Type | Parastatal |
---|---|
Industry | Power generation |
Founded | 2001 |
Headquarters | Block C, Victoria Office Park 6-9 Okot Close, Bukoto Kampala, Uganda [1] |
Key people | Proscovia Margaret Njuki [2] Chairperson Harrison E. Mutikanga [3] CEO |
Products | Electricity |
Revenue | (Aftertax) USh2.8 billion (US$770,220) (2020) [4] |
Total assets | USh7.1 trillion (US$1.953 billion) (20200 [4] |
Number of employees | 200 (2020) [4] |
Website | Homepage |
The Uganda Electricity Generation Company Limited (UEGCL) is a parastatal company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGL's generation capacity was 380 megawatts, with that capacity planned to increase to over 1,300 megawatts, by 2023. [5]
The headquarters of UEGCL are on Block C, Victoria Office Park, Plot 6-9 Okot Close, Bukoto, in Kampala, Uganda's capital and largest city. Its coordinates are 0°19'35.0"N, 32°34'38.0"E (Latitude:0.326389; Longitude:32.577222). [6] The company maintains a second office at 18-20 Faraday Road, Amberly Estate, in Jinja, [7] a city located approximately 80 kilometres (50 mi), by road, east of Kampala. [8]
UEGCL was incorporated by the Uganda Ministry of Finance, Planning and Economic Development in 2001, [9] following the break-up of the Uganda Electricity Board. [10]
UEGCL is responsible for the operation, maintenance, and improvement of the power stations owned by the Ugandan government. [11]
In 2002, UEGCL executed a 20-year operational, management, and maintenance concession to Eskom Uganda Limited, a subsidiary of South African energy company Eskom, to cover the two power stations UEGCL owned at the time: Kiira Power Station and Nalubaale Power Station. Eskom sells the electricity it generates to the Uganda Electricity Transmission Company Limited (UETCL) as the authorized single buyer. UETCL resells the power to Umeme, the energy distributor, which then sells it to the public. [12]
As of 30 June 2020, UEGCL controlled 563 megawatts of the national installed generation capacity of 1,252 megawatts, accounting for about 45 percent. It is expected that when the 600 megawatts Karuma Power Station comes on board in the first half of 2021, UEGCL will control an estimated 1,163 MW out of 1,852 MW, accounting for about 62 percent at that time. [4]
In January 2015, the UEGCL chairman announced plans to list shares of company stock on the Uganda Securities Exchange in an initial public offering within the following two years. The funds raised would be used to develop more electricity generation stations, thus adding to national electricity output. At that time, UEGCL owned 380 megawatts of generating capacity, with a goal to increase to 563 megawatts in 2018 and 1,213 megawatts in 2020. [13] [14]
UEGCL is governed by a seven-person board of directors whose chairman is Proscovia Margaret Njuki. Other UEGCL board members include (a) Zachary Baguma Atwooki, (b) Ms. Hope Bizimana, (c) Paul Patrick Mwanja, (d) Nixon Kamukama and (e) Mark Martin Obia. [2] The chief executive officer is Harrison E. Mutikanga. [3] In August 2017, UEGCL received the ISO 9001: 2015 certification, becoming the first Ugandan government agency to receive this certification. [19]
In December 2021, UEGCL launched a corporate social responsibility (CSR) project to extend grid electricity to over 40 villages in both Kayunga District and Kamuli District, as mitigation for "the increased pressure on local infrastructure, social services, and livelihoods arising from the construction of the.." Isimba Hydroelectric Power Station. The project is expected to last 24 months in Kayunga District and 36 months in Kamuli District. It will cost USh11 billion (approx. US$3.1 million). [20]
Nalubaale Power Station, formerly known as Owen Falls Dam, is a hydroelectric power station across the White Nile near its source at Lake Victoria in Uganda. Nalubaale is the Luganda name for Lake Victoria.
The Owen Falls was a waterfall on the White Nile in Uganda near the city of Jinja. The falls, together with the nearby Ripon Falls, were submerged in 1954 with the completion of the Nalubaale Hydroelectric Power Station. The dam that houses the power station was originally named Owen Falls Dam, but was later renamed Nalubaale Dam and the name of the power station was also changed, from Owen Falls Power Station to Nalubaale Power Station.
Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.
The Ministry of Energy and Mineral Development, also Ministry of Energy, Oil and Mineral Development is one of the governmental bodies of Uganda. The ministry has the function of developing and implementing policies related to electricity, minerals, petroleum and petroleum products. The ministry is part of the national cabinet and is headed by a cabinet minister. The current Cabinet Minister of Energy is [Hon. Ruth Ssentamu Nankabirwa].
The Bujagali Power Station is a hydroelectric power station across the Victoria Nile that harnesses the energy of its namesake; the Bujagali Falls, in Uganda. Construction began in 2007 and concluded in 2012. It was officially inaugurated on 8 October 2012 by Ugandan President Yoweri Museveni and Aga Khan IV in the presence of African politicians and investors.
Kiira Hydroelectric Power Station, is a hydroelectric power station in Uganda, with an installed capacity of 200 megawatts (270,000 hp).
The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.
Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.
Namanve Power Station is a 50 MW heavy fuel oil-fired thermal power plant in Uganda. Sometimes the power station is referred to as Kiwanga Power Station.
The Muzizi Power Station is a proposed 45 megawatts (60,000 hp) hydroelectric power project in Uganda. The project, which has been planned for several years, has received a funding commitment from KfW and the French Development Agency.
Ayago Hydroelectric Power Station, also Ayago Power Station, is a planned 840 megawatt hydroelectric power project to be constructed in Uganda. If it is built, Ayago would be the largest power station in Uganda, based on generating capacity.
Nyagak III Power Station is a 6.6 megawatts (8,900 hp) mini hydroelectric power project, under construction in Uganda, the third-largest economy in the East African Community.
Bujagali Energy Limited (BEL), is an electric energy generating company in Uganda. The company owns and operates the Bujagali Power Station, which was the largest hydropower plant in the country as of July 2014.
The Uganda Electricity Transmission Company Limited (UETCL) is a parastatal company whose primary purpose is to make bulk electricity purchases and transmit the electricity along high voltage wires to local and foreign distribution points. UETCL is the sole authorized national bulk energy purchaser and the sole authorized electricity importer and exporter in Uganda.
Eskom Uganda Limited (EUL) is the largest generator of energy in Uganda and was incorporated in 2002 for a 20 year concession under a government regulatory framework.
Harrison E. Mutikanga is a civil engineer, business executive, and academic in Uganda. He is the managing director and the chief executive officer of the Uganda Electricity Generation Company Limited.
Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.
The Nkenda–Mpondwe–Beni High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Nkenda, in Kasese District, in the Western Region of Uganda, to another high voltage substation at Beni, in North Kivu Province, in the Democratic Republic of the Congo.
Kiba Hydroelectric Power Station is a proposed 295 megawatts (396,000 hp) hydroelectric power station in Uganda.