Kiira Motors Corporation or KMC is a State Enterprise in Uganda established to champion the Development of the Domestic Automotive Value Chain for job and wealth creation and commercialize the Kiira Electric Vehicle Project. The Equity Partners are the Government of the Republic of Uganda represented by the Ministry of Science, Technology and Innovation, Office of the President holding 96% of the initial stock and Makerere University holding 4%. [1] [2]

Contents

Africa's first electric vehicle was developed under the Kiira Electric Vehicle Project in 2011. KMC developed Africa's first hybrid vehicle, the Kiira EVS, [3] in 2014 and Africa's first solar electric bus, the Kayoola Solar Bus [4] in 2016. [5]

KMC's market entry products are the Kayoola EVS a Fully Electric Low Floor City Bus with a range of 300 kilometers on a full charge and the Kayoola Coach, a premium highway coach available in both electric and diesel powertrains. [6] [7]


History

The KMC journey dates back to 2007; evolving from an extra-curricular activity under the auspices of then Makerere University Faculty of Technology, to a university curricular activity and later a mainstream national initiative for automotive manufacturing. In 2007, a global consortium of over 31 universities and colleges across the world took part in a Vehicle Design Summit (VDS) to design and bring to market a 5-Seater plug-in hybrid electric vehicle, the Vision 200, targeting the Indian market. [8] Under the United States-based Massachusetts Institute of Technology led three-year project, Uganda's Makerere University was the only participant from Africa. The team from the Faculty of Technology now College of Engineering, Design, Art and Technology was responsible for design and integration of the Low Power Electronics and Data Networking Systems. [9] Given the experience in building the Vision 200, other global experiences through collaborations, and best practices benchmarking, the Makerere team resolved to embark on a project aimed at designing and building a vehicle in Uganda. [10]

The Kiira EV in Kampala Kiira EV.png
The Kiira EV in Kampala

The Center for Research in Transport Technologies (CRTT) was then conceived under Makerere University in December 2008 and approved as part of the University Structures effective 1 January 2011. The strategic goal of CRTT was to advance research and innovation in transportation technologies on land, air and sea with specific emphasis on green mobility solutions for Africa. The Kiira EV Project was the first project implemented under CRTT. [11] The Kiira EV, Africa's first electric vehicle, was completed by the team and launched by Yoweri Museveni, the President of the Republic of Uganda, on 24 November 2011. [12]

The successful execution of the Kiira EV Project led to the establishment of the Kiira Motors Project as a government initiative for Automotive Industry Development aimed at Establishing a Vehicle Plant in Uganda. The Kiira Motors Project started the Kiira Vehicle Technology Innovation Program through which the Kiira EV SMACK, the first Electric Hybrid Vehicle designed and built in Africa, was developed and unveiled at a very high-profile event at the Kenyatta International Convention Centre in Nairobi, Kenya in November 2014. [13] [14]

The team then designed and built the Kayoola Solar Bus, the first Electric Solar Bus designed and built in Africa. The Kayoola Solar Bus was launched by Yoweri Museveni on 16 February 2016 at the Kampala Serena Hotel. [4]

Kiira Motors conducted a Pre-Investment Analysis (The KMC Business Case) to affirm the viability of vision Vehicles Made in Uganda. This informed the development of the Kiira Motors Corporation Business Strategy and subsequently Business Plan. The KMC Pre-Investment Analysis (Business Case) was launched by the Uganda Prime Minister Ruhakana Rugunda on 7 December 2015 at the President's Office Conference Hall. [15] [16]

Commercial Production

Cabinet of Uganda sitting on Monday 9 April 2018 at Statehouse Entebbe approved the roadmap for the Commercialization of the Kiira Electric Vehicle Project. [17] This is to be undertaken in a phased manner with the market-entry point being assembly of vehicles (including electric vehicles) in partnership with reputable vehicle manufacturers. [18] Cabinet approved a Seed Fund of US$40 Million (USh 143.7 Billion) over a period of four years starting in the Financial Year 2018/19 with an allocation of USh 24 Billion under the Ministry of Science, Technology and Innovation. [19] The decision was facilitated by a comprehensive appraisal and approval of a Feasibility Study for Setting Up and Operating the Kiira Vehicle Plant by the Ministry of Finance, Planning and Economic Development. Cabinet also authorised the Minister of Science, Technology and Innovation to put in place the necessary Institutional Framework for the Commercialization of the Kiira Electric Vehicle Project and mandated the Ministry of Science, Technology and Innovation to establish and oversee the project governance and management structures. [20] [21]

Kiira Vehicle Plant

The government of Uganda, acting through the Uganda Investment Authority (UIA), allocated 100 acres for the establishment of the Kiira Vehicle Plant, located at the Jinja Industrial and Business Park, Plot No. 701, Block 2 Kagogwa Village, Mawoito Parish, Kakira Town Council, Jinja District. [22]

Artistic Impression of the Kiira Vehicle Plant Kiira Vehicle Plant.jpg
Artistic Impression of the Kiira Vehicle Plant

Kiira Motors Corporation and National Enterprise Corporation (NEC) signed a Memorandum of Understanding for Construction of the Kiira Vehicle Plant Start-Up Facilities (Phase I) at the Jinja Industrial and Business Park based on the Force Account Mechanism provided for under Section 95(A) of the PPDA Act, 2003 (as amended). This was subsequent to clearance of the MOU by the Solicitor General.  The Kiira Vehicle Plant Site was handed over to NEC on 18 January 2019, who deployed security and commenced work on 11 February 2019. Construction is expected to take two and a half (2.5) Years with completion slated for June 2021. [23] [24]

The Scope of Work for NEC includes: Site Clearance; Construction of a 3.6 kilometres (2 mi) perimeter fence and Two Gates; Excavation of a 1.4 kilometres (1 mi) Open Channel along the Western Boundary; Construction of the Assembly Shop, Offices, R&D Space, Materials Storage Areas, Overhead Water Reservoir, Container Yards, Finished Vehicle Park Yard, and Plant Monument; Construction and Installation of Servicing Facilities including the Plant Campus Circulation Roads, Power Distribution, Water Distribution, I.T Network Backbone, Drainage and Waste (Water and Solid) Management Systems; and defects liability period shall be for 12 months commencing on the date of Practical Completion of the Project. [25] [26] [24]

The construction and installation of a 3.7 kilometres (2 mi) long 33kV medium voltage electricity line connecting the Kiira Vehicle Plant Site to the national electricity grid was completed, tested and commissioned by Umeme. The construction and installation of a 5.4 kilometres (3 mi) long 6-inch water pipeline connecting the plant site to the municipal water supply system was completed, tested and commissioned by National Water and Sewerage Corporation. [24]

Establishment of the Kiira Vehicle Plant is expected to catalyse investment by small and medium enterprises in the manufacture of vehicle parts, components and autonomy systems (brake pads, seats, bolts and nuts, bumpers, vehicle electronics, navigation system, among others). Kiira Motors Corporation has developed a roadmap for the Domestic Manufacture of Auto-Parts in Uganda and secured accreditation from PPDA for an alternative system for procurement of auto-parts suppliers providing for sample parts development and accreditation of the production part manufacturing system. [27]

Establishment of the Kiira Vehicle Plant is projected to increase demand for the utilization of Uganda's natural resources such as steel from iron ore deposits; plastics from oil and gas, lithium-ion batteries from graphite, lithium and cobalt deposits, vehicle upholstery and interior padding from cotton and leather, glass from silica and sand, among others. [27]

The Kiira Vehicle Plant's contribution to employment in Uganda is estimated at 940 jobs from the start-up investment. The full-scale plant operation is estimated to create over 2,000 direct jobs and 12,000 indirect jobs. [27]

The Kiira Vehicle Plant start-up facilities will have an installed capacity of 5,000 vehicles annually.

In January 2020, the Daily Monitor newspaper reported that the Kayoola electric buses were, as of then, available for sale to the public. [28] KMC plans to manufacture 5,000 electric vehicles annually, beginning in July 2021. The manufacturer plans to procure up to 90 percent of the components in Uganda. It is being assisted by CHTC Motor Company, a subsidiary of the state-owned Sinomach Automobile Company. The long-term plan is to reduce air pollution in Uganda's capital, Kampala. [29]

In August 2021, the progress of construction of the manufacturing plant was reported at 85 percent, with completion expected in the fourth quarter of calendar year 2021. At that time, production of motor vehicles was expected to start during the first half of 2022. [30]

The President of Uganda aboard the Kayoola EVS after Laying the Foundation Stone at the Kiira Vehicle Plant Kiira Motors corporation - Laying of the foundation stone ceremony.jpg
The President of Uganda aboard the Kayoola EVS after Laying the Foundation Stone at the Kiira Vehicle Plant

Yoweri Kaguta Museveni the President of the Republic of Uganda laid the Foundation Stone for the Kiira Vehicle Plant on 14 August 2021. The President at the event directed that there will no longer be any importation of fully built buses into Uganda. [31] [32]

In May 2022, the Ugandan Finance Ministry released the final Ush159 billion ($42 million) of the government's Ush218 billion ($58 million) investment package. This set the stage for completion of the manufacturing plan and the beginning of commercial production anticipated in June 2023. [33]

Products

Kayoola EVS [34]

The Kayoola EVS is the market-entry product of Kiira Motors Corporation. The Kayoola EVS is a Fully Electric, Low Floor City Bus specifically designed for Urban Mass Transportation. At full charge, the Kayoola EVS has a range of up to 300 kilometers making it capable of handling the daily duty cycle. With a sitting capacity of up to 90 passengers. [6] [28] [35] [36] [37] [38]

The Kayoola EVS Kayoola EVS.jpg
The Kayoola EVS

The Kayoola EVS buses were used to offer Airport Transfer Services between Entebbe International Airport and Munyonyo Commonwealth Resort for delegates during the EU-Uganda Business Forum in March 2020. [39] The buses have also undertaken the following exhibition drills and select shuttle services in Uganda:

  1. Transportation of Uganda Government Communication Officers from Ministry of Science, Technology and Innovation Offices in Kampala to the Kiira Vehicle Plant Site in Jinja covering a distance of over 230 kilometers; [40]
  2. Transportation of the Rt. Hon. Speaker of Parliament of Uganda from the Source of the Nile Bridge to the Kiira Vehicle Plant Site in Jinja covering a distance of over 20 kilometers; [41] [42]
  3. Transportation of Delegates for the Uganda Europe Business Forum between Entebbe International Airport and Commonwealth Resort, Munyonyo in March 2020; [43]
  4. Transportation of Uganda Civil Aviation Authority Staff between Kampala and Entebbe International Airport. [44]

As of June 2024, KMC in collaboration with Luweero Industries could manufacture the following varieties of Kayoola EVS buses: [45] [46]

The Varieties of Kayoola EVS Bus Models
RankLengthCapacityNotes
118 metres (59 ft)
120
[45] [46]
212 metres (39 ft)
90
[45] [46]
310 metres (33 ft)
70
[45] [46]
48 metres (26 ft)
56
[45] [46]

At that time the company possessed 39 fully assembled buses (27 electric and 12 low-emission diesel). There were orders for about 100 buses from Tanzania, South Africa, Eswatini and Nigeria. The company and its partner, Luweero Industries Limited were working hard to meet those orders and secure new ones. [47] In August 2024, the Daily Monitor reported that the manufacturing plant was 95 percent complete with commercial commissioning scheduled for October 2024. [48]

Kayoola Coach

The Kayoola Diesel Coach Kayoola Diesel Coach.jpg
The Kayoola Diesel Coach

The Kayoola Coach is an intercity bus in Africa that is available in both Electric and Diesel variations. [49] The Kayoola Diesel Coach is powered by a 6-cylinder turbo charged inter cooled Cummins engine, providing over 375 horsepower, and able to achieve a top speed of 140 km/h. [49]

Kiira EVS

The Kiira EVS, a vehicle designed and Built by Kiira Motors Corporation, is a four-seater executive vehicle built off the Kiira EV SMACK platform. The Kiira EVS has undertaken a nationwide tour in excess of 3,650 kilometers in Eastern, Northern and Western Uganda with exhibitions in Masaka, Mbarara, Kabale, Kisoro, Kibaale, Bushenyi, Jinja, Kampala, Pakwach, Nebbi, Arua, Koboko, Oraba, Gulu, Kitgum, Lira, Soroti, Katakwi, Moroto, Mbale, Iganga along with a grand expo at the Africa Now Summit 2019. [50] [51] [52] [53] [54] [55] [56]

The Kiira EVS Kiira EVS.jpg
The Kiira EVS

Awards

KMC was recognized for the initiatives in Green Mobility by Frost & Sullivan with the 2016 Frost & Sullivan Visionary Innovation Leadership Award in Sustainable Mobility. [57]

KMC was awarded as the African Company of the Year in the 2021 African Business Leadership Awards. [58]

Kiira Vehicle Plant Open Day and E-mobility Expo 2024

The   Government of   Uganda   through the Science, Technology and Innovation Secretariat - Office of the President has taken definitive steps towards building a sustainable and scalable e-Mobility Ecosystem. The Government in   the National e-Mobility Strategy aims at positioning Uganda as a net source rather than a consumer of e-Mobility Solutions in Africa.

Kiira Motors Corporation, a State Mobility Enterprise was established to champion value addition in  the nascent   Motor Vehicle Industry in Uganda   through Technology   Transfer, Contract Manufacturing   and Supply  Chain Localization.   This   strategic  intervention   is   poised to contribute to the industrialization agenda envisaged to aid the socioeconomic transformation of Uganda.

Kiira Motors Corporation is honoured to host the Inaugural Kiira Vehicle Plant Open Day and E-Mobility Expo 2024 under the theme “The Future is Green; The Future is Now.” The Expo aims to gather industry leaders, policymakers, innovators, and the public to showcase the Plant's capabilities, products and share knowledge, and foster collaborations within the Mobility Ecosystem. Specifically, the event will:

1.     Spotlight on the e-Mobility Ecosystem

2.     Provide a platform to inform, Educate & drive Influence for the e- mobility Ecosystem

3.     Public Accountability.

4.     Connect with Key stakeholder of the Mobility Ecosystem in Uganda

5.    Build Trust & Brand Equity

Bulamu Ventilator

In April 2020, Makerere University, in close collaboration with KMC, ResilientAfrica Network, and in partnership with the Ministry of Science, Technology and Innovation started the development of an open design low-cost medical ventilator, called the Bulamu Ventilator, to fill the critical need for ventilators for Uganda and the region, in response to COVID-19. Once the ventilator is developed, tested and optimally operational, the consortium will develop capacity for its mass production. The ventilator will be applied beyond COVID-19 to other severe conditions that require assisted breathing. This technology will substantially improve the capacity for critical care in Uganda. [59]

As of 30 June 2020, the consortium had undertaken Phase I of the development of the Bulamu Ventilator which included Technology Assessment & Open Design Adaptation, Systems Design and Specification, Development of Initial Engineering Prototype for Proof of Functionality and Development of Three (3) Engineering and Validation Prototypes. [60] [61]

The raw materials for the machine are majorly sourced within Uganda. It is expected to retail at about US$3,000, compared to US$25,000 for an imported medical ventilator. [62]

Governance

In May 2021, a new 13-person board of directors was installed. The board members of the company are as listed in the table below. [63]

Board of Directors of Kiira Motors Corporation
RankDirectorPositionNotes
1 Sandy Stevens Tickodri-Togboa Executive Chairman
2David Omara Oleke ObongPermanent Secretary
Ministry of Science, Technology and Innovation
3 Barnabas Nawangwe Vice Chancellor
Makerere University
4Yusuf KirandaActing University Secretary for Makerere University
5Paul Isaac Musasizi Chief Executive Officer
6Basil AjerNon-Executive Director
7Ronald RwankangiNon-Executive Director
8Sister Mary Grace AkirorNon-Executive Director
9Aisha NaigaNon-Executive Director
10Henry AlinaitweNon-Executive Director
11Christine SekyanaNon-Executive Director
12Yudaya BabiryeNon-Executive Director
13 Charles Barugahare Non-Executive Director
Total
13

Customers

Starting in September 2022, Kiira Motor Corporation began supplying both electric and diesel buses to Tondeka Metro Bus Service (TMBS), to establish a public rapid bus service in the Kampala metropolitan area. Starting with five diesel units, a total of 30 units are expected in 2022. Another 600 buses are planned to be delivered in 2023. The first phase of the TMBS system is planned to absorb 980 buses, with future stages requiring more units. [64] [65]

Related Research Articles

<span class="mw-page-title-main">Jinja, Uganda</span> Place in Eastern Region, Uganda

Jinja is a city in the Eastern Region of Uganda, located on the north shore of Lake Victoria.

<span class="mw-page-title-main">Nalubaale Hydroelectric Power Station</span> Dam in Jinja

Nalubaale Power Station, formerly known as Owen Falls Dam, is a hydroelectric power station across the White Nile near its source at Lake Victoria in Uganda. Nalubaale is the Luganda name for Lake Victoria.

<span class="mw-page-title-main">National Enterprise Corporation</span>

The National Enterprise Corporation (NEC) is a state-owned corporation in Uganda. It is the commercial arm of the Uganda People's Defence Force. NEC was established in 1989 by an Act of the Parliament of Uganda. Its investments and activities include agriculture, manufacturing, healthcare, services, and defense industry projects and companies.

<span class="mw-page-title-main">Njeru</span> Place in Central Region, Uganda

Njeru is a town in Buikwe District, in the Central Region of Uganda. It is the largest town in the district. It is mainly a residential town. However, it hosts industries such as East African Packaging Solutions Limited, a manufacturer of paper packaging supplies, Nile Breweries Limited, a subsidiary of AB InBev and Nyanza Textile Industries Limited (Nytil), a textile manufacturer.

<span class="mw-page-title-main">Bujagali Hydroelectric Power Station</span> Power station in Uganda

The Bujagali Power Station is a hydroelectric power station across the Victoria Nile that harnesses the energy of its namesake, the Bujagali Falls, in Uganda. Construction began in 2007 and concluded in 2012. It was officially inaugurated on 8 October 2012 by Ugandan President Yoweri Museveni and Aga Khan IV in the presence of African politicians and investors.

<span class="mw-page-title-main">Kiira Hydroelectric Power Station</span> Power station in Uganda

Kiira Hydroelectric Power Station is a hydroelectric power station in Uganda, with an installed capacity of 200 megawatts (270,000 hp).

<span class="mw-page-title-main">Kampala–Jinja Highway</span> Road in Uganda

The Kampala–Jinja Highway is a road in Uganda, connecting the cities of Kampala and Jinja. Sometimes referred to as Kampala–Jinja Road, it is a busy road, with several towns, trading centers and other points of interest along the way. As of October 2016, a new, wider, four-lane dual carriageway expressway, the Kampala–Jinja Expressway, is proposed to be constructed south of the present highway to relieve traffic and complement existing transport infrastructure between Kampala and Jinja.

The Kampala Northern Bypass Highway, often referred to as the Northern Bypass, is a road in Uganda. It forms a semicircle across the northern suburbs of Kampala, Uganda's capital and largest city. The road was constructed to relieve traffic congestion within the city center, allowing cross-country traffic to bypass the city's downtown area.

Sandy Stevens Tickodri-Togboa is a scientist, engineer, academic, and politician in Uganda. From 2015 to 2016, he served as the State Minister for Higher Education and Technology in the Cabinet of Uganda. He was appointed to that position on 1 March 2015, replacing John Chrysostom Muyingo; in the reshuffle of June 2016, however, he was not reappointed. As a cabinet minister, he was also an ex officio member of parliament. Before his ministerial appointment, he was a deputy vice chancellor at Makerere University, the oldest and largest of the eight public universities in Uganda.

<span class="mw-page-title-main">Source of the Nile Bridge</span> Bridge in Uganda

The Source of the Nile Bridge, also New Jinja Bridge, which was commissioned on 17 October 2018, by the President of Uganda, is a cable-stayed bridge across the Victoria Nile in Uganda. It replaced the Nalubaale Bridge, which was built in 1954.

Nile Breweries Limited (NBL) is the leading beer manufacturer in Uganda.

Bujagali Energy Limited (BEL) is an electric energy generating company in Uganda. The company owns and operates the Bujagali Power Station, the largest hydropower plant in the country as of July 2014.

The Kampala–Jinja Expressway, also known as the Jinja–Kampala Expressway, is a proposed four-lane toll highway in Uganda, linking Kampala, the capital and largest city of Uganda, with the city of Jinja in the Eastern Region of Uganda.

The Uganda Electricity Generation Company Limited (UEGCL) is a parastatal company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGCL's generation capacity was 380 megawatts, with that capacity planned to increase to over 1,300 megawatts, by 2023.

Pakistan has a significant market for hybrid vehicles such as Honda's Vezel, Toyota's Prius, and Aqua. The Automotive Development Policy (2016–2021) and the launch of the China-Pakistan Economic Corridor (CPEC) encourage foreign investments for new automobile brands to enter the Pakistani market.

National Defence College, Uganda is a National Security and Strategic Studies training and educational institution in Uganda.

The Tondeka Metropolitan Kampala Bus Service (TMBS), is the proposed principal public transport operator in the Kampala metropolitan area. Expected to start in September 2020, the bus system, Tondeka Metro, proposes to serve the city of Kampala, Uganda's capital, the city of Entebbe, including Entebbe International Airport, Buloba, Nsangi, Ssabagabo, Mukono, Kira Town, Matugga, Wakiso, and the areas in Mukono District and Wakiso District that connect with these urban centers.

<span class="mw-page-title-main">Charles Barugahare</span> Financial Advisor, Auditor and Author

Charles Barugahare is a Ugandan Financial Consultant, Auditor and an author. He is the former University Secretary of Makerere University, Oldest University in Uganda. Currently, he is the Director of Retirement Life Hub that is knowned for the 30-day Personal Finance Improvement Challenge. He also serves as a board member of Kiira Motors Corporation, a state enterprise aimed at commercialising the Kiira Electric Vehicle Project.

References

  1. Kiira Motors (10 April 2018). "Kiira Motors Corporation: About Us". Kampala: Kiiramotors.com. Retrieved 10 April 2018.
  2. "MPs Want UGX 400Bn Allocated to Science and Technology Ministry :: Uganda Radio Network". ugandaradionetwork.com. Retrieved 22 May 2019.
  3. Roland Nasasira (4 February 2016). "KIIRA EV SMACK: A car made in Uganda". Daily Monitor . Kampala, Uganda. Retrieved 17 October 2017.
  4. 1 2 Patel, Heenali (15 February 2016). "Uganda unveils Africa's first solar-powered bus - CNN". Cable News Network . Retrieved 10 April 2018.
  5. BBC (1 February 2016). "Africa's 'first solar bus' unveiled". London: British Broadcasting Corporation (BBC). Retrieved 10 April 2018.
  6. 1 2 "Kayoola EVS". Kiira Motors Corporation. Kakira, Uganda. 14 November 2019. Retrieved 23 March 2020.
  7. "Kiira Motors raving to go as it unveils long-distance Kayoola coach". 256 Business News. 13 February 2021. Retrieved 29 April 2021.
  8. Makerere University (10 April 2018). "Vehicle Design Project: (2006–2010)" (PDF). Kampala: Makerere University . Retrieved 10 April 2018.
  9. EVWorld.com (4 September 2008). "Ugandan Students Participate in International Plug-in Hybrid Project". EVWorld.com. Retrieved 10 April 2018.
  10. B Wilkins (5 March 2016). "Solar-powered buses redefining public transportation in Uganda". Launchforth.io. Retrieved 10 April 2018.
  11. Makerere University (8 June 2017). "Center for Research in Transportation Technologies: The College of Engineering, Design, Art and Technology, Makerere University". Makerere University . Retrieved 10 April 2018.
  12. Makerere University (25 November 2011). "President Museveni Launches Kiira EV, Pledges More Support to Makerere". Kampala: Makerere University . Retrieved 10 April 2018.
  13. Mulupi, Dinfin (25 November 2014). "Introducing the 'Made in Uganda' electric car". How We Made It In Africa. Retrieved 10 April 2018.
  14. Anguyo, Innocent (13 November 2014). "Uganda's hybrid car launched in Kenya". New Vision . Kampala. Retrieved 10 April 2018.
  15. PC Tech Magazine (8 December 2015). "Made in Uganda: Kiira Motors says vehicle assembly will start in 2018". PC Tech Magazine. Retrieved 10 April 2018.
  16. Lyatuu, Justus (9 December 2015). "Kiira Motors to employ 10,000 people". The Observer (Uganda) . Kampala. Retrieved 10 April 2018.
  17. "Uganda Backs Electric Vehicle Project It Says Can Lead Continent". Bloomberg.com. 10 April 2018. Retrieved 1 May 2018.
  18. "Cabinet nods to Kiira Motors commercialisation, slams brakes on URA bank accounts bid | 256 Business News". 256businessnews.com. Retrieved 1 May 2018.
  19. "Govt Allocates Shs 24Bn for Kiira Motors' Car Assembly Plant – Online news from Uganda and the East African region – SoftPower News". www.softpower.ug. 10 April 2018. Retrieved 1 May 2018.
  20. "Uganda to manufacture cars starting this year as cabinet approves cash". Nile Post. 10 April 2018. Retrieved 1 May 2018.
  21. Xinhua (11 April 2018). "Uganda to start commercial production of motor vehicles". The EastAfrican Quoting Xinhua . Nairobi. Retrieved 13 April 2018.
  22. Okello, Picho (8 February 2016). "UDC Projects: Kiira Motors Corporation". Kampala. Retrieved 10 April 2018.
  23. "UPDF's National Enterprise Corporation Signs MoU With Kiira Motors". The NileWires. 17 January 2019. Retrieved 22 May 2019.
  24. 1 2 3 cbsfm. "Government should consider locally made cars – PM Rugunda – CBS FM" . Retrieved 22 May 2019.
  25. Nile Post (17 January 2019). "UPDF takes over manufacture of Kiira EV for sale". Nile Post Uganda. Retrieved 5 February 2019.
  26. "Rt. Hon. Dr. Ruhakana Rugunda Receives Brief on Kiira Vehicle Plant | Kiira Motors Corporation". 9 April 2019. Retrieved 22 May 2019.
  27. 1 2 3 "UCC's Mutabazi Places Order for a Car from Kiira Motors". ChimpReports. 17 January 2019. Retrieved 22 May 2019.
  28. 1 2 Claire Muhindo (17 January 2020). "14,000 jobs to be created as Kayoola electric buses hit the market". Daily Monitor . Kampala. Retrieved 18 January 2020.
  29. Frank Jacobs (27 August 2020). "Uganda To Build 5,000 EVs A Year". Barchon, Belgium: Global Fleet. Retrieved 29 August 2020.
  30. Kenneth Kazibwe (14 August 2021). "No more importation of buses here, says Museveni at Kiira vehicle plant". Nile Post Uganda. Kampala, Uganda. Retrieved 15 August 2021.
  31. "No more importation of buses here, says Museveni at Kiira vehicle plant". Nile Post. 14 August 2021. Retrieved 16 August 2021.
  32. "📸 In 30 pictures: How Museveni toured, unveiled foundation stone at Kiira Motors plant". New Vision. Retrieved 16 August 2021.
  33. Michael Wakabi (26 June 2022). "Uganda's Kiira Motors in race against time". The EastAfrican . Nairobi, Kenya. Retrieved 27 June 2022.
  34. "The Kayoola EVS". YouTube . 24 July 2020.
  35. "Kiira Motors Produces Its Second Kayoola Electric Bus and is Now Taking Orders for Vehicles Made in Uganda". Uganda Update. Retrieved 23 March 2020.[ dead link ]
  36. "UGANDAN CABINET MINISTERS SPEAKOUT ON THE NEW STELLAR KAYOOLA ELECTRIC BUS". Uganda Update. Retrieved 23 March 2020.
  37. "Kiira Motors mulls building 96 buses in 2020". 256 Business News. 7 December 2019. Retrieved 23 March 2020.
  38. "Uganda's Kiira Motors starts ramp-up to domestic bus manufacture". 256 Business News. 23 November 2019. Retrieved 23 March 2020.
  39. "Kayoola EVS excites EU delegates – CBS FM buganda" . Retrieved 23 March 2020.
  40. "MINISTER NABAKOOBA SAYS UGANDA'S KAYOOLA ELECTRIC BUSES KEY FOR A CLEAN ENERGY REVOLUTION IN AFRICA – CBS FM buganda" . Retrieved 23 March 2020.
  41. "SPEAKER KADAGA VISITS KIIRA VEHICLES PLANT IN KAYOOLA ELECTRIC BUS PLEDGES FULL SUPPORT". Uganda Update. Retrieved 23 March 2020.
  42. "Kadaga visits Kiira Motors, takes ride on Kayoola bus | edge" . Retrieved 23 March 2020.
  43. "Elioda: Kayoola Buses a Success Story Despite Limited Funding for Technology Ministry". ChimpReports. 22 May 2020. Retrieved 24 July 2020.
  44. "Uganda's Kiira Motors: Electric Bus Pilot Program & Jinja EV Factory Construction Update". CleanTechnica. 22 July 2020. Retrieved 24 July 2020.
  45. 1 2 3 4 5 The Independent Uganda (7 June 2024). "Kiira Motors Unveils The 2024 8-Meter Kayoola EVS Model". The Independent (Uganda) . Kampala, Uganda. Retrieved 7 June 2024.
  46. 1 2 3 4 5 Muhamadi Byemboijana (7 June 2024). "Kiira Motors Unveils The 2024 8 Meter Kayoola EVS Model". SoftPower Uganda. Kampala, Uganda. Retrieved 7 June 2024.
  47. Esiara Kabona (22 June 2024). "Uganda's 100 e-Buses Drive In Fits And Starts". The EastAfrican . Nairobi, Kenya. Retrieved 22 June 2024.
  48. Tom Brian Angurini (2 August 2024). "Vehicle manufacturing plant 95% complete, says Kiira". Daily Monitor . Kampala, Uganda. Retrieved 5 August 2024.
  49. 1 2 Tuhereze, Elias (23 February 2021). "Kayoola Diesel Bus launched". Makerere University News. Retrieved 29 April 2021.
  50. "Kiira EVS: What you need to know about the Ugandan-made sedan". SautiTech. 14 January 2019. Retrieved 22 May 2019.
  51. "KIIRA EVS mesmerises Mbarara residents, students". www.newvision.co.ug. Retrieved 22 May 2019.
  52. "KIIRA EVS rocks Kabale". www.newvision.co.ug. Retrieved 22 May 2019.
  53. Independent, The (20 February 2019). "KIIRA EVS excites Masaka, Mbarara". The Independent Uganda. Retrieved 22 May 2019.
  54. "The Beast: Kiira EV SMACK goes north". www.newvision.co.ug. Retrieved 22 May 2019.
  55. "Thousands turn up to welcome Kiira Ev car in West Nile". West Nile Web. Retrieved 22 May 2019.
  56. "Kiira EVS excites Iganga locals". www.newvision.co.ug. Retrieved 22 May 2019.
  57. Frost & Sullivan (15 August 2016). "Frost & Sullivan Recognises the Drive and Vision of Kiira Motors Corporation in Redefining Mobility in Uganda". Frost & Sullivan . Retrieved 10 April 2018.
  58. "Breaking: Celebrating Grit, Purpose, And Impact As African Leadership Magazine Unveils 2021 African Business Leadership Award Winners". African Leadership Magazine. 16 August 2021. Retrieved 16 August 2021.
  59. "Bulamu Ventilator". Kiira Motors Corporation. 6 June 2020. Retrieved 29 July 2020.
  60. Sserwanga, Moses (12 June 2020). "UGANDA'S MINISTER OF HEALTH UNVEILS BULAMU A LOCALLY MADE LOW COST MEDICAL VENTILATOR TO FIGHT THE COVID-19 PANDEMIC". Uganda Update News. Retrieved 29 July 2020.
  61. "Locally made medical ventilator launched to support life in ICUs". Nile Post. 11 June 2020. Retrieved 29 July 2020.
  62. Tonny Abet (22 June 2020). "Makerere's low-cost ventilator ready to assist Covid-19 patients". Daily Monitor . Kampala. Retrieved 22 June 2020.
  63. Nicholas Agaba and Moses Paul Sserwanga (19 May 2021). "Minister Inaugurates New Kiira Motors Board of Directors". Kampala Post. Retrieved 17 June 2021.
  64. Peter Sserugo (6 September 2022). "Kiira Motors delivers 5 buses for city transport". Daily Monitor . Kampala, Uganda. Retrieved 21 September 2022.
  65. Kenneth Kazibwe (13 September 2022). "Tondeka buses start transport services in Kampala". Nile Post Uganda. Kampala, Uganda. Retrieved 21 September 2022.