Nalubaale Hydroelectric Power Station | |
---|---|
Country | Uganda |
Location | Jinja |
Coordinates | 00°26′37″N33°11′06″E / 0.44361°N 33.18500°E |
Purpose | Power |
Status | Operational |
Opening date | 1954 |
Operator(s) | Uganda Electricity Generation Company Limited |
Dam and spillways | |
Impounds | White Nile |
Spillways | 6 |
Spillway type | Under sluice |
Nalubaale Power Station | |
Operator(s) | Uganda Electricity Generation Company Limited |
Turbines | 10 |
Installed capacity | 180 MW (240,000 hp) [1] |
Website [uegcl.go.ug] |
Nalubaale Power Station, formerly known as Owen Falls Dam, is a hydroelectric power station across the White Nile near its source at Lake Victoria in Uganda. Nalubaale is the Luganda name for Lake Victoria.
The dam sits across the Nile River between the town of Jinja, in Jinja District approximately 85 kilometres (53 mi), by road, east of Kampala, Uganda's capital and largest city. [2]
Before the construction of the dam, water levels on Lake Victoria were moderated by a natural rock dam on the north side of the lake. Rising lake waters would spill over the natural dam into the White Nile, which flows through Uganda, South Sudan, Sudan, and Egypt before emptying into the Mediterranean Sea. When water levels dropped too low, flow into the river ceased.
In 1947, Charles Redvers Westlake, an English engineer, reported to the Colonial Government of Uganda recommending the construction of a hydroelectric dam at Owen Falls near the city of Jinja. This led to the establishment of the Uganda Electricity Board (UEB), with Westlake as its first chairman. A treaty between Uganda and Egypt ensured that the dam would not alter the natural flow of the Nile. The consultant engineer on the project was Sir Alexander Gibb & Partners. Eighty thousand tons of plant and construction materials (including 36,000 tons of cement) were shipped out from Europe in the difficult post-war period. They were then hauled 1,200 kilometres (750 mi) by rail from Mombasa to Jinja. The dam was completed in three years, ahead of schedule in 1954, submerging Ripon Falls. [3]
It supplies electricity to Uganda and parts of neighbouring Kenya and Tanzania. Maintenance and availability of the station declined seriously during the government of Idi Amin.
The rating of the Nalubaale power station is 180 megawatts (MW). Originally it was designed for ten turbines rated at 15 MW each (for a total of 150 MW. The station was refurbished in the 1990s to repair the accumulated wear from a decade of civil disorder. During the repairs, the output power of the generators was increased, bringing the Nalubaale Power Complex's generating capacity to 180 MW. [4]
The Uganda Government, through the Uganda Electricity Generation Company (UEGCL), a 100 percent parastatal, awarded a 20-year operational, management and maintenance concession to Eskom Uganda Limited, a subsidiary of Eskom, the South African energy company, to cover both Nalubaale Power Station and the adjacent Kiira Power Station. The concession agreement commenced in 2002. The electricity generated here, is sold to the Uganda Electricity Transmission Company Limited (UETCL), the authorized single buyer. UETCL in turn sells the power to Umeme, the energy distributor. [5]
On 31 March 2023, the 20-year concession with Eskom for both dams expired and was not renewed. Uganda Electricity Generation Company Limited (UEGCL) took over the management of the power stations and absorbed 93 percent of Eskom Uganda staff, effective 1 April 2023. [6]
In 2021, Eskom Uganda Limited hired Babcon Uganda Limited at a cost of USh888 million (approx. US$251,000) to repair and strengthen the powerhouse staircase to Units 1, 5 and 9. The deterioration of the staircase is blamed on Alkali Silica Reaction (ASR), which results when water reacts with concrete, over time, causing expansion of the concrete and loosening of attached hardware. [7]
In September the same year, Sinohydro Corporation Limited completed renovations to the dam's structure. The repairs that lasted nearly one year, were meant to stop water leakages due to "deterioration of grout curtain". It is expected that the repairs, last carried out in 1999, will give the dam at least another 20 years of life. The repairs cost USh11.6 billion (US$3.3 million). [8]
In September 2022, Eskom Uganda spent UGX:6.84 billion (approx. US$1.8 million) to replace three of the ten generator transformers. The transformers to units 3, 5 and 6 "were past their service life expectancy" and were replaced. The transformers from units 1 to 4, step up voltage from 11kV to 33kV, while those from units 5 to 10 step up voltage from 11kV to 132kV. The power at high voltage is then transmitted across the grid. Transmission of power at high voltage over long distances reduces power losses. [9]
In 1993 work started on the Owen Falls Extension project, a second powerhouse located about 1 km from the 1954 powerhouse. A new power canal was cut to bring water from Lake Victoria to the new powerhouse. Major construction was completed in 1999 with first power from the project from two units in 2000. The extension has space for five hydroelectric turbine generators with four installed as of 2001. Each unit at the extension has a capacity of 40 megawatts. During official opening ceremonies in 2003, the extension was named the Kiira Power Station. Design and project management of the extension project was by Acres International of Canada, now known as Hatch Limited.
Eskom Uganda operates Nalubaale Power Station as a concessionaire. They regularly clear debris water hyacinth from the intakes of the stations. [10] Further downstream, the 250 MW Bujagali Hydroelectric Power Station was constructed between 2007 and 2012.
Since January 2006, hydroelectric generation at Nalubaale and Kiira stations has been curtailed due to a prolonged drought and low level of water in Lake Victoria. The hydrology of Lake Victoria has unusual features. [11]
In 2006 there was a release of secret documents from 1956 in Britain that indicated the British had considered using this dam to reduce the water in the Nile in an effort to remove Egyptian President Nasser. The plan was not carried out because it would have seasonally flooded land in Kenya, Uganda and Tanzania, reduced flows to a trickle in Sudan and the effect of shutting off the White Nile even to coincide with the seasonal lull in the Blue Nile would not have affected Egypt for at least 16 months. [12] Veto power over construction projects on the Nile River and its tributaries was granted to Egypt by the Anglo-Egyptian treaty of 1929, reinforced by the bilateral agreement between Egypt and Sudan signed in 1959. In 1959 upriver Nile states such as Uganda denounced this treaty purportedly claiming virtually all of the waters of the Nile to themselves and leaving none to the upriver states. The countries along the White Nile excluding Sudan seek to create a unified international legal framework for the basin and for the time being respect keeping lake levels virtually unaltered so as not to upset their own eco-systems and established patterns of crop production and livestock raising. [13]
In October 2024, Jan Sadek, the ambassador of the European Union to Uganda, announced an economic package valued at €170 million (UGX:680 billion), to rehabilitate, stabilize and prolong the life of both Nalubaale and Kiira dams. Of the total, €30 million is a grant from the EU to the government of Uganda. The remaining €140 million is a concessional loan from the European Investment Bank and the French Development Agency (FDA). [14]
The White Nile is a river in Africa, the minor of the two main tributaries of the Nile, the larger being the Blue Nile. The name "White" comes from the clay sediment carried in the water that changes the water to a pale color.
Jinja is a city in the Eastern Region of Uganda, located on the north shore of Lake Victoria.
Mukono is one of the districts in the Central Region of Uganda. The town of Mukono serves as the district headquarters and is home to the district's main commercial center.
The Owen Falls was a waterfall on the White Nile in Uganda near the city of Jinja. The falls, together with the nearby Ripon Falls, were submerged in 1954 with the completion of the Nalubaale Hydroelectric Power Station. The dam that houses the power station was originally named Owen Falls Dam, but was later renamed Nalubaale Dam and the name of the power station was also changed, from Owen Falls Power Station to Nalubaale Power Station.
Articles related to Uganda include:
Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.
Umeme Limited is the largest energy distributor in Uganda, distributing about 97 percent of all electricity used in the country. The shares of the stock of the company are listed on the Uganda Securities Exchange (USE) and are cross listed on the Nairobi Stock Exchange (NSE). As of December 2023, the company's total assets were approximately UGX:2.347 trillion, with shareholders' equity of approximately UGX:937.381 billion.
Njeru is a town in Buikwe District, in the Central Region of Uganda. It is the largest town in the district. It is mainly a residential town. However, it hosts industries such as East African Packaging Solutions Limited, a manufacturer of paper packaging supplies, Nile Breweries Limited, a subsidiary of AB InBev and Nyanza Textile Industries Limited (Nytil), a textile manufacturer.
The Bujagali Power Station is a hydroelectric power station across the Victoria Nile that harnesses the energy of its namesake, the Bujagali Falls, in Uganda. Construction began in 2007 and concluded in 2012. It was officially inaugurated on 8 October 2012 by Ugandan President Yoweri Museveni and Aga Khan IV in the presence of African politicians and investors.
Kiira Hydroelectric Power Station is a hydroelectric power station in Uganda, with an installed capacity of 200 megawatts (270,000 hp).
The Kampala–Jinja Highway is a road in Uganda, connecting the cities of Kampala and Jinja. Sometimes referred to as Kampala–Jinja Road, it is a busy road, with several towns, trading centers and other points of interest along the way. As of October 2016, a new, wider, four-lane dual carriageway expressway, the Kampala–Jinja Expressway, is proposed to be constructed south of the present highway to relieve traffic and complement existing transport infrastructure between Kampala and Jinja.
Kimaka is a neighborhood in the city of Jinja, in the Eastern Region of Uganda.
Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.
Buikwe District is a district in the Central Region of Uganda. It is named after its 'chief town', Buikwe, where the district headquarters are located.
Ayago Hydroelectric Power Station, also Ayago Power Station, is a planned 840 megawatt hydroelectric power project to be constructed in Uganda. If it is built, Ayago would be the largest power station in Uganda, based on generating capacity.
Nyagak III Power Station is a 6.6 megawatts (8,900 hp) mini hydroelectric power project, under construction in Uganda.
The Uganda Electricity Generation Company Limited (UEGCL) is a parastatal company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGCL's generation capacity was 380 megawatts, with that capacity planned to increase to over 1,300 megawatts, by 2023.
Eskom Uganda or Eskom Uganda Limited (EUL) is the largest generator of energy in Uganda and was incorporated in 2002 for a 20 year concession under a government regulatory framework.
Nkusi Hydroelectric Power Station, also referred to as Nkusi Power Station, is a 9.6 MW (12,900 hp) hydroelectric power station in the Western Region of Uganda.