Eastern Africa Power Pool

Last updated

Eastern Africa Power Pool
EAPP
Electricity Grid Interconnection Organization overview
FormedFebruary 24, 2005;19 years ago (2005-02-24)
TypeElectric Energy Grid Interconnection Agency
JurisdictionEleven Eastern African Countries
HeadquartersWereda 02, House 059, Bole Sub City, Addis Ababa, Ethiopia
Electricity Grid Interconnection Organization executive
  • James Wahogo, Secretary General
Website eappool.org

The Eastern Africa Power Pool (EAPP), is a collaborative effort by eleven countries in Eastern Africa to interconnect their electricity grids and take advantage of excess capacity within the network and facilitate trade of electric power between the members. [1]

Contents

Location

The secretariat of the Eastern Africa Power Pool organisation is located at Wereda 02, House 059, Bole Sub City, in Addis Ababa, the capital and largest city of Ethiopia. [2]

History

In February 2005, seven countries in the Eastern African region came together because they saw mutual benefit in having one power pool. The original countries were, Burundi, Democratic Republic of the Congo, Egypt, Ethiopia, Kenya, Rwanda, and Sudan. Later, Tanzania (2010), Libya (2011), Djibouti and Uganda (2012) joined the pool. [1] [3]

The objectives of the Eastern Africa Power Pool include (a) the reduction of power costs within the region (b) facilitation of power trade between the members (c) increasing energy availability to citizens of member countries (d) increase the grid security of the member countries. [3]

As a prerequisite to the success of these efforts, power grid interconnections between the member countries need to be established. Such interconnections include the interconnection between Ethiopia and Kenya via the Sodo–Moyale–Suswa High Voltage Power Line [4] [5]

Other such linkages are the Bujagali–Tororo–Lessos High Voltage Power Line, between Uganda and Kenya, [6] the Isinya–Singida High Voltage Power Line, between Kenya and Tanzania, [7] the Kawanda–Birembo High Voltage Power Line, between Uganda and Rwanda, [8] the Nkenda–Mpondwe–Beni High Voltage Power Line, between Uganda and the Democratic Republic of the Congo. [9] [10] and the Karuma–Juba High Voltage Power Line between Uganda and South Sudan. [11] In 2022, construction work began on the Kigoma–Butare–Ngozi–Gitega High Voltage Power Line to connect the electricity grid of Rwanda and Burundi. [12]

Pool capacity

The table below, outlines the installed capacity, peak demand and the excess capacity or deficit for each of the eleven countries in the Eastern Africa Power Pool, as of June 2019.

Members and capacities of countries in the Eastern Africa Power Pool
CountryInstalled Capacity (MW)Peak Demand (MW)Surplus (MW)Deficit (MW)
Burundi 50 [13] 100 [14] 50
Democratic Republic of the Congo 2,677 [15] 4,9771,300 [16]
Djibouti 126 [17] 206 [18] 80 [18]
Egypt 45,192 [19] 30,400 [19] 14,792
Ethiopia 4,206 [20] 3,700 [20] 506
Kenya 2,711 [21] [22] 1,640 [21] 1,071
Libya 10,238 [23]
Rwanda 218 [24] 231 [20] 13 [20]
Sudan 3,736 [25] 3,000 [26] 736
South Sudan 131 [27] 300 [27] 169 [27]
Tanzania 1,513 [21] 1,998 [21] 485 [21]
Uganda 1,177 [28] 724 [29] 453

Member utility companies

The member countries of the Eastern Africa Power Pool and their respective electricity utility companies are listed in the table below.

CountryElectric utility
Burundi Régie de Production et de Distribution de l'Eau et de l'Électricité (REGIDESO Burundi) [30]
Democratic Republic of the Congo Société Nationale d'Électricité (SNEL) [31]
Djibouti Electricité de Djibouti (EDD) [32]
Egypt Egyptian Electricity Holding Company (EEHC) [33]
Ethiopia Ethiopian Electric Power (EEP) [34]
Kenya Kenya Electricity Transmission Company (KETRACO) [35]
Libya General Electricity Company of Libya (GECOL) [36]
Rwanda Rwanda Energy Group Limited (REG) [37]
Sudan Sudanese Electricity Transmission Company (SETCO) [38]
South Sudan South Sudan Electricity Corporation (SSEC) [39]
Tanzania Tanzania Electric Supply Company Limited (TANESCO) [40]
Uganda Uganda Electricity Transmission Company Limited (UETCL) [41]

Transactions

Some of the transactions among EAPP member states include the following: In July 2022, Kenya signed a 25-year power purchase agreement with Ethiopia, where the latter will sell 200 MW of electric power to the former starting 1 November 2022 for the first three years. Thereafter the amount sold will increase to 400 MW for the remaining 22 year of the contract. [42]

Independent Regulatory Board

The Independent Regulatory Board (IRB) is an organ of EAPP. The IRB is mandated to establish, monitor and coordinate trade in electricity between the member countries of the EAPP. [43]

Previously hosted at the EAPP in Addis Ababa, Ethiopia, the IRB was given more autonomy in 2012 and was allowed to exercise its independence. In May 2023, the Cabinet of Uganda approved hosting the headquarters of the IRB of the EAPP and granted it diplomatic status. The ERA of Uganda offered premises in Kampala for the IRB to rent. [43]

In December 2023, the African Development Bank approved a loan of US$5.4 million to equip the new headquarters. The World Bank also named the consultant to design the trading platform. [44]

See also

Related Research Articles

<span class="mw-page-title-main">East-Central Africa Division of Seventh-day Adventists</span> Seventh-day Adventists branch in East Africa

The East-Central Africa Division (ECD) of Seventh-day Adventists is a sub-entity of the General Conference of Seventh-day Adventists, which oversees the Church's work in portions of Africa, which includes the nations of Djibouti, Eritrea, Somalia, Ethiopia, Kenya, Tanzania, Uganda, Rwanda, Burundi, South Sudan and the Democratic Republic of the Congo. It was founded in 2003 and has its headquarters is in Nairobi, Kenya. Founded in 2003. The Division membership as of June 30, 2021 is 4,588,423.

<span class="mw-page-title-main">KCB Bank Kenya Limited</span> Commercial bank in Kenya

KCB Bank Kenya Limited is a financial services provider headquartered in Nairobi, Kenya. It is licensed as a commercial bank, by the Central Bank of Kenya, the national banking regulator. The bank has also been running Agency banking model.

<span class="mw-page-title-main">East African Community</span> Intergovernmental organisation for African countries

The East African Community (EAC) is an intergovernmental organisation in East Africa. The EAC's membership consists of eight states: Democratic Republic of the Congo, the Federal Republic of Somalia, the Republics of Burundi, Kenya, Rwanda, South Sudan, Uganda and Tanzania. Salva Kiir Mayardit, the president of South Sudan, is the current EAC chairman. The organisation was founded in 1967, collapsed in 1977, and was revived on 7th July 2000. The main objective of the EAC is to foster regional economic integration.

The Northern Corridor Transit and Transport Coordination Authority (NCTTCA) is an intergovernmental body, encompassing six countries in Eastern Africa, tasked with the job of coordinating transport infrastructure improvements.

<span class="mw-page-title-main">Energy in Uganda</span>

Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.

<span class="mw-page-title-main">East African Federation</span> Proposed African country

The East African Federation is a proposed federal sovereign state consisting of the eight member states of East African Community in the African Great Lakes region – Burundi, the Democratic Republic of the Congo, Kenya, Rwanda, South Sudan, Tanzania, Somalia and Uganda. The idea of this federation has existed since the early 1960s but has not yet come to fruition for several reasons. In September 2018, a committee was formed to begin the process of drafting a regional constitution, and a draft constitution for the confederation was set to be written by the end of 2021 with its implementation by 2023. However, the COVID-19 pandemic disrupted plans to draft and implement a constitution. On 9 May 2023, the drafting of the constitution resumed with a 20-day consultation with local stakeholders in Kenya.

KCB Group Limited, also known as the KCB Group, is a financial services holding company based in the African Great Lakes region. The Group's headquarters are in Nairobi, Kenya, with its subsidiaries being KCB Bank Kenya Limited, KCB Bank Burundi Limited, KCB Bank Rwanda Limited, KCB Bank South Sudan Limited, KCB Bank Tanzania Limited, KCB TMB Congo and KCB Bank Uganda Limited.

The Trade and Development Bank (TDB), formerly the PTA Bank, is a trade and development financial institution operating in eastern and southern Africa. TDB is the financial arm of the Common Market for Eastern and Southern Africa (COMESA), although membership is open to non-COMESA states and other institutional shareholders.

KCB Bank Uganda Limited, also KCB Bank Uganda, is a commercial bank in Uganda. It is licensed by the Bank of Uganda, the central bank and national banking regulator.

The Rusumo Hydroelectric Power Station, also known as the Rusumo Power Station, is a hydropower plant under construction, with initial planned capacity installation of 80 megawatts (110,000 hp) when completed. The project will involve the construction of a dam, with run of river design. A more expensive 90 megawatts (120,000 hp) reservoir design was considered before being abandoned in favor of an 80 MW project with a smaller environmental impact and an estimated cost of US$300 million compared to US$400 million for the bigger project. The World Bank announced on 6 August 2013 that it had approved loans totaling US$340 million towards the US$468.60 million needed for the project. In November 2013, the African Development Bank approved a loan of US$113 million towards completion of the project.

<span class="mw-page-title-main">Equity Bank Tanzania Limited</span>

Equity Bank Tanzania Limited, is a commercial bank in Tanzania, the second-largest economy in the East African Community. It is licensed by the Bank of Tanzania, the country's central bank and national banking regulator. The bank is a member of the Equity Group Holdings Limited, a large financial services conglomerate, headquartered in Nairobi, Kenya, with subsidiaries in Kenya, Rwanda, South Sudan, Tanzania, Uganda, Democratic Republic of the Congo and a representative office in Ethiopia.

<span class="mw-page-title-main">Energy in Kenya</span>

This article describes energy and electricity production, consumption, import and export in Kenya. Kenya's current effective installed electricity capacity is 2,651 megawatts (MW), with peak demand of 1,912 MW, as of November 2019. At that time, demand was rising at a calculated rate of 3.6 percent annually, given that peak demand was 1,770 MW, at the beginning of 2018. Electricity supply is mostly generated by renewable sources with the majority coming from geothermal power and hydroelectricity.

Grania Rosette Makatu Rubomboras is a Ugandan electrical engineer and corporate executive. She is the Programme Officer, Power Project of the Nile Equatorial Lakes Subsidiary Action Program, based in Kigali, Rwanda, where she heads the Power Development and Trade Department.

Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.

Bujagali–Tororo–Lessos High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Bujagali, in Uganda to another high voltage substation at Lessos, in Kenya.

The Masaka–Mutukula–Mwanza High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Masaka, in Masaka District, in the Central Region of Uganda, to another high voltage substation at Mwanza, in Mwanza Region, in the Republic of Tanzania.

The Kenya Standard Gauge Railway (SGR) is a partially finished railway system connecting Kenya's cities. Once completed, it will link the country to the neighboring country of Uganda, and through Uganda, to South Sudan, the Democratic Republic of the Congo, Rwanda, and Burundi. There are also plans to link to Addis Ababa, in neighboring Ethiopia to the north. The first segment, between Mombasa and Nairobi, opened passenger rail service in June 2017, and freight rail service in January 2018. Other segments are under construction or planned. The new standard gauge railway, is intended to replace the old, inefficient metre-gauge railway system.

The Kigoma–Butare–Ngozi–Gitega High Voltage Power Line, also Rwanda–Burundi High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kigoma in Rwanda to another high voltage substation at Gitega in Burundi.

References

  1. 1 2 EAPP (2016). "The Eastern Africa Power Pool (EAPP)". Addis Ababa: Eastern Africa Power Pool (EAPP). Retrieved 2 April 2019.
  2. EAPP (2016). "Eastern Africa Power Pool: Contacts". Addis Ababa: Eastern Africa Power Pool (EAPP). Retrieved 2 April 2019.
  3. 1 2 Safaa Hamed (March 2010). "About Eastern Africa Power Pool" (PDF). Washington, DC: United States Energy Association (USEA). Retrieved 2 April 2019.
  4. Omondi, George (8 May 2018). "Uhuru in deal to speed up Ethiopia-Kenya power line". Business Daily Africa . Nairobi. Retrieved 2 April 2019.
  5. Olingo, Allan (6 August 2018). "Phase One of Regional Power Pool Project Set For Completion By Mid-2019". The EastAfrican . Nairobi. Retrieved 2 April 2019.
  6. Christabel Ligami (31 October 2015). "Kenya to sell power to Uganda". The EastAfrican . Nairobi, Kenya. Retrieved 15 December 2023.
  7. "Kenya, Tanzania seek consultant for cross-border power lines". The EastAfrican Quoting Reuters . Nairobi, Kenya. 9 February 2015. Retrieved 2 April 2019.
  8. Nelson Wesonga (22 June 2016). "Plan to export Karuma excess power on". Daily Monitor . Kampala, Uganda. Retrieved 2 April 2019.
  9. Biryabarema, Elias (16 August 2017). "Uganda says signs deal with Congo to build $150 million power line". Reuters.com . Archived from the original on 19 August 2017. Retrieved 2 April 2019.
  10. Stephen Otage, and Nelson Wesonga (4 October 2017). "Uganda to export electricity to South Sudan, DR Congo". Daily Monitor . Kampala. Retrieved 2 April 2019.
  11. Baker Batte Lule (9 October 2019). "Uganda to supply electricity to South Sudan". The Observer (Uganda) . Kampala. Retrieved 22 February 2020.
  12. Jean Marie Takouleu (1 August 2022). "Burundi/Rwanda: A power line will interconnect the two countries". Afrik21.africa. Paris, France. Retrieved 3 August 2022.
  13. The World Bank (31 October 2011). "Burundi - Energy Efficiency Project" (PDF). Washington, DC: The World Bank . Retrieved 1 April 2019.
  14. Patrick Nduwimana (24 April 2014). "Word Bank to help fund hydro dams in power-starved Burundi". Reuters.com. Archived from the original on 14 February 2019. Retrieved 1 April 2019.
  15. USAID (13 March 2019). "Power Africa Fact Sheet: Democratic Republic of the Congo". Washington, DC: United States Agency for International Development (USAID). Retrieved 3 April 2019.
  16. William Clowes (13 June 2018). "Congo to Start $13.9 Billion Hydropower Project This Year". New York City: Bloomberg.com . Retrieved 3 April 2019.
  17. USAID (21 March 2019). "Djibouti: Power Africa Fact Sheet". Washington, DC: United States Agency for International Development (USAID). Retrieved 1 April 2019.
  18. 1 2 The World Bank (12 May 2017). "International Development Association Project Appraisal Document On A Proposed Credit In The Amount of US$23.3 Million For A Djibouti Sustainable Electrification Program" (PDF). Washington, DC: The World Bank . Retrieved 9 April 2019.
  19. 1 2 Engineer Ahmed Abo Salem (2017). "Ministry of Electricity and Renewable Energy: Egyptian Holding Electricity Company: Egyptian Renewable Energy Plan" (PDF). Auptde.org. Retrieved 1 April 2019.
  20. 1 2 3 4 Njiraini Muchira (1 April 2019). "EA states stuck with excess power after building billion-dollar plants". The EastAfrican . Nairobi. Retrieved 1 April 2019.
  21. 1 2 3 4 5 Halima Abdallah, and Njiraini Muchira (6 May 2019). "How Far Will Tariffs Fall As Kenya, Uganda Move To Share Power?". The EastAfrican . Nairobi. Retrieved 6 May 2019.
  22. Edwin Okoth (19 June 2019). "Ministry cuts power generation target by 2,800MW". Business Daily Africa . Nairobi. Retrieved 19 June 2019.
  23. The World Bank (14 December 2017). "Supporting Electricity Sector Reform In Libya" (PDF). Washington, DC: The World Bank . Retrieved 2 April 2019.
  24. Rwanda Energy Group (January 2019). "Facts & Figures: Installed Generation capacity on the National Grid". Kigali: Rwanda Energy Group. Retrieved 1 April 2019.
  25. Index Mundi (20 January 2018). "Sudan Electricity: Installed Generating Capacity". Indexmundi.com Quoting CIA Factbook . Retrieved 9 April 2019.
  26. Dabanga Sudan Organization (4 January 2018). "Electricity tariff hike 'a death blow to Sudanese industry'". Khartoum: Dabangasudan.org. Retrieved 9 April 2019.
  27. 1 2 3 Jacob Manyuon Deng (17 January 2019). "Regional motivation to develop South Sudan's hydro power capacity". Rondebosch, South Africa: ESI-Africa.com. Retrieved 9 April 2019.
  28. Wandera, Julius (16 April 2019). "Uganda's Increased Electricity Generation". The Independent (Uganda) . Kampala. Retrieved 25 April 2019.
  29. Electricity Regulatory Authority (2 April 2019). "Maximum Demand". Kampala: Electricity Regulatory Authority . Retrieved 16 June 2020.
  30. Jean Marie Takouleu (16 March 2022). "Burundi: Tembo Power seeks partners for two run-of-river power plants". Afrik21.africa. Paris, France. Retrieved 7 June 2022.
  31. Devex (7 June 2022). "Société Nationale d'Electricité (SNEL): DR Congo". Devex.com. Washington DC, United States. Retrieved 7 June 2022.
  32. Jean Marie Takouleu (21 May 2020). "Djibouti: Government approves Engie's solar pv project in Grand Bara". Afrik21.africa. Paris, France. Retrieved 7 June 2022.
  33. EuroAfrica Interconnector (7 June 2022). "Egyptian Electricity Holding Company (EEHC)". EuroAfrica Interconnector . Nicosia, Cyprus. Retrieved 7 June 2022.
  34. Devex (7 June 2022). "Ethiopian Electric Power(EEP)". Devex.com. Washington DC, United States. Retrieved 7 June 2022.
  35. Sam Kiplagat (2 November 2021). "Judge orders Ketraco to deposit Sh66m in land ownership case". Business Daily Africa . Nairobi, Kenya. Retrieved 7 June 2022.
  36. Abdulkader Assad (2 June 2022). "Libyan GECOL warns of damage to power grid if gas supply ceases". The Libya Observer . Tripoli, Libya. Retrieved 7 June 2022.
  37. Devex (7 June 2022). "Rwanda Energy Group Limited (REG)". Devex.com. Washington DC, United States. Retrieved 7 June 2022.
  38. Arab Fund for Economic and Social Development (25 April 2019). "Construction of a 500 kV Transmission Ring Around Khartoum". Arab Fund for Economic and Social Development . Kuwait City. Retrieved 7 June 2022.
  39. Kennedy Senelwa (23 February 2021). "South Sudan renews push to reduce power deficit". The EastAfrican . Nairobi, Kenya. Retrieved 7 June 2022.
  40. Josephine Christopher (4 May 2022). "Local firms up in arms over Tanesco international tender". The Citizen (Tanzania) . Dar es Salaam, Tanzania. Retrieved 7 June 2022.
  41. Isaac Mufumba (7 May 2022). "UETCL back to drawing board after Shs1.5b loss". Daily Monitor . Kampala, Uganda. Retrieved 7 June 2022.
  42. Capital FM Kenya (28 July 2022). "Kenya Power Signs PPA With Ethiopian Electric Power". Capitalfm.co.ke. Nairobi, Kenya. Retrieved 3 August 2022.{{cite web}}: CS1 maint: numeric names: authors list (link)
  43. 1 2 ERA (1 June 2023). "Cabinet Approves ERA's Bid to Host the Independent Regulatory Board". Electricity Regulatory Authority (ERA). Kampala, Uganda. Retrieved 15 December 2023.
  44. Paul Adude (14 December 2023). "AfDB approves Shs20b for Eastern Africa Power Pool". Daily Monitor . Kampala, Uganda. Retrieved 15 December 2023.

09°01′04″N38°48′21″E / 9.01778°N 38.80583°E / 9.01778; 38.80583