Mahathi Fuel Transport and Storage Depot

Last updated

Mahathi Fuel Transport and Storage Depot
Location
Country Flag of Uganda.svg  Uganda
LocationBugiri - Bukasa Village, Wakiso District
Coordinates 00°07′23″N32°34′10″E / 0.12306°N 32.56944°E / 0.12306; 32.56944
Details
OpenedDecember 30, 2022;4 months ago (2022-12-30) [1]
Owned by Mahathi Infra Uganda Limited
Type of harbour Natural/Artificial

Mahathi Fuel Transport and Storage Depot is a privately-owned inland, lakeside fuel transport and storage depot in Uganda. [2] Gasoline, kerosene, diesel-fuel and Jet A1 are delivered by ship from Kisumu, across the lake in neighboring Kenya. The fuel is stored here and conveyed by truck to final destinations in Uganda, the Democratic Republic of the Congo, Rwanda, Burundi and South Sudan, significantly cutting down delivery times and transport costs. [2]

Contents

Location

The facility is located along the north-eastern shores of Lake Nalubaale, on approximately 30 acres (12 ha), in the neighborhood of Bugiri-Bukasa in Wakiso District, off of Kampala–Entebbe Road, approximately 36 kilometres (22 mi), by road, south of the central business district of Kampala, the capital and largest city of Uganda. [3] This is approximately 24 kilometres (15 mi), by road, north-east of Entebbe International Airport. [4] The geographical coordinates of Mahathi Fuel Transport and Storage Depot are 00°07'23.0"N, 32°34'10.0"E (Latitude:0.123056; Longitude:32.569444). [5]

Overview

The facility is owned by a consortium, comprising (a) Mahathi Infra Group of India (b) Siginon Group of Kenya and (c) Fortune Energy of Uganda. This consortium has registered a special purpose vehicle (SPV) company to carry out the project. The SPV company is called Mahathi Infra Uganda Limited. [6]

The depot has 14 storage tanks with capacity to hold 70,000,000 liters (15,397,847 imp gal; 18,492,044 U.S. gal) of fuel. This allows plenty of room to trade in fuel among the destination countries, considering that Uganda uses only 4,500,000 liters (989,862 imp gal; 1,188,774 U.S. gal) of fuel daily. Major oil companies in the region, including Shell Oil, Total SE and Mogas, have signed supply contracts with Mahathi Infra Uganda Limited. [6]

In addition to the storage tanks, Uganda’s part of the project involves the construction of a 220-metre-long jetty including four dedicated pipelines, one each for the four refined petroleum types. Also, facilities for berthing of oil tankers and construction of four self-propelling oil tanker barges, each with capacity of 4,400,000 litres (967,865 imp gal; 1,162,357 US gal), are part of the project. Each tanker barge has capacity equivalent to about 150 fuel trucks. [7]

Costs and funding

The total cost of the project is budgeted at US$270 million. Of the total, US$70 million was borrowed from Equity Group. The remaining US$200 million was raised by the consortium member companies. [6]

Construction

Construction began in 2017. [8] As of September 2020, works were 80 percent complete, with commissioning expected in the first half of 2021. [6]

As of October 2021, construction was nearly complete, with commercial commissioning anticipated in December 2021. [9]

In January 2022, the New Vision newspaper reported that commercial operations were planned to begin in March 2022. [10] Construction was completed in 2022 and the first shipment of fuel was received at th facility on 30 December 2022. [1]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in Uganda</span>

Transport in Uganda refers to the transportation structure in Uganda. The country has an extensive network of paved and unpaved roads.

<span class="mw-page-title-main">Entebbe</span> Place in Central Uganda, Uganda

Entebbe is a city in Central Uganda. Located on a Lake Victoria peninsula, approximately 36 kilometres (22 mi) southwest of the Ugandan capital city, Kampala. Entebbe was once the seat of government for the Protectorate of Uganda prior to independence, in 1962. The city is the location of Entebbe International Airport, Uganda's largest commercial and military airport, best known for the Israeli rescue of 100 hostages kidnapped by the militant group of the PFLP-EO and Revolutionary Cells (RZ) organizations. Entebbe is also the location of State House, the official office and residence of the President of Uganda.

Port Bell is a small industrial centre in the greater metropolitan Kampala area, in Uganda. Port Bell has a rail link and a railroad ferry wharf used for International traffic across Lake Victoria to Tanzania and Kenya.

<span class="mw-page-title-main">Lake Victoria ferries</span> Ferry service carrying passengers throughout Lake Victoria

Lake Victoria ferries are motor ships for ferry services carrying freight and/or vehicles and/or passengers between Uganda, Tanzania, and Kenya on Lake Victoria.

<span class="mw-page-title-main">Entebbe International Airport</span> International airport in Uganda

Entebbe International Airport is the only international airport in Uganda. It is located about 6 kilometres (3.7 mi) southwest of the town of Entebbe, on the northern shores of Lake Victoria. This is approximately 40 kilometres (25 mi) by road south-west of the central business district of Kampala, the capital city of Uganda.

<span class="mw-page-title-main">Oil terminal</span> Industrial facility for the storage of oil, petroleum and petrochemical products

An oil terminal is an industrial facility for the storage of oil, petroleum and petrochemical products, and from which these products are transported to end users or other storage facilities. An oil terminal typically has a variety of above or below ground tankage; facilities for inter-tank transfer; pumping facilities; loading gantries for filling road tankers or barges; ship loading/unloading equipment at marine terminals; and pipeline connections.

Kasese Airport is an airport in Uganda.

Kenya Pipeline Company (KPC) is a state corporation that has the responsibility of transporting, storing and delivering petroleum products to the consumers of Kenya by its pipeline system and oil depot network.

The Kampala Northern Bypass Highway, often referred to as the Northern Bypass, is a road in Uganda. It forms a semicircle across the northern suburbs of Kampala, Uganda's capital and largest city. The road was constructed to relieve traffic congestion within the city center, allowing cross-country traffic to bypass the city's downtown area.

The Mukwano Group of Companies, commonly known as the Mukwano Group, is a conglomerate based in Uganda, with operations in other East African countries.

<span class="mw-page-title-main">Ministry of Works and Transport (Uganda)</span>

The Ministry of Works and Transport is a Cabinet level government ministry of Uganda, that is mandated to plan, develop and maintain an economic, efficient and effective transport infrastructure, and transport services by road, rail, water, and air. The ministry is also mandated to manage public works including government structures and promote standards in the construction industry. The ministry is headed by a Cabinet Minister. The current Minister of Works and Transport is Katumba Wamala.

The Uganda National Oil Company (UNOC), also known as the National Oil Company of Uganda, is a limited liability petroleum company in Uganda owned by the Ugandan government. The 2013 Petroleum Act of Uganda provides for the establishment of the national oil company. UNOC's board of directors was inaugurated on 23 October 2015 by the president of Uganda.

The Petroleum Authority of Uganda (PAOU), also known as the Uganda National Petroleum Authority, is governmental organisation that regulates the petroleum industry in Uganda, the third-largest economy in the East African Community. Its responsibilities include licensing, regulation, supervision of exploration, harvesting, refining, marketing, and disposal of petroleum products in the country. Although owned by the Ugandan government, it is expected to act independently.

The Hoima–Kampala Petroleum Products Pipeline (HKPPP) is a proposed pipeline to transport refined oil products from the Uganda Oil Refinery in Hoima to a distribution terminal near Buloba in Wakiso District, approximately 28 kilometres (17 mi), by road, west of Kampala's central business district.

<span class="mw-page-title-main">East African Crude Oil Pipeline</span>

The East African Crude Oil Pipeline (EACOP), also known as the Uganda–Tanzania Crude Oil Pipeline (UTCOP), is a 1,443 km crude oil pipeline with a foundation stone nominally under construction since 2017 and intended to transport crude oil from Uganda's oil fields to the Port of Tanga, Tanzania on the Indian Ocean. Once completed, the pipeline will be the longest heated crude oil pipeline in the world. Because of the large scale displacement of communities and wildlife, global environmental groups are protesting its construction and finance.

Hoima International Airport, also Kabaale International Airport, is an airport under construction in Hoima, Uganda. It is part of the infrastructure under construction as Uganda prepares to develop its nascent petroleum industry. When completed, it would be Uganda's second international airport, besides Entebbe International Airport. The new airport is expected to facilitate mobilization of equipment for construction of the Uganda Oil Refinery and assist in the development of agriculture and tourism in Uganda's Western Region.

Bukasa Inland Port is a planned inland port in Uganda.

The Nairobi–Malaba Standard Gauge Railway (SGR) is the project of standard-gauge railway that should connect Kenya's capital city of Nairobi to Malaba, at the international border with Uganda. The Nairobi–Malaba SGR was to connect other standard gauge railways in Uganda, Rwanda, Burundi, South Sudan and eastern Democratic Republic of the Congo, under the East African Railway Master Plan.

The Uganda National Medical Stores, commonly referred to as National Medical Stores (NMS), is a government-owned organisation in Uganda, mandated to procure, store and distribute human medication and health-related consumable items to government-owned health units in all districts of Uganda.

References

  1. 1 2 John Mutua (3 January 2023). "Uganda ships maiden fuel cargo from Kisumu port". Business Daily Africa . Nairobi, Kenya. Retrieved 21 May 2023.
  2. 1 2 Private Sector Foundation Uganda (4 September 2020). "PSFU visits Mahathi Infra Uganda Limited". Kampala: Private Sector Foundation Uganda. Retrieved 17 September 2020.
  3. Google (17 September 2020). "Road Distance From Central Kampala To Mahathi Infra Uganda Limited" (Map). Google Maps . Google. Retrieved 17 September 2020.
  4. Google (17 September 2020). "Travel Distance Between Entebbe International Airport And Mahathi Infra Uganda Limited" (Map). Google Maps . Google. Retrieved 17 September 2020.
  5. Google (17 September 2020). "Location of Mahathi Fuel Transport and Storage Depot" (Map). Google Maps . Google. Retrieved 17 September 2020.
  6. 1 2 3 4 James Anyanzwa and Njiraini Muchira (17 September 2020). "Kisumu jetty all set, but Uganda asks for time to fix complex parts". The EastAfrican . Retrieved 17 September 2020.
  7. Njiraini Muchira (21 September 2019). "Kenya oil jetty remains idle a year on as Uganda construction yet to take off". The EastAfrican . Nairobi. Retrieved 17 September 2020.
  8. Jeff Mbanga (10 May 2017). "Indian firm wins oil route on Lake Victoria". The Observer (Uganda) . Kampala. Retrieved 17 September 2020.
  9. Brian Musaasizi (29 October 2021). "Mahathi Infra Uganda Oil Terminal Impress Busoga King 'Kyabazinga'". Red Pepper Uganda . Mukono, Uganda. Retrieved 30 October 2021.
  10. Abbey Ramadhan (24 January 2021). "Uganda readies more Kawuku fuel reservoirs". New Vision . Kampala, Uganda. Retrieved 24 January 2022.