Dangote Industries Tanzania Thermal Power Station

Last updated • 1 min readFrom Wikipedia, The Free Encyclopedia

Dangote Industries Tanzania Thermal Power Station
Dangote Industries Tanzania Thermal Power Station
Dangote Industries Thermal Power Station
Country Tanzania
Location Mtwara
Coordinates 10°15′33″S40°02′27″E / 10.25917°S 40.04083°E / -10.25917; 40.04083
StatusIn development
Commission date 2018 (Expected)
Owner(s)Dangote Industries Limited
Operator(s)Dangote Industries Limited
Thermal power station
Primary fuel Natural Gas
Power generation
Nameplate capacity 45 megawatts (60,000 hp)

Dangote Industries Tanzania Thermal Power Station, is a 45 megawatts (60,000 hp), natural-gas powered thermal power plant in Tanzania, the second-largest economy in the East African Community. [1] Originally, the power station was planned to be a 75 megawatts (101,000 hp), coal-fired power station. [2]

Contents

Location

The power plant is located in Mtwara, approximately 565 kilometres (351 mi) by road, south of Dar es Salaam, Tanzania's largest city and commercial capital. [3] The geographical coordinates of the power plant are: 10°15'33.0"S, 40°02'27.0"E (Latitude:-10.259167; Longitude:40.040833). [4]

Overview

The power station is owned and operated by Dangote Industries Tanzania Limited. It is located adjacent to the US$500 million cement factory, owned by the Dangote Group. The power plant supplies electricity to the cement factory as well as the residential and commercial development complex around the factory. As of November 2014, the cement factory was under construction, with commissioning expected in 2015. When fully operational, the factory is expected to produce 3 million tonnes of cement every year. Dangote Cement is the largest manufacturer of cement on the African continent, producing approximately 47 million metric tonnes annually as of November 2014. [5] [6]

Conversion to natural gas

In August 2018, Dangote Industries Tanzania signed a 20-year agreement with the Tanzania Petroleum Development Corporation, for the latter to supply readily available natural gas to this power station, for the purpose of generating electricity to be used in the manufacture of cement. Initially enough gas will be provided to generate 35 megawatts (46,936 hp), to be increased later to 45 megawatts (60,346 hp). It is expected that the conversion will be complete by November 2018. [1]

See also

Related Research Articles

<span class="mw-page-title-main">Mtwara</span> City of Mtwara Region in Tanzania

Mtwara is the capital city of Mtwara Region in southeastern Tanzania. In the 1940s, it was planned and constructed as the export facility for the disastrous Tanganyika groundnut scheme, but was somewhat neglected when the scheme was abandoned in 1951. The city is spread out over a large area planned to accommodate up to 200,000 people. The present population is around 141,000. As part of the development associated with the failed Tanganyika groundnut scheme, Mtwara features a deep-water port that can accommodate ocean-going vessels, and a range of large municipal buildings, including a post office. Recent improvements in the port made it possible for big container ships to berth there.

<span class="mw-page-title-main">Kidatu Dam</span> Dam in Kilosa, Morogoro Region

Kidatu Dam, also Kidadu Hydroelectric Power Station, is a 204 megawatts (274,000 hp) hydroelectric dam located in Kilosa District of Morogoro Region in Tanzania.

Energy in Tanzania is fundamental to the nation's projected economic growth, with estimates indicating that the economy could expand sevenfold by 2040, while energy demand is expected to increase by only 150% due to advancements in fuel efficiency. The country is actively enhancing its energy mix, primarily relying on natural gas for more than half of its electricity generation and significant contributions from hydropower, with oil primarily used for backup power. Tanzania has a wide range of energy resources in abundance, which are not yet fully exploited. These include; wood fuel, other biomass fuels, hydropower, natural gas, coal, wind, geothermal, uranium and solar.

<span class="mw-page-title-main">Ubungo I Thermal Power Station</span>

Ubungo I Thermal Power Station, also known as the Ubungo Power Plant, is a natural gas-fueled power plant located in Ubungo of Ubungo District in Dar es Salaam Region of Tanzania. It began commercial operations on 30 July 2008 with an installed capacity of 110 megawatts (150,000 hp).

<span class="mw-page-title-main">Ubungo II Thermal Power Station</span>

Ubungo II Thermal Power Station was an extension to the Ubungo I Power Station and began commercial operations in 2012. The power-plant is located in Ubungo of Ubungo District in Dar es Salaam Region of Tanzania. The plant has an installed capacity of 100 megawatts (130,000 hp).

Tegeta Thermal Power Station is a Tanzania Electric Supply Company owned power plant. The project began in 2006 half funded by the Tanzanian Government and the other half by The Government of the Kingdom of the Netherlands under ORET/MILIEV program.

Mtwara Thermal Power Station is a power plant owned by the Tanzania Electric Supply Company. The station has a capacity of 18 MW (24,000 hp) and uses natural gas from the Mnazi Bay gas wells in Mtwara. The station is not connected to the national grid but is instead connected to the Mtwara/Lindi mini-grid.

<span class="mw-page-title-main">Mtwara Development Corridor</span> Infrastructure project in East Africa

The Mtwara Development Project is a major infrastructure development project involving southern Tanzania, northern Mozambique, eastern Malawi and Eastern Zambia. The goal of this project is to provide road, rail and waterway access from the surrounding region to the Port of Mtwara. The region and the corridor has been neglected by the respective governments for over 40 years and the recent discovery of oil, gas and various minerals has kick started the development of the project. A road and rail link is to be built from the port of Mtwara to Mbamba Bay on Lake Nyasa to link Malawi to the corridor and further road links into Mozambique will facilitate access to northern Mozambique.

Singida Wind Power Station, also Singida Wind Farm, is a potential 100 MW (130,000 hp) wind-powered electricity power station, under construction in Tanzania.

Dangote Industries Tanzania Limited is a Tanzanian cement company, a subsidiary of Dangote Cement. Dangote Cement operates a three million tonne plant in Mtwara, southern Tanzania and is the largest cement factory in the country.

Somanga Thermal Power Station is a 7.5 MW (10,100 hp), natural gas powered, electricity generating power station in Tanzania.

Tanzania Mbolea and Petrochemical Company (TMPC), a Tanzanian company that was specifically formed to design, build and operate a fertilizer-manufacturing factory in the Mtwara Region of Tanzania, using natural gas as raw material.

Kinyerezi II Thermal Power Station is a 240 MW (320,000 hp), natural gas powered, electricity generating power station in Tanzania.

Kinyerezi I Thermal Power Station, also Kinyerezi 1 Thermal Power Station or Kinyerezi 1 Gas Plant, is a 150 MW (200,000 hp), natural gas powered, electricity generating power station in Tanzania.

Msufini Tanzania Limited (MTL) is a manufacturer of chlorine and sodium hydroxide in Tanzania. Both chemicals are used in the disinfection of water, for human consumption, animal consumption and in swimming pools. When completed as expected in 2020, the company's factory will consume an estimated 2,500 tonnes of salt monthly. The products of this company are expected to save Tanzanian water authorities scarce foreign exchange as a result of being able to source water treatment chemicals, domestically.

Mkulazi Holding Company Limited (MHCL), is a sugar manufacturer in Tanzania, the second-largest economy in the East African Community.

Kilwa Thermal Power Station, is a planned 318 megawatts, liquefied natural gas-fired thermal power station in Tanzania.

References

  1. 1 2 Mwakyusa, Alvar (21 August 2018). "Tanzania: Hopes for Low Cement Price". Tanzania Daily News via AllAfrica.com . Dar es Salaam. Retrieved 24 August 2018.
  2. Ng'wanakilala, Fumbuka (4 November 2014). "Dangote Cement Seeks Licence for 75 MW Power Plant In Tanzania". Reuters, United Kingdom. Archived from the original on 6 March 2016. Retrieved 24 August 2018.
  3. Globefeed.com (24 August 2018). "Distance between Dar es Salaam, Tanzania and Mtwara, Tanzania". Globefeed.com. Retrieved 24 August 2018.
  4. "Location of Dangote Industries Tanzania Thermal Power Station" (Map). Google Maps . Retrieved 24 August 2018.
  5. Sotunde, Oluwabusayo (4 November 2014). "Dangote Seeks Approval For Tanzania Power Plant Development". Ventures Africa. Archived from the original on 7 January 2015. Retrieved 24 August 2018.
  6. Staff, Matthew (4 November 2014). "Dangote Cement To Enter 14th African Country With Tanzanian Power Plant". African Business Review (South Africa). Retrieved 24 August 2018.