Pension Towers | |
---|---|
General information | |
Type | Commercial |
Location | Lumumba Avenue Kampala, Uganda |
Coordinates | 00°19′15″N32°34′38″E / 0.32083°N 32.57722°E |
Construction started | August 2008 |
Completed | August 2024 (Expected) |
Technical details | |
Floor count | 32 |
Floor area | 75,000 square metres (807,293 sq ft) |
Design and construction | |
Architect(s) | Sentoogo & Partners |
Main contractor | China Railway Construction Engineering Group Company Limited |
Pension Towers is a building under construction in Kampala, the capital of Uganda and the largest city in that country. [1]
The skyscraper is located on Lumumba Avenue, on Nakasero Hill, an upscale neighborhood in Kampala (pop.1,507,080 in 2014), the capital and largest city in Uganda. [2] The geographical coordinates of the building are: 0°19'15.0"N, 32°34'38.0"E (Latitude:0.320833; Longitude:32.577222). [3] opposite the french Embassy
Under construction since 2008, the office complex consists of three interconnected towers; one central tower of 32 stories in height, flanked on either side by a ten-story tower. When finished, the three towers will contain approximately 75,000 square metres (807,293 sq ft) of office space. [4] Parking for over 500 vehicles will be provided in the development. [5]
As of December 2021, the skyscraper which was approximately 70 percent complete, was valued at about USh300 billion (approx. US$85 million). It was the largest (both in size and value), single real-estate investment in the country, at that time. [6]
National Social Security Fund (Uganda) (NSSF), currently maintains its headquarters in Workers House on Pilkington Avenue. In order to take advantage of the shortage of upscale commercial rental space in the city, NSSF began the construction of a headquarters complex in 2008. Initially the design called for a central tower of 25 stories, with matching 8 story towers on each side of the central building. [7] In 2011, the design was changed, increasing the side towers to 10 stories each and modifying the architecture.
ROKO Construction Company, a Ugandan engineering and construction company, constructed the four basement floors between 2008 and 2012, but failed to qualify for further works on the project. Three Chinese firms were in a final bidding process to complete the construction. [8]
In August 2018, Patrick Byabakama Kaberenge, the Chairman of NSSF, announced that the construction of phase 2 of the skyscraper had been awarded to China Railway Construction Engineering Group Company Limited. The height of the central tower had been increased to 32 storeys. Work on the second phase is expected to start before the end of 2018 and last about three years. [9]
In February 2019, Ugandan print media reported that construction would resume in March 2019 with completion stated no later than May 2022. The main contractor would use own funds to construct the skyscraper, with NSSF paying at closing in 2022. [10]
Phase I of the civil works, which was performed by ROKO Construction Company, cost UGX:42.5 billion. In August 2012, China Civil Engineering Construction Corporation (CCECC) was awarded the contract to complete the construction of the second phase of the project at a contract price of UGX:222.3 billion. This brings the total construction price to UGX:264.8 billion. [11] During the 2018 Annual General Meeting, the NSSF chairman announced that construction of the second phase would cost US$110 million. [9]
In August 2012, it came to light that the selection of the contractor had contravened Uganda's procurement protocols. The winning bid was reported to be UGX:20 billion more expensive than the lowest bidder. The Inspector General of Government (IGG) stepped in and voided the award. An NSSF manager responsible for "procurement and disposal" was fired. [12] In the meantime, the IGG has recommended that the whole tendering process be repeated and outsourced. The jostling for the way forward continues between NSSF, the IGG, and the government's Public Procurement Disposal of Public Assets Authority. [13] [14] [15]
In September 2018, NSSF officials made public announcements that after a seven-year delay, work on the skyscraper would resume later the same year. A new contractor, China Railway Construction Engineering Group Company Limited, has been selected, at a new revised cost of US$110 million (approx. USh410 billion). [4] [16]
Housing Finance Bank (HFB) is a commercial bank in Uganda. It is one of the commercial banks licensed by Bank of Uganda, the national banking regulator.
DFCU Bank, registered as the Development Finance Company of Uganda Bank Limited, is a commercial bank in Uganda. It is licensed by the Bank of Uganda (BoU), Uganda's central bank and national banking regulator.
Ecobank Uganda is a bank in Uganda that operates as a commercial bank under a license granted by the Bank of Uganda, the central bank and national banking regulator.
The National Social Security Fund (NSSF) aka NSSF Uganda is a quasi-government agency responsible for the collection, safekeeping, responsible investment, and distribution of retirement funds from employees of the private sector in Uganda who are not covered by the Government Retirement Scheme. Participation for both employers and employees is compulsory. The Uganda National Social Security Fund is the largest pension fund in the countries of the East African Community, with total assets of USh18.58 trillion, as of June 2023.
National Housing and Construction Company Limited (NHCC), is a Ugandan construction and real estate management company, partly owned by the Uganda Government. The Company’s mandate is to increase the housing stock in the country, rehabilitate the housing industry and encourage Ugandans to own homes in an organized environment.
Uganda Clays Limited (UCL), commonly referred to as Uganda Clays, is a building materials manufacturer in Uganda. The company manufactures baked clay building products, using Italian-made heavy clay processing machinery. The clay is excavated using surface mining techniques. The company is listed on the Uganda Securities Exchange (USE), being the first equity to list on the exchange in 2000.
Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.
Richard Patrick Byarugaba is a Ugandan business executive, banker, and entrepreneur. He is the former managing director and chief executive officer of the National Social Security Fund (Uganda), a semi-autonomous retirement pension organisation for non-government employees in Uganda. He served in that capacity from November 2017 until November 2022. He was also listed in 2012 as one of the wealthiest individuals in Uganda.
Mapeera House is a building in Kampala, the capital and largest city of Uganda.
DFCU House is a building in Kampala, the capital and largest city of Uganda.
Movement House is a building under construction in Kampala, the capital of Uganda and the largest city in that country. The building is sometimes referred to as NRM House, in reference to its largest tenant, the National Resistance Movement (NRM), the ruling political party in Uganda since 1986.
Janani Luwum Church House, or simply Church House, is a commercial building in Kampala, the capital of Uganda. The building is owned by the Anglican Church in Uganda, known as the Church of Uganda.
The Kampala–Jinja Expressway, also known as the Jinja–Kampala Expressway, is a proposed four-lane toll highway in Uganda, linking Kampala, the capital and largest city of Uganda, with the city of Jinja in the Eastern Region of Uganda.
The Mukono–Kyetume–Katosi–Nyenga Road is a road in the Central Region of Uganda, connecting the towns of Mukono, Kyetume and Katosi in Mukono District to Nkokonjeru and Nyenga in Buikwe District.
ROKO Construction Limited, also Roko Construction Limited, is one of the top five construction companies in Uganda, according to Construction Review Online, as of April 2021. Headquartered in Kampala, Uganda's capital city, ROKO, as it is often referred to, is active in Uganda, Kenya, Rwanda, DR Congo, Tanzania and South Sudan.
Christ The King Catholic Church, also Christ The King Church, is the parish church of Christ The King Catholic Parish in Kampala, the capital and largest city of Uganda.
The Insurance Towers (IT), is a government building under construction in Uganda. When completed, the skyscraper will house the headquarters of the Insurance Regulatory Authority of Uganda.
Uganda Inspectorate of Government Towers is a building under construction, in Kampala, the capital and largest city of Uganda.
Electricity Regulatory Authority House, also New ERA House, is a commercial office building constructed between June 2018 and September 2021, in Kampala, the capital of Uganda, and the largest city in that country. The building serves as the headquarters of Electricity Regulatory Authority, (ERA), the Uganda government agency responsible for the regulation, licensing, and supervision of the generation, transmission, distribution, sale, export, and importation of electricity in that country.
{{cite web}}
: |author=
has generic name (help)CS1 maint: numeric names: authors list (link){{cite web}}
: |author=
has generic name (help)CS1 maint: numeric names: authors list (link){{cite web}}
: CS1 maint: bot: original URL status unknown (link)