Bukasa Inland Port

Last updated

Bukasa Inland Port
Bukasa Inland Port
Click on the map for a fullscreen view
Location
Country Uganda
LocationBukasa, Kira Town, Wakiso District
Coordinates 00°17′23″N32°40′14″E / 0.28972°N 32.67056°E / 0.28972; 32.67056
Details
Owned by Government of Uganda
Type of harbour Natural/Artificial
The map showing Wakiso District were Bukasa Inland port is being constructed Wakiso District in Uganda.svg
The map showing Wakiso District were Bukasa Inland port is being constructed

Bukasa Inland Port is an inland port ubder construction in Uganda. [1] Construction of the first phase began on 2 May 2024 with completion expected in 2025. [2]

Contents

Location

The port is located along the northern shores of Lake Victoria, on approximately 400 hectares (1.5 sq mi) in the neighborhood of Bukasa in Wakiso District, [2] about 16 kilometres (10 mi), by road, south-east of the central business district of Kampala, the capital and largest city of Uganda. [3] When fully functional, the port is expected to occupy a bigger land area. [4] Efforts to secure more land are underway. [5]

In February 2019, the Daily Monitor reported that the project area had been increased to 465 hectares (1,149 acres). [6]

Overview

When completed the inland port is designed to handle up to 5.2 million tonnes of freight annually. [4] The port will facilitate movement of goods from the Tanzanian ports of Dar es Salaam and Tanga, via rail to the port of Mwanza on Lake Victoria. Barges would then bring the cargo over the lake to Bukasa. This would reduce Uganda's near-total dependence on the port of Mombasa, Kenya. [7]

Funding

Two German financial institutions agreed to lend US$48 million towards the construction of this port. The Uganda government will contribute US$8.5 million to this project. The funding for the construction of the port is as depicted in the table below: [8]

Bukasa Inland Port Funding
RankName of FunderDollars Funded (Millions)Percentage Funding
1European Export and Trade Bank
24.0
42.48
2 Commerzbank
24.0
42.48
3 Government of Uganda
8.5
15.04
Total
56.5
100.00

Totals may be off slightly, due to rounding.

Construction

As of February 2018, GAUFF Gmbh & Co. Engineering KG, [9] a German firm that is performing the consultancy work for the construction of the port, is finalizing the master design of the development. In July 2018, dredging of the swamps is expected to commence. Physical construction of the administration unit and the shipping facilities called Roll-on/Roll-off (RoRo) is expected to commence in June 2019, and last until April 2022. More development and expansion will continue until 2030. [1] Construction of the initial phase is expected to last three years. [10]

In February 2019, the National Environment Management Authority of Uganda (NEMA), approved the construction of this inland port. Construction will be phased. [6]

Phase I

The first phase will involve construction of the port, administration jetty, free trade zone, shunting yard, a two-berth multipurpose terminal and a two berth Roro terminal.

Phase II

The second phase, expected to be complete by 2030, will extend the multipurpose terminal by additional two berths to a total quay length of 540 metres (1,772 ft).

Phase III

The third phase, to be completed by 2040, will extend the quay length of the multipurpose terminal to 960 metres (3,150 ft). All three phases will require the dredging Lake Victoria. [6]

Developments

The engineering, procurement and construction (EPC) contract for the first phase was awarded to "Coppieters JV", at a contract price of €14.9 million. Gauff Consulting Engineers from Germany are the supervising consultants. [2]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in Uganda</span>

Transport in Uganda refers to the transportation structure in Uganda. The country has an extensive network of paved and unpaved roads.

<span class="mw-page-title-main">Port Bell</span> Place in Central Uganda, Uganda

Port Bell is a small industrial centre in the greater metropolitan Kampala area, in Uganda. Port Bell has a rail link and a railroad ferry wharf used for International traffic across Lake Victoria to Tanzania and Kenya.

<span class="mw-page-title-main">Inland port</span> Port on an inland waterway

An inland port is a port on an inland waterway, such as a river, lake, or canal, which may or may not be connected to the sea. The term "inland port" is also used to refer to a dry port.

<span class="mw-page-title-main">Entebbe International Airport</span> International airport in Uganda

Entebbe International Airport is the only international airport in Uganda. It is located about 6 kilometres (3.7 mi) southwest of the town of Entebbe, on the northern shores of Lake Victoria. This is approximately 40 kilometres (25 mi) by road south-west of the central business district of Kampala, the capital city of Uganda.

<span class="mw-page-title-main">Uganda Railways Corporation</span> State-owned railway company of Uganda

The Uganda Railways Corporation (URC) is the parastatal railway of Uganda. It was formed after the breakup of the East African Railways Corporation (EARC) in 1977 when it took over the Ugandan part of the East African railways.

<span class="mw-page-title-main">Kilindini Harbour</span> Port in Kenya

Kilindini Harbour is a large, natural deep-water inlet extending inland from Mombasa, Kenya. It is 25–30 fathoms (46–55 m) at its deepest center, although the controlling depth is the outer channel in the port approaches with a dredged depth of 17.5 m (57 ft). It serves as the harbour for Mombasa, with a hinterland extending to Uganda. Kilindini Harbour is the main part of the Port of Mombasa, the only international seaport in Kenya and the biggest port in east Africa. It is managed by the Kenya Ports Authority (KPA). Apart from cargo handling, Mombasa is frequented by cruise ships.

<span class="mw-page-title-main">Energy in Uganda</span>

Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.

<span class="mw-page-title-main">Kasese Airport</span> Airport

Kasese Airport is an airport in Uganda.

Tororo Inland Port is a proposed dry port in inland Uganda.

<span class="mw-page-title-main">Uganda Oil Refinery</span>

The Uganda Oil Refinery is a planned crude oil refinery in Kabaale village, on the Eastern shore of Lake Albert along the Hoima–Kaiso–Tonya Road, Buseruka Sub-county, Hoima District, Western Region, Uganda, near the border with the Democratic Republic of the Congo. It has been planned since 2010. Community opposition was repressed early on. After 5 years of negotiations the Albertine Graben Refinery Consortium (AGRC) formed in 2018 and agreed to design and build the refinery.

<span class="mw-page-title-main">Lubigi</span> Wetland on the outskirts of Kampala, Uganda

Lubigi is a swampy wetland on the northern and western outskirts of Kampala, the capital and largest city of Uganda.

The Uganda National Oil Company (UNOC), also known as the National Oil Company of Uganda, is a limited liability petroleum company in Uganda owned by the Ugandan government. The 2013 Petroleum Act of Uganda provides for the establishment of the national oil company. UNOC's board of directors was inaugurated on 23 October 2015 by the president of Uganda.

The Kampala–Jinja Expressway, also known as the Jinja–Kampala Expressway, is a proposed four-lane toll highway in Uganda, linking Kampala, the capital and largest city of Uganda, with the city of Jinja in the Eastern Region of Uganda.

Aga Khan University Hospital, Kampala, is a hospital under construction in Uganda. It is an urban, tertiary, referral and teaching hospital whose planned construction will last five years, starting in 2020. It will be built in two phases. The first phase will consist of 150 beds at an estimated cost of US$100 million. The bed capacity will be increased to 600 during the second phase.

<span class="mw-page-title-main">East African Crude Oil Pipeline</span> Pipeline from Uganda to Tanzanian coast

The East African Crude Oil Pipeline (EACOP), also known as the Uganda–Tanzania Crude Oil Pipeline (UTCOP), is a 1,443 km crude oil pipeline in planning since 2013, with a foundation stone nominally under construction since 2017, and is intended to transport crude oil from Uganda's Tilenga and Kingfisher oil fields to the Port of Tanga, Tanzania on the Indian Ocean.

Kabalega International Airport, also Hoima International Airport, is an airport under construction in Hoima District, Uganda. It is part of the infrastructure under construction as Uganda prepares to develop its nascent petroleum industry. When completed, it would be Uganda's second international airport, besides Entebbe International Airport. The new airport is expected to facilitate mobilization of equipment for construction of the Uganda Oil Refinery and assist in the development of agriculture and tourism in Uganda's Western Region.

<span class="mw-page-title-main">Haldia Port</span> Port in India

The Haldia Port, officially Haldia Dock Complex (HDC), is a port on the confluence of the Haldi River and the Hooghly River. The port is located at Haldia in West Bengal, about 130 kilometres (81 mi) from the sandheads–deep sea area of the Bay of Bengal, 45 kilometres (28 mi) upstream from Pilotage Station at Sagar and 104 km downstream of Kolkata. In 1968, an oil jetty was commissioned at Haldia, and officially in 1977 the port facility of Haldia started functioning as a subsidiary port of the Port of Kolkata under the name Haldia Dock Complex.

Katosi Water Works (KWW), also Katosi Water Treatment Plant is a water purification and distribution project in Uganda.

The Kenya Standard Gauge Railway (SGR) is a partially finished railway system connecting Kenya's cities. Once completed, it will link the country to the neighboring country of Uganda, and through Uganda, to South Sudan, the Democratic Republic of the Congo, Rwanda, and Burundi. There are also plans to link to Addis Ababa, in neighboring Ethiopia to the north. The first segment, between Mombasa and Nairobi, opened passenger rail service in June 2017, and freight rail service in January 2018. Other segments are under construction or planned. The new standard gauge railway, is intended to replace the old, inefficient metre-gauge railway system.

Mahathi Fuel Transport and Storage Depot is a privately-owned inland, lakeside fuel transport and storage depot in Uganda. Gasoline, kerosene, diesel-fuel and Jet A1 are delivered by ship from Kisumu, across Lake Victoria in neighboring Kenya. The fuel is stored here and conveyed by truck to final destinations in Uganda, the Democratic Republic of the Congo, Rwanda, Burundi and South Sudan, significantly cutting down delivery times and transport costs.

References

  1. 1 2 Misairi Thembo Kahungu (15 February 2018). "Construction of Bukasa Inland Port starts next year". Daily Monitor . Kampala, Uganda. Retrieved 15 February 2018.
  2. 1 2 3 Samuel Balagadde (3 May 2024). "Construction of Bukasa Port Starts". New Vision . Kampala, Uganda. Retrieved 3 May 2024.
  3. "Road Distance Between Central Bank of Uganda, Kampala Road, Kampala, Central Region, Uganda and Kirombe, Kampala, Central Region, Uganda" (Map). Google Maps . Retrieved 3 May 2024.
  4. 1 2 256BN (25 April 2016). "Bukasa Inland Port secures funding". 256 Business News (256BN). Retrieved 2 August 2016.{{cite web}}: CS1 maint: numeric names: authors list (link)
  5. Musisi, Frederic (26 February 2013). "Bukasa Inland Port survey scheduled for next month". Daily Monitor . Kampala. Retrieved 2 August 2016.
  6. 1 2 3 Tajuba, Paul (25 February 2019). "Nema okays Kampala port construction". Daily Monitor . Kampala. Retrieved 26 February 2019.
  7. Biryabarema, Elias (12 February 2013). "Uganda to build inland port to reduce reliance on Kenya". Reuters.com. Archived from the original on 17 August 2016. Retrieved 2 August 2016.
  8. Asiimwe, Dicta (30 April 2016). "Kampala borrows $48m to build inland port on shores of Lake Victoria". The EastAfrican . Nairobi. Retrieved 2 August 2016.
  9. "Bukasa Port - GAUFF Engineering Kompetenz in Infrastruktur". www.gauff.net. Retrieved 5 February 2021.
  10. Vision Reporter (12 February 2013). "Uganda to build inland port to reduce reliance on Kenya". New Vision . Kampala. Retrieved 15 February 2018.

00°17′23″N32°40′14″E / 0.28972°N 32.67056°E / 0.28972; 32.67056