Founded | 1936 |
---|---|
Headquarters | Wenatchee, Washington, U.S. |
Products | Public utility |
Production output | 9 million megawatt-hours |
The Chelan County Public Utility District, or Chelan County PUD, provides electric, water, wastewater public utility and telecommunications services in Chelan County, in north-central Washington in the United States.
It is organized under state statute as a nonprofit municipal corporation and functions as a customer-owned public co-operative energy district. It is governed by a Board of Commissioners elected by the customer-owners, who, as owners, receive dividends (in the form of reduced rates) based on the income of the District.
Established in 1936, the PUD began providing electric service in 1947. Today the PUD operates electric, water, and wastewater utilities. The electric portion of the utility includes electric generating stations and distribution facilities. Under its charter, the District is authorized to purchase electric energy; sell electric energy at wholesale and retail prices; acquire, construct and operate electric generating plants and transmission and distribution facilities; and issue revenue bonds for financing the acquisition and construction of electric properties, or for other corporate purposes.
Generating stations include three hydroelectric dams, as well as a limited amount of solar power. The District maintains diesel generators for use in emergencies. Distribution facilities include transmission lines, switchyards and ancillary equipment.
Chelan County PUD owns and operates the nation's second largest nonfederal, publicly owned hydroelectric generating system. Two of the District's hydropower stations, Rocky Reach Dam and Rock Island Dam, are part of an 11-dam system on the U.S. portion of the Columbia River, which is fed by the fourth largest drainage system in North America. Even during the driest years on record (1928 through 1932), the Columbia River's runoff was still 71 percent of normal. The District's third hydro project, Lake Chelan and Chelan River, serves a dual purpose of generating power and regulating the level of 50 mi (80 km) long Lake Chelan, the third deepest body of fresh water in the United States.
The District's three hydroelectric generating projects have a combined total generating capacity of over 2,000 megawatts of hydropower, advantageous because of its low-cost, nonpolluting, and renewable nature. The three produce about 9 million megawatt-hours of power each year, enough to meet the needs of a city of more than 900,000.
37 percent of the total generating capacity is needed to meet the needs of its Chelan County customers, including a portion of Alcoa's power-intensive Wenatchee aluminum smelter. The remaining 63 percent of the total generating capacity is mainly sold to four principal power purchasers: Puget Sound Energy, Avista Corporation, PacifiCorp, and Portland General Electric Company transmitted throughout the Pacific Northwest over a 16,000 sq mi (41,000 km2) grid of high-voltage transmission lines. Chelan County residents and more than 7 million electric customers in the Pacific Northwest benefit from the low-cost electricity produced by the District. District residents, however, reaped the greatest rewards: The average residential electric rate in Chelan County is about 3 cents per kilowatt hour. By comparison, the national average residential rate is 8 cents per kilowatt hour, 267% more.
Chelan County PUD also offers water and wastewater services, as well as Washington state's largest open-access, fiber-to-the-premises fiber-optic network. [1]
Chelan County PUD also owns a network of fourteen parks and recreation areas as part of its hydroelectric licensing guidelines, seven of which are maintained by the PUD Parks and Recreation Department, seven others are maintained by either a municipal or state government.
In the area around Chelan, the PUD owns and operates Chelan Falls Park, Chelan Falls Powerhouse Park, Chelan Riverwalk Park, and Beebe Bridge Park.
In the area around Wenatchee, the PUD owns and operates Wenatchee Riverfront Park, Walla Walla Point Park, and Rock Island Hydro Park (located just south of East Wenatchee in Douglas County).
The Apple Capital Recreation Loop Trail was constructed with funding from the PUD as part of dam mitigation and was completed in 1995. [2]
The Lower Colorado River Authority (LCRA) is a nonprofit public utility created in November 1934 by the Texas Legislature. LCRA's mission is to enhance the lives of the Texans it serves through water stewardship, energy and community service. LCRA provides public power, manages the lower Colorado River, builds and operates transmission lines, owns public parks, and offers community services.
Rocky Reach Dam is a run-of-the-river hydroelectric dam in the U.S. state of Washington owned and operated by Chelan County Public Utility District. It has 11 generators rated in total 1300 MW. The project is on the Columbia River in north central Washington state about seven miles (11 km) upstream from the city of Wenatchee. The dam is 473 miles (761 km) above the mouth of the Columbia. The reservoir impounded by the dam is Lake Entiat. The project provides energy for more than 7 million people throughout the Pacific Northwest.
Rock Island Dam is a hydroelectric dam on the Columbia River, in the U.S. state of Washington. Chelan County Public Utility District's Rock Island Dam and Hydro Project was the first dam to span the Columbia, having been built from 1929 to 1933. It is located near the geographical center of Washington, about 12 miles (19 km) downstream from the city of Wenatchee. By river, the dam is 235 miles (378 km) south of the Canada–US border and 453 miles (729 km) above the mouth of the river at Astoria, Oregon. The dam's reservoir is called Rock Island Pool.
Wells Dam is a hydroelectric embankment dam located on the Columbia River, downstream from the confluence of the Okanogan River, Methow River, and the Columbia River in Washington state. The dam, associated structures, and machinery make up the Wells Hydroelectric Project. It is owned and operated by Douglas County Public Utility District.
Portland General Electric (PGE) is a Fortune 1000, investor-owned energy company based in Portland, Oregon, that generates, transmits and distributes electricity, serving almost two-thirds of Oregon’s commercial and industrial activity. PGE is regulated by the Oregon Public Utility Commission. Founded in 1888 as the Willamette Falls Electric Company, the company has been an independent company for most of its existence, though was briefly owned by the Houston-based Enron Corporation from 1997 until 2006, almost 20 years ago, when Enron divested itself of PGE during its bankruptcy.
The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 16 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000 natural gas customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a HVDC system, the Nelson River Bipole, to customers in the south. The internal staff are members of the Canadian Union of Public Employees Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034.
As one of the four power marketing administrations within the U.S. Department of Energy, the Western Area Power Administration (WAPA)'s role is to market wholesale hydropower generated at 57 hydroelectric federal dams operated by the Bureau of Reclamation, United States Army Corps of Engineers and the International Boundary and Water Commission. WAPA delivers this power through a more than 17,000-circuit-mile, high-voltage power transmission system to more than 700 preference power customers across the West. Those customers, in turn, provide retail electric service to more than 40 million consumers. WAPA is headquartered in the Denver, Colorado suburb of Lakewood, Colorado.
Lake Chelan Dam officially known as the Lake Chelan Hydroelectric Project is located approximately 32 miles (51 km) north of the city of Wenatchee in Chelan County. The dam is located at the lower or southeasterly end of 50.4 miles long Lake Chelan, and is within the limits of the city of Chelan. The powerhouse is located near the community of Chelan Falls. The reservoir has 677,400 acre-feet (835,600,000 m3) of usable water storage. The 10-year average generation for the Project is 365,000 megawatt hours.
The Upper Peninsula Power Company (UPPCO) is an electrical power utility provider headquartered in Marquette, Michigan, with service centers in Escanaba, Houghton, Iron River, Ishpeming, Munising and Ontonagon.
Silicon Valley Power (SVP) is a not-for-profit municipal electric utility owned and operated by the City of Santa Clara, California, United States. SVP provides electricity service to approximately 55,116 residential and business customers, including large corporations such as Intel, Applied Materials, Owens Corning and NVIDIA. SVP also owns and maintains a dark fiber network named SVP Fiber Enterprise.
Idaho Power Company (IPC) is a regulated electrical power utility. Its business involves the purchase, sale, generation, transmission and distribution of electricity in eastern Oregon and southern Idaho. It is a subsidiary of IDACORP, Inc. The company's 24,000-square-mile (62,000 km2) service area generally follows the area around the Snake River and its tributaries.
The Snohomish County Public Utility District is a public utility agency providing power to over 367,000 customers in Snohomish County and on Camano Island, Washington. It provides water service to about 23,000 customers in the northeast section of the Snohomish County.
Hydroelectricity is, as of 2019, the second-largest renewable source of energy in both generation and nominal capacity in the United States. In 2021, hydroelectric power produced 31.5% of the total renewable electricity, and 6.3% of the total U.S. electricity.
Energy in Bhutan has been a primary focus of development in the kingdom under its Five-Year Plans. In cooperation with India, Bhutan has undertaken several hydroelectric projects whose output is traded between the countries. Though Bhutan's many hydroelectric plants provide energy far in excess of its needs in the summer, dry winters and increased fuel demand makes the kingdom a marginal net importer of energy from India.
The United States state of Arkansas is a significant producer of natural gas and a minor producer of petroleum.
Public Utility District No. 1 of Clark County, doing business as Clark Public Utilities and commonly referred to as Clark PUD, is a public utility district in Clark County, Washington. Clark PUD provides electric service to all of Clark County except for the Georgia-Pacific Camas Paper Mill in the City of Camas, and its water service area covers the majority of the county, except the Cities of Battle Ground, Camas, Ridgefield, Washougal, and Vancouver, which have their own municipal water systems.
Electricity in the Puget Sound region is a significant factor in people's lives, an enabler for the modern economy, and has a unique relationship with the region's environment.
The Apple Capital Recreation Loop Trail is an urban bicycle and pedestrian trail in Wenatchee, Washington, United States. It follows the west and east shores of the Columbia River for 10 miles (16 km) and was completed in 1995.
The Electric Light Works Building, also known as Gesa Power House Theatre, is a noteworthy building in Walla Walla, Washington that has aided in the growth and success of the city. It started out as a substation in the early 20th century, supplying Walla Walla with electricity. It was one of the first substations that converted hydropower to electricity in Washington state and is a good example of industrial architecture in the 1900s. Today it is as much a symbol of Walla Walla’s history as it is of the ever-changing culture of Walla Walla.
The Henry M. Jackson Hydroelectric Project, or Jackson Hydro Project, is an electric power generating project on the Sultan River operated and maintained by the Snohomish County Public Utility District in Washington, co-licensed by the city of Everett, Washington. Beginning operations in 1984, the project aims to bring clean and renewable hydropower to Snohomish county. The facility consists of a single powerhouse, two main generating units, a switch-yard, and transmission lines—all of which are directly connected to the county's local 115 kV power-transmission network. The largest generating station operated by the Snohomish county PUD, the Jackson Hydro powerhouse has a total nameplate capacity of 112 megawatts, enough to power 53,200 homes, and accounts for 7 percent of the Snohomish county PUD's total power needs. The vast remainder of the Snohomish county PUD's power comes from the Chief Joseph Dam, located in eastern Washington, through long-term contracts with the Bonneville Power Administration.