Kawanda | |
---|---|
Coordinates: 00°25′14″N32°32′26″E / 0.42056°N 32.54056°E Coordinates: 00°25′14″N32°32′26″E / 0.42056°N 32.54056°E | |
Country | Uganda |
Region | Central Uganda |
District | Wakiso District |
Elevation | 1,300 m (4,300 ft) |
Time zone | UTC+3 (EAT) |
Kawanda is a town in Wakiso District, Central Uganda.
The town is in Kawanda Parish, Nabweru Sub-county, [1] being one of the six parishes in that administrative unit. Kawanda is approximately 13 kilometres (8.1 mi), by road, north of Kampala, the capital and largest city in Uganda. [2] This is approximately 247 kilometres (153 mi) south of Karuma Falls, on the Kampala–Gulu Highway. [3] The coordinates of the Kawanda are 0°25'14.0"N, 32°32'26.0"E (Latitude:0.420556; Longitude:32.540556). [4]
Kawanda is the location of Kawanda National Agricultural Research Laboratory, a unit of the National Agricultural Research Organisation. The laboratory carries out crop research, focusing primarily on banana varieties and their diseases. [5] [6]
The Uganda Electricity Transmission Company Limited maintains a major electricity substation that receives high voltage power from Bujagali Power Station via 73 kilometres (45 mi) of 220kV cables. [7] A 264 kilometres (164 mi) 440kV electricity power line from Karuma Power Station is under construction to the company substation in Kawanda, under the supervision of Intec Gopa International Energy Consultants GmbH of the Federal Republic of Germany. [8]
Lira is a city in the Northern Region of Uganda. It is the main municipal, administrative, and commercial centre of Lira District.
The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.
Karuma Falls is a town in Uganda.
The Uganda Electricity Generation Company Limited (UEGCL) is a parastatal company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGCL's generation capacity was 380 megawatts, with that capacity planned to increase to over 1,300 megawatts, by 2023.
Olwiyo is a town in Nwoya District in the Northern Region of Uganda.
The Uganda Electricity Transmission Company Limited (UETCL) is a parastatal company whose primary purpose is to make bulk electricity purchases and transmit the electricity along high voltage wires to local and foreign distribution points. UETCL is the sole authorized national bulk energy purchaser and the sole authorized electricity importer and exporter in Uganda.
Karuma is a settlement in the Western Region of Uganda.
Lugogo is an area in the city of Kampala, Uganda's capital.
Nkusi Hydroelectric Power Station, also referred to as Nkusi Power Station, is a 9.6 MW (12,900 hp) hydroelectric power station in the Western Region of Uganda.
Achwa 2 Hydroelectric Power Station is a 41 megawatts (55,000 hp) hydroelectric power plant, in Uganda.
Kawanda–Birembo High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Kawanda, in Uganda to another high voltage substation at Birembo, in Rwanda.
The Karuma–Kawanda High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Karuma Hydroelectric Power Station, in the Western Region of Uganda, to another high voltage substation at Kawanda, in the Central Region of Uganda.
The Nkenda–Mpondwe–Beni High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Nkenda, in Kasese District, in the Western Region of Uganda, to another high voltage substation at Beni, in North Kivu Province, in the Democratic Republic of the Congo.
Nkenda is a hill in Kasese District in the Western Region of Uganda. The name is also applied to the settlement at the bottom of that hill.
The Masaka–Mutukula–Mwanza High Voltage Power Line is a proposed high voltage electricity power line, connecting the high voltage substation at Masaka, in Masaka District, in the Central Region of Uganda, to another high voltage substation at Mwanza, in Mwanza Region, in the Republic of Tanzania.
The Lira–Gulu–Nebbi–Arua High Voltage Power Line is a high voltage electricity power line, under construction in Uganda. It connects the high voltage substation at Lira, in Lira District, to another high voltage substation at Arua, in Arua District, all in the Northern Region of the country.
The Opuyo–Moroto High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation at Opuyo, a southern suburb of the city of Soroti, in the Eastern Region to another high voltage substation at Moroto, in the Northern Region of Uganda. The power line was energized in June 2021.
The Karuma–Juba High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Karuma, in Kiryandongo District, in the Western Region of Uganda, to another high voltage substation at Juba, in Jubek State, in South Sudan.
The Hoima–Kinyara–Kafu High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Kabaale, Buseruka sub-county, Hoima District, in the Western Region of Uganda to another high voltage substation at Kafu, Nakasongola District, in the Central Region of Uganda. On the way, the power line passes through Kinyara Sugar Works, in Masindi District.
Bulo is a settlement in Butambala District in the Central Region of Uganda.