Uganda Electricity Transmission Company Limited

Last updated
Uganda Electricity Transmission Company Limited (UETCL)
Type Parastatal
IndustryPower transmission
FoundedMarch 26, 2001;22 years ago (2001-03-26) [1]
Headquarters10 Hannington Road
Kampala, Uganda.
Key people
Kwame Ejalu
Chairman
Joshua Karamagi
Chief Executive Officer [2] [3]
ProductsElectricity
Number of employees
500 (2023)
Website Homepage

The Uganda Electricity Transmission Company Limited (UETCL) is a parastatal company whose primary purpose is to make bulk electricity purchases and transmit the electricity along high-voltage wires to local and foreign distribution points. [4] UETCL is the sole authorized national bulk energy purchaser and the sole authorized electricity importer and exporter in Uganda. [5] [6]

Contents

Location

The headquarters of UETCL are at 10 Hannington Road [7] on Nakasero Hill in Kampala, Uganda's capital and largest city. The coordinates of the company headquarters are 0°19'13.0"N 32°35'12.5"E (Latitude:0.320278; Longitude:32.586806). [8]

History

The company was incorporated as a limited company on 26th March 2001 by an act of the Ugandan parliament following the break-up of the defunct Uganda Electricity Board. [5] [6] [9]

Operations

UETCL is responsible for the development, [10] operations, maintenance, and improvement of the high-voltage power transmission lines, above 33kV, in Uganda. It also owns and operates the high-voltage substations (above 33kV), around the country. [11] UETCL is wholly owned by the Ministry of Finance, Planning and Economic Development and is regulated by the Ugandan Ministry of Energy & Mineral Development. [6]

Power loss reduction

To reduce electricity transmission losses in the country, UETCL has borrowed US$100 million (UGX:337 billion) from Exim Bank of China to construct four mega substations. The installations will feed the industrial parks at Luzira, Namanve, Mukono, and Iganga. The work also involves construction of 38 kilometres (24 mi) of 132 kilovolt transmission lines. The work was expected to be complete in 2019. [12]

New board members

In June 2022, Ruth Nankabirwa, the incumbent Minister of Energy and Minerals, introduced and swore in a new board of directors for the company. The new board members are:

See also

Related Research Articles

The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.

The Uganda Electricity Generation Company Limited (UEGCL) is a parastatal company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGCL's generation capacity was 380 megawatts, with that capacity planned to increase to over 1,300 megawatts, by 2023.

Kawanda is a town in Wakiso District, Central Uganda.

Eskom Uganda or Eskom Uganda Limited (EUL) is the largest generator of energy in Uganda and was incorporated in 2002 for a 20 year concession under a government regulatory framework.

Achwa 2 Hydroelectric Power Station is a 41 megawatts (55,000 hp) hydroelectric power plant, in Uganda.

Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.

The Karuma–Kawanda High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Karuma Hydroelectric Power Station, in the Western Region of Uganda, to another high voltage substation at Kawanda, in the Central Region of Uganda.

The Nkenda–Fort Portal–Hoima High Voltage Power Line is a high voltage electricity power line, in operation, connecting the high voltage substation at Nkenda, Kasese District, to another high voltage substation at Kabaale, Buseruka sub-county, Hoima District, all in the Western Region of Uganda.

The Nkenda–Mpondwe–Beni High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Nkenda, in Kasese District, in the Western Region of Uganda, to another high voltage substation at Beni, in North Kivu Province, in the Democratic Republic of the Congo.

Nkenda is a hill in Kasese District in the Western Region of Uganda. The name is also applied to the settlement at the bottom of that hill.

The Masaka–Mutukula–Mwanza High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Masaka, in Masaka District, in the Central Region of Uganda, to another high voltage substation at Mwanza, in Mwanza Region, in the Republic of Tanzania.

The Lira–Gulu–Nebbi–Arua High Voltage Power Line is a high voltage electricity power line, under construction in Uganda. It connects the high voltage substation at Lira, in Lira District, to another high voltage substation at Arua, in Arua District, all in the Northern Region of the country.

The Achwa 1 Hydroelectric Power Station (A1HPS), also Achwa I Hydroelectric Power Station, is a hydroelectric power station in Uganda, with a planned installed capacity of 41 megawatts (55,000 hp).

The Opuyo–Moroto High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation at Opuyo, a southern suburb of the city of Soroti, in the Eastern Region to another high voltage substation at Moroto, in the Northern Region of Uganda. The power line was energized in June 2021.

The Karuma–Juba High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Karuma, in Kiryandongo District, in the Western Region of Uganda, to another high voltage substation at Juba, in Jubek State, in South Sudan.

The Hoima–Kinyara–Kafu High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Kabaale, Buseruka sub-county, Hoima District, in the Western Region of Uganda to another high voltage substation at Kafu, Nakasongola District, in the Central Region of Uganda. On the way, the power line passes through Kinyara Sugar Works, in Masindi District.

The Mbarara–Nkenda High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation in the city of Mbarara, in the Western Region to another high voltage substation at Nkenda, also in the Western Region of Uganda.

The Mirama–Kabale High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation in the town of Mirama Hills, in the Western Region to another high voltage substation in te city of Kabale, also in the Western Region of Uganda.

The Mirama–Kikagati–Nsongezi High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Mirama Hills, in the Western Region of Uganda, to another high voltage substation at Kikagati Hydroelectric Power Station and continues to end at Nshungyezi Hydropower Station.

The Mutundwe–Entebbe High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation in the Kampala suburb of Mutundwe to another high voltage substation in the city of Entebbe, in the Central Region of Uganda.

References

  1. https://uetcl.go.ug/about-us/
  2. https://cioafrica.co/joshua-karamagi-appointed-uganda-electricity-transmission-company-ceo/
  3. https://uetcl.go.ug/board-of-directors/
  4. Odyek, John (20 March 2018). "UETCL asked to speed up power transmission projects". New Vision . Kampala. Retrieved 8 July 2018.
  5. 1 2 NRFB (February 2015). "Investing in the electricity sector in Uganda: Ten things to know". Nortonrosefulbright.com (NRFB). Retrieved 12 November 2015.
  6. 1 2 3 UETCL (8 July 2018). "About Uganda Electricity Transmission Company Limited". Kampala: Uganda Electricity Transmission Company Limited (UETCL). Retrieved 8 July 2018.
  7. UETCL (24 December 2015). "Contact Address of Uganda Electricity Transmission Company Limited". Kampala: Uganda Electricity Transmission Company Limited (UETCL). Retrieved 24 December 2015.
  8. Google (19 August 2015). "Location of the Headquarters of UETCL, Kapala, Uganda" (Map). Google Maps . Google. Retrieved 19 August 2015.
  9. https://uetcl.go.ug/about-us/
  10. Kasita, Ibrahim (31 October 2013). "France gives $23m for Fort Portal, Hoima power". New Vision . Kampala. Retrieved 12 November 2015.
  11. Agaba, John (24 October 2013). "Uganda gets €21m loan from German bank for electricity". New Vision . Kampala. Retrieved 12 November 2015.
  12. Kato, Joseph (5 June 2016). "UETCL to build Shs300b power sub-stations". Daily Monitor . Kampala. Retrieved 5 June 2016.
  13. Benon Ojiambo (11 August 2022). "UETCL top management sacked". New Vision . Kampala, Uganda. Retrieved 24 August 2022.
  14. Maurice Muhoozi (9 June 2022). "Ray of hope as Minister Nankabirwa inaugurates new UETCL board". Watchdog Uganda. Kampala, Uganda. Retrieved 9 June 2022.
  15. https://www.monitor.co.ug/uganda/news/national/new-uetcl-board-of-directors-swears-in-today-3842100

00°19′13″N32°35′12.5″E / 0.32028°N 32.586806°E / 0.32028; 32.586806