDR) is a 6.64-mile (10.69 km) heritage railway from Totnes to Buckfastleigh in Devon. Mostly running alongside the River Dart, it was initially known as the Dart Valley Railway. The railway is now operated by the South Devon Railway Trust, a registered charity.

Exeter St Davids railway station Railway station in Devon, England

Exeter St Davids is the principal railway station serving the city of Exeter in Devon, England. It is 193 miles 72 chains (312.1 km) from London Paddington on the line through Bristol which continues to Plymouth and Penzance. It is also served by an alternative route to London Waterloo via Salisbury and branch lines to Exmouth and Barnstaple.

Newton Abbot railway station Railway station in Devon, England

Newton Abbot railway station serves the town of Newton Abbot in Devon, England. It is 20 miles 13 chains (32.4 km) down the line from Exeter St Davids and 214 miles 5 chains (344.5 km) measured from London Paddington via Bristol Temple Meads, at the junction for the branch to Paignton. The station today is managed by Great Western Railway, who provide the train service along with CrossCountry.

Totnes railway station Railway station in Devon, England

Totnes railway station serves the towns of Totnes and Dartington in Devon, England. It was opened by the South Devon Railway Company in 1847. Situated on the Exeter to Plymouth Line, it is 28 miles 74 chains (46.6 km) down the line from Exeter St Davids and 222 miles 66 chains (358.6 km) measured from London Paddington via Bristol Temple Meads.

Plymouth, Devonport and South Western Junction Railway Former English railway company

The Plymouth, Devonport and South Western Junction Railway (PD&SWJR) was an English railway company. It constructed a main line railway between Lydford and Devonport, in Devon, England, enabling the London and South Western Railway (LSWR) to reach Plymouth more conveniently than before.

Cornwall Railway Former railway company in southwestern England

The Cornwall Railway was a 7 ft 14 in broad gauge railway from Plymouth in Devon to Falmouth in Cornwall, England, built in the second half of the nineteenth century. It was constantly beset with shortage of capital for the construction, and was eventually forced to sell its line to the dominant Great Western Railway.

Plymouth Millbay railway station former railway station in Plymouth, England

Plymouth Millbay railway station was the original railway terminus in Plymouth, Devon, England. It was used for passenger trains from 1849 to 1941. It was rebuilt in 1903.

Bristol and Exeter Railway Former English railway company

The Bristol & Exeter Railway (B&ER) was an English railway company formed to connect Bristol and Exeter. It was built on the broad gauge and its engineer was Isambard Kingdom Brunel. It opened in stages between 1841 and 1844. It was allied with the Great Western Railway (GWR), which built its main line between London and Bristol, and in time formed part of a through route between London and Cornwall.

Ashburton railway station Disused railway station in Devon, England

Ashburton railway station is a closed railway station situated in the town of Ashburton in Devon, England. It was the terminus of a branch line from Totnes.

South Devon and Tavistock Railway

The South Devon and Tavistock Railway linked Plymouth with Tavistock in Devon; it opened in 1859. It was extended by the Launceston and South Devon Railway to Launceston, in Cornwall in 1865. It was a broad gauge line but from 1876 also carried the standard gauge trains of the London and South Western Railway between Lydford and Plymouth: a third rail was provided, making a mixed gauge. In 1892 the whole line was converted to standard gauge only.

Dartmouth and Torbay Railway

The Dartmouth and Torbay Railway was a broad gauge railway linking the South Devon Railway branch at Torquay with Kingswear in Devon, England. It was operated from the outset by the South Devon Railway.

The Torbay and Brixham Railway was a 7 ft broad gauge railway in England which linked the Dartmouth and Torbay Railway at Churston railway station, Devon with the important fishing port of Brixham. It was a little over two miles long. Never more than a local branch line, it closed in 1963.

The South Devon Railway Company built and operated the railway from Exeter to Plymouth and Torquay in Devon, England. It was a 7 ft 14 in broad gauge railway built by Isambard Kingdom Brunel.

The Wilts, Somerset and Weymouth Railway (WS&WR) was an early railway company in south-western England. It obtained Parliamentary powers in 1845 to build a railway from near Chippenham to Salisbury and Weymouth. It opened the first part of the network but found it impossible to raise further money and sold its line to the Great Western Railway (GWR) in 1850.

The Lampeter, Aberayron and New Quay Light Railway was an independent branch line railway in south west Wales. It connected Aberayron to the former Manchester and Milford Railway line at Lampeter; New Quay was never reached.

Exeter to Plymouth railway of the LSWR

The Exeter to Plymouth railway of the London and South Western Railway (LSWR) was the westernmost part of a route competing with that of the Great Western Railway (GWR) and its 'associated companies' from London and Exeter to Plymouth in Devon, England. Whereas the GWR route from Exeter followed the coast to Newton Abbot and then went around the southern edge of Dartmoor, the LSWR route followed the northern and western margins of Dartmoor, passing through the towns of Crediton, Okehampton, and Tavistock.

Railways in Plymouth Overview of railways in Plymouth, Devon, England

The network of railways in Plymouth, Devon, England, was developed by companies affiliated to two competing railways, the Great Western Railway and the London and South Western Railway. At their height two main lines and three branch lines served 28 stations in the Plymouth area, but today just six stations remain in use.

Chard branch line

The Chard branch lines were two lines serving the town of Chard in Somerset, England. One was a northward branch, opened in 1863, from the Salisbury to Exeter main line, and the other, opened in 1866, ran south-eastwards from the Bristol – Taunton main line. Each branch had its own Chard passenger station at first, although the two lines connected in Chard.

Staverton railway station heritage railway station in Devon, England

Staverton railway station is situated on the South Devon Railway, a heritage railway in Devon, England. It serves the village of Staverton.

The Yeovil–Taunton line was a railway line in England, built by the Bristol and Exeter Railway (B&ER) to connect its main line with the market town of Yeovil in Somerset. It opened in 1853 using the broad gauge of 7 ft 14 in and was the first railway to serve Yeovil. It ran from a junction at Durston although in later years passenger trains on the line ran through to and from Taunton where better main and branch line connections could be made.

References

  1. 1 2 3 4 5 6 7 8 9 10 Kingdom 1977.
  2. Carter 1959.
  3. 1 2 Awdry 1990.
  4. MacDermot 1931, p. 242.
  5. Directors' Report to Shareholders' General Meeting, 29 February 1868, partly quoted in Kingdom
  6. MacDermot 1931.
  7. MacDermot 1931, p. 250.
  8. 1 2 3 4 Oakley 2007.
  9. Kingdom 1977, p. 113.