Kampala Southern Bypass Highway | |
---|---|
Route information | |
Length | 11 mi (18 km) |
History | Designated in 2016 (Expected) Expected completion in 2026 |
Major junctions | |
North end | Bweyogerere |
Butabika Luzira Kyeyitabya | |
South end | Munyonyo |
Location | |
Country | Uganda |
Highway system | |
The Kampala Southern Bypass Highway is a proposed four-lane, dual carriage highway in the Central Region of Uganda, connecting, Bweyogerere, in the Wakiso District, to Munyonyo in the Makindye Division of Kampala, the largest city and capital of Uganda. [1]
The road would start at Bweyogerere on the Kampala–Jinja Expressway, near Mandela National Stadium at Namboole. [2] It would pass through Butabika, Luzira, and Kyeyitabya, to end at Munyonyo, where it would join the southern spur of the Entebbe–Kampala Expressway. [3] [4] The approximate coordinates of the highway at Bweyogerere would be 0°21'04.0"N, 32°39'45.0"E (Latitude:0.351117; Longitude:32.662496). [5] The Kampala Southern Bypass would measure approximately 18 kilometres (11 mi). [6]
As part of efforts to decongest Kampala, a southern bypass similar to the Kampala Northern Bypass Highway has been proposed. The road would form an arc through the city's southeastern suburbs. It would join the southern spur of the Entebbe–Kampala Expressway, which traverses the southeastern suburbs of the city, to form a semi-circle. The road would be a toll road and would be tendered, constructed, and owned by the consortium that will own, manage, and operate the Kampala–Jinja Expressway. [1]
Originally, the tender for this road together with that for the Kampala–Jinja Expressway were planned to be advertised in May 2015. [4] Once construction starts, the combined 95 kilometres (59 mi) Kampala–Jinja Expressway & Kampala Southern Bypass Highway is projected to take 10 years to construct. [1]
In September 2018, UNRA revealed that eight firms had bid to be considered in the construction of this highway and the connecting Kampala–Jinja Expressway. The consortia vying for the contract include (1) South Korean and Chinese firms, comprising the CCKS Consortium (2) Tecnasol Luisa Goncal from Portugal (3) Shapoorji Pacconji Group from India (4) A consortium of Chang Chyi Enterprise Company Limited (CCECL) & CRCCIG from China (5) Enkula Expressway Consortium from South Africa (6) A consortium of Austria & Turkish firms, Strabag & IC Ictas (7) A consortium of French and Portuguese firms KJ Connect, Vinci Concessions & Mota-Engil and (8) China Communications Construction Company & China First Highway Engineering Company Limited. [7]
It is estimated that the Kampala Southern Bypass Highway would cost approximately US$250 million (about UGX:664 billion) to build. [1]
Bank of Africa Uganda Limited, also known as BOA Uganda (BOAU), is one of the commercial banks in Uganda that have been licensed by the Bank of Uganda, the country's central bank and national banking regulator.
The Kampala–Jinja Highway is a road in Uganda, connecting the cities of Kampala and Jinja. Sometimes referred to as Kampala–Jinja Road, it is a busy road, with several towns, trading centers and other points of interest along the way. As of October 2016, a new, wider, four-lane dual carriageway expressway, the Kampala–Jinja Expressway, is proposed to be constructed south of the present highway to relieve traffic and complement existing transport infrastructure between Kampala and Jinja.
Nateete is a location in the city of Kampala, Uganda's capital.
Bweyogerere is one of the six townships or wards that constitute Kira Municipality in Wakiso District in southern central Uganda. The other five wards are Kimwaanyi, Kira, Kireka, Kirinnya and Kyaliwajjala.
The Kampala Northern Bypass Highway, often referred to as the Northern Bypass, is a road in Uganda. It forms a semicircle across the northern suburbs of Kampala, Uganda's capital and largest city. The road was constructed to relieve traffic congestion within the city center, allowing cross-country traffic to bypass the city's downtown area.
Busega is a neighborhood within Kampala, Uganda's capital and largest city.
The Entebbe–Kampala Expressway, also known as the "Kampala–Entebbe Expressway" or the "Entebbe–Kampala Highway", is a four-lane toll highway in the Central Region of Uganda. The highway links Entebbe International Airport, the country's largest civilian and military airport, to Kampala, the country's capital and largest metropolitan area. Originally, the highway was planned for commissioning in 2016, but because of the delayed works, commissioning was done on 15 June 2018 by Uganda's sitting president, Yoweri Museveni. Recently, the Uganda Minister for Works and Transport, Gen. Katumba Wamala launched the toll point at Kajjansi along Kampala–Entebbe Road.
The Ministry of Works and Transport is a Cabinet level government ministry of Uganda, that is mandated to plan, develop and maintain an economic, efficient and effective transport infrastructure, and transport services by road, rail, water, and air. The ministry is also mandated to manage public works including government structures and promote standards in the construction industry. The ministry is headed by a Cabinet Minister. The current Minister of Works and Transport is Katumba Wamala.
The Uganda National Roads Authority (UNRA) is a government agency mandated to develop and maintain the national roads network, advise the government on general roads policy, contribute to the addressing of national transport concerns, and perform certain other functions. UNRA is charged with, among other things, the selection of contractors, the supervision of construction, the scheduling of maintenance, and the prioritization of national road works.
The Kampala–Jinja Expressway, also known as the Jinja–Kampala Expressway, is a proposed four-lane toll highway in Uganda, linking Kampala, the capital and largest city of Uganda, with the city of Jinja in the Eastern Region of Uganda.
The Mukono–Kyetume–Katosi–Nyenga Road is a road in the Central Region of Uganda, connecting the towns of Mukono, Kyetume and Katosi in Mukono District to Nkokonjeru and Nyenga in Buikwe District.
The Kampala–Mpigi Expressway, also Busega–Mpigi Expressway, is a four-lane, dual carriage highway under construction in the Central Region of Uganda, connecting, Kampala, the capital city, and Mpigi, the headquarters of Mpigi District.
The Kampala–Bombo Expressway is a proposed four-lane, dual carriage highway in the Central Region of Uganda, connecting, Kampala, the capital city, and Bombo, in Luweero District.
The Kampala–Masaka Road is a road in the Central Region of Uganda, connecting the capital city of Kampala to the southwestern town of Masaka in Masaka District. The first 36 kilometres (22 mi) of this road, is in the process of being developed into the Kampala–Mpigi Expressway.
Kampala–Busunju Expressway is a planned road in the Central Region of Uganda. The road would connect the county's capital city, Kampala, to the town of Busunju in Mityana District.
The Kampala Outer Beltway, also known as the Kampala Outer Ring Road, is a planned road in Uganda. It will form a full circle around Kampala, Uganda's capital and largest city.
The Kampala–Entebbe Road, also known as the Entebbe–Kampala Road or the Entebbe Road, is a road in the Central Region of Uganda, connecting the capital city of Kampala and Entebbe International Airport.
The Kampala Flyover Road Project, also Kampala Flyover Project, is a road-improvement project in the Central Division of Kampala, the capital city of Uganda and the largest city in that East African country.
Kigo is a neighborhood in the town of Ssabagabo in Uganda. The name also refers to Kigo Hill, that forms part of the neighborhood.