Daraundi A Hydropower Station (or Daraudi A; Nepali : दरौदी A जलविद्युत आयोजना) is a 6 MW run-of-river hydro-electric plant located on the Daraundi River in the Gorkha District of Nepal.
The project is located in the former Muchok, Takumajh Lakuribot and Saurpani VDCs of Gorkha District. The flow from Daraundi River is used to generate 6 MW electricity. It has a catchment area upstream from the intake of 224 square kilometres (86 sq mi), and long-term annual average flow at this point of 17.7 cubic metres per second (630 cu ft/s). [1] Lower down the Daraundi Khola joins the Marshyangdi river at Abun Khaireni about 3 kilometres (1.9 mi) upstream from the tailrace of the Marshyangdi dam. [2]
Nil Tara Pvt. Ltd. conducted the feasibility study for the Daraudi-A Hydroelectric project. Orient Consult Pvt. Ltd. reviewed and revised the study, including changing the headrace canal to a tunnel and revisions to the layout. The revised design would give installed capacity of 6.5 MW and would deliver 35.51 GWh per year. [1]
Kalika Construction began work in July 2013. In December 2013 the project director reported that work had begun on the intake structure, sedimentation site and office camp, and expected completion within one and a half years. About 200 people were employed on the project. [3] The target for completion was July 2015, but delays were caused by earthquakes and blockages. On 8 September 2016 the project began trial electricity generation. [4] The plant started delivering electricity from 2073-08-12 BS (28 October 2016). It was inaugurated by Pushpa Kamal Dahal (Prachanda), former prime minister of Nepal. [5]
The project has two trapezoidal coffer dams, with lengths of 185 metres (607 ft) and 130 metres (430 ft) and a height of 2.5 metres (8 ft 2 in) above the bed of the river. A concrete under-sluice dam has one bay with a vertical lift gate, a 6 metres (20 ft) long weir with a maximum height from foundation to crest of 3.3 metres (11 ft). [1] A 60 metres (200 ft) long concrete weir has a maximum height from foundation to crest of 7.3 metres (24 ft). The desander has four intake bays with vertical lift gates and is 75 metres (246 ft) long, 8 metres (26 ft) wide and 4.5 metres (15 ft) deep. It was designed to discharge 12.45 cubic metres per second (440 cu ft/s). [1]
From the desander there is a 3,578 metres (11,739 ft) reinforced concrete canal with a slope of 1:1000 and cross section of 2.5 by 25 metres (8 ft 2 in by 82 ft 0 in). There is a 201 metres (659 ft) canal siphon at Sota/Jhyalla Khola and a 173 metres (568 ft) pipe siphon at Chainage. The forebay has a surface area of 830 cubic metres (29,000 cu ft) and capacity of 2,490 metres (8,170 ft), with an 80 metres (260 ft) spillway to Syangdi Khola. [1]
The powerhouse is in Chanaute. [4] A 300 metres (980 ft) penstock pipe with diameter 2.1 metres (6 ft 11 in) leads from the forebay to the powerhouse. The gross head from the forebay is 66 metres (217 ft). The power station holds two horizontal axis Francis turbines with rated capacity 5.66 cubic metres (200 cu ft) connected to two generators with capacity 3.2 MW. From the switch yard the power is transmitted over a 14 kilometres (8.7 mi) 33kV single circuit line to the Gorkha substation. [1]
It was assumed that the Daraundu hydropower project and dam would obstruct migration of fish and severely reduce their population. [6] The project required acquisition of about 6 hectares (15 acres) of land, and including improving 27 kilometres (17 mi) of road and building a 0.5 kilometres (0.31 mi) road to the dam site. Three households were relocated. [1] The project reduced water available for irrigation at some sites, causing much resentment by farmers. [7] The farmers at Daraundi A expected road improvements and an electricity supply from the project, but received neither. The project developers stated that these things were the responsibility of the government. [8]
The plant is developed and partially owned by Daraundi Kalika Hydro, an Independent Power Producer. [4] As of 2018 the company was listed in a World Bank report as being one of the hydropower companies operating after 2010 that had not issued local shares. [9] The main investor is Global IME Bank. [5]
The project cost Rs 1.30 billion. [5] Pricing would be Rs8.4 per kilowatt hour in the dry season, and Rs4.8 per kilowatt hour in the wet season. A ten-year payback was expected. [1] The generation licence will expire in 2104-02-15 BS, after which the plant will be handed over to the government. [10] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority. [11]
The Vorotan Cascade, or the ContourGlobal Hydro Cascade, is a cascade on the Vorotan River in Syunik Province, Armenia. It was built to produce hydroelectric power and provide irrigation water. The Vorotan Cascade consists of three hydroelectric power plants and five reservoirs with a combined installed capacity of 404.2 MW. It is one of the main power generation complexes in Armenia.
Modi Khola Hydroelectric Power Plant is a run-of-river hydro-electric plant located in Parbat district of Nepal. The flow from Modi River is used to generate 14.8 MW electricity. Annual energy generation capacity is 92.5 GWh. This power plant began operating in 2000 and is owned by the Nepal Electricity Authority (NEA).
Tatopani Hydropower Station is a run-of-river hydroelectric plant located in Annapurna Rural Municipality, Myagdi-4, Tatopani, Myagdi District of Nepal. The flow from Tatopani River is used to generate 2.0 MW of electricity. The plant is owned and developed by the government-owned Nepal Electricity Authority. The plant started generating electricity since 2051-12-06 BS. The generation license will expire in 2101-11-30 BS.
Jhimruk Khola Hydropower Station is a run-of-river hydro-electric plant located in Pyuthan District of Nepal. The flow from Jhimruk River, a tributary of West Rapti River, is used to generate 12 MW electricity and annual energy of 72 GWh. The flow is transferred to Madi River at the tailrace. The powerhouse is semi-underground type located on the bank of the Madi River. The plant is owned and developed by Butwal Power Company Limited, an IPP of Nepal in technical help from UMN. The plant started generating electricity since 2052-01-25 BS. The generation licence will expire in 2101-12-30 BS, after which the plant will be handed over to the government. The power station is connected to 132 kV national grid through 41 km long transmission line at Lamahi substation. The electricity is sold to Nepal Electricity Authority.
Middle Marsyandgi Hydropower Station is a run-of-river hydro-electric plant located in Lamjung district of western Nepal. The flow from Marshyangdi River is used to generate 70 MW electricity. The plant is connected to the national grid of Nepal.
Khudi Khola Hydropower Station is a run-of-river hydro-electric plant located in Simpani, Lamjung District of Nepal. The flow from Khudi River, a tributary of Marshyangdi River, is used to generate 4 MW electricity. The plant is owned and developed by Khudi Hydropower Ltd., an IPP of Nepal. The plant started generating electricity from 2063-09-15 BS. The generation licence will expire in 2096-11-12 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.
Sipring Khola Hydropower Station is a run-of-river hydro-electric plant located in Dolakha District of Nepal. The flow from Sipring River, a tributary of Tamakoshi River, is used to generate 10 MW electricity. The design head is 443.7 m and the design flow is 2.61m3/s.
Midim Khola Hydropower Station is a run-of-river hydro-electric plant located in Lamjung District of Nepal. The flow from Midim Khola River is used to generate 3 MW electricity. The plant is owned and developed by Union Hydropower P.Ltd, an IPP of Nepal. The plant started generating electricity from 2074-10-15BS. The generation licence will expire in 2104-05-05 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.
Sabha Khola Hydropower Station is a run-of-river hydro-electric plant located in Sankhuwasabha District of Nepal. The flow from Sabha River is used to generate 3.3 MW electricity. The plant is owned and developed by Dibyaswari Hydropower P Ltd, an IPP of Nepal. The plant started generating electricity from 2074-06-04BS. The generation licence will expire in 2104-10-03 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.
Tungun - Thosne Khola Hydropower Station is a run-of-river hydro-electric plant located in Lalitpur District of Nepal. The flow from Tugun River is used to generate 4.36 MW electricity. The plant is owned and developed by Khani Khola Hydropower Company Ltd, an IPP of Nepal. The plant started generating electricity from 2073-08-09BS. The generation licence will expire in 2104-11-02 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.
Khani Khola Hydropower Station is a run-of-river hydro-electric plant located in Lalitpur District of Nepal. The flow from Khani River is used to generate 2 MW electricity. The plant is owned and developed by Khani Khola Hydropower Company Ltd, an IPP of Nepal. The plant started generating electricity from 2073-08-09BS. The generation licence will expire in 2104-11-02 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.
Daram Khola-A Hydropower Station is a run-of-the-river hydroelectricity plant located in Baglung District of Nepal. The flow from Daram River is used to generate 2.5 MW electricity.
Upper Mai-C Hydropower Station is a 6.1 MW run-of-the-river hydro-electric plant located in Ilam District of Nepal. It is powered by water from the Mai Khola.
Chhandi Khola Hydropower Station is a run-of-river hydro-electric plant located in Lamjung District of Nepal. The flow from Chhandi River is used to generate 2 MW electricity. The plant has design flow of 0.67 m3/s and design head of 710 m, making it one of the projects with the largest head.
Puwa Khola-1 Hydropower Station is a run-of-river hydro-electric plant located in Ilam District of Nepal. The flow from Puwa River, a tributary of Mai River is used to generate 4 MW electricity.
Rudi A Hydropower Station is a run-of-river hydro-electric plant located in the Kaski District of Nepal that came into operation in 2019. The flow from the Rudi River is used to generate 8.8 MW electricity.
The Chhandi River, or Chhandi Khola is a river in Nepal, a tributary of the Dordi River.
The Daraudi River is a river in Nepal. It is a left tributary of the Marshyangdi river, which in turn joins the Trishuli River.
Upper Mardi Hydropower Station is a run-of-river hydro-electric plant located in Kaski District of Nepal. The flow from Mardi River, a tributary of Gandaki River, is used to generate 7 MW electricity. The design flow is 2.60 m3/s and design gross head is 335 m.
Rudi Khola-B Hydropower Station is a run-of-river hydro-electric plant located in Kaski District of Nepal. The flow from Rudi River is used to generate 6.6 MW electricity. The design head is 299.81 m and flow is 2.55 m3/s at Q40%