Company type | Public utility |
---|---|
Industry | Energy |
Predecessor | Tanganyika Electric Supply Company Ltd. Dar es Salaam and District Electric Supply Company Ltd |
Founded | 1964 |
Headquarters | Plot No. 114, Block G , Dar es Salaam Road, Dodoma Tanzania |
Area served | Tanzania Mainland, Zanzibar |
Key people | Engineer Gissima Nyamo-Hanga (MD) |
Products | Electricity |
Services | Electricity Generation, Electricity transmission, Electricity Distribution |
Revenue | ![]() |
![]() | |
Total assets | ![]() |
Total equity | ![]() |
Owner | Tanzanian Government (100%) |
Number of employees | 10,320 |
Website | Tanesco website |
The Tanzania Electric Supply Company Limited (TANESCO) is a Tanzanian parastatal organisation established in 1964. It is wholly owned by the government of Tanzania. The Ministry of Energy and Minerals regulates the operations of TANESCO. [1]
Its business include: electricity generation, electricity transmission, electricity distribution and sale of electricity to the Tanzanian mainland and bulk power supply to the island of Zanzibar.
The company has a workforce of 7,300 persons. Its main offices are located in Ubungo west of Dar es Salaam central business district and it operates regional offices throughout Tanzania. [2]
Electricity was first introduced in Tanzania (Tanganyika) in 1908 by the German colonial authorities in Dar-es-salaam. [3] After the British mandate was established a Government electricity department was formed and took over energy generation and transmission in the colony. [4] In 1931 electricity was handed to two private companies, Tanganyika Electric Supply Company Ltd. (Tanesco) and Dar es Salaam and District Electric Supply Company Ltd (Danesco).[ citation needed ]
Commercial operations for Tanesco began in 1933 with the first diesel generator in the Tanga Region. The first dam was completed in 1936 on the Pangani River. By 1959 the total capacity was 17.5MW and the company had 400 km of supply lines. On 12 February 1948 Tanesco secured the contract to sell surplus power from the hydro dam to Mombasa, Kenya. [4]
At independence (1961) the government acquired some shares from both of the utilities. However, with Tanzania's economic policy shifting towards Ujamaa, by 1975 the government acquired all the shares and merged the two utilities to form a state own utility called the Tanzania Electric Supply Company Ltd. [3] From 1975 the firm responsible for generating, transmitting and distributing power on the mainland. Furthermore, Tanesco is also responsible in selling bulk electricity to Zanzibar based ZECO Electric Company. [5]
The government liberalised private sector investment in electricity generation in 1992. [6] In 2002 as part of the Companies Act, 2002 of Tanzania, Tanesco was incorporated as a limited liability company; however all its shares were still held by the government. [7] Due to the high dependence on Hydroelectric dams and poor hydrology between 2005 and 2008, Tanesco lead to the procurement of their first Emergency Power Project (EPP). [5] The first EPP was the expansion of the Ubungo Power Station with Songas. [8] From 2011 to 2013 TANESCO experienced a shortage of power generation due to poor hydrology and again procurement of costly EPPs was then undertaken. [5] By the end of 2016, TANESCO sought an increase by 8.53 percent of the energy tariff, due to its difficult financial situation. In 2017, The president John Magufuli, dismissed the raise firing the director manager of TANESCO Felchesmi Mramba.
Tanesco's management operations is conducted at their headquarters Umeme Park and is located in Ubungo, Dar es salaam. The Management of the company is under the managing director. Currently the managing director is Eng. Boniface Gissima Nyamo-Hanga appointed by the president Samia Suluhu Hassan in September 2023. [9] [10] The company is organised under the following business units: Generation, Transmission, Distribution and Customer Services, Investment, Finance, Information, Communication and Technology, Human Resources and the Legal Counsel.
The Tanzania Electric Supply company ltd. is wholly owned by the Government of Tanzania. It is a public corporation governed by the Public Corporations Act, revised edition 2002. [11]
Rank | Name of Owner | Number of Shares | Percentage Ownership |
---|---|---|---|
1 | Government of Tanzania | 56,568,418,061 | 100.00 |
Total | 56,568,418,061 | 100.00 | |
There has been much debate to either privatise the company or list the company on the Dar-es-salaam Stock Exchange. [12] The government however encourages the public sector to enter the market and compete with Tanesco, however, the government is adamant to maintain its public status to help keep the cost of electricity always low for the majority of the population. [13]
The key trends for TANESCO's consolidated Group over recent years are shown below (as at year ending 30 June):
2016 | 2017 | 2018 | 2019 | 2020 | |
---|---|---|---|---|---|
Revenue (TSh billion) | 1,379 | 1,415 | 1,436 | 1,535 | 1,564 |
Cost of Sales (TSh billion) | 1,469 | 1,537 | 1,460 | 1,525 | 1,494 |
Profit after Tax (TSh billion) | (349.5) | (265.3) | (112.5) | (36.2) | 45.2 |
Total number of customers (000s) | 1,744 | 2,013 | 2,218 | 2,443 | 2,864 |
Number of Units Sold (m) | 5,549 | 6,059 | 5,729 | 6,551 | |
Transmission Losses (%) | 6.2 | 6.0 | 5.91 | 5.86 | 5.89 |
Distribution Losses (%) | 10.9 | 7.9 | 11.83 | 10.35 | 9.41 |
Number of employees | 5,990 | 6,469 | 6,784 | 6,981 | 7,344 |
Notes/sources | [14] | [15] | [16] | [17] | [17] |
TANESCO's core business are: to generate, transmit, distribute and supply electricity in Tanzanian mainland and sell bulk power to Zanzibar.
The following is the overview of Tanesco's operations As of March 2015 [update] : [5]
Generation Capacity in the interconnected grid system:
Transmission network:
Distribution network:
Tanesco has to import a small amount of its energy from Uganda and Zambia to supply the needs of the bordering regions that are not connected to the national grid. [18] Currently Tanzania only exports electricity to Kenya near the Horo Horo region, [19] and the Isinya–Singida High Voltage Power Line is under construction. With the recent expansion of the Gas Sector in Tanzania the company has major plans to increase exports to neighbouring countries.
In 2009 the Government through Energy and Water Utilities Regulatory Authority (EWURA) approved Small Power Project framework. Since the Government didn't have Renewable energy policy in place nor did they have any major plans for energy generation through renewable fuels, the government encouraged Renewable energy projects (mini hydro, biomass, solar and wind) with capacity range between 0.1 MW to 10 MW to be developed. [20] Since introduction of SPPs only mini hydro and biomass power projects are in operation; the high cost of setup, fluctuating foreign exchange prices and low tariffs have discouraged investment. The SPP framework also ties in with The Rural Energy Agency (REA) and they are responsible for financing of rural electrification projects. This is mainly extension of grid connected and mini-grid connected distribution network to the rural areas. [5] [21]
Small power producers are allowed to sell their power directly to the consumer and sell the excess to Tanesco. However, the tariffs of sale have been decided by Tanesco to maintain public interest. Below is a table showing the possible tariff cases an SPP can engage in; an SPP can engage in one case or a combination of many. [21]
Connected to main grid | Connected to isolated mini-grid | |
---|---|---|
Selling wholesale | Case 1 | Case 2 |
Selling retail (directly to final customers) | Case 3 | Case 4 |
One of the major challenges the firm faced was revenue collection. With thousands of customers defaulting on their electricity payments, Tanesco planned to establish a convenient prepaid metering system for low demand users. Tanesco undertook a prepayment metering project between 1993 and 1997 though world bank funding. The new program was referred to as "Lipa Umeme Kadiri Utumiavyo"(LUKU) meaning "Pay for electricity as you need it" in English. The system allows users to recharge their units from multiple vendors in their communities plus the ability to purchase units using their mobile money accounts. Currently the installation of these meters is restricted to domestic, light industrial and light commercial customers. [22]
India is the third largest producer of electricity in the world. During the fiscal year (FY) 2023–24, the total electricity generation in the country was 1,949 TWh, of which 1,734 TWh was generated by utilities.
The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.
The electricity sector in Argentina constitutes the third largest power market in Latin America. It relies mostly on thermal generation and hydropower generation (36%). The prevailing natural gas-fired thermal generation is at risk due to the uncertainty about future gas supply.
The electricity sector in Sri Lanka has a national grid which is primarily powered by hydroelectric power and thermal power, with sources such as photovoltaics and wind power in early stages of deployment. Although potential sites are being identified, other power sources such as geothermal, nuclear, solar thermal and wave power are not used in the power generation process for the national grid.
Kikagati Hydroelectric Power Station, also referred to as Kikagati Power Station, is a 15.57 MW (20,880 hp) hydroelectric power station, in Uganda.
Energy in Tanzania is fundamental to the nation's projected economic growth, with estimates indicating that the economy could expand sevenfold by 2040, while energy demand is expected to increase by only 150% due to advancements in fuel efficiency. The country is actively enhancing its energy mix, primarily relying on natural gas for more than half of its electricity generation and significant contributions from hydropower, with oil primarily used for backup power. Tanzania has a wide range of energy resources in abundance, which are not yet fully exploited. These include; wood fuel, other biomass fuels, hydropower, natural gas, coal, wind, geothermal, uranium and solar.
Ubungo I Thermal Power Station, also known as the Ubungo Power Plant, is a natural gas-fueled power plant located in Ubungo of Ubungo District in Dar es Salaam Region of Tanzania. It began commercial operations on 30 July 2008 with an installed capacity of 110 megawatts (150,000 hp).
Ubungo II Thermal Power Station was an extension to the Ubungo I Power Station and began commercial operations in 2012. The power-plant is located in Ubungo of Ubungo District in Dar es Salaam Region of Tanzania. The plant has an installed capacity of 100 megawatts (130,000 hp).
Tegeta Thermal Power Station is a Tanzania Electric Supply Company owned power plant. The project began in 2006 half funded by the Tanzanian Government and the other half by The Government of the Kingdom of the Netherlands under ORET/MILIEV program.
Mtwara Thermal Power Station is a power plant owned by the Tanzania Electric Supply Company. The station has a capacity of 18 MW (24,000 hp) and uses natural gas from the Mnazi Bay gas wells in Mtwara. The station is not connected to the national grid but is instead connected to the Mtwara/Lindi mini-grid.
The Mtwara–Dar es Salaam Natural Gas Pipeline (MDNGP), is a pipeline that transports natural gas from Tanzania's natural gas fields in Mnazi Bay, Mtwara Region to Dar es Salaam.
Somanga Thermal Power Station is a 7.5 MW (10,100 hp), natural gas powered, electricity generating power station in Tanzania.
Kinyerezi II Thermal Power Station is a 240 MW (320,000 hp), natural gas powered, electricity generating power station in Tanzania.
Kinyerezi I Thermal Power Station, also Kinyerezi 1 Thermal Power Station or Kinyerezi 1 Gas Plant, is a 150 MW (200,000 hp), natural gas powered, electricity generating power station in Tanzania.
The Eastern Africa Power Pool (EAPP), is a collaborative effort by eleven countries in Eastern Africa to interconnect their electricity grids and take advantage of excess capacity within the network and facilitate trade of electric power between the members.
The Kishapu Solar Power Station is a proposed 50 MW (67,000 hp) solar power plant in Tanzania. The power station is under development by Tanzania Electric Supply Company Limited (TANESCO), the national electricity monopoly utility company. The energy will be integrated into the national grid, also operated by TANESCO. The solar farm will be developed in phases to capacity of 150 megawatts. When completed and commissioned, it will be the largest, grid-ready solar power station in the country.
Mwenga Dam is a hydroelectric dam in Tanzania, located in the Iringa Region. Its installed capacity is 4 megawatts (5,400 hp). The Power plant is operated by an Independent Power Producer, Rift Valley Energy.
Ruhudji Hydroelectric Power Station is a planned 358 megawatts hydroelectric power station in Tanzania. The lead developer of this renewable energy project is Tanzania Electric Supply Company Limited (TANESCO), the government-owned electricity utility company. TANESCO plans to develop the power station, as a public private partnership (PPP) project. Work is contemporaneously ongoing, along with the development of the 222 megawatts Rumakali Hydroelectric Power Station, also located in Njombe Region.
Rumakali Hydroelectric Power Station is a 222 megawatts hydroelectric power station under construction in Tanzania. The power station is under development by a consortium comprising Tanzania Electric Supply Company Limited (TANESCO), the government-owned electricity utility company and the China Gezhouba Group. The power generated at this power station will be sold to TANESCO, for integration into the national electric grid.