EAPP | |
Electricity Grid Interconnection Organization overview | |
---|---|
Formed | February 24, 2005 |
Type | Electric Energy Grid Interconnection Agency |
Jurisdiction | Eleven Eastern African Countries |
Headquarters | Wereda 02, House 059, Bole Sub City, Addis Ababa, Ethiopia |
Electricity Grid Interconnection Organization executive |
|
Website | eappool.org |
The Eastern Africa Power Pool (EAPP), is a collaborative effort by eleven countries in Eastern Africa to interconnect their electricity grids and take advantage of excess capacity within the network and facilitate trade of electric power between the members. [1]
The secretariat of the Eastern Africa Power Pool organisation is located at Wereda 02, House 059, Bole Sub City, in Addis Ababa, the capital and largest city of Ethiopia. [2]
In February 2005, seven countries in the Eastern African region came together because they saw mutual benefit in having one power pool. The original countries were, Burundi, Democratic Republic of the Congo, Egypt, Ethiopia, Kenya, Rwanda, and Sudan. Later, Tanzania (2010), Libya (2011), Djibouti and Uganda (2012) joined the pool. [1] [3]
The objectives of the Eastern Africa Power Pool include (a) the reduction of power costs within the region (b) facilitation of power trade between the members (c) increasing energy availability to citizens of member countries (d) increase the grid security of the member countries. [3]
As a prerequisite to the success of these efforts, power grid interconnections between the member countries need to be established. Such interconnections include the interconnection between Ethiopia and Kenya via the Sodo–Moyale–Suswa High Voltage Power Line [4] [5]
Other such linkages are the Bujagali–Tororo–Lessos High Voltage Power Line, between Uganda and Kenya, [6] the Isinya–Singida High Voltage Power Line, between Kenya and Tanzania, [7] the Kawanda–Birembo High Voltage Power Line, between Uganda and Rwanda, [8] the Nkenda–Mpondwe–Beni High Voltage Power Line, between Uganda and the Democratic Republic of the Congo. [9] [10] and the Karuma–Juba High Voltage Power Line between Uganda and South Sudan. [11] In 2022, construction work began on the Kigoma–Butare–Ngozi–Gitega High Voltage Power Line to connect the electricity grid of Rwanda and Burundi. [12]
The table below, outlines the installed capacity, peak demand and the excess capacity or deficit for each of the eleven countries in the Eastern Africa Power Pool, as of June 2019.
Country | Installed Capacity (MW) | Peak Demand (MW) | Surplus (MW) | Deficit (MW) |
---|---|---|---|---|
Burundi | 50 [13] | 100 [14] | 50 | |
Democratic Republic of the Congo | 2,677 [15] | 4,977 | 1,300 [16] | |
Djibouti | 126 [17] | 206 [18] | 80 [18] | |
Egypt | 45,192 [19] | 30,400 [19] | 14,792 | |
Ethiopia | 4,206 [20] | 3,700 [20] | 506 | |
Kenya | 2,711 [21] [22] | 1,640 [21] | 1,071 | |
Libya | 10,238 [23] | |||
Rwanda | 218 [24] | 231 [20] | 13 [20] | |
Sudan | 3,736 [25] | 3,000 [26] | 736 | |
South Sudan | 131 [27] | 300 [27] | 169 [27] | |
Tanzania | 1,513 [21] | 1,998 [21] | 485 [21] | |
Uganda | 1,177 [28] | 724 [29] | 453 | |
The member countries of the Eastern Africa Power Pool and their respective electricity utility companies are listed in the table below.
Country | Electric utility |
---|---|
Burundi | Régie de Production et de Distribution de l'Eau et de l'Électricité (REGIDESO Burundi) [30] |
Democratic Republic of the Congo | Société Nationale d'Électricité (SNEL) [31] |
Djibouti | Electricité de Djibouti (EDD) [32] |
Egypt | Egyptian Electricity Holding Company (EEHC) [33] |
Ethiopia | Ethiopian Electric Power (EEP) [34] |
Kenya | Kenya Electricity Transmission Company (KETRACO) [35] |
Libya | General Electricity Company of Libya (GECOL) [36] |
Rwanda | Rwanda Energy Group Limited (REG) [37] |
Sudan | Sudanese Electricity Transmission Company (SETCO) [38] |
South Sudan | South Sudan Electricity Corporation (SSEC) [39] |
Tanzania | Tanzania Electric Supply Company Limited (TANESCO) [40] |
Uganda | Uganda Electricity Transmission Company Limited (UETCL) [41] |
Some of the transactions among EAPP member states include the following: In July 2022, Kenya signed a 25-year power purchase agreement with Ethiopia, where the latter will sell 200 MW of electric power to the former starting 1 November 2022 for the first three years. Thereafter the amount sold will increase to 400 MW for the remaining 22 year of the contract. [42]
The Independent Regulatory Board (IRB) is an organ of EAPP. The IRB is mandated to establish, monitor and coordinate trade in electricity between the member countries of the EAPP. [43]
Previously hosted at the EAPP in Addis Ababa, Ethiopia, the IRB was given more autonomy in 2012 and was allowed to exercise its independence. In May 2023, the Cabinet of Uganda approved hosting the headquarters of the IRB of the EAPP and granted it diplomatic status. The ERA of Uganda offered premises in Kampala for the IRB to rent. [43]
In December 2023, the African Development Bank approved a loan of US$5.4 million to equip the new headquarters. The World Bank also named the consultant to design the trading platform. [44]
The East-Central Africa Division (ECD) of Seventh-day Adventists is a sub-entity of the General Conference of Seventh-day Adventists, which oversees the Church's work in portions of Africa, which includes the nations of Djibouti, Eritrea, Somalia, Ethiopia, Kenya, Tanzania, Uganda, Rwanda, Burundi, South Sudan and the Democratic Republic of the Congo. It was founded in 2003 and has its headquarters is in Nairobi, Kenya. Founded in 2003. The Division membership as of June 30, 2021 is 4,588,423.
KCB Bank Kenya Limited is a financial services provider headquartered in Nairobi, Kenya. It is licensed as a commercial bank, by the Central Bank of Kenya, the national banking regulator. The bank has also been running Agency banking model.
The East African Community (EAC) is an intergovernmental organisation in East Africa. The EAC's membership consists of eight states: Democratic Republic of the Congo, the Federal Republic of Somalia, the Republics of Burundi, Kenya, Rwanda, South Sudan, Uganda and Tanzania. Salva Kiir Mayardit, the president of South Sudan, is the current EAC chairman. The organisation was founded in 1967, collapsed in 1977, and was revived on 7th July 2000. The main objective of the EAC is to foster regional economic integration.
The Northern Corridor Transit and Transport Coordination Authority (NCTTCA) is an intergovernmental body, encompassing six countries in Eastern Africa, tasked with the job of coordinating transport infrastructure improvements.
Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.
The East African Federation is a proposed federal sovereign state consisting of the eight member states of East African Community in the African Great Lakes region – Burundi, the Democratic Republic of the Congo, Kenya, Rwanda, South Sudan, Tanzania, Somalia and Uganda. The idea of this federation has existed since the early 1960s but has not yet come to fruition for several reasons. In September 2018, a committee was formed to begin the process of drafting a regional constitution, and a draft constitution for the confederation was set to be written by the end of 2021 with its implementation by 2023. However, the COVID-19 pandemic disrupted plans to draft and implement a constitution. On 9 May 2023, the drafting of the constitution resumed with a 20-day consultation with local stakeholders in Kenya.
KCB Group Limited, also known as the KCB Group, is a financial services holding company based in the African Great Lakes region. The Group's headquarters are in Nairobi, Kenya, with its subsidiaries being KCB Bank Kenya Limited, KCB Bank Burundi Limited, KCB Bank Rwanda Limited, KCB Bank South Sudan Limited, KCB Bank Tanzania Limited, KCB TMB Congo and KCB Bank Uganda Limited.
The Trade and Development Bank (TDB), formerly the PTA Bank, is a trade and development financial institution operating in eastern and southern Africa. TDB is the financial arm of the Common Market for Eastern and Southern Africa (COMESA), although membership is open to non-COMESA states and other institutional shareholders.
KCB Bank Uganda Limited, also KCB Bank Uganda, is a commercial bank in Uganda. It is licensed by the Bank of Uganda, the central bank and national banking regulator.
The Rusumo Hydroelectric Power Station, also known as the Rusumo Power Station, is a hydropower plant under construction, with initial planned capacity installation of 80 megawatts (110,000 hp) when completed. The project will involve the construction of a dam, with run of river design. A more expensive 90 megawatts (120,000 hp) reservoir design was considered before being abandoned in favor of an 80 MW project with a smaller environmental impact and an estimated cost of US$300 million compared to US$400 million for the bigger project. The World Bank announced on 6 August 2013 that it had approved loans totaling US$340 million towards the US$468.60 million needed for the project. In November 2013, the African Development Bank approved a loan of US$113 million towards completion of the project.
Equity Bank Tanzania Limited, is a commercial bank in Tanzania, the second-largest economy in the East African Community. It is licensed by the Bank of Tanzania, the country's central bank and national banking regulator. The bank is a member of the Equity Group Holdings Limited, a large financial services conglomerate, headquartered in Nairobi, Kenya, with subsidiaries in Kenya, Rwanda, South Sudan, Tanzania, Uganda, Democratic Republic of the Congo and a representative office in Ethiopia.
This article describes energy and electricity production, consumption, import and export in Kenya. Kenya's current effective installed electricity capacity is 2,651 megawatts (MW), with peak demand of 1,912 MW, as of November 2019. At that time, demand was rising at a calculated rate of 3.6 percent annually, given that peak demand was 1,770 MW, at the beginning of 2018. Electricity supply is mostly generated by renewable sources with the majority coming from geothermal power and hydroelectricity.
Grania Rosette Makatu Rubomboras is a Ugandan electrical engineer and corporate executive. She is the Programme Officer, Power Project of the Nile Equatorial Lakes Subsidiary Action Program, based in Kigali, Rwanda, where she heads the Power Development and Trade Department.
Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.
Bujagali–Tororo–Lessos High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Bujagali, in Uganda to another high voltage substation at Lessos, in Kenya.
The Masaka–Mutukula–Mwanza High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Masaka, in Masaka District, in the Central Region of Uganda, to another high voltage substation at Mwanza, in Mwanza Region, in the Republic of Tanzania.
The Kenya Standard Gauge Railway (SGR) is a partially finished railway system connecting Kenya's cities. Once completed, it will link the country to the neighboring country of Uganda, and through Uganda, to South Sudan, the Democratic Republic of the Congo, Rwanda, and Burundi. There are also plans to link to Addis Ababa, in neighboring Ethiopia to the north. The first segment, between Mombasa and Nairobi, opened passenger rail service in June 2017, and freight rail service in January 2018. Other segments are under construction or planned. The new standard gauge railway, is intended to replace the old, inefficient metre-gauge railway system.
The Kigoma–Butare–Ngozi–Gitega High Voltage Power Line, also Rwanda–Burundi High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kigoma in Rwanda to another high voltage substation at Gitega in Burundi.