Celtic Array

Last updated
Celtic Array
Celtic Array
Country
  • United Kingdom
Location Irish Sea
Coordinates 53°46′16″N4°24′40″W / 53.771°N 4.411°W / 53.771; -4.411 Coordinates: 53°46′16″N4°24′40″W / 53.771°N 4.411°W / 53.771; -4.411
StatusCancelled
Owner(s) Centrica, Dong Energy
Wind farm
Type Offshore

The Celtic Array was a proposed UK round 3 offshore wind farm in the Irish Sea south east of the Isle of Man.

Contents

The wind farm zone was awarded to Centrica for development in 2012, and in 2012 Centrica formed a joint venture with Dong Energy to develop the zone; a "zone appraisal report" published in 2012 split the area into 3 development zones, with large scale gaps between, primarily to prevent disruption to shipping; the three development zones were estimated to have a total capacity of between 2.9 and 5.4 GW. In 2012 a planning application for the southeastern zone was submitted, as the Rhiannon Wind Farm, with an estimated capacity of 2.2 GW.

In July 2014 the developers terminated plans for the wind farm due to unviable turbine foundation costs.

History and development

In late 2007 the UK Department for Business, Enterprise and Regulatory Reform instigated studies to identify offshore wind sites for around 25 GW of generating capacity; [1] the study, the Offshore Energy Strategic Environmental Assessment (OESEA1, 2009) identified up to 33 GW of potential offshore wind power within English and Welsh territorial waters at sea bed depth of less than 60 m (200 ft); In June 2008 the "Round 3" phase of UK offshore development was announced, subsequently the OESEA plan was adopted, and the Crown Estate designated several areas of potential development, and began a competitive tender process to allocate the sites to developers. Zone development agreements were made in December 2009. [2]

In January 2010 Centrica was awarded the license to develop the Irish Sea round 3 zone; the zone had a total area of 2,200 km2 (850 sq mi) with an estimated potential of 4.2 GW through wind power generation. [3] In March 2012 Centrica and Dong Energy formed a joint venture to develop the wind farm zone, acquiring 50% of Centrica Energy Renewable Investments Ltd., the Irish Sea wind farm development subsidiary, at a cost of £40 million. [4]

The site was split into three zones: a north-east zone of 359 km2 (139 sq mi) with 1 to 2 GW estimated capacity; a south-west zone of 255 km2 (98 sq mi) with 0.5 to 0.8 GW; and a south-eastern zone of 617 km2 (238 sq mi) with 1.4 to 2.6 GW. [5] [6] [7]

The sea bed of the wind farm zone consisted of sand/gravel, or glacial material including sand/gravel and boulders in Diamicton (mud/sand); below the sea bed surface strata include boulder clays and tills. Bedrock was located at between sea bed level and 100m below sea bed, with deeper levels at the west of the zone. [8]

Significant shipping routes crossed the wind farm zone at several points, including: Liverpool to Belfast shipping crosses the zone roughly between the south-eastern and north-eastern development areas; shipping mainly tankers to the Mersey ports via the pilot station at Point Lynas cross the zone roughly between the southwestern and southeastern development zones; additional Liverpool to Dublin shipping skirted close to the southern edge of the zone, as well as crossing the southeastern zone. [9] To reduce collision risk an additional shipping buffer zone was recommended at the southern and southwestern edges of the southeastern development zone (Rhiannon). [10] Considerations of the main shipping routes were a major factor in forming shapes of the development zones. [11] [12]

The south-east zone was the first to be taken forward, with a planning scoping report submitted to the Infrastructure Planning Commission in 2012 as the Rhiannon Wind Farm. [7] In late 2012 the wind farm plan application for the northeast block was delayed based on concerns on its impact on shipping to the Isle of Man (such as that affecting the Isle of Man Steam Packet Company). [13]

In July 2014 plans for the wind farm were terminated by Centrica and Dong, due to the foundation requirements being beyond what was currently financially viable. [14] One factor was the differing ground conditions (sand/rock) which would have required different foundation types, increasing costs. [15]

Rhiannon wind farm

53°40′30″N4°14′17″W / 53.675°N 4.238°W / 53.675; -4.238 (Rhiannon offshore wind farm)

An initial scoping report was submitted in 2012; [7] [16] the proposed wind farm was on a site ~19 km from Anglesey, ~34 km from the Isle of Man and ~60 km from Cumbria, with a capacity of up to 2.2 GW; initial planning assumed a National grid connection at Anglesey. [17] The initial scoping report supposed wind turbines with between 5 MW and 15 MW capacity. [18]

The wind farm site had a maximum area of 497 km2 (192 sq mi) with water depths of 36 to 83 m (118 to 272 ft) with a tidal range of up to 8.5m. [19]

Public consultation began in late 2012, [20] [21] the second consultation phase began in March 2014. [22] [23]

By the stage 2 consultation (March 2014) the wind farm power export cables, landfall and national grid connection had been narrowed from 16 export cables with potential landfall and grid connection sites along the west English and north Welsh coasts, to 12 export cables making landfall at 4 sites in North Anglesey connected by an underground cable to a substation at Rhosgoch. [24] The National Grid expects to construct a 400 kV substation adjacent to the onshore Celtic Array wind farm substation, and to make the connection to the mainland electrical gridon the Wylfa Pentir overhead line. [25] The wind farm at stage 2 was expected to consist of between 146 and 440 (15 MW to 4 MW) wind turbines, with up to 8 HVAC offshore substations plus potentially up to 4 HVDC offshore substations; the use of HVDC was not a preferred option. The wind farm would potentially have had up to 4 offshore accommodation platforms for servicing. [26]

Related Research Articles

Wind power in the United Kingdom Use of wind turbines to generate electricity in the United Kingdom

The United Kingdom is one of the best locations for wind power in the world and is considered to be the best in Europe. Wind power contributed 20% of UK electricity generation in 2019, making up 54% of electricity generation from renewable sources. Polling of public opinion consistently shows strong support for wind power in the UK, with nearly three quarters of the population agreeing with its use, even for people living near onshore wind turbines. Wind power in the UK is a low cost generation mode which is still dropping in price and delivers a rapidly growing percentage of the electricity of the United Kingdom.

London Array

The London Array is a 175-turbine 630 MW Round 2 offshore wind farm located 20 kilometres (12 mi) off the Kent coast in the outer Thames Estuary in the United Kingdom. It was the largest offshore wind farm in the world until Walney Extension reached full production in September 2018.

Wind power in the European Union

As of December 2017, installed capacity of wind power in the European Union totaled 169.3 gigawatts (GW). In 2017, a total of 15,680 MW of wind power was installed, representing 55% of all new power capacity, and the wind power generated 336 TWh of electricity, enough to supply 11.6% of the EU's electricity consumption.

Siemens Gamesa

Siemens Gamesa Renewable Energy S.A., formerly Gamesa Corporación Tecnológica S.A. and Grupo Auxiliar Metalúrgico S.A., is a Spanish-German wind engineering company based in Zamudio, Biscay, Spain. It manufactures wind turbines and provides onshore and offshore wind services. It is the world's second largest wind turbine manufacturer.

Wind power in India

Wind power generation capacity in India has significantly increased in recent years. As of 30 September 2020, the total installed wind power capacity was 38.124 GW, the fourth largest installed wind power capacity in the world. Wind power capacity is mainly spread across the Southern, Western and Northern regions.

Wind power in China

China is the world leader in wind power generation, with the largest installed capacity of any nation and continued rapid growth in new wind facilities. With its large land mass and long coastline, China has exceptional wind power resources: it is estimated China has about 2,380 gigawatts (GW) of exploitable capacity on land and 200 GW on the sea.

Barrow Offshore Wind Farm

The Barrow Offshore Wind Farm is a 30 turbine 90MW capacity offshore wind farm in the East Irish Sea approximately 7 kilometres (4.3 mi) south west of Walney Island, near Barrow-in-Furness, Cumbria, England.

Burbo Bank Offshore Wind Farm

The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.

Lynn and Inner Dowsing Wind Farms

The Lynn and Inner Dowsing wind farms are a pair of round 1 wind farms located in the North Sea, in the shallow waters at the entrance to The Wash off the coast of Lincolnshire, England. The wind farms were developed as a single unit after planning consent was given in 2003. Construction work began in 2006 and was completed in 2009.

Offshore wind power Use of wind turbines constructed in marine bodies of water to harvest wind energy to generate electricity

Offshore wind power or offshore wind energy is the use of wind farms constructed in bodies of water, usually in the ocean, to harvest wind energy to generate electricity. Higher wind speeds are available offshore compared to on land, so offshore wind power’s electricity generation is higher per amount of capacity installed, and NIMBY opposition to construction is usually much weaker.

Lincs Wind Farm

The Lincs Wind Farm is a 270 MW offshore wind farm 8 kilometres (5.0 mi) off Skegness on the east coast of England. The total cost of the project is estimated at £1 billion including electrical transmission links. The farm was completed in 2013. It is adjacent to the smaller Lynn and Inner Dowsing Wind Farm.

Gunfleet Sands Offshore Wind Farm

Gunfleet Sands Offshore Wind Farm is a 172 MW wind farm about 7 kilometres (4.3 mi) off the Clacton-on-Sea coast in the Northern Thames Estuary.

Triton Knoll Wind Farm is a round 2 offshore wind farm under construction 33 kilometres (21 mi) off the coast of Lincolnshire, in the North Sea, England.

Docking Shoal Wind Farm was a proposed 500 MW offshore wind farm in the outer-Wash area of the Lincolnshire and Norfolk (UK) coastline; the wind farm was one of three Centrica was developing the area, together with Lincs wind farm and Race Bank wind farm.

Race Bank Wind Farm is a 573 MW Round 2 offshore wind farm located 27 km north of Blakeney Point off the coast of Norfolk, and 28 km east of Chapel St Leonards off the Lincolnshire coast in the North Sea. The farm was commissioned in February 2018.

Walney Wind Farm Offshore wind farm off the coast of Cumbria, England

Walney Wind Farms are a group of offshore wind farms 9 miles (14 km) west of Walney Island off the coast of Cumbria, in the Irish Sea, England. The group, operated by Ørsted, consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW making it the world's s second largest offshore wind farm.

Navitus Bay Wind Park was a proposed 970 MW Round 3 offshore wind farm, to be situated off the English coast approximately 10 km south of Dorset and the Isle of Wight. The wind farm was refused planning permission in September 2015.

First Flight wind farm was a late 2000s proposed offshore wind farm in the Irish Sea, southeast of the southern coast of County Down, Northern Ireland.

Dogger Bank Wind Farm is a group of offshore wind farms under construction 125 to 290 kilometres off the east coast of Yorkshire, in the North Sea, England. It is being developed by the Forewind consortium. It is expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. Planning consent for the first phase of the project was granted by the UK government in February 2015, and consent for the second phase was granted in August 2015.

Hornsea Wind Farm Wind farm in the North Sea

Hornsea Wind Farm is a Round 3 wind farm under construction in the North Sea off the coast of England. The wind farm is planned to have a total capacity of up to 6 gigawatt (GW).

References

  1. Supporting Information Relating to the Announcement of Round 3 (PDF), The Crown Estate, archived from the original (PDF) on 2014-04-29
  2. Round 3 Offshore Wind Site Selection at National and Project Levels - Non-Technical Summary (PDF), The Crown Estate, pp. 1–2, 11, archived from the original (PDF) on 2014-04-29
  3. Centrica awarded Round Three offshore wind development zone (Press release), Centrica, 8 January 2010
  4. Centrica and DONG Energy establish joint venture to co-develop Round 3 Irish Sea wind farm zone (Press release), Centrica, 21 March 2012
  5. 21. Conclusions and Next Steps 21.2
  6. 6. ZAP Engineering studies and envelope 6.3; Table 6.1
  7. 1 2 3 Rhiannon Wind Farm (Round 3 Irish Sea Zone) (Infrastructure Planning Commission). Environmental Impact Assessment Offshore Scoping Report (July 2012)
  8. 7. Geology and Sediment 7.4.1-7.4.2; Figs.7.1, 7.2
  9. 14. Shipping and Navigation 14.4.4-14.4.7 Figs.14.9-14.29
  10. 14. Shipping and Navigation 14.15.1 Figs.14.52
  11. Executive Summary p.vii, Figs.6,7 "Consideration of shipping traffic and adverse weather routes emerged as a key issue [..] safe passage of navigation was one of the main reasons driving the shape and location of the Potential Development Areas"
  12. 5. Identification of Potential Development Areas 5.3.3-5.4.3; Figs.5.8-5.12 [ permanent dead link ]
  13. "Celtic Array delay Irish Sea wind farm extension plans", BBC News, 19 Dec 2012
  14. "Centrica, Dong ditch R3 Irish Sea", renews.biz, 31 July 2014, archived from the original on 3 August 2014, retrieved 31 July 2014
  15. "Celtic Array Rhiannon wind farm off Anglesey scrapped", www.bbc.co.uk, 31 July 2014
  16. "Irish Sea windfarm proposals lodged with planning agency", BBC News Wales, 14 July 2012
  17. Rhiannon Wind Farm Limited - Environmental Impact Assessment Offshore Scoping Report (July 2012) pp.1, 3, 5; fig.1.1, p.7; fig.3.3, p.17
  18. Rhiannon Wind Farm Limited - Environmental Impact Assessment Offshore Scoping Report (July 2012) 4.9, p.20
  19. Rhiannon Wind Farm Limited - Environmental Impact Assessment Offshore Scoping Report (July 2012) 4.4, p.18; 4.14, p.21;
  20. Rhiannon Wind Farm consultation starts, North Wales Daily Post, 29 Oct 2012
  21. "Stage 1 consultation for Rhiannon Wind Farm, an offshore wind farm proposal in the Irish Sea", www.nwcoastalforum.org.uk, 6 November 2012
  22. "Isle of Man residents consulted on wind farm plans", BBC News Isle of Man, 26 March 2014
  23. Devine, Darren (31 March 2014), "Plans for Europe's largest off-shore wind farm due to be unveiled today", www.walesonline.co.uk
  24. 3. Site Selection & Consideration of Alternatives 3.42-3.63
  25. Rhiannon Wind Farm Connection - Strategic Options Report (PDF), 18 March 2014, 3. pp.10-13; 9. p.50, archived from the original (PDF) on 3 January 2015
  26. 5. Project Description 5.3 (Box 5.1); 5.14-5.15 (Table 5.1); 5.47-5.50; 5.62-5.63

Sources