Kampala Northern Bypass Highway | |
---|---|
Route information | |
Length | 14 mi (23 km) |
History | Designated in 2004 Completion in 2022 [1] |
Major junctions | |
East end | Bweyogerere |
Naalya Kisaasi Bukoto Bwaise Namungoona | |
West end | Busega |
Location | |
Country | Uganda |
Highway system | |
The Kampala Northern Bypass Highway, often referred to as the Northern Bypass, is a road in Uganda. It forms a semicircle across the northern suburbs of Kampala, Uganda's capital and largest city. The road was constructed to relieve traffic congestion within the city center, allowing cross-country traffic to bypass the city's downtown area. [2]
The bypass stretches from Namboole, approximately 11 kilometres (7 mi) to the east of downtown Kampala. [3]
The highway winds through the suburbs of Naalya, Kiwaatule, Kulambiro, Kigoowa, Bukoto, Mulago, Makerere, Bwaise, Kawaala, and Namungoona, to end at Busega, approximately 8 kilometres (5.0 mi) west of the city. [4] The highway measures approximately 22.5 kilometres (14 mi) in length. [5] [6] The coordinates of the road at its northernmost point are 00°21′56″N32°36′18″E / 0.36556°N 32.60500°E . [7]
The bypass opened to traffic on 1 October 2009. [8] Constructed between 2004 and 2009, the bypass is about 22 kilometres (14 mi) long. [8] The project was funded by the European Union and the Uganda government. [8]
In August 2012, Ugandan print media reported that expansion of the bypass to dual carriageway for its entire length would begin in early 2013. [9] Funding for the expansion is being provided by the European Investment Bank, the European Union, and the Ugandan government. [9]
In May 2014, the Uganda National Roads Authority awarded the construction contract for the expansion to Mota-Engil, Engenharia E Construcao SA, a subsidiary of the Mota-Engil civil engineering and construction conglomerate based in Portugal. Construction was expected to start in June 2014 and last 30 months. [4]
In October 2014, Ugandan print media reported that the construction start was postponed to the end of 2014 and would last approximately 30 months. [10]
On 23 February 2015, the widening of the bypass was officially launched. [11] [6] [12]
Construction costs are budgeted at €67.4 million. The breakdown of the funding sources is in the table below: [13]
Rank | Development Partner | Contribution in Euros | Percentage | Notes |
---|---|---|---|---|
1 | European Union | 37.0 million | 54.90 | Grant |
2 | European Investment Bank | 15.0 million | 22.25 | Loan |
3 | Government of Uganda | 15.4 million | 22.85 | Investment |
Total | 67.4 million | 100.00 | ||
As of December 2018, an estimated 51 percent of the work had been completed, with completion planned in 2021. Six interchanges are planned to replace existing roundabouts at (1) Sentema Road (3) Hoima Road (3) Gayaza Road (4) Bukoto/Kyebando (5) Ntinda/Kisaasi and at (6) Naalya. [14]
As of March 2020, with an estimated 70 percent of the expansion completed, completion was still planned for the 4th quarter of 2021. The delays were blamed on protracted land acquisition processes, changes in road design and increased scope of work (construction of new road interchanges). [15]
In August 2021, it was reported that work was in its final stages, with completion expected during the 4th quarter of 2021. At that time the cost of the road was reported as €106million (about UShs445 billion). [16]
In January 2022, the completed dual carriageway road was commissioned by Jessica Alupo, the Vice President of Uganda. The highway is a component of the Northern Corridor. [1]
Some of the points of interest along or near the bypass include: [17] (1) Mandela National Stadium, at Bweyogerere. (2) Mulago Hill, the highway skirts the northern borders of the hill between Bukoto and Bwaise. (3) Kampala–Bombo Road, crosses the Northern Bypass, at the northern end of Makerere University Campus.(4) Makerere University, the road passes near the northern borders of the university campus between Bwaise and Kawaala. (5) Kampala–Mityana Road, joins the highway at Busega where Kasumba Square Mall is located. (6) Entebbe–Kampala Expressway, joins the bypass highway at Busega. (7) Kampala–Masaka Road, is connected to the bypass highway by a short connector at Busega. [18]
In September 2022 Kalita Bus Company, a private enterprise, began public rapid bus transport service Between Bweyogerere and Busega, covering the entire length of the Northern Bypass Highway. The service began with two electric motor coaches of the Kayoola EVS variety, manufactured by Kiira Motors Corporation. [19]
Kira Town, a municipality in the Wakiso District of the Central Region of Uganda, is the country's second most populous city. It is administered by the Kira Town Council, an urban local government.
Kawempe Division (sub-county) is one of the five divisions that comprise the city of Kampala along with Makindye division, Lubaga division, Nakawa division and Central division, It has 19 parishes and 771 villages. The parishes include Bwaise I, Kanyanya, Kazo ward, Kyebando, Makerere iii, Mulago I, Bwaise ii, Kawempe I, Kikaya, Makerere I, Mpererwe, Mulago iii, Bwaise III, Kawempe ii, Komambogo, Makerere ii, Mulago i, Makerere University. The division's current mayor is His worship Dr. Emmanuel Serunjogi.
Bweyogerere is one of the six townships or wards that constitute Kira Municipality in Wakiso District in southern central Uganda. The other five wards are Kimwaanyi, Kira, Kireka, Kirinnya and Kyaliwajjala.
Kisaasi is a location, within the city of Kampala, Uganda.
Bukoto is a township within the city of Kampala, Uganda's capital and largest metropolitan area.
Naalya is a township in Kira Municipality, in Kyaddondo County, Wakiso District, in Uganda.
Kiwaatule is a township within the city of Kampala, Uganda's capital.
Kamwookya, sometimes spelled as Kamwokya, is a location within the city of Kampala, Uganda's capital and largest metropolitan area.
Kulambiro, sometimes spelled as Kkulambiro, is a neighborhood within the city of Kampala, Uganda's capital and largest city.
Kawaala is a neighborhood within Kampala, Uganda's capital and largest city.
Busega is a neighborhood within Kampala, the capital and largest city of Uganda.
The Entebbe–Kampala Expressway, also known as the "Kampala–Entebbe Expressway" or the "Entebbe–Kampala Highway", is a four-lane toll highway in the Central Region of Uganda. The highway links Entebbe International Airport, the country's largest civilian and military airport, to Kampala, the country's capital and largest metropolitan area. Originally, the highway was planned for commissioning in 2016, but because of the delayed works, commissioning was done on 15 June 2018 by Uganda's sitting president, Yoweri Museveni. Recently, the Uganda Minister for Works and Transport, Gen. Katumba Wamala launched the toll point at Kajjansi along Kampala–Entebbe Road.
Kyengera is a town in the Central Region of Uganda. It is one of the urban centers in Wakiso District.
Kyaliwajjala is a neighborhood in Kira Municipality, Kyaddondo County, Wakiso District, in Central Uganda.
The Ministry of Works and Transport is a Cabinet level government ministry of Uganda, that is mandated to plan, develop and maintain an economic, efficient and effective transport infrastructure, and transport services by road, rail, water, and air. The ministry is also mandated to manage public works including government structures and promote standards in the construction industry. The ministry is headed by a Cabinet Minister. The current Minister of Works and Transport is Katumba Wamala.
Lubigi is a swampy wetland on the northern and western outskirts of Kampala, the capital and largest city of Uganda.
The Kampala–Mpigi Expressway, also Busega–Mpigi Expressway, is a four-lane, dual carriage highway under construction in the Central Region of Uganda, connecting, Kampala, the capital city, and Mpigi, the headquarters of Mpigi District.
The Kampala Southern Bypass Highway is a proposed four-lane, dual carriage highway in the Central Region of Uganda, connecting, Bweyogerere, in the Wakiso District, to Munyonyo in the Makindye Division of Kampala, the largest city and capital of Uganda.
Mbalwa is a neighborhood in Kyaliwajjala Parish, Kira Municipality, Wakiso District in the Central Region of Uganda.